Peter, The flexipoles you have provided have proved extremely easy to install and maintain, and in most cases have been in place, undamaged, for more than double the length of time of other company’s products – which we have previously used. Hope this helps Ian McCracken Stiward Llwybr / Route Steward Asiantaeth Cefnffyrdd Gogledd Cymru North Wales Trunk Road Agency (07909) 934686 01745 536399 [email protected] www.northwales-tra.gov.uk Yn gweithio i’r Llywodraeth Cymru Working for the Welsh Government

Upload: peter-hoban

Post on 15-Aug-2015

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: flexipole case study NWTRA

Peter,

The flexipoles you have provided have proved extremely easy to install and maintain, and in most cases have been in place, undamaged, for more than double the length of time of other company’s products – which we have previously used.

Hope this helps

Ian McCracken                                                                                                          Stiward Llwybr / Route StewardAsiantaeth Cefnffyrdd Gogledd CymruNorth Wales Trunk Road Agency (07909) 934686  01745 536399     [email protected] www.northwales-tra.gov.uk

Yn gweithio i’r Llywodraeth CymruWorking for the Welsh Government

NOTE the 3 different products that have been used here and all failed. This is the only failed one (bottom picture) but all they simply did was replace the sign as pole is still vertical and a new sign is installed in 5-10 mins.