Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 Consultant Acquisition Plan Florida Department of Transportation District 5

Upload: vandiep

Post on 16-Apr-2018

265 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Consultant Acquisition PlanFlorida Department of TransportationDistrict 5

Page 2: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

OPENING

Florida Department of

TRANSPORTATION

Michelle SloanDistrict Five Procurement Services Manager

CAPFDOT-D5

February 6, 2018

HELPFUL LINKS:Posting of this Presentation: http://www.fdot.gov/procurement/marketingD5/http://www.cflroads.com/d5fdotdesign/

CAP Report:http://www.fdot.gov/procurement/InternetReports.shtm

FTP Site:http://www.fdot.gov/procurement/FTP%20Sites.shtm

Page 3: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

• Welcome – Michael Shannon• Operations – Alan Hyman• Disadvantaged Business Enterprise/Small Business – Ligia Benoit• Construction, Engineering and Inspection – Amy Scales• Structures Maintenance – Ed Kestory• Traffic Operations – Jeremy Dilmore• 30 minute “Networking Break”• Development – Loreen Bobo• Modal Development – Annette Brennan• Planning and Environmental Management – Amy Sirmans• Design – Mario Bizzio

– Roadway Design – Mario Bizzio

– Survey and Mapping – John Cheney– Consultant Project Management – Suzanne Phillips

• Closing Remarks – Loreen Bobo

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Agenda

Page 4: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

WELCOME

Florida Department of

TRANSPORTATION

Michael Shannon, PEDistrict Five Secretary

CAPFDOT-D5

February 6, 2018

Page 5: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

OPERATIONS

Florida Department of

TRANSPORTATION

Alan E. Hyman, PEDirector of Transportation Operations

CAPFDOT-D5

February 6, 2018

Page 6: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

CAPFDOT-D5

February 6, 2018

Page 7: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Disadvantaged Business Enterprise (DBE) Program

Florida Department of

TRANSPORTATION

Ligia BenoitDistrict Compliance Specialist

CAPFDOT-D5

February 6, 2018

Page 8: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DBE Program Objectives

• Ensure equal opportunity in contract award

and administration

• Level the playing field to promote competitiveness

• Ensure FDOT’s DBE program complies with applicable laws

• Ensure the integrity of certifying DBE firms

• Remove barriers to DBE participation on DOT contracts

• Enable firms to successfully compete in the marketplace

Page 9: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DBE/SBE Aspirational Goals for Consultants

• FDOT has established a three year goal of 10.65% DBE participation beginning in October 2017.

• Although not a contract requirement, FDOT believes that the aforementioned aspirational goal can realistically be achieved based on current availability of DBE firms.

• FDOT further believes that the 10.65% overall goal can be achieved through race neutral means, using standard competitive procurement processes.

Page 10: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DBE Participation Best Practices for Consultants

• Consider DBE firms during your bid or proposal processes• Report bid opportunities for DBE and non DBE firms

– Equal Opportunity Compliance (EOC) System– At the time of proposal submittal

• Utilize the Florida DBE Directory to find qualified DBE consultants• Document results from solicitations and requests for proposal• Ensure monthly updates to DBE commitments and

payments are entered in the EOC• Pass along DBE availability in your sub-consultant agreements

Page 11: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

John Tyler, DCEAmy Scales, Assistant DCE

Alida Schmitt, District CEI ManagerDenise Nazario, CEI Contract Administrator

ConstructionCEI Contracts

Page 12: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Project

Manager Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

N/A CHAPMAN

237984-3

171 HAYDEN

242484-7

437341-1

175 GOPAL

239714-1

176 BRIGGS

438003-1

438003-2

177 BRIGGS

440557-5,

440557-6,

440557-7

437595-1

178 MADRID

437327-1

437348-1

433860-1439139-1

179 LARKIN

431798-3

435660-2

439238-1

AW 11 NAZARIO

(Contractual Services) Public Information Contract for Construction Projects

CEI

Group

Advertising

DateCounty

2018 2019

District

Wide6/1/2018

3/5/2018

Marion

District

Wide

Lake

Flagler

6/11/2018

11/19/2018

5/7/2018

11/5/2018 Orange

SR 600 US 17/92 1900' W OF POINCIANA BLVD TO CR 535

I-95 Resurfacing from Volusia Co Line to N of Palm Coast Parkway and to Pellicer CreekFlagler

Osceola2/12/2018

6/4/2018

SR 400 (I-4) W OF SR 528 BEACHLINE TO W OF SR 435 KIRKMAN RD

SR 435/KIRKMAN ROAD FROM N OF SR 482 TO S OF SR 408

SR A1A CONSTRUCTION Segments 1, 2 & 3

SR 5/US 1 Roundabout

Continuing Services to provide area wide CEI Support

SR 25/US 27 FROM OBRIEN ROAD TO ARLINGTON RIDGE

SR 44 FROM 1900' WEST OF CR 437 TO VOLUSIA CO.

SR-33 AT CR 561, SR 33 OVER GREEN SWAMP BRIDGE # 110002SR 25 FROM ARLINGTON RIDGE BLVD TO CR 33

NE36TH AVE.

SR 326 SR 25/500/US441

Page 13: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

Provide Public Information for Construction Projects

Public Information Contract: 242484-3-62-06Contractual Services

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Project Manager: Tamii Chapman, District Office

Advertise: June 1, 2018

TRC: TBD

Contract Amount: $475,000 (first year)

Page 14: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

SR 400 (I-4) W OF SR 528 BEACHLINE TO W OF SR 435 KIRKMAN RD, SR 435/KIRKMAN ROAD FROM N OF SR 482 TO S OF SR 408

GROUP 171, Orange County: 242484-7-62-01, & 437341-1-62-01

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Kevin Hayden, I-4 Ultimate Office

CEI Advertise: November 5, 2018

TRC: TBD

Construction Cost: $774.5 Million

Page 15: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

SR 600 US 17/92 1900' W OF POINCIANA BLVD TO CR 535

GROUP 175, Osceola County: 239714-1-62-01

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Ray Gopal, Orlando Operations

CEI Advertise: February 12, 2018

TRC: TBD

Construction Cost: $30 Million

Page 16: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

I-95 FROM VOLUSIA COUNTY LINE TO NORTH OF PALM COAST PARKWAY &I-95 FROM N OF PALM COAST PKWY TO PELLICER CREEK

GROUP 176, Flagler County:438003-1-62-01 & 438003-2-62-01

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Chris Briggs, Deland Operations

CEI Advertise: June 04, 2018

TRC: TBD

Construction Cost: $36.5 Million

Page 17: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

SR A1A CONSTRUCTION Segments 1, 2 & 3

SR 5/US 1 Roundabout

GROUP 177, Flagler County: 440557-5, 440557-6, 440557-7 & 437595-1

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Chris Briggs, Deland Operations

CEI Advertise: March 5, 2018

TRC: TBD

Construction Cost: $42.8 Million

Page 18: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

SR 25/US 27 FROM OBRIEN ROAD TO ARLINGTON RIDGE, SR 44 FROM 1900' WEST OF CR 437 TO VOLUSIA CO., SR-33 AT CR 561, SR 33 OVER GREEN SWAMP BRIDGE # 110002,

SR 25 FROM ARLINGTON RIDGE BLVD TO CR 33

GROUP 178, Lake County: 437327-1, 437348-1, 436127-1, 433860-1, 439139-1

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Karen Madrid, Leesburg Operations

CEI Advertise: June 11, 2018

TRC: TBD

Construction Cost: $26.7 Million

Page 19: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

NE 36TH AVENUE FROM NE 20TH PLACE TO NORTH OF NE 25TH STREET;

SR 326 FROM SR 326 RXR CROSS 627142B TO E OF CR 25A (NW GAINESVILE RD);

SR 25/500/US441/ FROM SR 35/SE BASELINE RD TO SR 200/SW 10TH STREET

GROUP 179, Marion County: 431798-3, 435660-2, & 439238-1

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Construction PM: Denise Larkin, Ocala Operations

CEI Advertise: Nov. 19, 2018

TRC: TBD

Construction Cost: $27.6 Million

Page 20: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Project Highlights

Continuing Services to provide area wide CEI Support

Areawide 11: 237984-2-62-19

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

PM: Denise Nazario, District Office

CEI Advertise: May 7, 2018

TRC: TBD

Contract Amount: $5 Million or a length of 5 years

Page 21: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Structures MaintenanceBridge Inspection Contracts

Local Govt. Bridge and State Underwater

Page 22: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

• One Advertisement – Two Inspection firms will be selected• 2 YEAR CONTRACT WITH OPTION FOR 2 YEAR RENEWAL (each contract)• Advertise: October 29, 2018• Contract Execution: April 2019• Local Govt. Bridge Inspection: PROJECT NO. 244932-1-72-94 & 244937-1-72-92

– Initial Budget: $1,680,000– PM: Julia Blackwelder

• State Underwater Inspection: PROJECT NO. 245191-2-72-05– Initial Budget: $1,000,000– PM: Sandusky McCartney

– MAJOR WORK GROUP: 5.1, 5.2, 5.3, 5.4– MINOR WORK GROUPS: 4.1.1

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Page 23: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Traffic Operations

Page 24: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Traffic Operations Staff

District Traffic Operations Engineer

Jim Stroz P.E.

Transportation Systems Management and Operations

ITS

Signal Timing

Safety

Pushbutton

Traffic Services

Access Management

Studies

Page 25: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Traffic Operations Staff

District Traffic Operations Engineer

Jim Stroz P.E.

District TSM&O Engineer

Jeremy Dilmore, P.E.

TSM&O Engineer-Arterials

Jay Williams, P.E.

FMS/AMS Timing Engineer

VACANT

TSM&O Engineer - Freeways

VACANT

FMS/AMS PM Supervisor

Tushar Patel

FMS/AMS Project Manager

Noemi Rodriguez-Bonilla

FMS/AMS Project Manager Jim Miller

FMS/AMS ITS Supervisor

Steve Johnson

Page 26: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

440271-1-22-01 Corridor Pricing Optimization Study

441616-1-32-01 Orange County ATMS Phase IV Design

436325-2-32-01 Event Management Phase II Design

435446-1-52-03 Transit Signal Priority Phase III Design Build

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Upcoming Traffic Operations Projects

Page 27: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Scope:

What systems can be priced together? How this improve traffic flow?

• Fee - $400,000

• Project Manager – Noemi Rodriguez

• TRC– Jeremy Dilmore

– Brenda Young

– Tushar Patel

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

440271-1-22-01 Corridor Pricing Optimization Study

• Major Work Groups – 6.1, 6.3.1

• Advertise Fall 2018

Page 28: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

441616-1-32-01 Orange County ATMS Phase IV Design

Scope:

Fiber, Signal Upgrades

• Fee - $340,000

• Project Manager – Noemi Rodriguez

• TRC

– Jeremy Dilmore

– Jay Williams

– Tushar Patel

• Major Work Groups – 6.3.1, 6.3.2, 6.3.3

• Advertise April 2018

Page 29: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

436325-2-32-01 Event Management Phase II Design

Scope:

Second Phase of Daytona Area System Rehabilitation

• Fee - $500,000

• Project Manager – Noemi Rodriguez

• TRC– Jeremy Dilmore

– Jay Williams

– Tushar Patel

• Major Work Groups – 6.3.1, 6.3.2, 6.3.3

• Advertise Late Fall 2018

Page 30: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

435446-1-52-03 Transit Signal Priority Phase III Design Build

Scope:TSP Phase 3; DB, includes design, integration, and timing plan development

• Fee - $2.8 million • Project Manager – Jim Miller• TRC

– Jeremy Dilmore– Jay Williams– Tushar Patel

• Major Work Groups – 6.3.1, 6.3.2, 6.3.3

• Work Class – 39 Traffic Signal

• Advertise April 2018

Page 31: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

BREAK30 minutes

Page 32: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

DEVELOPMENT

Florida Department of

TRANSPORTATION

Loreen Bobo, PEDirector of Transportation Development

CAPFDOT-D5

February 6, 2018

Page 33: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Modal Development

Brian M. Stanger, P. E., Modal Development AdministratorBrenda Young, P. E., Passenger Operations Manager

James Wikstrom, Freight & Logistics ManagerDawn Weaver, Rail Administrator

Page 34: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Loreen C. Bobo, P.E.Director Transportation Development

James WikstromFreight & Logistics

Manager

Dawn Weaver Rail Administrator

Brenda Young, P.E. Passenger Operations

Manager

Brian M. Stanger, P.E. Modal Development Administrator

Modal Development Unit

Page 35: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Passenger Operations

Passenger Operations Manager

Brenda Young, P.E.

Bicycle/Pedestrian Coordinator

Michael Ziarnek

Project Manager

Joe Bitar

Transit Project Coordinator

Jo Santiago

Transit Project Coordinator

Carlos Colon

Transit Programs Administrator

Diane Poitras

Transit Programs Administrator

Diane Poitras

Libertad Acosta-Anderson, P.E. Transit Intermodal Supervisor

Page 36: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

James WikstromFreight & Logistics Manager

Freight & Logistics

Allison McCuddy

Freight & Logistics Specialists

Lauren Farrell Freight & Logistics Specialists

Vacant

District Freight Coordinator

Page 37: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

• Contract Type: Continuing Services

• Title: Innovative Approaches to Multimodal Corridors

• Brief Description: Develop concepts on regionally significant corridors in Central Florida for phased implementation approach to improve all modes using operational, design, modal, and technology elements.

• Dollar Value: $1,000,000

• Prequalification requirements: 2.0, 3.2, 6.1, 6.2, 6.3, 7.1, 7.2, 7.3, 13.5, 13.6

• Advertising: June 2018

• Project Manager: Libertad Acosta-Anderson

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Page 38: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Planning & Environmental Management Office

PLEMO Contracts

Page 39: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Loreen Bobo, P.E.Director Transportation Development

Amy Sirmans, P.E. Project Development

Manager

Bill Walsh Environmental Manager

Carol ScottPlanning Manager

Alison StettnerPlanning & Environmental Administrator

Planning & Environmental Management Office

Page 40: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of TransportationCAP

FDOT-D5February 6, 2018

Planning Unit

Planning Manager

Carol Scott

Planning Supervisor

Kellie Smith

SIS Administrator

John Zielinski

Design Traffic / Modeling

Jason Learned

MetroPlan Orlando – Jennifer Horton

Ocala-Marion TPO – Jamie Kersey

Lake-Sumter TMO – Kayleen Hamilton

Space Coast TPO – Janna Taylor

River to Sea TPO - Vickie Wyche

Traffic

Matthew Pierce

Growth Management/IJR

Jean Parlow

Page 41: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Environmental Management Unit

Environmental Manager

Bill Walsh

Senior Environmental Scientist

Catherine Owen

Environmental Scientist

Heather Chasez

Contamination Impact Coordinator

Randy Stafford

ETDM Coordinator / Env. Scientist

Kathaleen Linger

Scenic Highway Coordinator

Claudia Calzaretta

Page 42: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

PD&E Project Manager

Lorena Cucek

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Project Development Unit

Project Development Manager

Amy Sirmans, P.E.

Planning & Corridor Dev. Manager

Heather Garcia

Corridor Studies

Judy Pizzo

Contract Management

Vacant

PD&E Project Manager

Heather Grubert, P.E.

PD&E Project Manager

Mary McGehee

Page 43: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

SR 524 PD&E Study

▪ 437983-1-22-01

▪ From Friday Road to Industry Road

▪ Brevard County

▪ Approximately $1,738,000 contract

▪ Advertising March 2018

▪ PM: Heather Grubert, P.E.

▪ Recommended TRC: Amy Sirmans, Brian Stanger, Bill Walsh

Page 44: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

SR 524 PD&E Study

▪ Widening 2 to 4 lanes

▪ Interchange with I-95

▪ Corridor Planning Study Information on www.cflroads.com, search 437983-1

Page 45: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

SR 524 PD&E Study

ETDM Programming Screen

▪ ETDM number: 14321

▪ Begin ETAT Review: 12/08/17

▪ End ETAT Review: 2/6/18

Page 46: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

US 17/92 PD&E Study

▪ 437200-1-22-01

▪ From CR 54 (Ronald Reagan Parkway) to west of Poinciana Blvd

▪ Osceola County

▪ Approximately $1,500,000 contract (FY 2020)

▪ Advertising January 2019

▪ PM: TBD

▪ Recommended TRC: TBD

Page 47: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

US 17/92 PD&E Study

▪ Approximately 5.5 miles

▪ Widening 2 to 4 lanes

▪ Addition of Bicycle and Pedestrian facilities

Page 48: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

US 17/92 PD&E Study

▪ Corridor Planning Study

▪ Information on www.cflroads.com, search 437200-1

Page 49: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ One contract to be awarded

▪ Contractual Services Agreement

▪ 5 year contract

▪ Advertising May 2018

▪ PM: Randy Stafford

▪ Recommended TRC: TBD

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Districtwide – Asbestos Consultant

Page 50: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ Two contracts to be awarded

▪ Contractual Services Agreements

▪ 5 year contracts

▪ Advertising May 2018

▪ PM: Randy Stafford

▪ Recommended TRC: TBD

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Districtwide – Asbestos Abatement

Page 51: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ 243811-1-12-11

▪ Two contracts will be awarded

▪ Approximately $300,000 per fiscal year allocated

▪ 5 year / $5 million contract

▪ Advertising October 2018

▪ PM: Jason Learned

▪ Recommended TRC: Brian Stanger, Jeremy Dilmore, Heather Garcia

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Continuing Services – Modeling Support

Page 52: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ Scope of Contract:

• Travel Model Development

• Planning and Concept Development Studies

• Engineering Analyses and Reports

• Growth Management

• Miscellaneous Services

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Continuing Services – Modeling Support

Page 53: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ 405854-1-12-11

▪ Approximately $400,000 per fiscal year allocated

▪ 3 year / $5 million contract

▪ Advertising February 12, 2018

▪ PM: TBD

▪ Recommended TRC: Heather Garcia, Amy Sirmans,

Bill Walsh

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Continuing Services – Corridor Planning

Page 54: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ Scope of Contract:

• Conduct Planning and Concept Development Studies

• Engineering Analyses and Reports

• PD&E Studies

• Growth Management

• Public Involvement

• Miscellaneous Services

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Continuing Services – Corridor Planning

Page 55: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Where to Find More Information

https://fldot.sharepoint.com/sites/D5-EXT-EMO/PD/Lists/ConsultantAcquisitionPlan

Page 56: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

OFFICE OF DISTRICT DESIGNMario Bizzio - District Design Engineer

Suzanne Phillips - Consultant Project Management EngineerJeff Cicerello - District Roadway Design EngineerNeil Kenis - District Structures Design Engineer

Staci Nester - District Utilities AdministratorJohn Cheney - District Surveyor & Mapper

Page 57: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

DISTRICT DESIGN

Consultant Project

ManagementRoadway Surveying & Mapping

Roadway

Design

Drainage /

Permitting Traffic DesignConstructability

Structures Utilities

Page 58: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

CONSULTANT PROJECT MANAGEMENT

Page 59: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

Suzanne Phillips, PE - District Consultant Project Mgmt. Eng.

Beata Stys-Palasz, PE - Project Management SupervisorTodd Long, PE - Project Management Supervisor

Catalina Chacon, PE - Project Management SupervisorStorm Kazmierczak, PE - Project Management SupervisorAshraf Elmaghraby, PE - Project Management SupervisorAnnette Brennan, PE - Project Management Supervisor

CONSULTANT PROJECT MGMT. SUPERVISORS

Page 60: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

CONSULTANT PROJECT MANAGEMENT PROJECT MANAGERS

Hatem Aguib, PE Kathy Enot, EI

Su Hao, PECarol Hatfield, PETodd Helton, PE

Jude Jean-FrancoisEliode Joseph, PE

Megan OwensTaleb Shams, PE

Daniel SimpsonZach Sullivan, PE

Heidi Trivett Sarah Van Gundy

Gene Varano

Page 61: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

ROADWAY PRODUCTIONSUPERVISORS

Jeff Cicerello, PE – District Roadway Design EngineerGeorge Borchik, PE – Roadway Engineer Supervisor

Steven Buck, PE - Roadway Engineer SupervisorNaziru Isaac, PE – Roadway Engineer Supervisor

Ayman Mohamed, PHD, PE – TP&S Engineer SupervisorTodd Alexander, EI – Constructability Supervisor

Page 62: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

CONSTRUCTABILITY

Page 63: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

CONSTRUCTABILITY TEAM

Todd Alexander, EILori Epperson, PE

Jim Harkrider

Page 64: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

DRAINAGE / PERMITTING

Page 65: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

DRAINAGE / PERMITTING TEAM

Karen Snyder, PEPatrick McConaghy, PE

Efren Rivera, PE

Freddy Andrade, PEKyle Howard, EI

Casey LyonEd Northey

Ferrell Hickson Jr., PE - District Drainage Engineer

Page 66: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

ROADWAY DESIGN

Page 67: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

ROADWAY DESIGN TEAM

Naziru Isaac, PEMatthew Gallup, EIBrenda LaBombard

Leonardo Quiterio, EI

Juan Rivera, EISteven Buck, PE

Claudia Bustamante, EIGabor Chiorean, EI

Ivana Oliveira, PEGeorge Borchik, PE

David StokesJohn Clapham

Jeff Cicerello, PE

Page 68: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

TRAFFIC DESIGN

Page 69: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

TRAFFIC DESIGN TEAM

Ayman Mohamed, PHD, PE – District TP&S EngineerSasha Fernandez, EI

Andrew Perez, EIJavish Rodriguez-Rivera

Page 70: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

STRUCTURES

Page 71: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

STRUCTURES TEAM Neil Kenis, PE – District Structure Design Engineer

Gary Skofronick, PE Marianne Saunders, PE

Haosu Sun, PE Chris Dabson, PE Mark Trebitz, PEStefan Levine, EI

Page 72: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

UTILITIES

Page 73: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

UTILITIES TEAM

Staci Nester – District Utilities AdministratorAlice GiulianiPaul Schoelzel

Jessica DiGiacomo

Page 74: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

SURVEYING & MAPPING

Page 75: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

SURVEYING & MAPPINGSUPERVISORS

John Cheney, PLS – District Surveyor & Mapper

Scott Miller, PLS – Surveying & Mapping SupervisorNick Campanile, PSM – Surveying & Mapping SupervisorThomas LaCorte, PLS – Surveying & Mapping Supervisor

Page 76: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

DRAINAGE / PERMITTING PROJECTS

FISCAL YEAR 2019

Page 77: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ DISTRICTWIDE CONTRACT

▪ Location is throughout District 5

▪ Work Mix – Districtwide Environmental

Permit Compliance

▪ Work Types – 2.0 and 3.1

▪ Design Costs - $1,500,000

▪ Advertisement Date – March 19, 2018

▪ Project Manager – Casey Lyon, M.S.

▪ TRC Members – TBD

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Drainage & Permitting/DW Financial Project 241110-1

Page 78: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

SURVEYING & MAPPING PROJECTS

FISCAL YEAR 2019

Page 79: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ CONTINUING SERVICES

▪ Location is throughout District 5

▪ Work Mix – Survey & Mapping services for

various work types

▪ Work Types – 8.1, 8.2, 8.3, 8.4

▪ Design Costs - $300,000 (first year)

▪ Potential - $5,000,000 over five years

▪ Advertisement Date – February 12, 2018

▪ Project Manager – Thomas LaCorte

▪ TRC Members – Scott Fowler, Nick Campanile,

David McCrary

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

CSC – Financial Project CSC-016 & 017Surveying & Mapping

Page 80: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of

TRANSPORTATION

CAPFDOT-D5

February 6, 2018

CONSULTANT PROJECT MANAGEMENT PROJECTS

FISCAL YEAR 2019

Page 81: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN PROJECT SUMMARY – FY 19

Page 82: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN

PROJECT

SPECIFIC

Page 83: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ S SUMTER CONNECTOR TRAIL FROM WITHLACOOCHEE STATE TRAIL TO VAN FLEET

▪ Sumter County

▪ Work Mix – BIKE PATH/TRAIL

▪ Work Types – 3.2

▪ Design Costs – $2,958,340

▪ Advertisement Date – November 12, 2018

▪ Project Manager – Zachary Sullivan

▪ TRC Members – Su Hao, Naziru Isaac, Todd Long

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 435471-1

Page 84: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ ORANGE BLOSSOM TRAIL PHASE 2A FROM 30TH STREET TO GORE STREET

▪ Orange County

▪ Work Mix – BIKE PATH/TRAIL

▪ Work Types – 3.1

▪ Design Costs - $1,000,000

▪ Advertisement Date – July 30, 2018

▪ Project Manager – Anthony Miller

▪ TRC Members – Taleb Shams, Steven Buck,

Storm Kazmierczak

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 437575-1

OB

T

Interstate 4

Gore St.

Page 85: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S OF SR 200

▪ Marion County

▪ Work Mix – REST AREA

▪ Work Types – 14

▪ Design Costs - $2,200,000

▪ Advertisement Date – August 13, 2018

▪ Project Manager – Megan Owens

▪ TRC Members – Beata Stys-Palasz, Todd Long,

Mike McCammon

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 438562-1

I-7

5

Page 86: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 3/N COURTENAY PKWY FROM SR 528 TO KENNEDY SPACE CENTER GATE

▪ Brevard County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs – 1,100,000

▪ Advertisement Date – September 17, 2018

▪ Project Manager – Gene Varano

▪ TRC Members – Jude Jean-Francois,Ayman Mohamed, Ashraf Elmaghraby

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 441013-1

SR 3

Kennedy Space Center

SR 528

Page 87: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 519 FROM I-95 TO SR 520

▪ Brevard County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $1,600,000

▪ Advertisement Date – May 21, 2018

▪ Project Manager – Jude Jean-Francois

▪ TRC Members – Eliode Joseph, Efren Rivera,Todd Long

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 441020-1

SR 520

I-95

SR 5

19

Page 88: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 19 FROM CR 452 TO GOLDEN GEM DR, SOUTH OF UMATILLA

▪ Lake County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $1,000,000

▪ Advertisement Date – September 4, 2018

▪ Project Manager – Kathy Enot

▪ TRC Members – Zachary Sullivan,Todd Alexander, Sarah Van Gundy

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 441135-1

Umatilla

CR 44

Page 89: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR25/SR200/US301/US441 FROM CR 25A TO US 301/US441 INTERCHANGE

▪ Marion County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs – $1,200,000

▪ Advertisement Date – July 23, 2018

▪ Project Manager – Sameer Ambare

▪ TRC Members – Carol HatfieldPatrick McConaghy, Zach Sullivan

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 441136-1

SR 2

5

I-75

SR 40

Page 90: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ BREVARD TRAFFIC MANAGEMENT CENTER - SR 404

▪ Brevard County

▪ Work Mix – TRAFFIC MANAGEMENT CENTERS

▪ Work Types – 14

▪ Design Costs - $900,000

▪ Advertisement Date – May 7, 2018

▪ Project Manager – Daniel Simpson

▪ TRC Members – Todd Long, Juan Rivera,Tushar Patel

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Project Specific Financial Project 441584-1

US 1

Page 91: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN

BUSINESS

DEVELOPMENT

INITIATIVE

(BDI)

Page 92: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 44 FROM EAST OF BRITT ROAD TO EAST OF VALLEY HILL LANE

▪ Lake County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $770,000

▪ Advertisement Date – June 18, 2018

▪ Project Manager – Ty Garner

▪ TRC Members – Taleb Shams, Ivana Oliveira,Sarah Van Gundy

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/BDI Financial Project 439142-1

SR 44

CR 44A

Page 93: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 15/US 441/KENANSVILLE RD FROM OKEECHOBEE COUNTY LINE TO SR 60

▪ Osceola County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $700,000

▪ Advertisement Date – August 20, 2018

▪ Project Manager – Sarah Van Gundy

▪ TRC Members – Kathy Enot, Ferrell Hickson,Eliode Joseph

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Financial Project 439487-1Design/BDI

SR 60

Page 94: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 500/US 441/US 92/US 17 FROM US 192 TO OLD DIXIE HIGHWAY

▪ Osceola County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $450,000

▪ Advertisement Date – August 20, 2018

▪ Project Manager – Taleb Shams

▪ TRC Members – Kathy Enot, Ferrell Hickson,Eliode Joseph

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/BDI Financial Project 441017-1

US

17

-92

US 192

Page 95: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 44 FROM NW 68TH BLVD TO END OF RURAL SECTION (.25 MI WEST OF I-75)

▪ Sumter County

▪ Work Mix – RESURFACING

▪ Work Types – 3.1

▪ Design Costs - $500,000

▪ Advertisement Date – October 1, 2018

▪ Project Manager – Carol Hatfield

▪ TRC Members – Hatem Aguib,Lori Epperson, Beata Stys-Palasz

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/BDI Financial Project 441014-1

I-75

Page 96: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ SR 40 FROM SW 27TH AVE TO MLK JR. AVE - MARION COUNTY

▪ Marion County

▪ Work Mix – SAFETY PROJECT

▪ Work Types – 3.1

▪ Design Costs - $300,000

▪ Advertisement Date – October 1, 2018

▪ Project Manager – Heidi Trivett

▪ TRC Members – Hatem Aguib,Lori Epperson, Beata Stys-Palasz

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/BDI Financial Project 441366-1

I-75

SR 40

Page 97: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN

CONTINUING SERVICES

CONTRACT

(CSC)

Page 98: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ I-4 Beyond the Ultimate (BTU) Corridor Management Continuing Services Contract

▪ Location is throughout District 5 and Polk County

▪ Work Mix – Corridor Consultant

▪ Work Types – 3.3, 4.2.1, 4.2.2

▪ Design Costs - $450,000 (first year)

▪ Potential – $5,000,000 over five years

▪ Advertisement Date – TBD

▪ Project Manager – Beata Stys-Palasz

▪ TRC Members – Suzanne Phillips, Catalina Chacon,

Jeremy Dilmore

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Corridor Consultant Financial Project TBD

Page 99: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ CONTINUING SERVICES

▪ Location is throughout District 5

▪ Work Mix – Design services for various work types

▪ Work Types – 3.2

▪ Design Costs - $5,000,000

▪ Advertisement Date – December 3, 2018

▪ Project Manager – N/A▪ Contact – Alison Rodriguez

▪ TRC Members – Suzanne Phillips,Storm Kazmierczak, Hatem Aguib

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Financial Project CSC-011, 012, & 013Design/CSC

Page 100: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN

CONTINUING SERVICES CONTRACT

BUSINESS DEVELOPMENTINITIATIVE

(BDI)

Page 101: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ BDI CONTINUING SERVICES

▪ Location is throughout District 5

▪ Work Mix – Design services for various work types

▪ Work Types – 3.1

▪ Design Costs - $1,500,000

▪ Advertisement Date – April 16, 2018

▪ Project Manager – N/A▪ Contact – Alison Rodriguez

▪ TRC Members – Catalina Chacon,Ashraf Elmaghraby, Todd Long

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/CSC BDI

Financial Project CSC-008, 009, & 010 BDI

Page 102: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DISTRICTWIDE CONTRACTS

Page 103: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

▪ Districtwide Value Engineering

▪ Location is throughout District 5

▪ Work Mix – Value Engineering

▪ Design Costs - $100,000 each year for FY’s 19-23

▪ Advertisement Date – October 2018

▪ Project Manager – Ashraf Elmaghraby

▪ TRC Members – TBD

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Districtwide VE Financial Project 416620-1

Page 104: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

COMBINED ADVERTISEMENTS

Page 105: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

▪ 2 Contracts

▪ 1 Advertisement▪ Advertisement Date – August 20, 2018

▪ Shortlist 5

▪ Final Selection based on

Interview for FPN TBD

▪ Final Select 2 with assignments

determined by Selection Committee

Design/Combined Advertisements

Financial Projects 439487-1 & 441017-1 (BDI)

Page 106: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Financial Projects 441366-1 & 441014-1 (BDI)

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

▪ 2 Contracts

▪ 1 Advertisement▪ Advertisement Date – October 1, 2018

▪ Shortlist 5

▪ Final Selection based on

Interview for FPN TBD

▪ Final Select 2 with assignments

determined by Selection Committee

Design/Combined Advertisements

Page 107: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

▪ 3 Contracts

▪ 1 Advertisement▪ Advertisement Date – April 16, 2018

▪ Shortlist 5

▪ Final Select 3

▪ Selections - Interviews

Design/Combined Advertisements

Continuing Services Contracts # 8, 9, & 10 (BDI)

Page 108: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

▪ 3 Contracts

▪ 1 Advertisement▪ Advertisement Date – December 3, 2018

▪ Shortlist 5

▪ Final Select 3

▪ Selections - Interviews

Design/Combined Advertisements

Continuing Services Contracts # 11, 12, & 13

Page 109: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

DESIGN

CONSULTANT

ACQUISITION

PLAN

(CAP)

Page 110: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Consultant Acquisition Plan

D5 CPM INTRANET (for those with VPN Access)

http://d5web.d5.dot.state.fl.us/542/

Page 111: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Consultant Acquisition Plan

D5 CPM INTERNET

http://www.fdot.gov/designsupport/Districts/D5/default.shtm/

Page 112: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Consultant Acquisition Plan

CONSULTANT ACQUISTION PLAN (CAP)

http://www.cflroads.com/d5fdotdesign/

Page 113: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Design/Consultant Acquisition Plan

CAP – DEBRIEFING MEETINGS

Page 114: Florida Department of TRANSPORTATION Consultant ... · Florida Department of TRANSPORTATION CAP FDOT-D5 February 6, 2018 ... Julia Blackwelder ... in Central Florida for phased implementation

Florida Department of Transportation

CAPFDOT-D5

February 6, 2018

Thank you!

Loreen Bobo, PE – Director of Transportation Development

HELPFUL LINKS:Posting of this Presentation: http://www.fdot.gov/procurement/marketingD5/http://www.cflroads.com/d5fdotdesign/

CAP Report:http://www.fdot.gov/procurement/InternetReports.shtm

FTP Site:http://www.fdot.gov/procurement/FTP%20Sites.shtm