Page 1: Floodplain Mapping Status in Wisconsin

Floodplain Mapping Status in WisconsinAmanda Schwoegler

Floodplain Mapping Project Coordinator, WDNRWLIA - 2/17/2011

Page 2: Floodplain Mapping Status in Wisconsin

2007 • 14 Counties affected• 4600 households have applied for assistance• $13 million + funds distributed

2008• 31 counties declared• $763,618,860 + in damages• Over 40,000 applied for Individual Assistance with over $55 million disbursed• Nearly 2,000 SBA low-interest disaster loans for over $46 million

Some Statistics From Recent Events

Page 3: Floodplain Mapping Status in Wisconsin
Page 4: Floodplain Mapping Status in Wisconsin
Page 5: Floodplain Mapping Status in Wisconsin

2003 – 2008Map Modernization

Program

• Multi-year FEMA program to update the nation’s flood insurance rate maps (FIRMs) to as digital, countywide format.

2009Transition Year

• Funding year between FEMA multi-year programs

• Funding provided for the main stem of the Rock River to the Illinois border.

2010 - ?Risk MAP

Mapping, Assessment and Planning

• New multi-year FEMA program using a watershed approach

• Funding provided for Upper and Lower Rock River watershed studies

From Map Mod to Risk MAP

Page 6: Floodplain Mapping Status in Wisconsin

6

Countywide Watershed

Geographic Approach

Page 7: Floodplain Mapping Status in Wisconsin

Program Goals and Measures

Page 8: Floodplain Mapping Status in Wisconsin

Transfer Risk

Reduce Risk

MapRisk Data

Risk MAPREDUCE LOSS OF LIFE & PROPERTY

Goal – Measure Quantifiable Risk Reduction

AssessPresent & FutureRisks

Plan for Risk

22AssessAssessRiskRisk

33CommunicateCommunicateRiskRisk44MitigateMitigate

RiskRisk

11Identify Identify RiskRisk

Risk MAP LifecycleFocus on Better Risk Communication

Page 9: Floodplain Mapping Status in Wisconsin

Traditional products are regulatory and subject to statutory due-process requirements

Risk MAP products are non-regulatory and are not subject to statutory due-process requirements

Traditional Regulatory ProductsTraditional Regulatory Products Non-Regulatory ProductsNon-Regulatory Products

Risk MAP Program Product Comparisons

Page 10: Floodplain Mapping Status in Wisconsin

10

Page 11: Floodplain Mapping Status in Wisconsin

11

Data Fields Include Example Data Values

Old Study Date e.g. 1985

Old Model Type(s) e.g. HEC-1 / HEC-2

Old Zone Type e.g. Zone A

Old Topography e.g. USGS 10-ft

New Study Info/Methods

Dates, Models, etc.

New Study Zone e.g. Zone AE

New Topography e.g. LiDAR 2-ft

New Study Engineering Factors / Changes

e.g. new structures, gages, topo, landuse, etc.

Estimated Structures e.g. 9

Estimated Population e.g. 27Enhanced

Page 12: Floodplain Mapping Status in Wisconsin

Flood Risk Database (red = enhanced)

Changes Since Last FIRM•Horizontal Changes and Results

•Structure/Population counts impacted by change

Depth & Analysis Grids•Depth (10, 04, 02, 01, 0.2 percent chance)

•Percent Annual Chance

•Percent 30-Year Grid

•Delivery of Water Surface Elevation (multi-freq)

•Water Surface Elevation Change Grid (1%)

•Velocity Grids, Annualized Depth, Top and Toe of Levee

•Multi Freq Grids for Levee and Coastal Areas, etc.

Flood Risk Assessment•Average Annualized Loss – 2010

•Refined Flood Risk Assessment

•HAZUS or Non-HAZUS with improved data/assumptions

Areas of Mitigation Interest•Areas of Mitigation Opportunity or Awareness

Page 13: Floodplain Mapping Status in Wisconsin

Flood Risk ReportContent Overview

• Background:– Purpose, Methods– Risk Reduction Practices

• Project Results:– Changes Since Last FIRM– Depth & Analysis Grids– Flood Risk Assessment– (enhanced analyses)

• e.g. Areas of Mitigation Interest

• Summarized by Locations:– Communities and Watersheds

Page 14: Floodplain Mapping Status in Wisconsin

Visually Promotes Risk Awareness• Contains results of Risk

MAP project non-regulatory datasets

• Promotes additional flood risk data not shown but located within the Flood Risk Database

Page 15: Floodplain Mapping Status in Wisconsin

WHERE ARE WE NOW?

Nationwide

KPI 1: 92% of Nation’s Population with Digital GIS Flood Data

KPI 2: 87% of Population with Adopted Maps that Meet Quality Standards by end of FFY11.

Wisconsin

50 counties will have Digital GIS Flood Data by end of 2011

11 counties will have Digital GIS Flood Data by end of 2013

New studies throughout the Upper and Lower Rock Watersheds

Page 16: Floodplain Mapping Status in Wisconsin
Page 17: Floodplain Mapping Status in Wisconsin
Page 18: Floodplain Mapping Status in Wisconsin
Page 19: Floodplain Mapping Status in Wisconsin

Rock River Watersheds

~300 miles of New Detailed Study

~300 miles of New Approximate Study

Lower Wisconsin

- Black Earth Creek

Chippewa/Eau Claire

-Some new studies

Page 20: Floodplain Mapping Status in Wisconsin

Mellen (Ashland Co.) 1946

Darlington (Lafayette Co.) 1990

Gays Mills (Crawford Co.) 2007