HOT TAP PACKAGE COMMENTS RESOLUTION SHEET 1 of 1 Rev.0 Sr No. Drawing No Comment Description Standard Reference Gas Response Remarks 1 Contractor to provide the RFIs of the sticker fabrication, welding of the 10” flange and the 1” weld boss 10" flange welding has been done and Signed RFI has attached , For the 1" Boss welding not yet done due to obstacle of pad welding, Hence it will be done at the site. 2 Sticker weld summary report along with RT and PT/MT reports to be attached to the package for review 10 " Flange welding RT has been done and report is attached for confirmation, since the Boss welding is not done yet RT/MT reports will be provided upon completion of the weld during the Hot tap activities. 3 The hot tap material shall be physically presented in their respective tie-in location and properly identified at the time of Inspection. Contractor shall raise RFI for the hot tap material verification using SAIC-L-2029 before starting any activities. The Hot tap material has been inspected by PID , RFI is attached for varification, Moreover the fabricated Stoople spool and remaining material will be presented at the site to varifing the from the respective department. 4 The hot tap shall be conducted within 90 days of the UT reading (i.e. before October 30, 2015). Noted, and will comply accordingly. Hot Tap Package Comment resolution GAS Arabian Services Company Ltd Dammam Comment Resolution sheet

Upload: hamid-ali-joyia

Post on 12-Apr-2016

55 views

Category:

Documents


14 download

DESCRIPTION

Hot Tap Package

TRANSCRIPT

Page 1: For Hot-tap Package Required Documents

HOT TAP PACKAGE COMMENTS RESOLUTION SHEET 1 of 1 Rev.0

Sr No. Drawing No Comment Description Standard Reference Gas Response Remarks

1Contractor to provide the RFIs of the sticker fabrication, welding of the 10” flange and the 1” weld boss

10" flange welding has been done and Signed RFI has attached , For the 1" Boss welding not yet done due to obstacle of pad welding, Hence it will be done at the site.

2

Sticker weld summary report along with RT and PT/MT reports to be attached to the package for review

10 " Flange welding RT has been done and report is attached for confirmation, since the Boss welding is not done yet RT/MT reports will be provided upon completion of the weld during the Hot tap activities.

3

The hot tap material shall be physically presented in their respective tie-in location and properly identified at the time of Inspection. Contractor shall raise RFI for the hot tap material verification using SAIC-L-2029 before starting any activities.

The Hot tap material has been inspected by PID , RFI is attached for varification, Moreover the fabricated Stoople spool and remaining material will be presented at the site to varifing the from the respective department.

4The hot tap shall be conducted within 90 days of the UT reading (i.e. before October 30, 2015).

Noted, and will comply accordingly.

Hot Tap Package Comment resolution

GAS Arabian Services Company Ltd Dammam

Comment Resolution sheet

Page 2: For Hot-tap Package Required Documents
Page 3: For Hot-tap Package Required Documents
Page 4: For Hot-tap Package Required Documents
Page 5: For Hot-tap Package Required Documents
Page 6: For Hot-tap Package Required Documents
Page 7: For Hot-tap Package Required Documents
Page 8: For Hot-tap Package Required Documents
Page 9: For Hot-tap Package Required Documents