Project Goals
• Operating full solid-state FM transmitter(s).
• Pilot phase for the “2 National FM Networks development in band 87.5-108 Mhz” project.
• Create a reliable future FM network.
• Future base platform for development of the
paging and the RDS services.
04/12/23 3
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Description
• Manufactures market study.• Standard proposal of technical
requirements for the FM transmitter.• Standard quotation list. • International tender for the equipment.• Contract.
FOR MORE INFO...
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072 Fax: 40 1 335 58 65
04/12/23 4
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Description, Cont.
• Acceptance tests and commissioning.
• Start the experimental broadcasting period.
• Final Report.
FOR MORE INFO...
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072; Fax: 40 1 335 58 65
04/12/23 5
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Competitive Analysis• Competitors
– Commercial private radio networks (i.e. PRO-TV, CONTACT, RADIO ROMANTIC, etc.)
– Private local radio stations.
• Strengths – Infrastructure: buildings, masts, power
service.
– License for 2 national FM networks (37 transmitters, each).
– Commissioning the equipment by own people.
04/12/23 6
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Competitive Analysis, Cont.
• Weaknesses– The state budget allocations.
– The FM networks ought to have a national coverage.
– The old FM networks operate in band OIRT (64MHz – 70.4MHz).
FOR MORE INFO...
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072; Fax: 40 1 335 58 65
04/12/23 7
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Technology
• Full solid-state utilizing the latest digital component technology– Produce an FM signal of exceptional
quality and reliability.– Generate the complete modulated
FM waveform in digital domain.– Modular design.– Operation and maintenance low
costs.
04/12/23 8
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Technology, Cont.
• Program input is standard AES/EBU digital stereo– Maintain a digital program path through the
stereo generation and frequency modulation process.
• Accept analog subcarriers for the RDS – Future development of the RDS service.
AES/EBU: American Engineering Society / European Broadcast Union
RDS: Radio Data System
04/12/23 9
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Team/Resources
• The Project has 4 teams:– Technical Team
– Network Planner and Installation projects Team
– Development Team
– Contract’s Team
04/12/23 10
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Team/Resources, Cont.
• Technical Team Tasks:– Manufactures Market Study;– Quotation List;– Acceptance and Commissioning;– Training;– Final Report.
04/12/23 11
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Team/Resources, Cont.
• Network Planner and Installation projects team tasks:– Feasibility studies for the new
frequencies and transmitters sites;– Installation projects;– Prepare and submit the
documentation for transmitter Authorization.
04/12/23 12
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Team/Resources, Cont.
• Development team tasks:– Prepare the Biding documentation;– The Biding.
• Contract’s team tasks:– The Contract draft;– Negations and signs the final version
of the Contract;– Support group engineering.
04/12/23 13
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Team/Resources, Cont.
• People – Engineers, technicians, accountant, legal
adviser, clerks
• Equipment– New equipment according with the budget
– Use the locations existing equipment
• Locations– Company Headquarter, Bucharest
04/12/23 14
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Schedule
• Review high-level schedule milestones here
FOR MORE INFO...
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072 Fax: 40 1 335 58 65
Manufactures Market StudyManufactures Market Study BiddingBidding
Bidding Documents preparingBidding Documents preparing
Jan’97 Feb Mar Apr MayJun’96 July Sep Oct Nov DecAug
Quotation list issueQuotation list issue ContractContract
Draft Contract-FM transmitterDraft Contract-FM transmitter
04/12/23 15
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Schedule, Cont.
• Review high-level schedule milestones here
Jan’98 Feb Mar Apr MayJun’97 July Sep Oct Nov Dec
Equipment ProductionEquipment Production
Experimental BroadcastingExperimental Broadcasting
Acceptance and CommissioningAcceptance and Commissioning
Aug
Installation ProjectsInstallation Projects
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072 Fax: 40 1 335 58 65
FOR MORE INFO...
TrainingTraining
04/12/23 16
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Schedule, Cont.
• Review high-level schedule milestones here
FOR MORE INFO...
Mr. Catalin Popescu – Project Engineer
Phone: 40 1 400 1072 Fax: 40 1 335 58 65
Experimental BroadcastingExperimental Broadcasting
ReportReport
Jan’99 Feb Mar Apr MayJun’98 July Sep Oct Nov DecAug
TrainingTraining
04/12/23 17
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Conclusions and more…
• The total time-frame is 2 years and 7 months.
• FM transmitter Proposal (included the quotation list) Draft documentation.
• First step to upgrade and development the national FM Networks in CCIR band .
• Introduce experimental operation of the RDS encoder, for future trends of the service development.
• Tests the monitoring possibilities.
04/12/23 18
S.N. RADIOCOMUNICATIROMANIA
FM –CCIR NETWORK DEVELOPMENT
Competitive Analysis
Technology
Team/Resources
Conclusions...
Description
Home
Schedule
Related Documents
• On going status– Technical Team, Mr. Adrian D.,Phone: 400
1072
• Budget– Development Team, Mrs.Bont M.,Phone:
400 1845
• Post mortem– Support Group Engineering, Mrs. Doina
M., Phone: 400 1945
• Submit questions to– Radio broadcasting Dept., Mr.Stefan
D.,Phone: 400 3563