    ITEMS OF WORK

    CONSTRUCTION OF TWO-STOREY RESIDENCE

    1.0 EARTHWORKS

    1.1. Excavation and backfilling of soil

    1.1.4 Excavation of soil for wall footings (P2)

    1.1.5 Excavation of soil for septic tank

    1.1.6 Excavation of soil for catch basin

    2.0 REBAR WORKS

    2.1. Steel Reinforcement for Column Footing

    2.1.1 Fabrication of Reinforcement for Column Footing

    2.2 Steel Reinforcement for Wall Footing

    2.2.1 Fabrication of Reinforcement for Wall Footing

    2.2.1.1 Fabrication of Reinforcement for Wall Footing, P1

    2.2.1.2 Fabrication of Reinforcement for Wall Footing, P2

    2.2.2 Installation of Reinforcement for Wall Footing

    2.1.1.1 Fabrication of Reinforcement for Column Footing,

    2.1.1.2 Fabrication of Reinforcement for Column Footing,

    2.1.2 Installation of Reinforcement for Column Footing

    2.1.2.1 Installation of Reinforcement for Column Footing,

    2.1.2.2 Installation of Reinforcement for Column Footing,

    2.2.2.1 Installation of Reinforcement for Wall Footing, P1

    2.2.2.2 Installation of Reinforcement for Wall Footing, P2

    2.5.1 Fabrication of Reinforcement for Floor Beam

    2.5.1.1 Fabrication of Reinforcement for Floor Beam, P1

    2.5.1.2 Fabrication of Reinforcement for Floor Beam, P2

    2.3.2.1 Installation of Reinforcement for Column, P1L1

    2.3.2.2 Installation of Reinforcement for Column, P2L1

    2.3.2.3 Installation of Reinforcement for Column, P1L2

    2.3.2.4 Installation of Reinforcement for Column, P2L2

    2.5 Steel Reinforcement for Floor Beam

    2.4.2.2. Installation of Reinforcement for Tie Beam, P2

    1.1.1 Excavation and backfilling of soil for column footings (P1)

    1.1.2 Excavation and backfilling of soil for column footings (P2)

    1.1.3 Excavation of soil for wall footings (P1)

    2.4 Steel Reinforcement for Tie Beam

    2.4.1. Fabrication of Reinforcement for Tie Beam

    2.4.1.1. Fabrication of Reinforcement for Tie Beam, P12.4.1.2. Fabrication of Reinforcement for Tie Beam, P2

    2.4.2. Installation of Reinforcement for Tie Beam

    2.4.2.1. Installation of Reinforcement for Tie Beam, P1

    2.3.1.1 Fabrication of Reinforcement for Column, P1L12.3.1.2 Fabrication of Reinforcement for Column, P2L1

    2.3.1.3 Fabrication of Reinforcement for Column, P1L2

    2.3.1.4 Fabrication of Reinforcement for Column, P2L2

    2.3.2 Installation of Reinforcement for Column

    2.3 Steel Reinforcement for Column

    2.3.1 Fabrication of Reinforcement for Column

  • 8/11/2019 Form Works

    2/53

    2.11 Steel Reinforcement for CHB Laying2.11.1 Fabrication of Reinforcement for CHB Laying

    2.11.1.1 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.2 Fabrication of Reinforcement for CHB Laying, P2

    2.11.1.3 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.4 Fabrication of Reinforcement for CHB Laying, P2

    2.11.2 Installation of Reinforcement for CHB Laying

    2.11.2.1 Installation of Reinforcement for CHB Laying, P1

    2.11.2.2 Installation of Reinforcement for CHB Laying, P2

    2.5.2 Installation of Reinforcement for Floor Beam

    2.5.2.1 Installation of Reinforcement for Floor Beam, P1

    2.7.2 Installation of Reinforcement for Floor Slabs

    2.6.2 Installation of Reinforcement for Roof Beam

    2.6.2.1 Installation of Reinforcement for Roof Beam, P1

    2.6.2.2 Installation of Reinforcement for Roof Beam, P2

    2.7 Steel Reinforcement for Floor Slab

    2.7.1 Fabrication of Reinforcement for Floor Slabs

    2.5.2.2 Installation of Reinforcement for Floor Beam, P2

    2.6 Steel Reinforcement for Roof Beam

    2.6.1 Fabrication of Reinforcement for Roof Beam

    2.6.1.1 Fabrication of Reinforcement for Roof Beam, P1

    2.6.1.2 Fabrication of Reinforcement for Roof Beam, P2

    2.7.1.1 Fabrication of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Fabrication of Reinforcement for Floor Slabs, P2L1

    2.7.1.2.3 Fabrication of Reinforcement for Floor Slabs, P1

    2.7.1.2.4 Fabrication of Reinforcement for Floor Slabs, P2

    2.10.1 Fabrication of Reinforcement for Septic Tank

    2.10.2 Installation of Reinforcement for Septic Tank

    2.9 Steel Reinforcement for Stair

    2.9.1 Fabrication of Reinforcement for Stair

    2.9.1.1 Fabrication of Reinforcement for Stair, P1

    2.9.1.2 Fabrication of Reinforcement for Stair, P2

    2.9.2 Installation of Reinforcement for Stair

    2.9.2.1 Installation of Reinforcement for Stair, P1

    2.9.2.2 Installation of Reinforcement for Stair, P2

    2.10 Steel Reinforcement for Septic Tank

    2.8.2.2 Installation of Reinforcement for Roof Slab, P2

    2.8.1 Fabrication of Reinforcement for Roof Slab

    2.8.1.1 Fabrication of Reinforcement for Roof Slab, P1

    2.8.1.2 Fabrication of Reinforcement for Roof Slab, P2

    2.8.2 Installation of Reinforcement for Roof Slab

    2.8.2.1 Installation of Reinforcement for Roof Slab, P1

    2.7.1.1 Installation of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Installation of Reinforcement for Floor Slabs, P2L1

    2.7.1.3 Installation of Reinforcement for Floor Slabs, P1L2

    2.7.1.4 Installation of Reinforcement for Floor Slabs, P2L2

    2.8 Steel Reinforcement for Roof Slab

  • 8/11/2019 Form Works

    3/53

    3.1.11 Fabrication of formworks for second floor slab, P1

    3.1.12 Fabrication of formworks for second floor slab, P2

    3.1.13 Fabrication of formworks for roofdeck

    3.2.12 Installation of formworks for second floor slab, P2

    3.2.13 Installation of formworks for roofdeck slab

    3.2.7 Installation of formworks for ground floor slab, P1

    3.2.8 Installation of formworks for ground floor slab, P2

    3.2.9 Installation of formworks for beam, P1

    3.2.10 Installation of formworks for beam, P2 3.2.11 Installation of formworks for second floor slab, P1

    3.2.5 Installation of formworks for column, P1

    3.2.6 Installation of formworks for column, P2

    3.2 Installation of formworks

    3.2.1 Installation of formworks for column footing, P1

    2.11.2.3 Installation of Reinforcement for CHB Laying, P1

    2.11.2.4 Installation of Reinforcement for CHB Laying, P2

    3.1 Fabrication of formworks

    3.2.2 Installation of formworks for column footing, P2

    3.2.3 Installation of formworks for wall footing, P1

    3.2.4 Installation of formworks for wall footing, P2

    3.0 FORMWORKS

    3.1.1 Fabrication of column footing formworks, P1

    3.1.2 Fabrication of column footing formworks, P2

    3.1.3Fabrication of formworks for wall footing, P1 3.1.4 Fabrication of formworks for wall footing, P2

    3.1.5 Fabrication of formworks for column, P1

    3.1.6 Fabrication of formworks for column, P2

    3.1.7 Fabrication of formworks for ground floor slab, P1

    3.1.8 Fabrication of formworks for ground floor slab, P2

    3.1.9 Fabrication of formworks for beams, P1

    3.1.10 Fabrication of formworks for beams, P2

    4.4 Concreting of Column

    4.3 Concreting of Retaining Wall

    4.2 Concreting of Wall Footing

    4.4.2 Concreting of Column, P2L1

    4.4.1 Concreting of Column, P1L1

    4.4.4 Concreting of Column, P2L2

    4.4.3 Concreting of Column, P1L2

    4.0 CONCRETE WORKS

    4.1 Concreting of Column Footing

    4.1.1 Concreting of Column Footing, P1

    4.3.2 Concreting of Retaining Wall, P2

    4.3.1 Concreting of Retaining Wall, P1

    4.2.2 Concreting of Wall Footing, P2

    4.2.1 Concreting of Wall Footing, P1

    4.1.2 Concreting of Column Footing, P2

  • 8/11/2019 Form Works

    4/53

    5.1.5 Laying of CHB for septic tank

    6.0 ELECTRICAL WORKS

    6.1 Installation of electrical wirings and conduits

    6.2 Installation of power distribution board

    6.3 Installation of electrical fittings

    7.0 PLUMBING WORKS

    7.1 Installation of pipes

    7.3.2. Installation of Gutter

    7.3.1. Fabrication of Gutter

    7.3 Gutter and Downpipe Works

    7.1.1 Installation of sanitary pipes and fittings

    7.1.2 Installation of cold water pipes and fittings

    7.1.3 Installation of pipes for catch basin

    7.2 Installation of plumbing fixtures

    6.4 Installation of electrical fixtures

    7.1.4 installation of pipes for septic tank

    4.7.1 Concreting of Roof Beam, P1

    4.8.1 Concreting of Floor Slab, P1L1

    4.8.2 Concreting of Floor Slab, P2L1

    4.8.4 Concreting of Floor Slab, P2L2

    4.8.3 Concreting of Floor Slab, P1L2

    4.5 Concreting of Tie Beam

    4.6.2 Concreting of Floor Beam, P2

    4.6.1 Concreting of Floor Beam, P1

    4.5.2 Concreting of Tie Beam, P2

    4.5.1 Concreting of Tie Beam, P1

    4.10 Concreting of Stair

    4.9 Concreting of Roof Deck

    4.8 Concreting of Floor Slab

    4.7 Concreting of Roof Beam

    5.0 MASONRY WORKS

    5.1 CHB Laying

    5.1.1 CHB Laying, P1L1

    5.1.2 CHB Laying, P2L1

    4.6 Concreting of Floor Beam

    4.7.2 Concreting of Roof Beam, P2

    4.9.2 Concreting of Roof Deck, P2

    4.9.1 Concreting of Roof Deck, P1

    5.2.3 Plastering of CHB, P1L2

    5.2.4 Plastering of CHB, P2L2

    5.1.3 CHB Laying, P1L2

    5.1.4 CHB Laying, P2L2

    5.2 Plastering of CHB

    5.2.1 Plastering of CHB, P1L15.2.2 Plastering of CHB, P2L1

    4.11 Concreting of Septic Tank

  • 8/11/2019 Form Works

    5/53

    7.3.3. Installation of Downpipes

    11.0 PREFABICATED STAIRS AND RAILINGS

    11.1 Installation of Prefabricated Stairs

    11.2 Installation of Prefabricated Steel Railings

    8.2 Interior Painting Works

    8.1.3 Painting of Windows

    8.1.2 Painting of Gate and Rails

    8.1.1 Painting of Walls and Columns

    8.1 Exterior Painting Works

    8.0 PAINTING WORKS

    10.1.2 Installation of Fabricated Windows

    10.1.1 Installation of Fabricated Doors

    10.1 Installation of Doors and Windows

    10.0 DOORS AND WINDOWS

    8.1.5 Painting of Roof Slab

    8.2.4 Painting of Cabinets

    8.2.3 Painting of slab

    8.2.2 Painting of Doors

    8.2.1 Painting of Walls

    9.1 Installation of Tiles For Ground Floor Slab

    9.0 TILEWORKS

    9.4.2 Installation of Wall Tiles For Comfort Room of Second Floor

    9.2 Installation of Tiles For Comfort Room of Ground Floor

    9.2.1 Installation of Floor Tiles For Comfort Room of Ground Floor

    9.2.2 Installation of Wall Tiles For Comfort Room of Ground Floor

    9.3 Installation of Tiles For Second Floor Slab

    9.4 Installation of Tiles For Comfort Room of Second Floor

    9.4.1 Installation of Floor Tiles For Comfort Room of Second Floor

  • 8/11/2019 Form Works

    6/53

    P1

    P2

    P1

    P2

  • 8/11/2019 Form Works

    7/53

    1

    1

    2

    2

    1

    1

    L2

    L2

  • 8/11/2019 Form Works

    8/53

    2

    2

  • 8/11/2019 Form Works

    9/53

  • 8/11/2019 Form Works

    10/53

  • 8/11/2019 Form Works

    11/53

  • 8/11/2019 Form Works

    12/53

  • 8/11/2019 Form Works

    13/53

  • 8/11/2019 Form Works

    14/53

    1.1.3 Excavation of soil for wall footings (P1)1.1.4 Excavation of soil for wall footings (P2)

    1.1.5 Excavation of soil for septic tank

    1.1.6 Excavation of soil for catch basin

    1.2 Backfilling of soil

    1.2.1 Backfilling of soil for column footings (P1)

    CONSTRUCTION OF TWO-STOREY RESIDENCE

    ITEMS OF WORK

    1.0 EARTHWORKS

    1.1. Excavation

    1.1.1 Excavation of soil for column footings (P1)

    1.1.2 Excavation of soil for column footings (P2)

    2.1.2 Installation of Reinforcement for Column Footing

    2.1.2.1 Installation of Reinforcement for Column Footing,

    2.1.2.2 Installation of Reinforcement for Column Footing,

    2.2 Steel Reinforcement for Wall Footing

    2.2.1 Fabrication of Reinforcement for Wall Footing

    2.2.1.1 Fabrication of Reinforcement for Wall Footing, P1

    1.2.2 Backfilling of soil for column footings (P2)

    2.0 REBAR WORKS

    2.1. Steel Reinforcement for Column Footing

    2.1.1 Fabrication of Reinforcement for Column Footing

    2.1.1.1 Fabrication of Reinforcement for Column Footing,

    2.1.1.2 Fabrication of Reinforcement for Column Footing,

    2.3.1.1 Fabrication of Reinforcement for Column, P1L1

    2.3.1.2 Fabrication of Reinforcement for Column, P2L1

    2.3.1.3 Fabrication of Reinforcement for Column, P1L2

    2.3.1.4 Fabrication of Reinforcement for Column, P2L2

    2.3.2 Installation of Reinforcement for Column

    2.3.2.1 Installation of Reinforcement for Column, P1L1

    2.2.1.2 Fabrication of Reinforcement for Wall Footing, P2

    2.2.2 Installation of Reinforcement for Wall Footing

    2.2.2.1 Installation of Reinforcement for Wall Footing, P1

    2.2.2.2 Installation of Reinforcement for Wall Footing, P22.3 Steel Reinforcement for Column

    2.3.1 Fabrication of Reinforcement for Column

    2.4.1.2. Fabrication of Reinforcement for Tie Beam, P2

    2.4.2. Installation of Reinforcement for Tie Beam

    2.4.2.1. Installation of Reinforcement for Tie Beam, P1

    2.4.2.2. Installation of Reinforcement for Tie Beam, P2

    2.5 Steel Reinforcement for Floor Beam

    2.3.2.2 Installation of Reinforcement for Column, P2L1

    2.3.2.3 Installation of Reinforcement for Column, P1L2

    2.3.2.4 Installation of Reinforcement for Column, P2L22.4 Steel Reinforcement for Tie Beam

    2.4.1. Fabrication of Reinforcement for Tie Beam

    2.4.1.1. Fabrication of Reinforcement for Tie Beam, P1

  • 8/11/2019 Form Works

    15/53

    2.5.1 Fabrication of Reinforcement for Floor Beam

    2.6.1 Fabrication of Reinforcement for Roof Beam

    2.6.1.1 Fabrication of Reinforcement for Roof Beam, P1

    2.6.1.2 Fabrication of Reinforcement for Roof Beam, P2

    2.6.2 Installation of Reinforcement for Roof Beam

    2.6.2.1 Installation of Reinforcement for Roof Beam, P1

    2.6.2.2 Installation of Reinforcement for Roof Beam, P2

    2.5.1.1 Fabrication of Reinforcement for Floor Beam, P1

    2.5.1.2 Fabrication of Reinforcement for Floor Beam, P2

    2.5.2 Installation of Reinforcement for Floor Beam

    2.5.2.1 Installation of Reinforcement for Floor Beam, P1

    2.5.2.2 Installation of Reinforcement for Floor Beam, P2

    2.6 Steel Reinforcement for Roof Beam

    2.7.2 Installation of Reinforcement for Floor Slabs

    2.7.1.1 Installation of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Installation of Reinforcement for Floor Slabs, P2L1

    2.7.1.3 Installation of Reinforcement for Floor Slabs, P1L2

    2.7.1.4 Installation of Reinforcement for Floor Slabs, P2L2

    2.8 Steel Reinforcement for Roof Slab

    2.7 Steel Reinforcement for Floor Slab

    2.7.1 Fabrication of Reinforcement for Floor Slabs

    2.7.1.1 Fabrication of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Fabrication of Reinforcement for Floor Slabs, P2L1

    2.7.1.2.3 Fabrication of Reinforcement for Floor Slabs, P1

    2.7.1.2.4 Fabrication of Reinforcement for Floor Slabs, P2

    2.9 Steel Reinforcement for Stair

    2.9.1 Fabrication of Reinforcement for Stair

    2.9.1.1 Fabrication of Reinforcement for Stair, P1

    2.9.1.2 Fabrication of Reinforcement for Stair, P2

    2.9.2 Installation of Reinforcement for Stair

    2.9.2.1 Installation of Reinforcement for Stair, P1

    2.8.1 Fabrication of Reinforcement for Roof Slab

    2.8.1.1 Fabrication of Reinforcement for Roof Slab, P1

    2.8.1.2 Fabrication of Reinforcement for Roof Slab, P22.8.2 Installation of Reinforcement for Roof Slab

    2.8.2.1 Installation of Reinforcement for Roof Slab, P1

    2.8.2.2 Installation of Reinforcement for Roof Slab, P2

    2.11.1.1 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.2 Fabrication of Reinforcement for CHB Laying, P2

    2.11.1.3 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.4 Fabrication of Reinforcement for CHB Laying, P2

    2.9.2.2 Installation of Reinforcement for Stair, P2

    2.10 Steel Reinforcement for Septic Tank2.10.1 Fabrication of Reinforcement for Septic Tank

    2.10.2 Installation of Reinforcement for Septic Tank

    2.11 Steel Reinforcement for CHB Laying

    2.11.1 Fabrication of Reinforcement for CHB Laying

  • 8/11/2019 Form Works

    16/53

  • 8/11/2019 Form Works

    17/53

    4.4.3 Concreting of Column, P1L2

    4.4.4 Concreting of Column, P2L2

    4.5 Concreting of Tie Beam

    4.7.1 Concreting of Roof Beam, P1

    4.7.2 Concreting of Roof Beam, P2

    4.8 Concreting of Floor Slab

    4.8.1 Concreting of Floor Slab, P1L1

    4.8.2 Concreting of Floor Slab, P2L1

    4.8.3 Concreting of Floor Slab, P1L2

    4.5.1 Concreting of Tie Beam, P1

    4.5.2 Concreting of Tie Beam, P2

    4.6 Concreting of Floor Beam

    4.6.1 Concreting of Floor Beam, P14.6.2 Concreting of Floor Beam, P2

    4.7 Concreting of Roof Beam

    5.0 MASONRY WORKS

    5.1 CHB Laying

    5.1.1 CHB Laying, P1L1

    5.1.2 CHB Laying, P2L1

    5.1.3 CHB Laying, P1L2

    5.1.4 CHB Laying, P2L2

    4.8.4 Concreting of Floor Slab, P2L2

    4.9 Concreting of Roof Deck

    4.9.1 Concreting of Roof Deck, P1

    4.9.2 Concreting of Roof Deck, P2

    4.10 Concreting of Stair

    4.11 Concreting of Septic Tank

    6.0 ELECTRICAL WORKS

    6.1 Installation of electrical wirings and conduits

    6.2 Installation of power distribution board

    6.3 Installation of electrical fittings

    7.0 PLUMBING WORKS

    7.1 Installation of pipes

    5.1.5 Laying of CHB for septic tank5.2 Plastering of CHB

    5.2.1 Plastering of CHB, P1L1

    5.2.2 Plastering of CHB, P2L1

    5.2.3 Plastering of CHB, P1L2

    5.2.4 Plastering of CHB, P2L2

    6.4 Installation of electrical fixtures

    7.1.1 Installation of sanitary pipes and fittings

    7.1.2 Installation of cold water pipes and fittings

    7.1.3 Installation of pipes for catch basin

    7.2 Installation of plumbing fixtures

    7.3 Gutter and Downpipe Works

    7.1.4 installation of pipes for septic tank

  • 8/11/2019 Form Works

    18/53

    7.3.2. Installation of Gutter

    7.3.3. Installation of Downpipes

    8.0 PAINTING WORKS

    8.1 Exterior Painting Works

    8.1.1 Painting of Walls and Columns

    8.1.2 Painting of Gate and Rails

    7.3.1. Fabrication of Gutter

    8.1.5 Painting of Roof Slab

    9.0 TILEWORKS

    9.1 Installation of Tiles For Ground Floor Slab

    9.2 Installation of Tiles For Comfort Room of Ground Floor

    9.2.1 Installation of Floor Tiles For Comfort Room of Ground Floor

    9.2.2 Installation of Wall Tiles For Comfort Room of Ground Floor

    8.1.3 Painting of Windows

    8.2 Interior Painting Works

    8.2.1 Painting of Walls

    8.2.2 Painting of Doors

    8.2.3 Painting of slab

    8.2.4 Painting of Cabinets

    10.1.1 Installation of Fabricated Doors

    10.1.2 Installation of Fabricated Windows

    11.0 PREFABICATED STAIRS AND RAILINGS11.1 Installation of Prefabricated Stairs

    11.2 Installation of Prefabricated Steel Railings

    9.3 Installation of Tiles For Second Floor Slab

    9.4 Installation of Tiles For Comfort Room of Second Floor

    9.4.1 Installation of Floor Tiles For Comfort Room of Second Floor

    9.4.2 Installation of Wall Tiles For Comfort Room of Second Floor

    10.0 DOORS AND WINDOWS

    10.1 Installation of Doors and Windows

  • 8/11/2019 Form Works

    19/53

    P1

    P2

    P1

    P2

  • 8/11/2019 Form Works

    20/53

  • 8/11/2019 Form Works

    21/53

    1

    1

    2

    2

  • 8/11/2019 Form Works

    22/53

  • 8/11/2019 Form Works

    23/53

  • 8/11/2019 Form Works

    24/53

    2.4.2. Installation of Reinforcement for Tie Beam

    2.4.2.1. Installation of Reinforcement for Tie Beam, P1

    2.3.2.3 Installation of Reinforcement for Column, P1L2

    2.3.2.4 Installation of Reinforcement for Column, P2L2

    2.4 Steel Reinforcement for Tie Beam

    2.4.1. Fabrication of Reinforcement for Tie Beam

    2.4.1.1. Fabrication of Reinforcement for Tie Beam, P1

    2.4.1.2. Fabrication of Reinforcement for Tie Beam, P2

    2.3.1.2 Fabrication of Reinforcement for Column, P2L1

    2.3.1.3 Fabrication of Reinforcement for Column, P1L2

    2.3.1.4 Fabrication of Reinforcement for Column, P2L2

    2.3.2 Installation of Reinforcement for Column

    2.3.2.1 Installation of Reinforcement for Column, P1L1

    2.3.2.2 Installation of Reinforcement for Column, P2L1

    2.2.2 Installation of Reinforcement for Wall Footing

    2.2.2.1 Installation of Reinforcement for Wall Footing, P12.2.2.2 Installation of Reinforcement for Wall Footing, P2

    2.3 Steel Reinforcement for Column

    2.3.1 Fabrication of Reinforcement for Column

    2.3.1.1 Fabrication of Reinforcement for Column, P1L1

    2.1.2.1 Installation of Reinforcement for Column Footing,

    2.1.2.2 Installation of Reinforcement for Column Footing,

    2.2 Steel Reinforcement for Wall Footing

    2.2.1 Fabrication of Reinforcement for Wall Footing

    2.2.1.1 Fabrication of Reinforcement for Wall Footing, P1

    2.2.1.2 Fabrication of Reinforcement for Wall Footing, P2

    2.0 REBAR WORKS

    2.1. Steel Reinforcement for Column Footing

    2.1.1 Fabrication of Reinforcement for Column Footing

    2.1.1.1 Fabrication of Reinforcement for Column Footing,

    2.1.1.2 Fabrication of Reinforcement for Column Footing,

    2.1.2 Installation of Reinforcement for Column Footing

    1.1.4 Excavation of soil for wall footings (P2)

    1.1.5 Excavation of soil for septic tank

    1.1.6 Excavation of soil for catch basin

    1.2 Backfilling of soil

    1.2.1 Backfilling of soil for column footings (P1)

    1.2.2 Backfilling of soil for column footings (P2)

    DESCRIPTION

    1.0 EARTHWORKS

    1.1. Excavation

    1.1.1 Excavation of soil for column footings (P1)

    1.1.2 Excavation of soil for column footings (P2)1.1.3 Excavation of soil for wall footings (P1)

  • 8/11/2019 Form Works

    25/53

    2.11.1.2 Fabrication of Reinforcement for CHB Laying, P2

    2.10 Steel Reinforcement for Septic Tank

    2.10.1 Fabrication of Reinforcement for Septic Tank

    2.10.2 Installation of Reinforcement for Septic Tank

    2.11 Steel Reinforcement for CHB Laying

    2.11.1 Fabrication of Reinforcement for CHB Laying

    2.11.1.1 Fabrication of Reinforcement for CHB Laying, P1

    2.9.1 Fabrication of Reinforcement for Stair

    2.9.1.1 Fabrication of Reinforcement for Stair, P1

    2.9.1.2 Fabrication of Reinforcement for Stair, P2

    2.9.2 Installation of Reinforcement for Stair

    2.9.2.1 Installation of Reinforcement for Stair, P12.9.2.2 Installation of Reinforcement for Stair, P2

    2.8.1.1 Fabrication of Reinforcement for Roof Slab, P1

    2.8.1.2 Fabrication of Reinforcement for Roof Slab, P2

    2.8.2 Installation of Reinforcement for Roof Slab

    2.8.2.1 Installation of Reinforcement for Roof Slab, P1

    2.8.2.2 Installation of Reinforcement for Roof Slab, P2

    2.9 Steel Reinforcement for Stair

    2.7.1.1 Installation of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Installation of Reinforcement for Floor Slabs, P2L1

    2.7.1.3 Installation of Reinforcement for Floor Slabs, P1L2

    2.7.1.4 Installation of Reinforcement for Floor Slabs, P2L2

    2.8 Steel Reinforcement for Roof Slab

    2.8.1 Fabrication of Reinforcement for Roof Slab

    2.7.1 Fabrication of Reinforcement for Floor Slabs

    2.7.1.1 Fabrication of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Fabrication of Reinforcement for Floor Slabs, P2L1

    2.7.1.2.3 Fabrication of Reinforcement for Floor Slabs, P1

    2.7.1.2.4 Fabrication of Reinforcement for Floor Slabs, P2

    2.7.2 Installation of Reinforcement for Floor Slabs

    2.6.1.1 Fabrication of Reinforcement for Roof Beam, P1

    2.6.1.2 Fabrication of Reinforcement for Roof Beam, P2

    2.6.2 Installation of Reinforcement for Roof Beam

    2.6.2.1 Installation of Reinforcement for Roof Beam, P1

    2.6.2.2 Installation of Reinforcement for Roof Beam, P2

    2.7 Steel Reinforcement for Floor Slab

    2.5.1.2 Fabrication of Reinforcement for Floor Beam, P2

    2.5.2 Installation of Reinforcement for Floor Beam

    2.5.2.1 Installation of Reinforcement for Floor Beam, P12.5.2.2 Installation of Reinforcement for Floor Beam, P2

    2.6 Steel Reinforcement for Roof Beam

    2.6.1 Fabrication of Reinforcement for Roof Beam

    2.4.2.2. Installation of Reinforcement for Tie Beam, P2

    2.5 Steel Reinforcement for Floor Beam

    2.5.1 Fabrication of Reinforcement for Floor Beam

    2.5.1.1 Fabrication of Reinforcement for Floor Beam, P1

  • 8/11/2019 Form Works

    26/53

    1/4 Marine Plywood

    2x2x10 Lumber

    1/4 Marine Plywood

    2x2x10 Lumber

    4.2.1 Concreting of Wall Footing, P1

    4.2.2 Concreting of Wall Footing, P2

    4.3 Concreting of Retaining Wall

    4.3.1 Concreting of Retaining Wall, P1

    4.3.2 Concreting of Retaining Wall, P2

    4.4 Concreting of Column

    4.1 Concreting of Column Footing

    4.1.1 Concreting of Column Footing, P1

    4.1.2 Concreting of Column Footing, P2

    4.2 Concreting of Wall Footing

    3.2.7 Installation of formworks for ground floor slab, P1

    3.2.8 Installation of formworks for ground floor slab, P2

    3.2.9 Installation of formworks for beam, P1

    3.2.10 Installation of formworks for beam, P2

    3.2.11 Installation of formworks for second floor slab, P1

    3.2.12 Installation of formworks for second floor slab, P2

    3.2.6 Installation of formworks for column, P2

    3.1.9 Fabrication of formworks for beams, P1

    3.1.10 Fabrication of formworks for beams, P2

    3.1.11 Fabrication of formworks for second floor slab, P1

    3.1.12 Fabrication of formworks for second floor slab, P2

    3.1.13 Fabrication of formworks for roofdeck

    3.2 Installation of formworks

    3.2.13 Installation of formworks for roofdeck slab

    4.0 CONCRETE WORKS

    3.1.5 Fabrication of formworks for column, P1

    3.1.6 Fabrication of formworks for column, P2

    3.1.7 Fabrication of formworks for ground floor slab, P1

    3.1.8 Fabrication of formworks for ground floor slab, P2

    2.11.2.3 Installation of Reinforcement for CHB Laying, P1

    2.11.2.4 Installation of Reinforcement for CHB Laying, P23.0 FORMWORKS

    3.1 Fabrication of formworks

    3.2.5 Installation of formworks for column, P1

    2.11.1.3 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.4 Fabrication of Reinforcement for CHB Laying, P2

    2.11.2 Installation of Reinforcement for CHB Laying

    2.11.2.1 Installation of Reinforcement for CHB Laying, P1

    2.11.2.2 Installation of Reinforcement for CHB Laying, P2

  • 8/11/2019 Form Works

    27/53

    6.4 Installation of electrical fixtures

    7.1.4 installation of pipes for septic tank

    7.1.2 Installation of cold water pipes and fittings

    7.1.3 Installation of pipes for catch basin

    6.1 Installation of electrical wirings and conduits

    6.2 Installation of power distribution board

    6.3 Installation of electrical fittings

    7.0 PLUMBING WORKS

    7.1 Installation of pipes

    7.1.1 Installation of sanitary pipes and fittings

    5.2 Plastering of CHB

    5.2.1 Plastering of CHB, P1L1

    5.2.2 Plastering of CHB, P2L1

    5.2.3 Plastering of CHB, P1L2

    5.2.4 Plastering of CHB, P2L2

    6.0 ELECTRICAL WORKS

    5.1 CHB Laying

    5.1.1 CHB Laying, P1L1

    5.1.2 CHB Laying, P2L1

    5.1.3 CHB Laying, P1L25.1.4 CHB Laying, P2L2

    5.1.5 Laying of CHB for septic tank

    4.9 Concreting of Roof Deck

    4.9.1 Concreting of Roof Deck, P1

    4.9.2 Concreting of Roof Deck, P2

    4.10 Concreting of Stair

    4.11 Concreting of Septic Tank

    5.0 MASONRY WORKS

    4.7.2 Concreting of Roof Beam, P2

    4.8 Concreting of Floor Slab

    4.8.1 Concreting of Floor Slab, P1L1

    4.8.2 Concreting of Floor Slab, P2L1

    4.8.3 Concreting of Floor Slab, P1L2

    4.8.4 Concreting of Floor Slab, P2L2

    4.5.2 Concreting of Tie Beam, P24.6 Concreting of Floor Beam

    4.6.1 Concreting of Floor Beam, P1

    4.6.2 Concreting of Floor Beam, P2

    4.7 Concreting of Roof Beam

    4.7.1 Concreting of Roof Beam, P1

    4.4.1 Concreting of Column, P1L1

    4.4.2 Concreting of Column, P2L1

    4.4.3 Concreting of Column, P1L2

    4.4.4 Concreting of Column, P2L2

    4.5 Concreting of Tie Beam

    4.5.1 Concreting of Tie Beam, P1

  • 8/11/2019 Form Works

    28/53

    10.1.2 Installation of Fabricated Windows

    11.0 PREFABICATED STAIRS AND RAILINGS

    11.1 Installation of Prefabricated Stairs

    11.2 Installation of Prefabricated Steel Railings

    9.4 Installation of Tiles For Comfort Room of Second Floor

    9.4.1 Installation of Floor Tiles For Comfort Room of Second Floor

    9.4.2 Installation of Wall Tiles For Comfort Room of Second Floor

    10.0 DOORS AND WINDOWS

    10.1 Installation of Doors and Windows

    10.1.1 Installation of Fabricated Doors

    9.0 TILEWORKS

    9.1 Installation of Tiles For Ground Floor Slab

    9.2 Installation of Tiles For Comfort Room of Ground Floor

    9.2.1 Installation of Floor Tiles For Comfort Room of Ground Floor

    9.2.2 Installation of Wall Tiles For Comfort Room of Ground Floor

    9.3 Installation of Tiles For Second Floor Slab

    8.2 Interior Painting Works

    8.2.1 Painting of Walls

    8.2.2 Painting of Doors

    8.2.3 Painting of slab

    8.2.4 Painting of Cabinets

    8.1.5 Painting of Roof Slab

    7.3.3. Installation of Downpipes

    8.0 PAINTING WORKS

    8.1 Exterior Painting Works8.1.1 Painting of Walls and Columns

    8.1.2 Painting of Gate and Rails

    8.1.3 Painting of Windows

    7.2 Installation of plumbing fixtures

    7.3 Gutter and Downpipe Works

    7.3.1. Fabrication of Gutter

    7.3.2. Installation of Gutter

  • 8/11/2019 Form Works

    29/53

    QUANTITY UNIT UNIT PRICE

    Bill of Materials

    P1

    P2

    P1

    P2

  • 8/11/2019 Form Works

    30/53

    1

    1

    L2

    L2

  • 8/11/2019 Form Works

    31/53

    31 pcs.

    260 pcs.

    23 pcs.

    160 pcs.

    2

    2

    2

    2

    1

    1

  • 8/11/2019 Form Works

    32/53

  • 8/11/2019 Form Works

    33/53

  • 8/11/2019 Form Works

    34/53

    AMOUNT SUBTOTAL

  • 8/11/2019 Form Works

    35/53

  • 8/11/2019 Form Works

    36/53

  • 8/11/2019 Form Works

    37/53

  • 8/11/2019 Form Works

    38/53

  • 8/11/2019 Form Works

    39/53

    2.4.1.2. Fabrication of Reinforcement for Tie Beam, P2

    2.4.2. Installation of Reinforcement for Tie Beam

    2.4.2.1. Installation of Reinforcement for Tie Beam, P1

    2.4.2.2. Installation of Reinforcement for Tie Beam, P2

    2.3.2.2 Installation of Reinforcement for Column, P2L1

    2.3.2.3 Installation of Reinforcement for Column, P1L2

    2.3.2.4 Installation of Reinforcement for Column, P2L2

    2.4 Steel Reinforcement for Tie Beam

    2.4.1. Fabrication of Reinforcement for Tie Beam

    2.4.1.1. Fabrication of Reinforcement for Tie Beam, P1

    2.3.1.1 Fabrication of Reinforcement for Column, P1L1

    2.3.1.2 Fabrication of Reinforcement for Column, P2L1

    2.3.1.3 Fabrication of Reinforcement for Column, P1L2

    2.3.1.4 Fabrication of Reinforcement for Column, P2L2

    2.3.2 Installation of Reinforcement for Column

    2.3.2.1 Installation of Reinforcement for Column, P1L1

    2.2.1.2 Fabrication of Reinforcement for Wall Footing, P2

    2.2.2 Installation of Reinforcement for Wall Footing

    2.2.2.1 Installation of Reinforcement for Wall Footing, P1

    2.2.2.2 Installation of Reinforcement for Wall Footing, P22.3 Steel Reinforcement for Column

    2.3.1 Fabrication of Reinforcement for Column

    2.1.2 Installation of Reinforcement for Column Footing

    2.1.2.1 Installation of Reinforcement for Column Footing,

    2.1.2.2 Installation of Reinforcement for Column Footing,

    2.2 Steel Reinforcement for Wall Footing

    2.2.1 Fabrication of Reinforcement for Wall Footing

    2.2.1.1 Fabrication of Reinforcement for Wall Footing, P1

    1.2.2 Backfilling of soil for column footings (P2)

    2.0 REBAR WORKS

    2.1. Steel Reinforcement for Column Footing

    2.1.1 Fabrication of Reinforcement for Column Footing

    2.1.1.1 Fabrication of Reinforcement for Column Footing,

    2.1.1.2 Fabrication of Reinforcement for Column Footing,

    1.1.3 Excavation of soil for wall footings (P1)1.1.4 Excavation of soil for wall footings (P2)

    1.1.5 Excavation of soil for septic tank

    1.1.6 Excavation of soil for catch basin

    1.2 Backfilling of soil

    1.2.1 Backfilling of soil for column footings (P1)

    DESCRIPTION

    1.0 EARTHWORKS

    1.1. Excavation

    1.1.1 Excavation of soil for column footings (P1)

    1.1.2 Excavation of soil for column footings (P2)

  • 8/11/2019 Form Works

    40/53

    2.11.1.1 Fabrication of Reinforcement for CHB Laying, P1

    2.11.1.2 Fabrication of Reinforcement for CHB Laying, P2

    2.11.1.3 Fabrication of Reinforcement for CHB Laying, P1

    2.9.2.2 Installation of Reinforcement for Stair, P22.10 Steel Reinforcement for Septic Tank

    2.10.1 Fabrication of Reinforcement for Septic Tank

    2.10.2 Installation of Reinforcement for Septic Tank

    2.11 Steel Reinforcement for CHB Laying

    2.11.1 Fabrication of Reinforcement for CHB Laying

    2.9 Steel Reinforcement for Stair

    2.9.1 Fabrication of Reinforcement for Stair

    2.9.1.1 Fabrication of Reinforcement for Stair, P1

    2.9.1.2 Fabrication of Reinforcement for Stair, P2

    2.9.2 Installation of Reinforcement for Stair

    2.9.2.1 Installation of Reinforcement for Stair, P1

    2.8.1 Fabrication of Reinforcement for Roof Slab

    2.8.1.1 Fabrication of Reinforcement for Roof Slab, P12.8.1.2 Fabrication of Reinforcement for Roof Slab, P2

    2.8.2 Installation of Reinforcement for Roof Slab

    2.8.2.1 Installation of Reinforcement for Roof Slab, P1

    2.8.2.2 Installation of Reinforcement for Roof Slab, P2

    2.7.2 Installation of Reinforcement for Floor Slabs

    2.7.1.1 Installation of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Installation of Reinforcement for Floor Slabs, P2L1

    2.7.1.3 Installation of Reinforcement for Floor Slabs, P1L2

    2.7.1.4 Installation of Reinforcement for Floor Slabs, P2L2

    2.8 Steel Reinforcement for Roof Slab

    2.7 Steel Reinforcement for Floor Slab

    2.7.1 Fabrication of Reinforcement for Floor Slabs

    2.7.1.1 Fabrication of Reinforcement for Floor Slabs, P1L1

    2.7.1.2 Fabrication of Reinforcement for Floor Slabs, P2L1

    2.7.1.2.3 Fabrication of Reinforcement for Floor Slabs, P1

    2.7.1.2.4 Fabrication of Reinforcement for Floor Slabs, P2

    2.6.1 Fabrication of Reinforcement for Roof Beam

    2.6.1.1 Fabrication of Reinforcement for Roof Beam, P1

    2.6.1.2 Fabrication of Reinforcement for Roof Beam, P2

    2.6.2 Installation of Reinforcement for Roof Beam

    2.6.2.1 Installation of Reinforcement for Roof Beam, P1

    2.6.2.2 Installation of Reinforcement for Roof Beam, P2

    2.5.1.1 Fabrication of Reinforcement for Floor Beam, P1

    2.5.1.2 Fabrication of Reinforcement for Floor Beam, P2

    2.5.2 Installation of Reinforcement for Floor Beam

    2.5.2.1 Installation of Reinforcement for Floor Beam, P1

    2.5.2.2 Installation of Reinforcement for Floor Beam, P22.6 Steel Reinforcement for Roof Beam

    2.5 Steel Reinforcement for Floor Beam

    2.5.1 Fabrication of Reinforcement for Floor Beam

  • 8/11/2019 Form Works

    41/53

    4.5.1 Concreting of Tie Beam, P1

    4.5.2 Concreting of Tie Beam, P2

    4.6 Concreting of Floor Beam

    4.4 Concreting of Column

    4.4.1 Concreting of Column, P1L1

    4.4.2 Concreting of Column, P2L1

    4.4.3 Concreting of Column, P1L2

    4.4.4 Concreting of Column, P2L2

    4.5 Concreting of Tie Beam

    4.2 Concreting of Wall Footing

    4.2.1 Concreting of Wall Footing, P1

    4.2.2 Concreting of Wall Footing, P2

    4.3 Concreting of Retaining Wall

    4.3.1 Concreting of Retaining Wall, P1

    4.3.2 Concreting of Retaining Wall, P2

    4.0 CONCRETE WORKS4.1 Concreting of Column Footing

    4.1.1 Concreting of Column Footing, P1

    4.1.2 Concreting of Column Footing, P2

    3.2.6 Installation of formworks for column, P2

    3.2.7 Installation of formworks for ground floor slab, P1

    3.2.8 Installation of formworks for ground floor slab, P2

    3.2.9 Installation of formworks for beam, P1

    3.2.10 Installation of formworks for beam, P2

    3.2.11 Installation of formworks for second floor slab, P1

    3.2.5 Installation of formworks for column, P1

    3.1.8 Fabrication of formworks for ground floor slab, P2

    3.1.9 Fabrication of formworks for beams, P1

    3.1.10 Fabrication of formworks for beams, P2

    3.1.11 Fabrication of formworks for second floor slab, P1

    3.1.12 Fabrication of formworks for second floor slab, P2

    3.1.13 Fabrication of formworks for roofdeck

    3.2.12 Installation of formworks for second floor slab, P2

    3.2.13 Installation of formworks for roofdeck slab

    3.1.5 Fabrication of formworks for column, P1

    3.1.6 Fabrication of formworks for column, P2

    3.1.7 Fabrication of formworks for ground floor slab, P1

    2.11.2.2 Installation of Reinforcement for CHB Laying, P2

    2.11.2.3 Installation of Reinforcement for CHB Laying, P1

    2.11.2.4 Installation of Reinforcement for CHB Laying, P2

    3.0 FORMWORKS 3.1 Fabrication of formworks

    3.2 Installation of formworks

    2.11.1.4 Fabrication of Reinforcement for CHB Laying, P2

    2.11.2 Installation of Reinforcement for CHB Laying

    2.11.2.1 Installation of Reinforcement for CHB Laying, P1

  • 8/11/2019 Form Works

    42/53

    8.1.1 Painting of Walls and Columns

    7.3 Gutter and Downpipe Works

    7.3.1. Fabrication of Gutter

    7.3.2. Installation of Gutter

    7.3.3. Installation of Downpipes

    8.0 PAINTING WORKS

    8.1 Exterior Painting Works

    7.1 Installation of pipes

    7.1.1 Installation of sanitary pipes and fittings

    7.1.2 Installation of cold water pipes and fittings

    7.1.3 Installation of pipes for catch basin

    7.1.4 installation of pipes for septic tank

    7.2 Installation of plumbing fixtures

    6.0 ELECTRICAL WORKS

    6.1 Installation of electrical wirings and conduits

    6.2 Installation of power distribution board

    6.3 Installation of electrical fittings

    6.4 Installation of electrical fixtures

    7.0 PLUMBING WORKS

    5.1.5 Laying of CHB for septic tank

    5.2 Plastering of CHB

    5.2.1 Plastering of CHB, P1L1

    5.2.2 Plastering of CHB, P2L1

    5.2.3 Plastering of CHB, P1L2

    5.2.4 Plastering of CHB, P2L2

    5.0 MASONRY WORKS

    5.1 CHB Laying

    5.1.1 CHB Laying, P1L1

    5.1.2 CHB Laying, P2L1

    5.1.3 CHB Laying, P1L2

    5.1.4 CHB Laying, P2L2

    4.8.4 Concreting of Floor Slab, P2L2

    4.9 Concreting of Roof Deck

    4.9.1 Concreting of Roof Deck, P1

    4.9.2 Concreting of Roof Deck, P2

    4.10 Concreting of Stair

    4.11 Concreting of Septic Tank

    4.7.1 Concreting of Roof Beam, P1

    4.7.2 Concreting of Roof Beam, P2

    4.8 Concreting of Floor Slab

    4.8.1 Concreting of Floor Slab, P1L14.8.2 Concreting of Floor Slab, P2L1

    4.8.3 Concreting of Floor Slab, P1L2

    4.6.1 Concreting of Floor Beam, P1

    4.6.2 Concreting of Floor Beam, P2

    4.7 Concreting of Roof Beam

  • 8/11/2019 Form Works

    43/53

  • 8/11/2019 Form Works

    44/53

    QUANTITY UNIT UNIT PRICE

    P1

    P2

    P1

    P2

    Bill of Materials

  • 8/11/2019 Form Works

    45/53

    1

    1

    2

    L2

    L2

  • 8/11/2019 Form Works

    46/53

    88.434 m2

    66.198 m2

    1

    2

    2

    2

    1

  • 8/11/2019 Form Works

    47/53

  • 8/11/2019 Form Works

    48/53

  • 8/11/2019 Form Works

    49/53

    Material Cost SUBTOTAL

  • 8/11/2019 Form Works

    50/53

  • 8/11/2019 Form Works

    51/53

  • 8/11/2019 Form Works

    52/53

  • 8/11/2019 Form Works

    53/53