Flexibility Solutions and

Upgrades for CCPPAnja Berghoff I Marketing and Sales Exp. M&U

Thomas Stoll I Regional Sales Head

siemens.at/future-of-energyUnrestricted © Siemens 2019.

Page 2: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Flexible Solutions

Page 3: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 3 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Market Development

for Combined Cycle Power Plants

10%

20%

30%

40%

50%

60%

70%

80%

2015 2016 2017 2018 06/2019

Service factor Load factor during operation

What can make your Power Plant more successful?

Service factor: Operating hours/period hours – Load factor: actual power / installed power

Data source: Siemens WinTS Data from Power plants in AT; HU; SK; CZ

Page 4: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 4 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Clean Spark Spread - Identify Potential for optimization

Example of CSS Overview based on own calculations sourced on ENTSO-E & EEX data

Scheduled

Maintenance

Minimum Load/

Fast Start

Maximum Power

Output

Power

Augmentation

Page 5: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 5 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Power Generation Service – Your Partner for Flex Solutions

Performance

Environment Flexible Operation

Maintenance

• Optimize maintenance intervals:

Minor & Major inspections

• Increase outage flexibility

• Fast outage: Innovative Field Service

methods & tools

• Turbine exchange (BEX)

• Further increase engine

efficiency – New Turbine

Generation

• Hydrogen Application

• Low NOx-Emission

Solutions

• Service Packages /

Upgrades & Modernization

• Plant Assesement / Plant

Optimization

• Increased Load Gradients, Fast

Start, Turn Up

• Optimize part load capabilities

Digital Solutions towards Intelligent Gas Turbine & Smarter Service

Our Target:

Be your Partner for innovative solutions

and attractive service programs.

Page 6: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Upgrades for Flexible

operation

Page 7: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 7 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Flexibility in modernized power plants:

What is it worth and can we afford to ignore it?

1

2

3

Advanced Turbine Efficiency Package

Turn Down – Part Load Options

Hot Start on the Fly – Shut Down on the Fly

H24

Page 8: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 8 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Advanced Turbine Efficiency Package (ATEP)Are you ready for the future?

Up to 31,7 MW add. Power Output

Up to 1,3%pts Efficiency Increase

Performance increase (not to scale, actuals may vary)

Combined Cycle Performance Gain*

Combined cycle Power

Co

mb

ine

d C

ycle

Eff

icie

ncy

Turbine Blades and Vanes Aero Design Optimization

Turbine Exit Diffuser Optimization

Operation Point and Pressure Ratio Increase

Turbine Outlet Temperature Increase

Utilized effects

+31 MW

+1,3 %-pts.

Page 9: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 9 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Advanced Turbine Efficiency Package (ATEP)Are you ready for the future?

Turbine Blades and Vanes 1-4

Turbine Exhaust Casing

Turbine Vane Carrier

Rear Hollow Shaft

Combustor Cooling Air Adaptions

Shaft Cover Modification

New Designed

Parts

Modification of parts in

place

Exchange parts with existing

designs (depending on site specific configuration)

Burner Upgrade

Torque Discs 1-3

Compressor Discs 14 & 15

Typical Upgrade Scope for

SGT5 – 400F version 4

Final scope depending on site

specific configuration and

project needs

Page 10: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 10 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Turn Down – Part Load Options

Further Scope

• I&C modifications (icing controller &

Cooling air monitoring)

• TVC/TEC liner sealing & CVC groove

7-9 grinding recommended

• Detailed engineering and

implementation of instrumentation

and controls modifications related to

the gas turbine

Hardware Modification

• New linearization unit for Inlet Guide Vane

• New Inlet Guide Vane position sensor with extended

operating range

• Modification of Inlet Guide Vane ring (including new scale

and new bolts for bearing blocks)

Page 11: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 11 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Part load OTC increase

Optimized secondary air control

Anti Icing activated

Po

wer

GT

OTC

OTC increase

100%

Standard

CO limit

CO limit

With bypass

Extended Part

Load Operation

Range with COR

Current limit%

Turn Down limit%

Ext TD limit%

Combustion Chamber Bypass

with extended Turn Down

Extended Part

Load with CC

Bypass

Turn Down operation line

Ext. Turn Down operation line

Turn Down

Schematic illustration for explanation of principles, actual values have to be

calculated plant specific with individual emission parameter.

Seite 11

Turn Down – Part Load Options

Page 12: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 12 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

* depend on the specific plant configuration

Standard hot startup

Hot Start on the Fly

Standard shutdown

Fast Plant Shutdown

GT Flame ON Source: Site data from 2016

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

-80 -70 -60 -50 -40 -30 -20 -10 0 0 -10 -20 -30

-80 -70 -60 -50 -40 -30 -20 -10 0 0 -10 -20 -30 min

min

Start

60%Up to 46 min reducedstart up time

Stop

56%Up to 17 min reducedplant shut down time

Gas

57%Up to 50 kNm³reduced gas consumption

Fast Plant Shutdown

Improving startup and shut down

Cycling operation with/without startup & shutdown improvements

Page 13: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 13 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

- Mechanical evaluation of steam turbine

- Revised start-up logics of UMC/BoP/ST

- I&C implementation & testing on site

- Operator training and documentation

Scope

- Hot start-up time reduction

- Efficient operation due to less fuel consumption

- Reduced gas turbine CO emissions during start-up

Benefit

- Siemens reheat steam turbines

Applicability

Hot Start Optimization

The perfect extension for the GT

Start Gradient Optimization !

Hot Start On The Fly

Page 14: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 14 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

- Revised shutdown logics of UMC/BoP/ST

- I&C implementation & testing on site

- Operator training and documentation

Scope

- Stutdown time reduction

- Efficient operation due to less fuel consumption

- Reduced gas turbine CO emissions during shutdown

Benefit

- Siemens CCPP with UMC

Applicability

Scope

Fast Plant Shutdown

Page 15: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 15 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Siemens Hydrogen Gas Turbines for our sustainable future –

The mission is to burn 100% hydrogen

Heavy-duty

gas turbines

Industrial

gas turbines

Aeroderivative

gas turbines

50H

z5

0H

z o

r60H

z60H

z450 MW

329 MW

187 MW

310 MW

215 to 260 MW

117 MW

60 to 71/58 to 62 MW

27 to 37/28 to 38 MW

4 to 6 MW

48 to 57 MW

40/34 to 41 MW

33/34 MW

24/25 MW

10 to 14/11 to 15 MW

8/8 to 9 MW

5/6 MW

41 to 44 MW

SGT5-9000HL

SGT5-8000H

SGT5-4000F

SGT5-2000E

SGT6-9000HL

SGT6-8000H

SGT6-5000F

SGT6-2000E

SGT-A65

SGT-800

SGT-A45

SGT-750

SGT-700

SGT-A35

SGT-600

SGT-400

SGT-300

SGT-100

SGT-A05

593 MW

405 MW

5

10

15

27

5

10

25

27

15

50

100

40

55

15

60

10

30

30 65

2

65

100

100

15

DLE burner WLE burner Diffusion burner with unabated NOx emissions1 ISO, Base Load, Natural GasVersion 2.0, March 2019

Higher H2 contents

to be discussed

on a project

specific basis

Values shown are indicative

for new unit applications and

depend on local conditions and

requirements. Some operating

restrictions/special hardware

and package modifications

may apply. Any project >25%

requires dedicated engineering

for package certification.

H2 capabilities in vol. %Gas turbine model Power Output1

Page 16: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 16 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Hydrogen Combustion in Siemens Large Gas Turbines

H2DeCarb1) SGT5-2000E & SGT5-4000F Status

SGT5-2000E

• Burner modified based on latest fleet improvements and

optimized for H2 combustion

• Successfully tested in High Pressure Combustion Test Rig

• Operational influence (emission & combustion behavior)

revealed and related control measures defined

• SGT5-2000E design derived for SGT5-4000F

• Functional changes & control measures defined

Capability: 27 vol% H2

Capability: 15 vol% H2

and with further potential as soon as requested

SGT5-4000F

1) Upgrade working title

Page 17: Flexibility Solutions and Upgrades for CCPP€¦ · SGT-A65 SGT-800 SGT-A45 SGT-750 SGT-700 SGT-A35 SGT-600 SGT-400 SGT-300 SGT-100 SGT-A05 593 MW 405 MW 5 10 15 27 5 10 25 27 15

Unrestricted © Siemens 2019.

June 27, 2019Page 17 Stoll GP SPG REU S EE&TR / Berghoff GP SPG MK&SOP SM GTM&U

Contact

siemens.at/future-of-energy

Thomas StollRegional Sales

Head for Eastern

Europe & Turkey

Anja BerghoffMarketing Expert

Modernization and

Upgrades

Department

Number

GP SPG REU S EE&TR

Phone

+49 (9131) 17-35703

Mobile

+49 (174) 1560446

E-mail

[email protected]

Department

Number

GP SPG MK&SOP SM GTM&U

Phone

+49 30 386-56707

Mobile

+49 173 8946971

E-mail

[email protected]