flexenclosure ecentre
DESCRIPTION
Flexenclosure eCentre. DRP VODACOM MO Ç AMBIQUE. Flexenclosure participants. Thomas Gustafsson, Customer Project Manager Johan Thörnberg, Electrical and Cooling resp . Mattias Stensson, Architectural and Structural resp. eCentre DRP layout. eCentre DRP layout. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/1.jpg)
Flexenclosure eCentreDRP VODACOM MOÇAMBIQUE
![Page 2: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/2.jpg)
2
Flexenclosure participants
• Thomas Gustafsson, Customer Project Manager
• Johan Thörnberg, Electrical and Cooling resp.
• Mattias Stensson, Architectural and Structural resp.
![Page 3: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/3.jpg)
3
eCentre DRP layout
![Page 4: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/4.jpg)
4
eCentre DRP layout
![Page 5: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/5.jpg)
5
eCentre DRP layout with future expand
![Page 6: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/6.jpg)
6
eCentre DRP Site layout with future expand
![Page 7: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/7.jpg)
7
AC System
• ATS design for 3 sources (grid and two gensets)
• Design for max 400Amp 400V TN-S system (275kW)
• Distribution according to single line drawing. (7233-E-001_Rev.02)
• Control system ATS based on PLC system incl: monitoring system for electrical power and cooling system
![Page 8: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/8.jpg)
8
AC System
![Page 9: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/9.jpg)
9
DC and Inverter system
• Main cabinet prepared for 24 rectifier @ 2900W tot 69,6kW
• Extension cabinet prepared for 24 rectifier @ 2900W tot 69,6kW
• Total capacity139,2kW
• Cable cabinet between main and ext. cabinet
• Recitifier 31pcs @ 2900W tot 89,9kW
• Inverter cabinet prepared for 20pcs inverter @ 1500VA tot 24kW/30kVA
• Inverter modules 10pcs @ 1500VA tot 12kW/15kVA
• Three battery cabinet and 48V batteri Enersys 12V190FT (48 block)
• Battery backup time < 55 min @ 85 kW, 2h @ 42,5 kW
![Page 10: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/10.jpg)
10
DC and Inverter system
![Page 11: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/11.jpg)
11
Cooling System
• 4pcs DX-units @ 35,6kW
• Return air temperature 28°C
• Supply air temperature 17°C
• Ambient temperature 40°C
![Page 12: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/12.jpg)
12
Raised floor system
• Concentrated loads 5kN
• Uniform distributed loads 8kN/m²
• Floor tile sureface ”Granit”
![Page 13: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/13.jpg)
13
Fire fighting system
• FM200 system
• Extinguishant control panel
• Detection system
![Page 14: Flexenclosure eCentre](https://reader036.vdocuments.mx/reader036/viewer/2022062810/56815b37550346895dc90aea/html5/thumbnails/14.jpg)
14
Time scheduling acc to layout rev 03 and current PO
• Production finish – pick-up 2012-12-12
• Planned site start 2013-01-24
• Hand over 2013-02-08