Forensic evaluation of pavement failure Using GPR
and UAV technology
Vahid Ganji, Ph.D., P.E. Pavement Department Manager, Michael Baker International
Robert Blight Supervising Engineer, NJDOT
Megan Kelly FAA Certified UAV Specialist, Michael Baker International, Inc.
September 18,
2019
Pavement Evaluation 2019 Conference
![Page 2: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/2.jpg)
• Introduction
• Field Testing
• Recommendations
• Conclusions
Presentation Outline
2
![Page 3: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/3.jpg)
• The ramp from Route 52 WB to North Shore Road in City of Somers Point, NJexhibited pavement failures that required frequent patching.
• The ramp was constructed between 2011 and 2012 as part of a project to eliminatethe traffic circle at this location and premature failures were unexpected.
Introduction
3
![Page 4: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/4.jpg)
• Pavement Coring & Dynamic Cone Penetration (DCP) Testing
• GPR (Ground Penetration Radar)
• Visual Survey
• UAV Survey (Unmanned Aerial Vehicle)
Field Testing
4
![Page 5: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/5.jpg)
• Five (5) core samples were extracted from the pavement.
• DCP testing was conducted for three (3) of the cores.
• Based on the core and GPR results, the pavement AC thicknessvaries from 9” to 14” (average 10”).
• The aggregate base layer appears to have been stabilized andDCP could not penetrate indicating California Bearing Ratio(CBR) values more than 100%.
• The relatively thick pavement, strong aggregate base layer, andlight traffic indicate that the pavement is structurally adequate.Hence, the cause of the pavement failure is not the structuralcapacity of the pavement.
GPR & Pavement Coring
5
![Page 6: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/6.jpg)
6
Core Results
![Page 7: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/7.jpg)
• The core results indicated significant stripping of the Hot MixAsphalt (HMA) surface course in the failed area due toprolonged presence of stagnant water on pavement.
Core Results
7
Core 1 (Failed area)
HMA Stripping in Surface Course
![Page 8: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/8.jpg)
Core 2 (Failed Area; Severe HMA Stripping)
Core Results
8
Core 4 (Failed Area)
HMA Stripping in Surface Course
![Page 9: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/9.jpg)
Core 3 (Slight HMA Stripping)
• The HMA stripping was less severe further from the failed area.
• Failed pavement area has been subjected to prolonged presenceof stagnant water that intensifies HMA stripping.
Core Results
9
Core 5 (No HMA Stripping)
![Page 10: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/10.jpg)
Refusal
• DCP Testing Indicated a Strong Pavement Base (CBR>100%)
DCP Results
10
![Page 11: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/11.jpg)
• GPR testing was conducted using two GSSI 2 GHz air-coupledantennas.
GPR Results
11
![Page 12: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/12.jpg)
12
GPR Results
![Page 13: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/13.jpg)
• considerable amount of deposited aggregates observed along the northbound curb on North Shore Road.
• The increasing aggregate deposits are indicative of reduced water velocity (due to decreased slope).
Visual Field Survey
13
![Page 14: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/14.jpg)
• A review of the pavement surface condition within the project area indicated that the pavement surface course placed circa 2012 shows signs of raveling and loss of aggregate, which can be the source of quarry processed aggregates along the curb.
Visual Field Survey
14
Significant Amount of Quarry-Processed Aggregates Deposit
at Sta. 104+60Raveling
![Page 15: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/15.jpg)
• UAV survey was done on 2/22/2019. The traffic was stoppedfrom the survey area for 3 minutes to fly the UAV and collect theaerial photos.
• The 3-D point cloud mapping can be viewed at the addressbelow using Google Chrome here
UAV Survey
15
![Page 16: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/16.jpg)
UAV Survey
16
![Page 17: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/17.jpg)
UAV Survey: Point Cloud Imagery
17
Pavement Failure Area
![Page 18: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/18.jpg)
UAV Survey: Slope Measurement
18
![Page 19: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/19.jpg)
19
Deposited Aggregates Inhibiting Flow of Water
![Page 20: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/20.jpg)
• A visual survey of the project area indicated that the pavementfailure area is at a low point receiving surface runoff water fromthe N. Shore Road Sta. 104+00 to Sta. 107+70.
• There are four inlets to catch the surface runoff water. Due tothe relatively steep slope north of Sta. 104+46, it is expectedthat majority of the water is to be captured by Inlets 1 and 2 nearthe low point of the roadway.
• Inlets 1 and 2 do not seem to coincide with the low point of theroadway (next slide). The low point is approximately 15’ north ofthe inlets
Analysis
20
![Page 21: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/21.jpg)
Analysis
21
![Page 22: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/22.jpg)
Analysis
22
Inlets 1 and 2 Do Not Coincide with Low Point of Road
Approximate Location of
Low Point of Road
Inlets 1 & 2
![Page 23: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/23.jpg)
23
Deposited Aggregates Inhibiting Flow of Water
Inlets 1 & 2
Deposited Aggregates Inhibiting Flow of Water
Low Point
![Page 24: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/24.jpg)
• The cause of pavement failure at the ramp from Route 52 to North Shore Road is a combination of:
Surface course prone to raveling
Stagnant water on the pavement due to the roadway geometry
Aggregate deposits
• The pavement does not have structural issues.
Conclusions
24
![Page 25: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/25.jpg)
• Seal coat the pavement that was placed circa 2012 betweenStations 103+90 to 109+90 (600’) to delay further raveling andloss of aggregates.
• Remove the surface course in the failed pavement area to adepth of 4” and replace with a binder rich mix that can resistHMA stripping better. Use of anti-stripping agents in the mixmay be considered.
• Regularly remove the deposited aggregates to allow for freeflow of surface run-off water and avoid ponding potential.
Short-Term Recommendations
25
![Page 26: Forensic evaluation of pavement failure Using GPR and UAV ... · exhibited pavement failures that required frequent patching. • The ramp was constructed between 2011 and 2012 as](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb8839de737600d205cc62c/html5/thumbnails/26.jpg)
• Mill 3” of the pavement from the intersection of Route 52 to Sta.109+90 to remove the raveled surface course and overlay with abinder rich surface course resistant to HMA stripping. Use ofanti-stripping agents may be considered.
• Survey the area and study drainage issues.
• Use of concrete curb and gutter may be considered to betterchannel the surface run-off water into the inlets.
Long-Term Recommendations
26