Form 1 for Prior Environmental Clearance Project Address: Khatha No. 69/458/69/1, (Survey No.45/5(P) & 46/1B), Hebbala Village, Kasaba Hobli, Bengaluru North Taluk, Bengaluru (U). PROJECT PROPONENT: Sri. A.L. Muthiah and Others Represented by GPA Holder M/s. Brigade Enterprises Limited ADDRESS: 29 th and 30 th Floor, World Trade Center, Brigade Gateway Campus, 26/1, Dr. Rajkumar Road, Malleswaram - Rajajinagar, Bengaluru - 560 055. Ph. 080-41379200, Mob: 9980141453. [email protected]; www.brigadegroup.com BRIGADE MIXED USE DEVELOPMENT

Upload: vuongquynh

Post on 29-May-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 for Prior Environmental

Clearance

Project Address: Khatha No. 69/458/69/1, (Survey No.45/5(P) & 46/1B),

Hebbala Village, Kasaba Hobli, Bengaluru North Taluk, Bengaluru (U).

PROJECT PROPONENT: Sri. A.L. Muthiah and Others Represented by GPA Holder M/s. Brigade Enterprises Limited

ADDRESS: 29th and 30th Floor, World Trade Center, Brigade Gateway Campus, 26/1, Dr. Rajkumar Road, Malleswaram - Rajajinagar, Bengaluru - 560 055. Ph. 080-41379200, Mob: 9980141453.

[email protected]; www.brigadegroup.com

BRIGADE MIXED USE DEVELOPMENT

Page 2: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 2

FORM 1

(I) Basic Information

Sl.

No. Item Details

1. Name of the project/s Brigade Mixed Use Development

2. Sl. No. in the schedule 8a (Construction)

3.

Proposed capacity / area / length / tonnage

to be handled / command area/lease

area/number of wells to be drilled

Total Built-up area = 34,350 Sq.m.

4. New/Expansion/Modernization New

5. Existing Capacity/Area etc. Not Applicable

6. Category of Project i.e. ‘A’ or ‘B’ ‘B’ (Construction < 1,50,000Sq.m of Built-up

area) - Note 1 of EIA Notification Applicable.

7. Does it attract the general condition? If yes,

please specify. No

8. Does it attract the specific condition? If yes,

please specify. No

9.

Location

Plot/Survey/Khatha No.

Village

Tehsil

District

State

Khatha No. 69/458/69/1, (Survey No.45/5(P) &

46/1B), Hebbala Village, Kasaba Hobli,

Bengaluru North Taluk, Bengaluru (U)

10. Nearest railway station/airport along with

distance in kms.

Nearest Railway Station: 2.5km (Hebbal

Railway Station); 12km Krantivira Sangolli

Rayanna Railway station - Bangalore City)

Airport: 25 km (Kempegowda International

Airport)

11. Nearest Town, city, District Headquarters

along with distance in kms. Bengaluru City Limits

12.

Village Panchayats, Zilla Parishad,

Municipal corporation, Local body

complete postal addresses with telephone

nos. to be given)

Bruhat Bangalore Mahanagara Palike (BBMP)

13. Name of the applicant Sri. A.L. Muthiah and Others Represented by

GPA Holder M/s. Brigade Enterprises Limited

14. Registered Address

29th and 30th Floor, World Trade Center,

Brigade Gateway Campus, 26/1, Dr. Rajkumar

Road, Malleswaram - Rajajinagar, Bengaluru -

560 055.

15. Address for correspondence: M/s. Brigade Enterprises Limited

Page 3: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 3

Name Abraham Koshy

Designation (Owner/Partner/CEO) Authorized Signatory

Address

29th and 30th Floor, World Trade Center,

Brigade Gateway Campus, 26/1, Dr. Rajkumar

Road, Malleswaram - Rajajinagar, Bengaluru.

Pin Code 560055

E-mail [email protected]

Telephone No. 080-41379200; Mob:9980141453

Fax No. 080-22210784

16.

Details of Alternative Sites examined, if any.

Location of these sites should be shown on

a topo sheet.

Village-District-State

Not Applicable

17. Interlinked Projects Not Applicable

18. Whether separate application of

interlinked project has been submitted? Not Applicable

19. If yes, date of submission Not Applicable

20. If no, reason Not Applicable

21.

Whether the proposal involves

approval/clearance under: if yes, details of

the same and their status to be given.

(a) The Forest (Conservation) Act, 1980?

(b) The Wildlife (Protection) Act, 1972?

(c) The C.R.Z Notification, 1991?

Not Applicable

22. Whether there is any Government

Order/Policy relevant/relating to the site? No

23. Forest land involved (hectares) No

24.

Whether there is any litigation pending

against the project and/or land in which the

project is propose to be set up?

(a) Name of the Court

(b) Case No.

(c) Orders/directions of the Court, if any

and its relevance with the proposed

project.

No

Page 4: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 4

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate quantities

/rates, wherever possible) with source of

information data

1.1

Permanent or temporary change

in land use, land cover or

topography including increase in

intensity of land use (with respect

to local land use plan)

Yes

Proposed Residential development on land

admeasuring 1 Acre 35.4 Guntas

(7,629.78Sq.m.)

1.2 Clearance of existing land,

vegetation and buildings? No

The site is generally devoid of rare vegetation

of any description. There will be no clearance of

rare vegetation of any kind.

A small shed exists on the project site which

shall be used as the security room during

construction phase.

Few Trees viz., Coconut, Bamboo and other

trees, numbering about 8 (Eight) are seen on

the project site. During construction, only

about 1 or 2 trees are proposed to be cut or

transplanted depending on its economic value,

age, girth, etc, since the remaining trees exist

on the periphery of the project site.

1.3 Creation of new land uses? No

The land-use of proposed project site is

earmarked as Industrial Hi-Tech where both

commercial & residential developments are

permitted as per BDA bye-laws.

1.4 Pre-construction investigations

e.g. bore houses, soil testing? Yes Soil testing is carried out for planning purpose

1.5 Construction works? Yes

The project will involve construction of

Commercial & Residential Blocks with total

built-up area of 34,350 Sq.m.

1.6 Demolition works? No

A small shed exists on the project site which

shall be used as the security room during

construction phase.

1.7

Temporary sites used for

construction works or housing of

construction workers?

Yes Labor camp for about 300 workers will be set-

up near the proposed site

1.8 Above ground buildings,

structures or Yes

The proposed project consists of Two separate

buildings comprising of 2 Basement + Ground

Page 5: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 5

earthworks including linear

structures, cut and fill or

excavations

Floor + 12 Upper Floors (Commercial) & 2

Basement + Ground Floor + 4 Upper Floors

(Residential). 2 number of Basements & Surface

Area shall be used for Car Parking.

Excavation will be for providing basements,

footings, sump tanks etc. and excavated earth

will be used for backfilling, leveling of earth,

internal roads, etc.

The built-up area of the proposed 2 Basement

floors is 11,140Sq.m. Considering Floor to Floor

height of Basement as 3.0m & the site profile,

the total excavated earth is 33,420cum.

3,052cum of soil shall be used for landscaping,

6,564cum shall be used for leveling, 9,750cum

shall be used for backfilling, 2,795cum shall be

used for internal roads & balance 11,259 cum

shall be used for manufacturing of cement

stabilized earth blocks.

1.9 Underground works including

mining or tunneling? No Not Applicable

1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing

processes? No Not Applicable

1.14 Facilities for storage of goods or

materials? No Not Applicable

1.15 Facilities for treatment or disposal

of solid waste or liquid effluents? Yes

Municipal Solid waste of around 349 kg/day will

be segregated at source into organic and

inorganic wastes. Around 124 kg/day of organic

waste will be treated through decentralized

composting systems within the development &

225 kg/day of inorganic waste will be handed

over to local recycling agencies.

Domestic sewage generated from the

commercial & residential development will be

treated in Sewage Treatment Plant of capacity

90KLD & 10KLD respectively, adopting

Sequencing Batch Reactor Technology process.

1.16 Facilities for long term housing of

operational workers? No

No long term housing of operational workers in

the residential development whereas in the

commercial development, the facilities

management team shall manage the

Page 6: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 6

housekeeping & other aspects on a rotational

basis among their staff.

1.17 New road, rail or sea traffic during

construction or operation? No NA

1.18

New road, rail, air waterborne or

other transport infrastructure

including new or altered routes

and stations, ports, airports etc?

No Existing & Proposed transport infrastructure

will be used

1.19

Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No Not Applicable

1.20 New or diverted transmission lines

or pipelines? Yes

New Water supply and electrical supply lines

shall be sourced for the project

1.21

Impoundment, damming,

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

No Not Applicable

1.22 Stream crossings? No Not Applicable

1.23 Abstraction or transfers of water

form ground or surface waters? No

Water will be sourced from Bangalore Water

Supply & Sewerage Board (BWSSB)

1.24

Changes in water bodies or the

land surface affecting drainage or

run-off?

No

Surface runoff is expected to increase due to

the development. However, this shall be

reduced to bare minimum by installation of

effective rainwater harvesting structures like

Infiltration Wells, Dug wells, recharge trenches,

etc. Only, the overflow from the Infiltration

Well shall pass through a sedimentation

chamber, just prior to exit from the site, to

avoid silt/sand from clogging the external

drains.

1.25

Transport of personnel or

materials for construction,

operation or decommissioning?

No

Transportation of construction materials will be

made mainly through mechanized hi-tech

trucks covered with tarpaulin to avoid dust

emissions into the surrounding environment.

Labour Camp is proposed nearby to the

proposed project site.

1.26

Long-term dismantling or

decommissioning or restoration

works?

No Not Applicable

1.27 Ongoing activity during

decommissioning which could No Not Applicable

Page 7: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 7

have an impact on the

environment?

1.28

Influx of people to an area in

either temporarily or

permanently?

Yes

There will be permanent influx of people into

the proposed Mixed Use Development, as part

of the Facilities Management Team, required

for overall maintenance of the development.

1.29 Introduction of alien species? No Not Applicable

1.30 Loss of native species or genetic

diversity? No Not Applicable

1.31 Any other actions? No --

Page 8: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 8

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short supply):

Sl.

No.

Information/checklist

confirmation Yes/No

Details thereof (with approximate quantities

/rates, wherever possible) with source of

information data

2.1

Land especially

undeveloped or agricultural

land (ha)

No Not Applicable

2.2 Water (expected source &

competing users) unit: KLD Yes Water of 105 KLD will be sourced from BWSSB

2.3 Minerals (MT) No Not Applicable

2.4

Construction material –

stone, aggregates, sand /

soil (expected source – MT)

Yes

Construction materials appropriate for built-up area

of 34,350 Sq.m. shall be sourced from nearby

sources.

2.5 Forests and timber (source

– MT) Yes Timber for door frames, flooring etc.,

2.6

Energy including electricity

and fuels (source,

competing users) Unit: fuel

(MT), energy (MW)

Yes

The total maximum power demand of 3000KVA for

the proposed project shall be sourced from

Bangalore Electricity Supply Company (BESCOM).

Separate electrical rooms will be constructed in the

development as per the requirement. It is proposed

to install 3 numbers of DG Sets as back-up power

during power cuts (Commercial (750 KVA x 1 No.+

500 KVA x 1 No.) & Residential (125 KVA x 1 No.)).

The installation of transformer, LT and HT panels

shall be as per the provision specified by the

concerned authorities.

The power requirement during construction of about

150KVA for lighting tools and plant equipment,

pumps and others will be met from BESCOM and

back up DG sets enclosed type of capacity 75KVA X

2Nos. is proposed.

Dual Fuel Mode of Low Sulphur High Speed Diesel

(HSD) with Sulphur content less than 50ppm &

Compressed Natural Gas (CNG) will be used for Diesel

Generators in case of power failure. Firefighting &

safety measures will be ensured as per the guidelines

from the concerned authority.

2.7

Any other natural resources

(use appropriate standard

units)

No Not Applicable

Page 9: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 9

3. Use, storage, transport, handling or production of substances or materials, which could be harmful

to human health or the environment or raise concerns about actual or perceived risks to human

health.

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

3.1

Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna,

and water supplies)

No Not Applicable

3.2

Changes in occurrence of disease

or affect disease vectors (e.g.

insect or water borne diseases)

No

Changes in occurrence of diseases will occur

due to climate change. However, we shall

implement a proper scientific Hygienic and

sanitation system to prevent outbreak of any

vector or water borne disease. Pest & Rodent

control measures will be done at regular

intervals.

3.3 Affect the welfare of people e.g.

by changing living conditions? No

The standard of living of the nearby local

population will improve due to the

employment opportunities created by the

proposed Development. On completion of the

project, it will improve not only the

infrastructure facility but will also improve the

aesthetic looks of the surroundings.

3.4

Vulnerable groups of people who

could be affected by the project

e.g. hospital patients, children,

the elderly etc.,

No

Not Applicable directly. But indirectly, as

considering the surrounding developments

which comprises occupied residential

developments, hospitals/clinics etc., there will

be a short term disturbance to the vulnerable

section of people which will be mitigated by

restricting the construction activity between

9am to 6pm, barricading the project boundary

with GI Sheets among other measures.

3.5 Any other causes No Not Applicable

Page 10: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 10

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

4.1 Spoil, overburden or mine

wastes No Not Applicable

4.2 Municipal waste (domestic

and or commercial wastes) Yes

During Construction - Municipal solid waste of

about 45 kg/day from the labor camp and staff will

be segregated and disposed to municipal

authorities through local agencies.

During Operation - The Municipal solid waste

generation in the project will be non-hazardous in

nature consisting of biodegradable and non-

biodegradable matter. This will comprise of solid

wastes from kitchens, garden, store rooms, wash

rooms, etc. The municipal solid waste from the

Mixed Use Development after completion and full

occupancy is expected to be around 349 kg/day.

The Municipal Solid wastes will be segregated into

biodegradable and non-biodegradable at source.

The biodegradable waste of 124 kg/day will be

composted within the project site using Organic

Waste Converter and the non-biodegradable waste

of 225 kg/day will be handed over to a local

recycling agency or the government municipal

agency for further treatment and safe disposal.

4.3

The Hazardous (Waste

Management, Handling and

Transboundary Movement)

Rules

Yes

Waste oil from DG sets of 500kg/annum will be

stored in leak proof sealed barrels, placed on

secondary collection trays and will be disposed off

to KSPCB authorized Re-processors. Oil soaked

cotton waste of 50kg/annum shall be stored in

separate bins and handed over to authorized

agencies for safe disposal in compliance with

Hazardous and Other Wastes (Management and

Trans-boundary Movement) Rules, 2016

4.4 Other industrial process

wastes No Not Applicable

4.5 Surplus product No Not Applicable

4.6

Sewage sludge or other

sludge from effluent

treatment

Yes

The Sewage generated from both the Commercial

& Residential Development will be collected

through an internal network of drainage system

and discharged to 2 numbers of Sewage Treatment

Page 11: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 11

Plant (STP) of 90 KLD & 10KLD capacity each,

adopting Sequencing Batch Reactor Technology, in

the project area and sewage sludge of around

10kg/day will be dewatered / dried & used as

organic manure within the site.

4.7 Construction or demolition

wastes Yes

The generation of waste material is inevitable at

different stages of construction process. About 40 -

60kg/m2 of the total construction raw material is

assumed as waste. Waste during construction

activity relates to excessive cement mix or concrete

left after work is over, rejection caused due to

change in design or wrong workmanship etc,

concrete appears in two forms in the waste.

Structural elements of building have reinforced

concrete, while foundations have mass non-

reinforced concrete. These materials are normally

reused as filler material at the same site after

completion of excavation work and for

construction of basement raft and internal road

etc. Excess construction and demolition waste if

any shall be disposed as per Construction and

Demolition Waste Management Rules 2016. Other

miscellaneous material during construction that

arise as waste includes, glass, plastic material,

general refuse, scrap metal, cardboard, plastics etc.

will be segregated and disposed to authorized

recyclers.

About 1720Tons of construction waste is expected

to be generated from the project during

construction.

4.8 Redundant machinery or

equipment No Not Applicable

4.9 Contaminated soils or other

materials No Not Applicable

4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

Page 12: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 12

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

5.1

Emissions from combustion

of fossil fuels from

stationary or mobile

sources

Yes

Air emission comprising PM, NOX, unburnt

hydrocarbon and SO2 will be from the operating DG

sets used as the standby power source. Emission of

the above pollutants will be temporary (during power

cuts) and will be further minimized by the use of low

Sulphur High Speed Diesel (HSD) – (Sulphur content

less than 50ppm) or alternatively Compressed

Natural Gas (CNG)

5.2 Emissions from production

processes No Not Applicable

5.3

Emissions from materials

handling including storage

or transport

No Not Applicable

5.4

Emissions from

construction activities

including plant and

equipment

Yes

The potential ambient air quality impacts arising from

the proposed project would occur mainly during

project construction phase. Particulate Matter would

be predominant pollutant generated from

construction activities. The gaseous emissions such as

SO2, NOX and un-burnt hydrocarbons would be

generated from the construction equipment’s and

vehicles.

Appropriate management plan will be designed to

mitigate any incremental rise in pollution level to an

acceptable limit.

Impacts of construction activities on air quality are a

cause for concern mainly in the dry months due to

settling of dust particles. The main sources of

emission during the construction phase are the

movement of equipment’s at site and dust emitted

during the leveling, grading, foundation works and

other construction related activities. The dust

emitted during the above mentioned activities

depend upon the type of soil and the ambient

humidity levels. The impact is likely to be for short

duration and confined locally to the construction site

itself. The composition of dust in this kind of

operation is however mostly coarse particles,

inorganic and non-toxic in nature. These are not

expected to travel long distance before settling.

Page 13: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 13

Sprinkling of water on temporary pathway’s &

driveways for movement of construction vehicles &

equipment’s in the site area is proposed to reduce

dust during construction.

Exhaust emissions from vehicles and equipment

deployed during the construction phase will also

result in marginal increase in levels of SO2, NOX, PM,

and un-burnt hydrocarbons. It may, therefore, be

deduced that construction activities may cause

changes in the PM levels locally. The impact will

however be reversible, marginal, and temporary in

nature.

The impact of such activities would be temporary and

restricted to the construction phase. The impact will

be confined within the project boundary and is

expected to be negligible outside the project

boundaries. Proper upkeep and maintenance of

vehicles, sprinkling of water on roads at construction

site, providing sufficient vegetation, barricading the

project site using GI Sheets, etc, are some of the

proposed measures that would greatly reduce the

impact on the air quality during the construction

phase of the project.

5.5

Dust or odours from

handling of materials

including construction

materials, sewage and

waste

Yes

Dust emission during construction phase will be

usually noticed and decreases gradually as project

progresses.

Sewage during construction stage will be treated in

septic tank. The municipal waste will be handed over

to local disposal agencies, thereby reducing the

nuisance of odour.

During operation phase, sewage generated shall be

treated in 2 numbers of scientifically designed

Sewage Treatment Plants of 90 KLD & 10KLD capacity

each adopting Sequencing Batch Reactor Technology.

Dust emission will be negligible and no odor problem

of sewage will be anticipated as it is treated in

scientifically designed Sewage Treatment Plants and

equipped with efficient exhaust system.

5.6 Emissions from incineration

of waste No Not Applicable

5.7 Emissions from burning of

waste in open air (e.g. slash No

Not Applicable. Construction debris & materials shall

be segregated according to its characteristics and re-

used to the maximum extent within the site. Only the

Page 14: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 14

materials, construction

debris)

recyclable materials are segregated and handed over

to authorized recyclers. The project team shall ensure

that no slash materials, construction debris etc., are

burnt in open air either by the contractors or their

sub vendors.

5.8 Emissions from any other

sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

with source of information data

6.1

From operation of

equipment e.g. engines,

ventilation plant,

crushers

During the operation phase, noise will be generated

from the DG sets, pump rooms, movement of vehicles

and general noise characteristics of the occupants. The

DG Set room and pumps will be isolated from the

outside environment through proper acoustic

measures, which will be regulate the noise generated

from the rooms. The noise levels outside the room will

be maintained within the stipulated norms as per CPCB,

both during the day and night times.

6.2 From industrial or similar

processes No Not Applicable

6.3 From construction or

demolition Yes

Heavy construction traffic for loading and unloading of

construction materials, fabrication and handling of

equipment’s and construction materials are likely to

cause an increase in the ambient noise levels. During

peak construction phase, marginal increase in noise

levels is expected to occur locally at construction site.

The peak noise levels from continuous construction

activity may be about 75 - 80dB (A). However, factors

like air absorption, vegetal cover etc., would result in

significant attenuation of at least 35 - 40dB (A) at 100 m

distance. The resultant noise levels on proposed project

site at 100m distance at peak level of construction is

anticipated to be about 40 - 45dB (A), which is well

within the limits for Residential area(55dB) during the

day time. Hence, the noise levels are considered to have

insignificant impact.

Further to minimize these potential impacts, major

construction activities would be scheduled during

Page 15: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 15

normal daylight working hours and would be

implemented consistent with the applicable standards.

The construction contractor will use equipment’s that

are adapted to operate with appropriate noise muffing

devices resulting in the least possible noise. Every effort

would be taken to minimize the noise levels including

the mandatory use of construction equipment’s with

operable mufflers.

Overall, the impact of noise generated on the

environment is likely to be insignificant, reversible and

localized in nature and mainly confined to daytime and

construction period only.

6.4 From blasting or piling No Not Applicable

6.5 From construction or

operational traffic Yes

During Construction - Explained in 6.3

Operational Phase - From the project itself, there are

two Entry and Exit, one for the commercial building

which are 8.0 m wide each located on the Southern side

(18m wide Dasarahalli Main Road) and the other one for

the residential building which is 6m wide located on the

North-East side. The total width of the internal road

(uni-directional) is 8m wide for the commercial & 6m

wide for the residential development, as per Fire

regulations. The traffic circulates around the individual

buildings simultaneously providing ingress & egress to

the two levels of parking in the commercial block &

Ground floor in the residential block and respective Exit

Points from the buildings. Hence, traffic noise is not

expected to be a major concern. Also, speed breakers at

regular intervals shall be put up to ensure that vehicles

do not over-speed within the property. Sign boards

indicating “No Horn” and “Speed Limit” shall be put up

at regular intervals to guide the drivers for a safe drive.

The Entry and Exit will be manned by trained and

experienced traffic wardens. Stopping or parking near

the Entrance and Exit portals will be prohibited; The

long driveway leading to the Parking bays and areas will

ensure that vehicles do not get piled up.

6.6 From lighting or cooling

systems No Not Applicable

6.7 From any other sources No Not Applicable

Page 16: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 16

7. Risks of contamination of land or water from releases of pollutants into the ground or into

sewers, surface waters, groundwater, coastal waters or the sea:

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

7.1

From handling, storage, use

or spillage of hazardous

materials

No

The hazardous material (Used Oil of 500kg/annum)

will be handled and stored in an environmentally

sound manner. Used oils shall be stored in leak proof

containers and placed in a secondary collection tray

to avoid contamination of soil / sub-surface water.

7.2

From discharge of sewage

or other effluents to water

or the land (expected mode

and place of discharge)

Yes

The discharge of wastewater during the operation

phase will be treated in the fully operational Sewage

Treatment Plant of 90 KLD & 10KLD capacity each for

both commercial & residential development

adopting Sequencing Batch Reactor Technology. The

treated wastewater will be used for toilet flushing,

HVAC, landscaping & excess shall be discharged into

the BWSSB Sewer.

7.3

By deposition of pollutants

emitted to air into the land

or into water

No

No such pollutant will be emitted into the air so as to

deposit into the land or water. Height of stack for DG

sets during operation shall be designed as per the

formula, H=h+0.2√KVA, where, h=height of building

and KVA is the rating of DG sets which will be used.

Based on the regular usage of DG sets for buildings,

the height of stack is considered as “height of

building+6metre”and which shall be implemented

during operation.

7.4 From any other sources No Not Applicable

7.5

Is there a risk of long term

buildup of pollutants in the

environment from these

sources?

No Not Applicable

Page 17: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 17

8. Risk of accidents during construction or operation of the Project, which could affect human

health or the environment

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

8.1

From explosions, spillages, fires

etc. from storage, handling,

use or production of hazardous

substances

No Not Applicable

8.2 From any other causes No

On site Personal Protective Equipment’s (PPE’s)

will be provided to all laborers and ensured that it

is used while at work, failing which, strict action

(for First Offence, strict warning and for second &

subsequent offences, imposition of penalty) shall

be taken against the contractor. Safety training

will be given by a qualified Safety Instructor to all

the laborers on a regular basis and also to the New

Joinees, during their induction. The construction

equipment will be operated as per the standard

operating procedures provided by the

manufacturers. Regular maintenance schedule of

the equipment’s shall be strictly followed to

ensure that they are in “Safe” operating

condition.

8.3

Could the project be affected

by natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc.)?

Yes

The project area falls in Zone - II of Seismic Zoning

map of India. The seismic factors have been

appropriately incorporated in the civil designs for

the proposed project.

Page 18: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 18

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality

Sl.

No.

Information/Checklist

confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

9.1

Lead to development of

supporting.

facilities, ancillary

development or development

stimulated by the project which

could have impact on the

environment e.g.:

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

• housing development

• extractive industries

• supply industries

• other

No

The proposed project is a Mixed Use

Development consisting of Residential

Apartments & Commercial Office for IT/ITES. The

project will have its own infrastructure in terms of

power supply in the form of Transformer and DG

sets, which will be operated only during power

cuts. The project will create housing

infrastructure along with world class amenities to

the persons who will be residing in the

development.

9.2

Lead to after-use of the site,

which could have an impact on

the environment

No

The project conceived is a Mixed Use

development which comprises both commercial

& residential and as such, since the construction

industry is not considered as a pollution

generating industry, there will be a very minimal

impact on the environment.

9.3 Set a precedent for later

developments Yes

Many such developments are currently in

progress in the vicinity of the project site and

many more can be expected in the future.

9.4

Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

Yes

The project will have cumulative effect due to

proximity to the other existing or planned

projects. However, the impact will be negligible

and temporary.

Page 19: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 19

(III) Environmental Sensitivity

Sl.

No. Areas

Name/

Identity

Aerial distance (within 15 km.)

Proposed project location boundary

1

Areas protected under

international conventions,

national or local legislation for

their ecological, landscape,

cultural or other related value

No Not Applicable

2

Areas which are important or

sensitive for ecological reasons -

Wetlands, watercourses or

other water bodies, coastal

zone, biospheres, mountains,

forests

Yes

Nagavara Lake-1.0km South-East of the Project

Site

Hebbal Lake-1.0km South-West of the Project

Site

3

Areas used by protected,

important or sensitive species

of flora or fauna for breeding,

nesting, foraging, resting, over

wintering, migration

No Not Applicable

4 Inland, coastal, marine or

underground waters No Not Applicable

5 State, National boundaries No Not Applicable

6

Routes or facilities used by the

public for access to recreation

or other tourist, pilgrim areas

Yes

The abutting Dasarahalli Main Road connects

Bellary Road (NH 7) on the West and

Dasarahalli/Rachenahalli/Kempapura on the

East. NH-7 is used to access Kempegowda

International Airport including Hyderabad,

Devanahalli, Nandi Hills on the North while

Dasarahalli Main Road connects to Jakkur Main

Road, which is used to access Bagalur and an

alternative route to Kempegowda International

Airport.

7 Defense installations No Not Applicable

8 Densely populated or built-up

area Yes Bengaluru City

9

Areas occupied by sensitive

man-made land uses (hospitals,

schools, places of worship,

community facilities)

Yes

The project site is a developed area with

hospitals, schools, places of worship,

community facilities, etc. which exists near the

project site.

10

Areas containing important,

high quality or scarce resources

(ground water resources,

No Not Applicable

Page 20: Form 1 for Prior Environmental Clearanceenvironmentclearance.nic.in/.../EC/...BrigadeMixedUseDevelopment.pdf · Railway Station); 12km Krantivira Sangolli Rayanna Railway station

Form 1 Brigade Mixed Use Development

Brigade Enterprises Limited Page 20

surface resources, forestry,

agriculture, fisheries, tourism,

minerals)

11

Areas already subjected to

pollution or environmental

damage. (those where existing

legal environmental standards

are exceeded)

No Not Applicable

12

Areas susceptible to natural

hazard which could cause the

project to present

environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

No

The project area falls in Zone - II of seismic

zoning map of India. The seismic factors have

been appropriately incorporated in the civil

designs for the proposed project.

(IV). Proposed Terms of Reference for EIA studies

Not Applicable

“I hereby given undertaking that the data and information given in the application and enclosures are

true to the best of my knowledge and belief and I am aware that if any part of the data and information

submitted is found to be false or misleading at any stage, the project will be rejected and clearance

give, if any to the project will be revoked at our risk and cost.”

Date: 02-11-2017

Place: Bengaluru

ABRAHAM KOSHY

AUTHORIZED SIGNATORY

BRIGADE ENTERPRISES LIMITED