![Page 1: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/1.jpg)
1
TPDC Paper No. EHW 51/2016 For Consideration by
The Environment, Housing and Works Committee on 13 July 2016
Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot Trial - To Set Up a Food Waste Pre-treatment Facilities at Existing Shuen Wan Leachate Pre-treatment Plant
1. PURPOSE
1.1. This paper briefs Members on the proposed food waste pre-treatment
facilities for the food waste/sewage sludge anaerobic co-digestion pilot trial to be built at the existing Shuen Wan leachate pre-treatment plant in Tai Po.
2. BACKGROUND
2.1. The Government has set out in the Food Waste & Yard Waste Plan for Hong
Kong (the Food Waste Plan) unveiled in February 2014 that Hong Kong needs to build a network of around five to six organic waste treatment facilities (OWTFs) with a total recycling capacity of about 1,300 to 1,500 tonnes per day to recycle food waste to energy.
2.2. Apart from constructing new facilities, we are exploring the use of existing sewage treatment facilities for food waste/sewage sludge anaerobic co-digestion as an additional part of the network of OWTFs to help raise Hong Kong's food waste treatment capability.
2.3. As a new environmental protection initiative in the 2016 Policy Address and
Policy Agenda, we will commence a food waste/sewage sludge anaerobic co-digestion pilot trial to confirm the feasibility of food waste/sewage sludge anaerobic co-digestion and determine the technical requirements for using such technology to convert food waste to energy. Results of the trial will provide the basis for our formulation of medium to long-term development roadmaps and action plans.
2.4. The pilot trial will be jointly carried out by the Drainage Service Department
(DSD) and Environmental Protection Department (EPD). A food waste
![Page 2: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/2.jpg)
2
pretreatment facilities will be set up at the existing Shuen Wan leachate pre-treatment plant site to provide up to 50 tonnes per day of pre-treated food waste to the existing sewage sludge anaerobic digestion systems at the Tai Po Sewage Treatment Works (STW) for co-digestion. For the site location, please refer to Appendix 1.
2.5. EPD will be responsible for the food waste sourcing, pre-treatment facilities
construction and conveying the pre-treated food waste to a designated anaerobic digester at the Tai Po STW for co-digestion.
2.6. The pilot trial will last for about 6 years.
3. FOOD WASTE PRE-TREATMENT FACILITIES 3.1. The Investigation, Design and Construction (IDC) consultancy for the food
waste treatment facilities commenced on 14th October 2015. The consultant has completed the engineering feasibility study, environmental review and reference design, and is preparing the tender for the Design, Build and Operate (DBO) contract. The consultant will also carry out site supervision and project management, and undertake performance monitoring and review during the commissioning phase.
3.2. The food waste pre-treatment facilities (FWPF) will consist of the following
major components: Reception area; Shredder and impurity separation system; and Deodourisation system.
3.3. The FWPF will be implemented through a DBO contract arrangement. The
design and construction works will commence in the first half of 2017 for completion and commissioning in the first half of 2018. The pilot trial will last for 6 years until 2024.
3.4. During the first 2 to 3 years of operation, the amount of food waste to be treated would be about 20-30 tonnes per day on average to test for the mixing ratio of food waste and sewage sludge as well as various operation parameters; and gradually built up to a maximum of about 40-50 tonnes per day in the later stage of the pilot trial.
![Page 3: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/3.jpg)
3
4. KEY FINDINGS OF THE ENVIRONMENTAL REVIEW 4.1. The Consultant has completed the environmental review and ascertained the
likely nature and extent of environmental impacts on air quality, water quality, landfill gas hazard, noise, landscape & visual arising from the FWPF. Where necessary, the environmental review has recommended mitigation and control measures to reduce the environmental impacts to acceptable levels.
4.2. Upon implementation of the recommended mitigation measures, the FWPF would be environmentally acceptable and no unacceptable residual impacts are anticipated. Regular monitoring of landfill gas concentration within the boundary of the FWPF site has also been specified in Environmental Monitoring & Audit (EM&A) section in the report.
Air Quality Impacts
4.3. Potential air pollution sources during construction phase arise mainly from dust emissions from the demolition and construction activities. With the implementation of the mitigation measures as stipulated under the Air Pollution Control (Construction Dust) Regulation, no adverse construction dust impact is anticipated.
4.4. During the operational phase, completely sealed bulk collection vehicles will
be used for food waste collection, which can prevent fugitive odour and leachate leakage on the delivery route to the FWPF. No adverse air quality impact from the induced traffic for food waste collection and delivery is anticipated.
4.5. Moreover, at-source mitigation measures will be implemented to minimize
the potential odour impact from the proposed facilities during operation to environmentally acceptable level. The mitigation measures include: Enclosing all potential odour sources for extraction; Maintaining negative pressure within the facilities to avoid odour
escape; Installation of deodouriser to control odour emission via ventilation
exhaust; Directing exhaust of deodouriser vertically upwards to avoid direct
discharge towards sensitive receivers; and
![Page 4: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/4.jpg)
4
Regular inspection and maintenance of deodouriser.
Noise Impact
4.6. No representative noise sensitive receivers are identified within 300m of the FWPF boundary. The closest sensitive receiver identified is at least 400 m away from the project area. Potential noise impacts from both construction and operational phase are not anticipated. Water Quality Impact
4.7. During the construction phase, construction site runoff and sewage from site workforce are identified as potential water pollution sources. Mitigation measures including covering excavated materials, providing proper drainage systems and providing sedimentation tanks onsite, etc. have been recommended to mitigate any potentially adverse temporary water quality impacts.
4.8. During the operational phase, wastewater generated during the food waste pre-treatment process including equipment cleansing and floor cleansing will be diverted to the Tai Po STW for proper treatment. Therefore, no adverse water quality impacts are anticipated. Landscape and Visual
4.9. According to the Outline Zoning Plan of the project site, the maximum building height of the FWPF is limited to 2 storeys. The outlook design of the FWPF will blend with and be compatible with the surrounding environment. The residual landscape and visual impacts are expected to be insubstantial.
5. TRAFFIC IMPACT ASSESSMENT
5.1. During the construction phase, a maximum of 12 round trips of truck traffic
are expected to be generated per day and there should be no adverse impacts to the existing traffic.
5.2. In the early stage of operation, food waste will be collected from within the Tai Po Industrial Estate and the collection will gradually be extended to the
![Page 5: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/5.jpg)
5
wet markets in Tai Po District. The food waste collection vehicles will enter the Shuen Wan leachate pre-treatment plant via Dai Li Street next to the Tai Po STW.
5.3. Most of the food waste will be collected by sealed bulk collection vehicles in order to minimize odour impact and leachate leakage. A small amount of food waste will be collected in 240L transit skips/ bins and delivered by heavy goods vehicles to the FWPF. Capacity per bulk collection vehicle is approximately 8 to 10 tonnes and about 10 to 14 round trips are required to deliver 50 tonnes of food waste to the FWPF. On the other hand, each heavy goods vehicles with 240L bins is able to handle 2-3 tonnes of food waste, about 34 to 50 round trips are required to deliver 50 tonnes of food waste.
5.4. Assessment of future traffic condition in the study area during construction and after commencement of operation of the facilities in Years 2018 and 2021 has been undertaken. All assessed junctions would be operating satisfactorily with ample capacity during both morning and evening peaks. In addition, it is likely that the peak food waste delivery to the FWPF would be during off-peak hours of commuter traffic. Therefore, the traffic impact induced by the FWPF will be insignificant.
6. WORKS PROGRAMME 6.1. We plan to invite tenders for the DBO contract for the FWPF in Q3 2016 and
commence the construction works in early 2017 for commissioning the co-digestion pilot trial in early 2018.
6.2. We will apply for revising the permitted land use of the subject site under the section 16 planning application of the Town Planning Ordinance (Cap.131) from “Leachate Pre-treatment Works” to “Leachate Pre-treatment Works cum Food Waste Pre-treatment Facilities” in end 2016 to allow co-use of the site for both leachate and food waste treatment.
7. ADVICE SOUGHT 7.1. Members are invited to provide comments on it.
Environmental Protection Department July 2016
![Page 6: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/6.jpg)
Appendix 1
![Page 7: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited](https://reader031.vdocuments.mx/reader031/viewer/2022021818/5aabde0a7f8b9aa06a8c6dda/html5/thumbnails/7.jpg)
TS
¥Ã´I®e¾¹¡]»
·sÀy½¦ºÞ
¬ü¨È¾T¼t
¬ü¤ß¹
FC Packing (Hong Kong) Ltd.
Sunnyhose Co. Ltd.
Meyer
Maxim's Food Factory 2
1
3-5
8-10
2
ÅS¤Ñ
Open Storage
L
L
L
H
H
L
L
L
L
HL
L
L
L
L
H
¤j¶
DAI K
WAI S
TR
EE
T
±×
±×
Ramp
Ramp
5.5
5.8
5.8
5.9
6.0
6.1
6.4
¤j¶
©U§
Dai K
wai Street
Refuse
Collectio
n Point
PC3 Product Customization & Consolidation Centre
7
12
14-18
¤Ú¤h
ESS
Bus Terminus
Âo¤
Âo¤
Âo¤
Âo¤
¬
FilterBed
FilterBed
FilterBed
FilterBed
Tank
L
L
L
HL
L
L
L
L
L
H
L
HLL
L L
L
H
L
L
¤j¶
¹D
Road
5.4
5.4
5.5
5.6
5.6
5.6
5.6
5.65.6
5.6
5.7
5.7
5.8
5.8
6.3
6.3
7.0
7.5
7.6
8.2
TS
°ª¬ì¾ô¥ú³q
¬ü¨È¾T¼t
·sÀy½¦ºÞ
»´ä¯q¤O¦h¨
©}¦Ú¤ó»]
Transtech Optical Communication Company Limited
Meyer Aluminium Limited
Sunnyhose Co., Ltd.
Hong Kong Yakult Co. Ltd.
Watsons Water Centre
5
1-3
6
4
¤j®H¤
º̄ Âo¦Ã¤ô¹
TAI PO INDUSTRIAL ESTATE
ES
S
Leachate
Pre-treatment Works
Âo¤¬
Âo¤Âo¤
·Ï
WT
WT
Filter BedTank
Filter Bed Chimney
Filter Bed
WT
Chimney
L
L
H L
L
ETL
L
HH
H
L
L
LLL
H H
H
H
¤j§ DAI LI STREET
¹D
ªd
ªd
¹D
FP
Road
Track
Track
Road
8.52 8.46
EXI
STI
NG
BO
X
CU
LV
ER
T
1 : 25
1 IN 32
ACCE
SSROAD
7.00
8.20
6.25
8.96
11.69
15.73
18.97
8.42
8.37
8.45
8.44
8.46
8.468.44
8.50
5.83
5.83
5.87
6.73
6.64
5.76
5.82
5.86 5.90
5.88 5.63 5.615.95 5.92 5.90 6.11
6.16
8.51
8.56
8.51
1 : 40
1 : 40
TYPE I
VALVE CHAMBER
TYPE II
VALVE CHAMBER
TYPE III
VALVE CHAMBER
TYPE IV
VALVE CHAMBER
TYPE III
VALVE CHAMBER
8.45
8.43
8.45
8.46
8.54
8.56
9.50
10.77
11.57 13.3514.84
16.49
17.97
19.14
20.538.51
8.38
8.35
8.36
8.39
7.87
6.84
5.80
5.81
5.79
5.86
5.85
6.66
7.27
7.59
7.86
8.16
8.44
8.51
9.48
10.49
10.11
9.09
8.31
8.17
8.10
7.85
7.49
7.15
6.64
6.20
5.81
11.38 13.02
15.37
16.87
18.52
19.28
20.30
TS
TS
TS
²îÆWªh®ðShuen Wan Landfill
Gas Treatment Plant
RETAINING WALL
5.65.8
5.9
5.9
6.0
6.1
6.1
6.1
6.5
6.6
7.2
8.1
8.3
8.5
8.5
8.6
8.6
8.7
9.6
10.8
11.0
11.5
12.1
12.7
13.3 15.6
16.6
17.2
17.8
18.0
18.0
18.2
18.2
18.4
18.9
19.2
19.3
20.0
20.3
20.5
22.5
23.1
23.7
23.8
23.8
24.0
24.1
24.4
24.5
24.6
26.0
26.4
26.4
26.4
26.5
27.2
27.9
33.1
34.6
35.3
35.5
35.6
35.6
35.7
35.7
36.5
TS
TS
TS
¦æ¬
ºû×
²Ä¤@±±¨î¤¤ ¦æ¬F
³ï¥æ¤¤
²Ä¤
@¤J¤ô¤f
±±¨
¹q¾¹
¦^¬y²Jªd
¤¤¥¡±±¦Ã¤ô¤
¾÷ª
¤¤¼°Ê¾
²Ä¤@¤G´
±Æ©ñ¤²Jªd¬¼ö¤ô
Old AdministrationBuilding
Maintenance Building
ServiceTower
BuildingStage I/IIControl Building
AdministrationBuildingIn
let
Works
(Stage I/II)
Scre
w
Pu
mp
Control R
oo
m
Electrical Workshop
Return ActivatedSludge Pumping
Station
Inlet Works
Central Building Complex
LubricantOil Store
Blower House (Stage I/II)
Effluent Pumping StationSludge Pumping
Station and
¤j®H¦Ã¤
Tai Po SewageTreatment Works
ESS
¬Âo¤
Âo¤¬
¬¬ Âo¤
Âo¤
Âo¤
¬¬Âo¤Âo¤
Âo¤Âo¤ Âo¤
Âo¤ Âo¤Âo¤
Âo¤Âo¤ Âo¤Âo¤
Âo¤Âo¤
Âo¤Âo¤Âo¤ Âo¤Âo¤
Âo¤
Âo¤ Âo¦
Âo¤
Âo¤Âo¤Âo¤ Âo¤ Âo¤ Âo¤
Âo¤Âo¤ Âo¤
Âo¤
Âo¤Âo¤
Âo¤Âo¤
Âo¤ Âo¤ Âo¤Âo¤
Âo¤
Âo¤Âo¤ Âo¤ Âo¤
¬
TankFilter Bed
Filter Bed
GTTank
Tank Tank Filter Bed
Filter Bed
FilterBeds
GTTankTank
Filter Bed Filter Bed
Filter BedFilter Bed Filter Bed
FilterBed Filter
Bed FilterBed
Filter Bed Filter Bed
Filter BedFilter BedFilter
Bed
Filter BedFilter Bed
FilterBed
Filter Bed
FilterBed
Filter Bed
FilterBed
Filter Bed
Filter Bed Filter BedFilter
BedFilterBedFilter
BedFilter Bed
WT
Filter BedFilterBed
Filter Bed
Filter Bed
Filter Bed
Filter Bed
Filter Bed Filter BedFilter
Bed Filter Bed
FilterBed
Filter Bed
FilterBed
Filter Bed Filter BedFilter Bed
Tank
GT
´
´
Nullah
Nullah
H
H
H
H
HH
H
H
H H
H
H
¹D¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
RoadRoad
Road
Road
Road Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
5.3
5.4
5.4
5.4
5.4
5.5
5.5
5.55.5
5.6
5.6
5.6
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.8
5.8
5.8
5.8
5.8
5.9
5.9
5.9
5.9
6.0
6.0
6.0
6.1
6.3
6.3
6.4
6.4
6.4
6.5
6.8
6.9
6.9
6.9
7.4
8.5
12.7
12.9
19.4
19.4
19.6
23.1
23.1
23.2
23.5
32.3
ENVIRONMENTAL
PROTECTION DEPARTMENT
GOVERNMENT OF THE HKSAR
Filena
me :
J:\
24
6190\
AR
UP\
CIVIL\
24
6190-S
K-
Z-001.d
gn
4/25/2016
Printed by :
Rev.
Status
Rev DateByDescription
Drawn
Drawing no.
Date Checked
Drawing title
Scale
Consultant
Approved
COPYRIGHT RESERVEDCOPYRIGHT RESERVED
Contract No. and Title
c OVE ARUP & PARTNERS HONG KONG LIMITED.
ALL RIGHTS RESERVED.
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.
Investigation, Design and Construction
Co-digestion Pilot Trial -
Sewage Sludge Anaerobic
Facilities for Food Waste /
Food Waste Pre-treatment
Agreement No. CE 16/2015 (EP)
TS
TS
TS
TS
TS
PH
TS
TS
TS
TS
¢°¢±
¢² ¢²¢
¢°¢¢°¢ ¢´ ¢µ
¢°¢¢¶
¢·¢°¢® ¢°¢ ¢¸ ¢°¢¢±
®¢°¢
¢±®
¢°¢¢°¢ ¢°¢
¢±¢¢±¢
¢±¢ ¢±¢ ¢±¢¢±¢
®
¤j®HªF
©_µØ¶°¹Î
°ª¬ì¾ô¥ú³q
¬ü¨È¾T¼t
·sÀy½¦ºÞ
»´ä¯q¤O¦h¨
©}¦Ú¤ó»]
16
15Block
14
Block
13
Block Block3A
12 10Block11
11Block 6
BlockBlock12
Block13
BlockBlockBlock
13ABlock
15Block Block
10Block
27
Block28
Block18
Block 16Block19
Block17
Block20 Block
21Block
22Block
23Block23A
Block25
Tai Po East Fire Station
Kee Wah Group Limited
Transtech Optical Communication Company Limited
Meyer Aluminium Limited
Sunnyhose Co., Ltd.
Hong Kong Yakult Co. Ltd.
Watsons Water Centre
46
B46
A
101
1-3
¤U
¦Ê¬
´ë°¥Å¨¤¸¹
¤j®H¤
º¯Âo¦Ã¤ô¹
²îÆWªh®ð
HA HANG
Casa Brava
ESS
Ha HangTelephoneExchange
ESS
Drainage Services DepartmentTing Kok Road
Pumping Station No.5
TAI PO INDUSTRIAL ESTATE
ES
S
LeachatePre-treatment Works
Shuen Wan LandfillGas Treatment Plant
¹Ó
Âo¤
¬Âo¤
Âo¤·Ï
CUL
Graves
WT
WT
Filter BedTank
Filter BedChimney
Filter Bed
WT
Chimney
Ž¸
¥Å¨
¥Å̈
¤j§
TING KOK ROAD
TING KOK ROAD
DAI LI STREET
¹D
³æ¨
³æ̈
¹D
³æ̈
¹D
ªd
ªdªd
¹D
FP
FP
FP
Road
Cycling TrackFP
FPEW
Road
Cycling Track
FP
FP
FP
Cycling Track
Road
FP
Track
Track
Track
Road
3.9
4.1
4.1
4.7
5.0
5.0
5.2
5.3
5.3
5.6
5.6
5.8
5.8
5.9
5.9
5.9
5.9
5.9
5.9
5.9
6.0
6.0
6.0
6.0
6.0
6.0
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.3
6.4
6.5
6.6
6.8
7.1
7.2
7.2
7.6
7.8
7.8
7.8
7.9
8.1
8.1
8.3
8.4
8.5
8.5
8.5
8.5
8.6
8.6
8.6
8.6
8.6
8.6
8.7
9.3
9.5
9.6
10.2
10.7
10.8
11.0
11.2
11.3
11.5
11.6
12.0
12.1
12.1
12.7
12.7
13.3
13.6
13.8
14.3
14.5
14.9
15.5
15.6
15.8
15.9
16.2
16.6
16.7
17.0
17.0
17.1
17.2
17.8
18.0
18.0
18.0
18.2
18.2
18.4
18.4
18.4
18.4
18.4
18.5
18.6
18.6
18.8
18.8
18.9
18.9
18.9
19.1
19.2
19.2
19.3
19.5
20.0
20.3
20.5
21.0
21.8
22.1
22.3
22.5
23.1
23.5
23.7
23.7
23.8
23.8
24.0
24.1
24.4
24.5
24.6
25.4
25.4
25.6
26.0
26.1
26.3
26.3
26.4
26.4
26.4
26.4
26.5
27.1
27.2
27.6
27.9
31.0
33.1
33.1
33.5
33.7
33.8
33.8
34.0
34.2
34.6
35.3
35.5
35.6
35.6
35.7
35.7
36.5
38.5 38.7
38.9
40.9
41.0
41.3
41.5
45.8
46.0
49.2
67.4
69.8
89.0
89.3
89.7
89.8
91.8
93.5
94.0
94.4
94.5
94.5
94.5
94.6
94.6
94.7
94.8
94.8
94.9
94.9
94.9
94.9
95.0
95.0
95.3
95.4
96.0
96.2
96.3
101.2
TS
TS
TS
TS
¦æ¬
ºû×
²Ä¤@±±¨î¤¤ ¦æ¬F
³ï¥æ¤¤
²Ä
¤@
¤J
¤ô
¤f
±±¨
¹q¾¹
¦^¬y²Jªd
¤¤¥¡±±¦Ã¤ô¤
¾÷ª
¤¤¼°Ê¾
²Ä¤@¤G´
Old AdministrationBuilding
Maintenance Building
ServiceTower
BuildingStage I/IIControl Building
AdministrationBuildingIn
let
Works
(Stage I/II)
Scre
w
Pu
mp
Control Roo
m
Electrical Workshop
Return ActivatedSludge Pumping
Station
Inlet Works
Central Building Complex
LubricantOil Store
Blower House (Stage I/II)
¬ÄÄR°ªº¸¤Ò²y·|
¤j®H¦Ã¤
Golf Park Golf Driving Range
Tai Po SewageTreatment Works
¬Âo¤
Âo¤¬
¬¬ Âo¤
Âo¤
Âo¤
¬¬Âo¤Âo¤
Âo¤Âo¤ Âo¤
Âo¤ Âo¤Âo¤
Âo¤Âo¤ Âo¤Âo¤
Âo¤Âo¤
Âo¤Âo¤Âo¤ Âo¤Âo¤
Âo¤
Âo¤ Âo¦
Âo¤
Âo¤Âo¤Âo¤ Âo¤ Âo¤ Âo¤
Âo¤Âo¤ Âo¤
Âo¤
Âo¤Âo¤
Âo¤Âo¤
Âo¤ Âo¤ Âo¤Âo¤
Âo¤
TankFilter Bed
Filter Bed
GTTank
Tank Tank Filter Bed
Filter Bed
FilterBeds
GTTankTank
Filter Bed Filter Bed
Filter BedFilter Bed Filter Bed
FilterBed Filter
Bed FilterBed
Filter Bed Filter Bed
Filter BedFilter BedFilter
Bed
Filter BedFilter Bed
FilterBed
Filter Bed
FilterBed
Filter Bed
FilterBed
Filter Bed
Filter Bed Filter BedFilter
BedFilterBedFilter
BedFilter Bed
WT
Filter BedFilterBed
Filter Bed
Filter Bed
Filter Bed
Filter Bed
Filter Bed Filter BedFilter
Bed Filter Bed
FilterBed
Filter Bed
´
´
Nullah
Nullah
¹D¹D
ªd
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
RoadRoad
Road
Road
Track
Road Road
Road
Road
Road
Road
Road
Road
Road
Road
5.4
5.4
5.4
5.4
5.5
5.6
5.6
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.8
5.8
5.8
5.8
5.8
5.9
5.9
5.9
5.9
6.0
6.0
6.1
6.3
6.3
6.4
6.4
6.4
6.5
6.8
6.9
6.9
6.9
7.4
8.5
12.9
19.4
19.6
23.1
23.1
23.2
23.5
32.3
37.5
38.2
38.4
38.7
39.3
39.7 40.0
¥
¥
TSZ
TS
RCP
RCP
Podium
TS
Podium
µ§§J
ªø¦¿¥Í
»´äÁp¦X§Q
¤j§
°·¥þ¹«~¤u·~¿³µØ¥
¼Ú¤ÆÃÄ·~¦¤j´Iµó
¥Ã´I®e¾¹¡]»
¿³¦t¨T¨®±Æ®ð
¬üºû¬ì§Þ¶°
ªF¤è¬õ¢Õ
Ÿ
²^¤Æ¤j¦P¹
·sÀy½¦ºÞ
¬ü¨È¾T¼t
¨ô¶V¥ú±»¼
¼w©÷¹q¾÷¤u·~»¤j®a¼Ö¤¤¥
¼Ý¿³ÃC±M
µØ¤j°ò¦]»´ä¬ã
¬ü¤ß¹
}·R¥Íª¡]»´ä¡^
¤j®a¼Ö¤¤¥¥Ã«n¹«~
Pico House
CK Life Sciences
Unilever Hong Kong Limited
Fairwood
Convenience Foods International Ltd.RCL Semiconductors Ltd.
Europharm Laboratories Company LimitedDai Fu Street Substation
FC Packing (Hong Kong) Ltd.
Hing Yu Metal Works Limited
Meadville Technologies Group Limited
Tung Fong Hung GMP Centre
Maxim's
Amoy Food Limited
Sunnyhose Co. Ltd.
Meyer
Remarkable Mask Tech. Co. Ltd.
Ming Fong Packaging & Chemicals Ltd.
Johnson Electric Industrial Mfy., Ltd.Cafe de Coral
Central Processing Plant 2
NHH Coltec Ltd.
BGI Hong Kong Co. Limited
Maxim's Food Factory 2
DIC Graphics(Hong Kong) Limited
Winner Food Products Ltd.Cafe de Coral
Central Processing Plant 1
30517A
14A16F
16D
16G
15A
15B
12A
11B
11A
3-5
11-15
8-10
16
A
22-6
13-11
°±¨
°±¨
¤U§|§ø
¤j®H¤
ÅS¤Ñ
Car Park
Car P
ark
Ha Hang Village Sitting-out Area
TAI PO INDUSTRIAL ESTATE
Open Storage
CU
L
WIP
Aug 2
015
CUL
SHR
¥Å
¼
¥Å
¼
¤j´
¤j¶
¤j¶
¤j´
¤j¶
TING
HING
ROAD
TIN
G
HIN
G
RO
AD
TIN
G
KO
K
RO
AD
DAI FU STREET
DAI F
U
ST
RE
ET
DAI S
HU
N
ST
RE
ET
DAI K
WAI S
TR
EE
T
DAI SHUN STREET
¹D
ªd
³æ¨
³æ¨
³æ̈
±×
±×
±×
Road
Track
FP
Cycling Track
Cycling Track
FP
Cycling Tra
ck
CW
FP
Ra
mp
Ramp
Ramp
3.9
4.0
4.0
4.1
4.1
4.3
4.4
4.4
4.6
4.7
4.8
4.9
4.9
4.9
5.0
5.0
5.0
5.2
5.2
5.4
5.4
5.4
5.45.4
5.4
5.5
5.5 5.5
5.6
5.6
5.6
5.6
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.8
5.8
5.8
5.8
5.8
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.1
6.1
6.1
6.26.2
6.2
6.2
6.3
6.3
6.4
6.4
6.4
6.4
6.4
6.4
6.5
6.5
6.5
6.5
6.6
6.6
6.6
6.6
6.7
9.19.5
9.7
17.4
36.9
TS
TS
¥²µoºë¿i¿û
ªF¤è³ø
«n¶¶
¤j¶
©U
§
¨È¬w¹qµø¤é²M¦³
C.A.Picard Far East Ltd
Oriental Press Centre
Lam Soon Building
Dai K
wai Street
Refuse
Collectio
n Point
PC3 Product Customization & Consolidation Centre
Asia Television Company Limited
Nissin Foods
¤Ú¤h
ESS
Bus Terminus
Âo¤
Âo¤
Âo¤
Âo¤
FilterBed
FilterBed
FilterBed
FilterBed
¤j´
¤j©
¤j²
¤j¶
DAI F
U
ST
RE
ET
DAI CHEONG STREET
DAI S
HIN
G
ST
RE
ET
¹D
Road
5.4
5.4
5.4
5.5
5.5
5.5
5.5
5.5
5.5
5.6
5.6
5.6
5.6
5.6
5.6
5.6 5.6
5.65.6
5.6
5.75.7
5.7
5.7
5.7
5.7
5.75.7
5.8
5.8
5.8
5.8
5.85.9
6.0
6.1
6.2
6.3
7.0
7.5
7.6
8.2
¥Å¨ TING KOK ROAD
KEY LOCATION PLAN
ANG04/16
-
DPSYU
LEGEND:
N 835600
N 835400
N 835200
E 837400
E 837600
E 837800
E 838000
THE SITE
1:1000 @A1
METRES
1 : 1000
10 20 30 40 500
PROPOSED SITE
SITE LOCATION PLAN
-
246190/SK/Z/001