92 880 Interchange ProjectHayward California
WDodacieHcrcu
icord
easant HillBrentwood
MointDiablo Discovery BaTiburon
bJU'dlltOStiraon Beach
LrvermorejuthSan
anciscoanton
emontMontara
Newar
Half Moon B
Woodside ©Yahoo!2008.Data£NAVTEQ2008
92 880 Interchange ProjectHayward California
Project Limits
Santa Clara St.
Winton Ave.
" k R /t w - 'I
Tennyson Rd.
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Proposed interchange improvements would:
Relieve traffic congestion
Provide additional capacity
Eliminate merging and weaving-related accidents
Improve traffic safety and operations
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Existing
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Eliminate Existing Loop EB92 to NB880
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Proposed Direct Connector EB92 to NB880
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EB92/NB880 Connector Column Forms
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EB 92 / NB 880 Connector Abutment form
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EB 92 / NB 880 ConnectorConstruction over 12 Lanes of Traffic
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EB 92 / NB 880 Soffit
/2008
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EB 92 / NB 880 Connector
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Eliminate Existing LoopWB92 to SB880
XV V
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Proposed Direct Connector WB92 to SB880
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Replace SR 92/1-880 Separation
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Proposed Replacement for Eldridge Avenue Pedestrian Overcrossing
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Replace Eldridge Ave. Pedestrian Overcrossing
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EldridgeAve POC Pile Driving
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
EldridgeAve POC Columns
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Eldridge Ave POC Soffit
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Replace CalarogaAvenue Overcrossing
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Staging Plan - CalarogaAve Overcrossing
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Pile Driving with Tight Access and Space ContraintsCalarogaAve OCTemp Structure
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Staging Plan - Route 92 / I- 880 Separation
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
Staging Plan - Route 92 / I- 880 Separation
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
RETAINING WALLS
FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange ProjectHayward California
CIDH (Cast-in-Drilled-Hole) Piles - RetainingWall A