  • FORM1&1A

    For

    ProposedGroupHousingScheme“PushkarSpringGardens”

    At

    LandBearingKhNo.274&275atWanadongri,Tahsil‐Hingna,Dist.Nagpur.

    ProposedBy

    M/s.PushkarHomesPvt.Ltd.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1

    APPENDIX‐I(Seeparagraph–6)

    FORM1

    (I) BASICINFORMATIONSr.No. Item Details

    1 Nameoftheproject/s Proposed Group Housing Scheme “PushkarSpringGardens”atNagpur

    2 S.No.intheSchedule 8 (a)3 Proposedcapacity/area/

    length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.

    TotalPlotArea 30,800 m2NetPlotArea 24,910.863 m2

    Built‐upAreaDetails

    F.S.Iarea 32,384.121 m2NonF.S.Iarea 16,435.50 m2TotalConstructionArea 48,819.63 m2Detailed Area Statement is attached asAnnexureI

    4 New/Expansion/Modernization New5 ExistingCapacity/Areaetc. ‐6 Categoryofprojecti.e.AorB BCategory7 Doesitattractthegeneralcondition?if

    yes,pleasespecifyNo

    8 Doesitattractthespecificcondition?Ifyes,pleasespecify

    No

    9 Location NagpurPlot/Survey/KhasraNo. 274&275Village WanadongariTehsil HingnaDistrict NagpurState Maharashtra

    10 Nearestrailwaystation/portalongwithdistanceinkms.

    RailwayStation:NagpurRailwaystationapprox.13.6kms

    11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.

    Nagpur

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2

    Sr.No. Item Details

    12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)

    Nagpur Metro Region under NagpurImprovementtrust

    13 Nameoftheapplicant Name:Mr.GauravD.AgarwalM/s.PushkarHomesPvt.Ltd.

    14 Registeredaddress Plot No.94, Behind Gupta Towers, CivilLines,Nagpur–440001

    15 Addressforcorrespondence:Name Mr.GauravDAgarwalDesignation(Owner/Partner/CEO) DirectorAddress PushkarHomesPvtLtd

    Address: Plot No.94, Behind Gupta Towers,CivilLines,Nagpur–440001

    Pincode 440001E‐mail [email protected]. 0712‐2540036,2540111FaxNo.

    16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.

    Village‐District‐State1.2.3.We are developing the proposed project onourownland

    17 Interlinkedprojects NotApplicable18 Whetherseparateapplicationof

    interlinkedprojecthasbeensubmitted?

    No

    19 Ifyes,dateofsubmission NotApplicable20 IfNo,Reason Standaloneconstructionproject21 Whethertheproposalinvolves

    approval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven

    a) TheForest(Conservation)Act,1980?

    b) Thewildlife(protection)Act,1972?

    c) TheCRZNotification,1991?

    NoNo

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3

    Sr.No. Item Details

    22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?

    No

    23 Forestlandinvolved(hectares) No forest land involved inproposedprojectsite

    24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?

    a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthecourt

    ifanyanditsrelevancewiththeproposedproject.

    No such litigation pending against theproject

    Capacity corresponding to sectoral activity (such as production capacity for manufacturing,mining lease area and production capacity for mineral production, area for mineralexploration, length for linear transport infrastructure, generation capacity for powergenerationetc.,)

    (II)Activity1. Construction, operation or decommissioning of the Project involving actions,

    whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)

    Sr.No.

    Information/Checklistconfirmation

    Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

    1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)

    No LandreservedforResidentialDevelopment

    1.2 Clearanceofexistingland,vegetationandbuildings?

    No1.3 Creationofnewlanduses? No Land is reserved for residential

    development.1.4 Pre‐construction

    investigationse.g.borehouses,soiltesting?

    No

    1.5 Constructionworks?

    Yes Residentialproject1.6 Demolitionworks?

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4

    Sr.No.

    Information/Checklistconfirmation

    Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

    1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?

    Yes Temporary sheds will be provided forworkers

    1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations

    No

    1.9 Undergroundworksincludingminingortunnelling?

    No

    1.10 Reclamationworks? No1.11 Dredging? No1.12 Offshorestructures? No1.13 Productionand

    manufacturingprocesses?No

    1.14 Facilitiesforstorageofgoodsormaterials?

    Yes Onlyconstructionmaterialwillbestored intemporarystoragesite

    1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?

    Yes Mechanical composting for Solid WasteDisposal and Sewage Treatment Plant forsewagedisposal.

    1.16 Facilitiesforlongtermhousingofoperationalworkers?

    No

    1.17 Newroad,railorseatrafficduringconstructionoroperation?

    No

    1.18 Newroad,rail,airwaterborneorothertransportinfrastructureincludingneworalteredroutesandstations,ports,airportsetc?

    No Existing roadwill beused for the transportpurpose.

    1.19 Closureordiversionofexistingtransportroutesorinfrastructureleadingtochangesintrafficmovements?

    No

    1.20 Newordivertedtransmissionlinesorpipelines?

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5

    Sr.No.

    Information/Checklistconfirmation

    Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

    1.21 Impoundment,damming,culverting,realignmentorotherchangestothehydrologyofwatercoursesoraquifers?

    No

    1.22 Streamcrossings? No1.23 Abstractionortransfersof

    waterformgroundorsurfacewaters?

    No

    1.24 Changesinwaterbodiesorthelandsurfaceaffectingdrainageorrun‐off?

    No There will not be any changes in waterbodiesorthelandsurface

    1.25 Transportofpersonnelormaterialsforconstruction,operationordecommissioning?

    Yes Construction workers and constructionmaterial

    1.26 Long‐termdismantlingordecommissioningorrestorationworks?

    No

    1.27 Ongoingactivityduringdecommissioningwhichcouldhaveanimpactontheenvironment?

    No

    1.28 Influxofpeopletoanareaineithertemporarilyorpermanently?

    Yes Only Constructionworkerswill stay duringconstructionphaseandofficepersonnel

    1.29 Introductionofalienspecies?

    No Nointroductionofalienspecieswilloccurasthisisresidentialproject

    1.30 Lossofnativespeciesorgeneticdiversity?

    No Nothreatofspecieslosswilloccur

    1.31 Anyotheractions?

    No No2 UseofNaturalresourcesforconstructionoroperationoftheProject(suchasland,

    water,materialsorenergy,especiallyanyresourceswhicharenon‐renewableorinshortsupply):

    Sr.No. Information/checklistconfirmation

    Yes/No Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

    2.1 Landespeciallyundevelopedoragriculturalland(ha)

    No

    2.2 Water(expectedsource&competingusers)unit:KLD

    Yes TotalWaterdemandwillbe334 KLDThedetailedwaterbalanceisattachedas

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6

    AnnexureIV2.3 Minerals(MT) No2.4 constructionmaterial–

    stone,aggregates,sand/soil(expectedsource–MT)

    Yes Stoneaggregatesdemandwillbesourcedfromnearbylocalvendors

    2.5 Forestsandtimber(source–MT)

    Yes Onlydoorframes(ifsoplanned)2.6 Energyincludingelectricity

    andfuels(source,competingusers)Unit:fuel(MT),energy(MW)

    Yes Totaldemandload:3.2MW SourceofElectricity:MSEDCL

    2.7 Anyothernaturalresources(useappropriatestandardunits)

    No

    3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concernsaboutactualorperceivedriskstohumanhealth.

    Sr.No. Information/Checklistconfirmation

    Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

    3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)

    Yes Used oil from DG sets will be given toauthorisedrecyclers

    3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)

    No

    3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?

    No ProposedProjectwillnotaffectthewelfareofpeople

    3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,

    No Proposed Project will not affect hospitalpatients, children etc. as these are locatedawayfromprojectsite

    3.5 Anyothercauses No4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)

    Sr.No. Information/Checklist

    confirmationYes/No Detailsthereof (withapproximate

    quantities/rates,whereverpossible)withsourceofinformationdata

    4.1 Spoil, overburden orminewastes

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7

    4.2 Municipalwaste(domesticandorcommercialwastes)

    Yes TotalSolidWasteGenerationwillbe1235kg/day

    4.3 Hazardouswastes(asperHazardousWasteManagementRules)

    No Used oil from DG set will be given toauthorisedrecyclers.

    4.4 Other industrial processwastes

    No No,ThisisaResidentialProject4.5 Surplusproduct No NotApplicable4.6 Sewagesludgeorother

    sludgefromeffluenttreatment

    Yes Usedasmanure

    4.7 Construction ordemolitionwastes

    No NotApplicable4.8 Redundantmachineryor

    equipmentNo NotApplicable

    4.9 Contaminatedsoilsorothermaterials

    No NotApplicable4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable

    5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)

    Sr.No.Information/Checklistconfirmation

    Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

    5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources

    No NotApplicable

    5.2 Emissionsfromproductionprocesses

    No NotApplicable5.3 Emissions from materials

    handling including storageortransport

    Yes Fugitiveemissionfromhandlingsuchassand,aggregates,cementetc.

    5.4 Emissions fromconstruction activitiesincluding plant andequipment

    Yes Transportationofconstructionmaterial,DGsetsetc.

    5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste

    Yes Transportation, loading and unloading ofmaterialwillgeneratedust

    5.6 Emissionsfromincinerationofwaste

    No NotApplicable5.7 Emissions from burning of

    wasteinopenair(e.g.slashmaterials, constructiondebris)

    No NotApplicable

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8

    Sr.No.

    Information/Checklistconfirmation

    Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

    5.8 Emissions from any othersources

    No NotApplicable

    6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:

    Sr.No.Information/Checklistconfirmation

    Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdatawithsourceofinformationdata

    6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers

    Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets

    6.2 From industrial or similarprocesses

    No NotApplicable6.3 Fromconstructionor

    demolitionYes Increase in noise levels due to operation of

    construction equipments & vehicularmovement emissions from vehicles & DGsets

    6.4 Fromblastingorpiling No OpenFoundation6.5 Fromconstructionor

    operationaltrafficYes Traffic during construction phase is

    negligible and during operation phase ismore.

    6.6 From lighting or coolingsystems

    No NotApplicable6.7 Fromanyothersources No NotApplicable

    7. Risks of contamination of land or water from releases of pollutants into the

    groundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:

    Sr.No. Information/Checklistconfirmation

    Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata

    7.1 Fromhandling,storage,useorspillageofhazardousmaterials

    Yes DuetospillageofusedoilfromDGset

    7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)

    No STPwillbeused.SurplusTreatedWaterwillbedischargedinMunicipalSewerLines

    7.3 By deposition ofpollutantsemittedtoairinto the land or intowater

    No NotApplicable

    7.4 Fromanyothersources No NotApplicable7.5 Is there a risk of long No NotApplicable

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9

    Sr.No. Information/Checklistconfirmation

    Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata

    term build up ofpollutants in theenvironmentfromthesesources?

    8. RiskofaccidentsduringconstructionoroperationoftheProject,which

    couldaffecthumanhealthortheenvironment

    Sr.No. Information/Checklistconfirmation

    Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

    8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances

    No NotApplicable

    8.2 Fromanyothercauses

    No NotApplicable8.3 Couldtheprojectbe

    affectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?

    No The proposed structure is designed as perSeismicZoneIIIstandards.

    9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which

    could leadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality

    Sr.No. Information/Checklist

    confirmationYes/No Details thereof (with approximate

    quantities/rates, wherever possible) withsourceofinformationdata

    9.1

    Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10

    •extractiveindustries•supplyindustries•other

    9.2 Lead to after‐use of thesite,which couldhaveanimpact on theenvironment

    No NotApplicable

    9.3 Set a precedent for laterdevelopments

    No NotApplicable9.4 Havecumulativeeffects

    duetoproximitytootherexistingorplannedprojectswithsimilareffects

    No NotApplicable

    (III)EnvironmentalSensitivity

    Sr.No.Areas Name/

    IdentityAerialdistance(within15km.)Proposedprojectlocationboundary

    1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue

    Yes SonegaonAirport:7.80kmAmbazariLake:8.29KmsPhutalaLake:9.9Kms

    2 Areaswhichareimportantor sensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies,coastalzone,biospheres, mountains,forests

    Yes Ambazari Lake:8.29KmsPhutalaLake:9.9Kms

    3 Areas used by protected,important or sensitivespecies of flora or faunafor breeding, nesting,foraging, resting, overwintering,migration

    No

    4 Inland, coastal, marine orundergroundwaters

    Yes Ambazari Lake:8.29KmsPhutalaLake:9.9Kms

    5 State,Nationalboundaries No6 Routesorfacilitiesusedby

    thepublicforaccesstorecreationorothertourist,pilgrimareas

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11

    Sr.No.

    Areas Name/

    IdentityAerialdistance(within15km.)Proposedprojectlocationboundary

    7 Defenceinstallations No8 Densely populated or

    built‐upareaYes Fullyurbanisedarea

    9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)

    Yes Hospitals, schools, colleges, communityfacilities& places of worship are presentaround the Project site. These places fallunderNagpurMunicipalCorporation

    10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

    No

    11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)

    No

    12 Areas susceptible tonatural hazard whichcouldcausetheprojectto present environmentalproblems(earthquakes, subsidence,landslides, erosion,floodingor extreme or adverseclimaticconditions)

    No

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    (IV). ProposedTermsofReferenceforEIAstudies

    Iherebygivenundertakingthat thedata&informationgivenintheapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedataandinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:18.01.2017Place:Nagpur GauravDAgarwal PushkarHomesPvt.Ltd.

    Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:

    1) The projects involving clearance under Coastal Regulation Zone Notification, 1991 shallsubmitwiththeapplicationaC.R.Zmapdulydemarcatedbyoneoftheauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR)andtherecommendationsoftheStateCoastalZonemanagementAuthority(atthestageofEC).SimultaneousactionshallalsobetakentoobtaintherequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.

    2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere

    Reserves,MigratoryCorridorsofWildAnimals, theprojectproponent shall submit themapduly authenticated by Chief Wildlife Warden showing these features vis‐avis the projectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)

    3) All correspondence with the ministry of Environment & Forests including submission ofapplication forTOR/Environmental Clearance, subsequent clarifications asmaybe requiredfromtimetotime,participationintheEACmeetingonbehalfoftheprojectproponentshallbemade by the authorised signatory only. The authorised signatory should also submit adocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13

    APPENDIX‐II(Seeparagraph6)

    FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)

    CHECKLISTOFENVIRONMENTALIMPACTS

    (ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand

    submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)1. LANDENVIRONMENT

    (Attachpanoramicviewoftheprojectsiteandthevicinity)1.1 Willtheexistinglanduseget

    significantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.

    Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.ProposeddevelopmentisinlinewithD.PFollowingdocumentsareattachedassupportingdocuments.1. ConceptualPlanisattachedasANNEXUREII

    1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.

    TotalPlotArea 30,800 m2

    NetPlotArea 24,910.86 m2

    Built‐upAreaDetails

    F.S.Iarea 32,384.12 m2

    NonF.S.Iarea 16,435.50 m2

    TotalConstructionArea 48,819.63 m2

    WaterConsumption

    TotalWaterConsumption

    334 KLD

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14

    EnergyConsumption

    TotalEnergyConsumption

    764 kW

    ParkingProvided

    Details Parking(Nos)ParkingProvided

    4Wheeler 2902Wheeler 1060Bicycle 1060Connectivity Locationplanisattached

    asANNEXUREIII1.3 Whatarethelikelyimpactsofthe

    proposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).

    Theprojectbeingawellplannedactivitywillresultin organized open spaces and green areas. Thebiodiversity in the area will increase due toproposedgreenareas.Communitycumrecreationalfacilitieswillbedevelopedhencenostressontheexistingfacilityisanticipated.

    1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).

    Themainreasonsforerosionareoverexploitationofgroundwater,instableslopes,landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas,whichwouldreduce thechancesoferosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.

    1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)

    Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15

    1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)

    Cuttingandfillingforconstructionactivity arebalanced,sonotransportationofearthwillberequired

    1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.

    SupplySource:NIT,Existingwell

    1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)

    Nowetlandsandlow‐lyingareasonthesite.

    1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)

    Nohealthhazard.Minorquantityofconstructiondebriswillbegeneratedwhichwillbesentoutside.

    2. WATERENVIRONMENT

    2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreak‐upofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.

    EnclosedasANNEXUREIVSOURCE:NIT,Existingwell

    2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?

    TheproposedwaterdemandwillbemetfromNIT,Existingwell

    2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)

    Waterwillbesourced:NIT,Existingwell

    2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesand

    TreatedwaterfromSTPwillbeusedforflushingintoiletandgardeningTotalsewagegenerated 311 KLDTotalSTPcapacity 325 KLD

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16

    usage)

    Treatedwaterrecycledforflushing

    112 KLD

    Treatedwaterforgardening 15 KLDSludgegenerated 3 KLDExcesstreatedwater 180 KLD

    2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)

    Nodiversionisanticipated

    2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)

    The total sewage of about 311 KLD will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatmentParameters Values UnitspH 7‐8 mg/lBOD 250‐300 mg/lCOD 450‐600 mg/lO&G/ABS 10‐20 mg/lTSS 100‐200 mg/lMitigation measures: Domestic Effluent will betreated in the SewageTreatment plant of capacity325m3. The treated sewage water will be reusedforflushingandgardening.

    2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.

    Theprojectactivityshallhaverainwaterharvestingonly of rainfall on terraces.Surface rainwaterwillbeconnectedtothestormwaterdrainagesystem

    2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?

    ProposeddevelopmentisintunewithD.PofNITTheprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17

    2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)

    In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasNIT,Existingborewell.Rainwaterharvesting schemewill bepracticed forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.

    2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)

    Topreventdegradationandmaintainthequalityofwatersource,adequatecontrolmeasureshavebeenproposed to check the surface run‐off, as well asuncontrolledflowofwaterintoanywaterbody. Avoidexcavationduringmonsoonseason. Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.

    Following methods can increase efficiency ofrainwaterharvestingandrecharginggroundwater. Catchdrainageall along theperipheryofplot topreventsurfacerunoff.

    Reduceandfiltersurfacerunoff. Usevegetatedswalesanddepressions to reducerunoff.

    2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)

    Duringrainyseason,aftertherainfallsomepartoftherainwaterpercolates into thegroundand joinsground water table, a part is retained as soilmoisture, some part is lost in evapotranspirationand the remaining part overflows as stormwaterrunoff. The quantity of runoff reaching the sewersordrainsisconsiderableascomparedwithsanitarysewageTheprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcerned authority. So therewill not be problemofwaterloggingduetothisproject.

    2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)

    No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soak pits. Solid waste will be disposed off inmunicipalwastedisposalsystem.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18

    2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)

    The Sewage Treatment Plant (STP) is designed totreat the raw waste water generated fromResidentialbuildingSewagegeneration:311KLDTreatedwatertoberecycledforgardening:15KLDTreatedwaterrecycledforflushing:112KLD

    2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.

    Yes,dualplumbingwillbeprovided

    3. VEGETATION

    3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithitsuniquefeatures,ifany)

    Thereisnosensitiveecosystempresentatsitethatwill be disturbed by the project, as existing landuseinsurroundingareaisResidential

    3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)

    3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)

    About 3086.50 m2 of areas are provided for thedevelopment of Green belt in the premises. Thegreen belt will be developed for control ofpollutionandaestheticviewofthecomplex

    4. FAUNA

    4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.

    No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals

    4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.

    No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.

    4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna

    SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19

    5. AIRENVIRONMENT

    5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)

    TheProjectwillresult innegligible increase intheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic.Theproposedactivitywillnot result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.

    5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.

    Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM,NOX and COemissions are expected due to fuel combustion ingeneratorsets.

    5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.

    TotalParkingprovided:4wheelers:290nos.2Wheelers:1060nos.Bicycles:1060nos.

    5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.

    Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex

    5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.

    Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.

    5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.

    DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.TheDGSetsshallbeaspertheguidelineslaiddownby EPR for specific noise emission standards.Measures shall be taken for reduction of noise byusingacousticenclosures.Noise emissions are expected from variousconstructionequipmentandmachinerybutwillnotresultinanimpact.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20

    6. AESTHETICS

    6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?

    The proposed land use of the site would beresidentialand will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganisedopenareas and landscapedareas are atthecentresothatallcanenjoythegreenareas.

    6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?

    Internal roads, footpaths/ pedestrian pathwayshavebeenplannedwithintheproposedcomplex

    6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.

    The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.

    6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.

    No anthropological or archaeological sites orartefactsarefoundnearthesitearea.

    7. SOCIO‐ECONOMICASPECTS

    7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.

    No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.

    7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.

    The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.

    7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?

    No. The Projectwill havepositive impact on localcommunities.

    8. BUILDINGMATERIALS

    8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterials

    Yesthebuildingmaterialswithhighembodiedenergywillbeused.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21

    andtheirenergyefficiency)8.2 Transportandhandlingof

    materialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?

    Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill beused.Regularmaintenance ofthe equipments will be carried out. Theconstruction activities will be carried out duringthe daytime only. The workers exposed to highnoisegeneratingwouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.

    8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?

    Fly ash in cement concrete. Typically 20‐ 25%offlyashissubstitutedincement.

    8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.

    Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:1235kg/day

    9. ENERGYCONSERVATION

    9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?

    Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.TotalEnergyConsumption

    764 kW

    DGSetCapacity 200 kVA9.2 Whattypeof,andcapacityof,

    powerback‐uptoyouplantoprovide?

    DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.Total 200 kVA

    9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?

    Reflective+A12+6mmdoubleglazing

    9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.

    The building structure will be designed in such away that solar light can be utilised maximum fordaytime.

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22

    9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.

    Solar street lights are proposed in areas suchas/openspaces/commonarea/pathways/RG/etcSolarhotwatersystemswillbeprovided

    9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?

    Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.

    9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.

    Yes. The rooms will be so dimensioned thateffectiveairconditioningcanbecarriedout.Publicareas will be cooled by natural ventilation. Thedesign of the buildingwill be such that maximumuse of natural ventilation can be achieved. Thewalls, roofs and openingswill be so designed thatinfluxofheatisminimum.

    9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?

    Heatemission from theproposedconstruction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheatgeneratedwillnotbesignificantandwillbedissipated in the lushgreensandopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.

    9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.

    UvalueinWatts/hr/m2/CRoof 0.409 Watts/hr/m2/C

    Wall 0.44 Watts/hr/m2/C

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23

    9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.

    The fire fighting system shall comprise of hydrantsystemandportableextinguishers.Smokedetectorswill be provided along with manual call points.Externalyardhydrantsshallbeinstalledaroundallbuildings in the complex in galvanized steel firehose cabinet (weather proof). All external yardhydrantsshallbeatonemeterheightfromfinishedgroundlevelasperNationalBuildingCode.Externalfirehydrants shall be located such that noportionofanybuilding ismore than45m fromahydrant,and the external hydrants are not vulnerable tomechanicalorvehiculardamage.

    9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.

    NotApplicable

    9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.

    Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat

    thewindowsaresealed,willbeprovided. Summer cross section ventilation will be

    maximum.9.13 Towhatextentthenon‐

    conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.

    NotApplicable

    10. EnvironmentManagementPlan

    TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.

    EnclosedasAnnexureV

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24

    ANNEXUREIAreaStatement

    Sr.No. Details m2

    1 F.S.IArea 32,384.1212 NonF.S.IArea 16,435.503 TotalConstructionArea 48,819.63

    Details of the layout Sq. Mt. 

    Total land as per 7/12 abstract 30800.000Total land as per K‐Prat abstract 30800.000Land under layout (Gross Area) 30800.000

    For Group Housing Area StatementArea of land as per 7/12  30800.000Minimum area of land as per K‐prat 30800.000Gross Area Under Layout  30800.000 100.000%Area under open space 3086.500 10.021%Area under Amenity space 3121.264 10.134%Area under service road/ road widening, as per clause 24.1 0.000

    NA1 ‐ Net plot area for layout @ 90% of area excluding amenity space, & area for road widening and service road as per clause 24.1, from Gross area under layout, as per clause 13.4.1 of SDCPR = 90% (30800 ‐ (3121.264+0.00) sqmt. = 90% (3800‐3121.264)=90% 27678.736 sqmt. =

    24910.863

    NA2 ‐ Area under D.P. / R.P. Roads + Area for road widening and service road as per clause 24.1

    0.000

    NA = Net Plot Area = NA1 + NA2 24910.863

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    ANNEXUREIIConceptualPlan

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26

    ANNEXUREIIILocationPlan

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27

    ANNEXUREIV

    WaterBalanceStatement

    *BasisforwatersupplyistakenfromBIS:NationalBuildingCodeofIndia2005:Part9Page19

    Particulars No of Flats /rooms /Cars Occupancy Total

    Population

    Water Requirement

    Basis (in lpcd)*

    Total Water Requirement/

    person

    Water Demand KLD

    Domestic Flushing Residential Wings 488 5 2,440 90 45 135 329

    Shops 26 3 78 15 30 45 4

    Total 333 Swimming pool 1 Total 2,518 334

    Sewage Generation

    90 % of Domestic & 100 % of Flushing Requirement 311

    Sludge 1 % of Sewage Generation 3

    Recycling for Flushing

    Residential Wings 488 5 2,440 45 45 110

    Shops 26 3 78 30 30 2 Total 2,518 112 Recycling for Gardening 3,086.50 5l/m2 15Total Recycled Water 128Excess Treated Water 180

  • ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28

    ANNEXUREVEnvironmentalManagementPlanduringConstructionPhase

    Sr.No.

    EnvironmentalComponents PredictedImpacts ProbablesourceofImpact MitigationMeasures Remarks

    CONSTRUCTIONPHASE1. AmbientAir

    QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.

    Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.

    Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments

    Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.

    2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.

    NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets

    Useofwellmaintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.

    Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.

    3. Water Nosignificantnegativeimpact.

    Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.

    Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.

    Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe

    4. Land Minornegativeimpact

    Excavation,Constructiondebris,wastefromlabourcamp.

    Reutilizationandrecyclingofconstructiondebris

    Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.

    5. Aesthetics Minornegativeimpacts

    ConstructionactivitiesandExcavation

    Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.

    Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.

  • ApplicationformforEnvironmentalClearance ProjectName:ProposedProjectatNagpur

    MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29

    EnvironmentalManagementPlanDuringFunctionalPhaseSr.No.

    EnvironmentalComponents

    PredictedImpacts

    ProbableSourceOfImpact MitigationMeasures Remarks

    FUNCTIONALPHASE

    1. AmbientAirQuality MinorNegativeimpact

    ParticulateandgaseousemissionsfromDGsetsandvehiclemovement

    UseoflowsulphurgoodfuelPeriodicmaintenanceofDGsetsUseofCNG/LPGasafuelshouldbeencouraged.

    DGsetswillbeused.

    2. Noise Minornegativeimpactinsidepremises.

    Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.

    HousingofDGsetsinbuildingswithappropriateacoustics.TrafficmanagementmeasurestoreducenoiseAppropriatetreeswhichwillactasnoisesbarrierswillbeplantedinthepremisesandalongroadside.

    ‐‐

    3. Water Nosignificantadverseimpact

    Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater

    Sewagewaterwillbetreatedandrecycled.Rainwaterharvestingandrechargeofgroundwateraquiferisproposed.Goodhousekeepingandstormwatermanagementwillbefollowed.

    Recycledwaterwillbeusedforgardeningandflushingpurpose.

    4. Land Nonegativeimpact

    Storageanddisposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.

    Treatmentandreuseofsewagewater.IntegratedwastemanagementandspillcontrolplanDrygarbagewillbesentforrecyclingandwetgarbagewillbecomposted.

    Segregationofdryandwetgarbagebeforewillbedonebeforedisposal.

    5. Biological OverallPositiveimpact

    Habitatdisturbance Greenspacesinsidethepremiseswillhelptocompensatetheearliereffectfromvegetation.Landscapingandextensiveplantationinthepremises.

    Landscapingwillhelpinreducinganyadverseimpactsonairandnoisequality.

    6. Socio‐economic Overallpositiveimpact

    Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.

    ‐‐ Positiveandlongtermimpact‐

    7. TrafficPattern NosignificantImpact

    Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.

    TrafficManagementpractiseswillbeemployed.Adequateparkingspacewillbeprovidedinthepremises.