for coordinators of ongoing and new eco …...1 for coordinators of ongoing and new eco-innovation...

6
1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports and deliverables through the Participant Portal (PP) How to submit Progress, Interim, and Final Reports using PP o Since recently, it is possible to submit Progress reports (PR) as well as technical parts of Interim (IR) and Final reports (FR) directly into the IT system of EASME, using the PP. Please from now on, use this functionality and do not anymore send us paper versions unless your EASME Project Officer requests you to do so. o If you need to submit deliverables together with a PR, IR and FR please do so by following instructions on page 5. o Please note: once you submit the Progress, Interim, and Final Reports through PP, please do not forget to submit the reports (that you created through PP) also as deliverables in the Deliverables section in PP. o Please note: the originally signed and dated financial reports still need to be sent to EASME by mail (2 hard copies) in addition to electronic submission by email. 1. Go to PP: http://ec.europa.eu/research/participants/portal/desktop/en/home.html. Log in with your user name and password.

Upload: others

Post on 28-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

1

For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013)

Step by step manual for submitting technical reports and deliverables through the

Participant Portal (PP)

How to submit Progress, Interim, and Final Reports using PP

o Since recently, it is possible to submit Progress reports (PR) as well as technical parts

of Interim (IR) and Final reports (FR) directly into the IT system of EASME, using the

PP. Please from now on, use this functionality and do not anymore send us paper

versions unless your EASME Project Officer requests you to do so.

o If you need to submit deliverables together with a PR, IR and FR please do so by

following instructions on page 5.

o Please note: once you submit the Progress, Interim, and Final Reports through PP,

please do not forget to submit the reports (that you created through PP) also as

deliverables in the Deliverables section in PP.

o Please note: the originally signed and dated financial reports still need to be sent to

EASME by mail (2 hard copies) in addition to electronic submission by email.

1. Go to PP: http://ec.europa.eu/research/participants/portal/desktop/en/home.html. Log in with

your user name and password.

Page 2: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

2

2. Choose your project by "Project ID" number. Press the button "Work With"

3. Select "Reports"

Page 3: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

3

4. Select the "Report type" and select "Create New Report"

5. Fill in the Project reporting fields based on your project progress. Follow the instructions on the

screen to fill in and eventually submit the form.

Page 4: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

4

6. Once you are done inputing information into allocated fields choose "Save" and "Submit". Your

Project and Financial officers will receive an email notification that you have submitted a report.

7. IMPORTANT: After you have submited the report, the system will save the file as PDF in the project

profile (to see it, go to the "Reports" on the left hand side menu and select the report in question).

Please save the file on your computer and submit it as deliverable.

Page 5: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

5

How to submit Deliverables using Participant Portal

8. Follow the steps 1, 2 above to get to the screen where you can select "Deliverables":

9. Select which deliverable you want to update:

Page 6: For coordinators of ongoing and new ECO …...1 For coordinators of ongoing and new ECO-Innovation projects (2011, 2012, and 2013) Step by step manual for submitting technical reports

6

10. Upload the file:

10. Submit the deliverable by pressing "Submit" button:

Approval of the reports and deliverables from the EASME side will be done by email.