fm approvals & water mist systems - aiia

61
FM Approvals & Water Mist Systems Paul Bardsley – Engineer, FM Approvals

Upload: others

Post on 03-Feb-2022

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FM Approvals & Water Mist Systems - AIIA

FM Approvals & Water Mist Systems

Paul Bardsley – Engineer, FM Approvals

Page 2: FM Approvals & Water Mist Systems - AIIA

Presentation Outline

• Introduction to FM Global

• Introduction to FM Approvals

• FM 5560 - Water Mist Systems

Page 3: FM Approvals & Water Mist Systems - AIIA

Who are FM Global?• The largest industrial and

commercial insurance company in the world.

• $5+ billion in annual premiums

• $6+ billion in reserves

• No outstanding debt

Page 4: FM Approvals & Water Mist Systems - AIIA

FM Global – An Overview…

• Mutual ownership company• Financially very strong (top 500 of

Fortune 1000)• Possess significant underwriting expertise• Integrate engineering & insurance

underwriting• A genuine belief that all loss is preventable• Possess an extensive global client base • Global bet on FM Approvals’ engineering

Page 5: FM Approvals & Water Mist Systems - AIIA

FM Global Clients

Page 6: FM Approvals & Water Mist Systems - AIIA

FM Global Clients

Page 7: FM Approvals & Water Mist Systems - AIIA

FM Global Network

Over 110 Countries Represented

Over 133,000 insured locations

1871 Engineers

60,000 Annual Visits

Page 8: FM Approvals & Water Mist Systems - AIIA

Presentation Outline

• Introduction to FM Global

• Introduction to FM Approvals

• FM 5560 - Water Mist Systems

Page 9: FM Approvals & Water Mist Systems - AIIA

EngineeringResearch

Introduction to FM Approvals

Member of the FM Global Group

Page 10: FM Approvals & Water Mist Systems - AIIA

FM Approvals approves and certifies products and services with unique focus on:

Objectively testing property loss prevention products and services and certifying those that meet rigorous loss prevention standards;

Encouraging the development and use of Approved products and services that improve and advance property loss prevention practices.

Mission Statement

Page 11: FM Approvals & Water Mist Systems - AIIA

Put another way…

– FM Approvals conducts tests on property loss prevention products and services,

– the requirements that are applied are described in rigorous loss prevention standards which have been written by FM Approvals,

– the requirements in the standards are established from data and evidence collected through the research activities of FM Global.

FM Approvals and Risk

Page 12: FM Approvals & Water Mist Systems - AIIA

– An FM Approved product has achieved certain minimum levels of performance against a defined series of requirements.

– FM Approved products are the ‘building blocks’ that can be used by FM Global and others to ensure loss prevention.

– Once the risk has been identified and fully understood, FM Approved products can be used, together with the appropriate installation standards to protect property.

FM Approvals and Risk

Page 13: FM Approvals & Water Mist Systems - AIIA

– What you are about to see is a FM Global research project looking at how much water is needed to control and extinguish a fire in a rack storage system of cardboard boxes containing expanded plastic food trays.

– You will see a fire introduced in the middle of the boxes and once the temperature at the ceiling level has achieved the required trigger temperature, water heads will be released at a known delivery rate.

The importance of research?

Page 14: FM Approvals & Water Mist Systems - AIIA

Watch the colour of the smoke drawn into the 20 Mega Watt Calorimeter.The fire will trigger the ceiling mounted extinguishing system which will deliver a constant 20 litres per minute per square metre.There are 24 x1m3

boxes, arranged in the racking in two rows.

Test Arrangement

Page 15: FM Approvals & Water Mist Systems - AIIA
Page 16: FM Approvals & Water Mist Systems - AIIA

– The water that was delivered was not enough to control or extinguish the fire.

– With this arrangement, there is a very high probability that the building and contents would have been destroyed.

– Can FM Approvals certify anything?

No!

Page 17: FM Approvals & Water Mist Systems - AIIA

– After hundreds of these tests, run with different configurations and arrangements, the research tests will have established how much water is required to control and to extinguish the fire.

– When used with the correct installation standards, the combined effect of the FM Approved product and FM Global’s research knowledge, the property & commodity is protected.

What can Approvals do?

Page 18: FM Approvals & Water Mist Systems - AIIA

In June 1897, the Inspection Department of the Associated Factory Mutual Fire Insurance Companies Approved its first Electrical Fittings.

FM Approvals History

Page 19: FM Approvals & Water Mist Systems - AIIA

FM Approvals in Europe• Notified Body under Construction Products

Directive • EOTA member for innovative CPD products. • Notified Body under the ATEX Directive • IECEx Certification Body • UKAS Accredited Certification Body• Member of Standards Committees & Industry

Groups• Undertaking FM Approval projects for US,

Canadian, European & International Markets

Page 20: FM Approvals & Water Mist Systems - AIIA

A look at the history of FM Approvals’ Test Laboratory …….

FM Approvals’ Laboratory

Page 21: FM Approvals & Water Mist Systems - AIIA

Everett Testing Facility 1932

Page 22: FM Approvals & Water Mist Systems - AIIA

Norwood Test Facility 1947

Page 23: FM Approvals & Water Mist Systems - AIIA

W. Glocester Test Center 1967

Test Center1967

Hydraulics1992

Page 24: FM Approvals & Water Mist Systems - AIIA

Large Fire Lab

Research Labs

Approvals LabsOffices

Nat Haz Labs

Hydraulics Labs

Electrical Labs

New Research Campus 2003

Page 25: FM Approvals & Water Mist Systems - AIIA

Hydraulics Laboratory

Page 26: FM Approvals & Water Mist Systems - AIIA

Hydraulics Laboratory

Page 27: FM Approvals & Water Mist Systems - AIIA

Hydraulics Laboratory

Page 28: FM Approvals & Water Mist Systems - AIIA

Water Mist TestWater Mist Test

Page 29: FM Approvals & Water Mist Systems - AIIA

Sprinkler Flow TestSprinkler Flow Test

Page 30: FM Approvals & Water Mist Systems - AIIA

2004 FM Approvals Offices

Norwood, MAW. Glocester, RINorwood, MAW. Glocester, RI

Page 31: FM Approvals & Water Mist Systems - AIIA

FM Approvals International

Beijing (2005)Beijing (2005)Windsor (2006) Windsor (2006)

Singapore (2006)Singapore (2006)Hong Kong (2007)Hong Kong (2007)

Shanghai (2007)Shanghai (2007)

Page 32: FM Approvals & Water Mist Systems - AIIA

FM Approvals ‘Hydraulics’ Products

• Fire pumps,• Fire pump controllers,• Diesel engine fire pump

drivers,• Sprinkler system

components & extinguishing systems,

• Water mist systems.

Page 33: FM Approvals & Water Mist Systems - AIIA

FM Approvals’ Offering in Europe

FMAPPROVED

1725

Page 34: FM Approvals & Water Mist Systems - AIIA

We have a common interest in the performance of the Water Mist System

This is what makes our Approval unique in the marketplace.

Our Approval is different……….

Page 35: FM Approvals & Water Mist Systems - AIIA

Presentation Outline

• Introduction to FM Global

• Introduction to FM Approvals

• FM 5560 - Water Mist Systems

Page 36: FM Approvals & Water Mist Systems - AIIA

• Defines the criteria for water mist system performance and test requirements for the FM Approval of land based systems.

• When installed in accordance with the recommendations described in FM Global Data Sheets will provide a ‘Highly Protected Risk’.

• Will be a truly living document which will be refined and expanded as needed for new applications of occupancy protection and for new water mist technology.

FM Standard 5560: Water Mist Systems

Page 37: FM Approvals & Water Mist Systems - AIIA

FM Global Property Loss Prevention Data Sheet 4-2 provides evaluation and installation criteria for FM Approved Water Mist Systems.

FM Standard 5560: Water Mist Systems

Page 38: FM Approvals & Water Mist Systems - AIIA

FM Approval requires successful compliance of the overall system operation and reliability against the requirements of FM Standard 5560 including …

–General Requirements,–Performance Requirements and –Operational Requirements.

FM Standard 5560: Water Mist Systems

Page 39: FM Approvals & Water Mist Systems - AIIA

FM Standard 5560 includes specific requirements for the components that make up the Water Mist System including …

Nozzles; Valves; Gas storage Cylinders; Detection Devices; Fittings & Piping; Hoses; Pneumatic Components; Switches; Tanks and Pumps.

FM Standard 5560: Water Mist Systems

Page 40: FM Approvals & Water Mist Systems - AIIA

FM Standard 5560 also examines the performance of the system with respect to …

–Verification of Hydraulic Calculations; Design, Installation, –Operation and Maintenance Manuals; –System Acceptance and Commissioning Documents and –Fire Test Performance.

FM Standard 5560: Water Mist Systems

Page 41: FM Approvals & Water Mist Systems - AIIA

Occupancy Protection Applications1. Machinery Spaces & Special Hazard

Machinery Spaces2. Protection of Combustion Turbines3. Light Hazard Occupancies4. Protection of Wet Benches and Other

Similar Processing Equipment5. Local Application6. Industrial Oil Cookers7. Protection of Computer Room Sub Floors

FM Standard 5560: Water Mist Systems

Page 42: FM Approvals & Water Mist Systems - AIIA

1. Machinery & Special Hazard Machinery SpacesMachinery Spaces: Rooms with machinery using fuel or lubrication fluids with volatiles less than or equal to light diesel

FM Standard 5560: Water Mist Systems

Special Hazard Machinery Spaces: Rooms with machinery using fuel or lubrication fluids with volatiles less than or equal to Heptane & Storage of less than 110 gallons of flammable liquids

Page 43: FM Approvals & Water Mist Systems - AIIA

1. Machinery & Special Hazard Machinery Spaces

Fire Test Protocol

FM Standard 5560: Water Mist Systems

• Test protocol is dependent upon the volume of the enclosure;

• Combination of shielded and unshielded spray and pool fires up to 6MW in size;

• Conducted with machinery mockup in place and• Spay cooling (no fire) test to assess for casing

warp

Page 44: FM Approvals & Water Mist Systems - AIIA

2. Protection of Combustion Turbines

FM Standard 5560: Water Mist Systems

•Total Flooding Application

•Prevent and limit damage from fires internal and external to the turbine

Page 45: FM Approvals & Water Mist Systems - AIIA

Fire Test Protocol

FM Standard 5560: Water Mist Systems

• Test protocol is dependent upon the volume of the enclosure;

• Combination of shielded and unshielded spray and pool fires;

• Conducted with combustion turbine mockup in place and

• Spay cooling (no fire) test to assess for casing warp

2. Protection of Combustion Turbines

Page 46: FM Approvals & Water Mist Systems - AIIA

3. Light Hazard Occupancies

FM Standard 5560: Water Mist Systems

• Non-storage and non-manufacturing areas:

• Inappropriate for ordinary hazard occupancies

• Limited Ceiling heights, Water supply conditions & room size.

Page 47: FM Approvals & Water Mist Systems - AIIA

3. Light Hazard Occupancies

FM Standard 5560: Water Mist Systems

• Restricted & Unrestricted Ceiling Height Approval • FM Approved quick response nozzles must be

used.• Nozzles are set at manufacture's maximum

spacing• All fire tests conducted for 10 minutes after the

activation of the first nozzle and any remaining fire shall be extinguished manually

Fire Test Protocol

Page 48: FM Approvals & Water Mist Systems - AIIA

Thermal images of Light Hazard Small Compartment fire (first)& Large Compartment fire (second).

Page 49: FM Approvals & Water Mist Systems - AIIA

4. Wet Benches & Other Similar Equipment

FM Standard 5560: Water Mist Systems

Equipment which consist of ventilated and unventilated compartments, spin rinse dryers, alcohol vapor dryers, chemical and mechanical polishing tools, and step and repeat exposure systems

Page 50: FM Approvals & Water Mist Systems - AIIA

4. Wet Benches & Other Similar Equipment

FM Standard 5560: Water Mist Systems

Fire Test Protocol• Specific FM Approvals simulated

clean room and wet bench mock-up

• Water mist system installed as specified by manufacturer

• Air flow of the open face wet bench shall be the maximum specified by the manufacturer

• Subsurface and working surface polypropylene and flammable liquid pool fires

Page 51: FM Approvals & Water Mist Systems - AIIA

5. Local Application

FM Standard 5560: Water Mist Systems

Protection of Special Hazards and Equipment:

•Paper machines and pulp dryers,

•Dip tanks & coaters,

•Belt Conveyers,

•Waste solvent recovery,

•Mechanical refrigeration.

Page 52: FM Approvals & Water Mist Systems - AIIA

5. Local Application

FM Standard 5560: Water Mist Systems

Fire Test Protocol• Seven test fire scenarios:

– Square diesel pool; channel diesel pool; heptane spray; diesel spray and pool; obstructed pool; offset pool & diesel spray with external ignition source

• Suitable automatic interlocks are required as part of overall system FM Approval, i.e., electrical system shutdown, fuel supply shutoff and ventilation shutdown.

Page 53: FM Approvals & Water Mist Systems - AIIA

6. Industrial Oil CookersNon-Insulated conveyor fryers & batch kettles where the main hazard is overheating of oil to Actual Ignition Temperature (AIT)

FM Standard 5560: Water Mist Systems

Page 54: FM Approvals & Water Mist Systems - AIIA

FM Standard 5560: Water Mist Systems

• Mock-up size determined from manufacturers specifications

• Open flames extinguished within one minute from start of discharge

• Water mist cannot cause thermal damage to cooker

Fire Test Protocol

6. Industrial Oil Cookers

Page 55: FM Approvals & Water Mist Systems - AIIA

Protection of mainframe electronic computer systems and major equipment or process control computer systems located in the sub-floor

FM Standard 5560: Water Mist Systems

7. Computer Room Sub Floors

Page 56: FM Approvals & Water Mist Systems - AIIA

FM Standard 5560: Water Mist Systems

7. Computer Room Sub FloorsFire Test Protocol

• Three type of Fire Test• Conducted at maximum nozzle spacing• Water shall be supplied for at least 10

minutes

Page 57: FM Approvals & Water Mist Systems - AIIA

General Examination & Performance Tests• Seat Leakage• Hydrostatic Strength• Operating Pressure• Durability – Cycling• Extreme Temperatures Operation• Salt Spray Corrosion (Residue Build-Up)• Vibration Resistance• Valve Locking/Supervision Ability• Friction Loss Determination• Seals and Gaskets

FM Standard 5560: Water Mist Systems

Page 58: FM Approvals & Water Mist Systems - AIIA

Water Mist Nozzle Tests•Assembly Load/Frame Strength •Strength of Heat Responsive Element •Leakage •Hydrostatic Strength •30-Day Leakage •Water Hammer •Operating Temperature (Liquid Bath) •Air Bath •Hang-Up of Operating Parts •Strength of Deflector (Flow Endurance) •Vacuum•High Ambient Temperature Exposure (90 Day Test)•Thermal Shock (Glass Bulb Nozzles Only) •Discharge Coefficient, K-Factor•Moist Air•Corrosion - Salt Spray

•Corrosion - Stress Cracking•Corrosion - Carbon Dioxide-Sulfur Dioxide•Corrosion - Hydrogen Sulfide•Vibration•Rough Use and Abuse•High Temperature Exposure•Freezing •Minimum Operating Pressure•Process Residue•Conductivity (C-Factor)•Sensitivity - Response Time Index (RTI) •Sensitivity (Recessed, Flush, and Concealed Types) •Sensitivity (Air Oven) •Water Mist Discharge Characteristics•Impingement•Protective Caps

FM Standard 5560: Water Mist Systems

Page 59: FM Approvals & Water Mist Systems - AIIA

Other Performance Requirements and Examinations

• Complete System Documentation Review • Hydraulic Calculations Method• Installation, Operation and Maintenance Manual• Manufacturing and Production Tests• Demonstrated Quality Control Program• Facilities and Procedures Audit (Quality Assurance)• System Acceptance and Commissioning • Installation Inspections by FM Global Field Engineers with

feedback for continuous improvements

FM Standard 5560: Water Mist Systems

Page 60: FM Approvals & Water Mist Systems - AIIA

For more information contact….FM Approvals at:

1 Windsor Dials, Windsor, Berkshire, UK, SL4 1RS.Tel: +44 (0) 1753 750 000 Fax: +44 (0) 1753 868 700E-mail: [email protected]

Website: www.fmapprovals.com

Page 61: FM Approvals & Water Mist Systems - AIIA

FM Approvals Ltd

‘Believing that all losses are preventable’

Thank You