form control plan

1
Prototype - Pre-Launch - Production (circle) Control Plan PART NAME: PRODUCT ENGINEERING FIRST ISSUED DATE: REVIEW / APPROVAL (SIGN / DATE) DESIGNATED ( ) YES ( X ) NO CONTROL ITEM PART NUMBER: PRODUCER: REVISION DATE: CUSTOMER SQA APPROVAL (SIGN / DATE) SUPPLIER CODE: END ITEM AND CUSTOMER: PLANT: LATEST DRAWING/SPEC. DATE: CUSTOMER ENG. APPROVAL (SIGN / DATE) Process Flow Machine Characteristics Methods NO. Process nam Device Jig Process Product Class Product/Process Evaluation Sample Size/ Analysis REACTIONS IF OUT OF CONTROL Tools for No. Parameters Characteristics Specification Methods Frequency Methods CONDITIONS ARE ENCOUNTERED Manufacturing 1 Skip lot 2 3 4 5 6 7 8 9 10 22-000 N/A Visual Receiving inspection Receiving inspection Per vendor history cards Per vendor history cards Per vendor history cards Per vendor history cards Per vendor history cards Reject shipment, invoke suspect/non- conforming work instruction Packing and shipping Correct part quantity, packing, and Ensure correct part quantity, packing, and Correct part quantity, packing, and 100% checked on line 100% checked visually Suspect/non-conforming work instruction, process adjusted

Upload: taufikrasyadi

Post on 25-Sep-2015

214 views

Category:

Documents


0 download

DESCRIPTION

Bagi yang membutuhkan form control plan, dapat di download di sini.Sumber : Internet

TRANSCRIPT

Control Plan Form

Sheet1Prototype - Pre-Launch - Production (circle)Control PlanPART NAME:PRODUCT ENGINEERINGFIRST ISSUED DATE:REVIEW / APPROVAL (SIGN / DATE)DESIGNATED( ) YES( X ) NOCONTROL ITEMPART NUMBER:PRODUCER:REVISION DATE:CUSTOMER SQA APPROVAL (SIGN / DATE)SUPPLIER CODE:END ITEM AND CUSTOMER:PLANT:LATEST DRAWING/SPEC. DATE:CUSTOMER ENG. APPROVAL (SIGN / DATE)Process FlowMachineCharacteristicsMethodsNO.Process nameDevice JigProcessProductClassProduct/ProcessEvaluationSample Size/AnalysisREACTIONS IF OUT OF CONTROLTools forNo.ParametersCharacteristicsSpecificationMethodsFrequencyMethodsCONDITIONS ARE ENCOUNTEREDManufacturing1Receiving inspectionReceiving inspectionSkip lotPer vendor history cardsPer vendor history cardsPer vendor history cardsPer vendor history cardsPer vendor history cardsReject shipment, invoke suspect/non-conforming work instruction234567891022-000Packing and shippingN/ACorrect part quantity, packing, and labelsEnsure correct part quantity, packing, and labelsCorrect part quantity, packing, and labelsVisual100% checked on line100% checked visuallySuspect/non-conforming work instruction, process adjusted