CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021 0.4 # of Existing Lanes: 2 # of Lanes Planned: 2 6 11 RC: NWG Sponsor: Bartow Co 2014 2,300 AUTH-fLAP - $ FLAP 1,890,000 1,890,000 $ FLAP/Local 86,000 86,000 $ Local 6,340,364 6,340,364 $ 1,890,000 280,000 2,170,000 $ - $ 6,146,364 6,146,364 $ PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB-101 Estimated Cost: 8,316,364 $ PROJECT DESCRIPTION: Safety improvements of section of Glade Road from Misty Valley Drive to Brandy Lane including the relocation of the bridge over Clark Creek. Limits included within PI 0003770. County: Bartow 0013321 Project Type: Bridge P.I. #: Length: Congressional District: GDOT District: Average Daily Traffic Volume: NEED AND PURPOSE: To improve road alignment in order to meet specifications for 35 mph routes. Network Year: 2024 Federal Cost ($): State Cost ($): Local Cost ($): PROJECT COST: SOURCE 2021 TOTAL Right-of-Way ($) Construction ($) Utilities ($) PROJECT PHASE Preliminary Engineering ($) 2018 2019 2020 PROJECT LOCATION MAP

Upload: others

Post on 19-Jan-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

0.4 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: Bartow Co

2014 2,300

AUTH-fLAP -$

FLAP 1,890,000 1,890,000$

FLAP/Local 86,000 86,000$

Local 6,340,364 6,340,364$

1,890,000 280,000 2,170,000$

-$

6,146,364 6,146,364$

PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB-101

Estimated Cost: 8,316,364$ PROJECT DESCRIPTION: Safety improvements of

section of Glade Road from Misty Valley Drive to

Brandy Lane including the relocation of the bridge over

Clark Creek. Limits included within PI 0003770.

County: Bartow

0013321

Project Type: Bridge

P.I. #:

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

NEED AND PURPOSE: To improve road alignment in order to meet specifications for 35 mph routes.

Network Year: 2024

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

SOURCE 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

2018 2019 2020

PROJECT LOCATION MAP

Page 2: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

# of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: GDOT

2015 210

Z001 600,000

Z001 250,000 250,000$

Z001 -$

Z001 -$

-$

120,000 50,000 170,000$

480,000 200,000 680,000$

NEED AND PURPOSE:

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

SOURCE 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

2018 2019 2020

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: SR 3/US 41 NB @ SR 293 Bridge PROJECT #: CB-108A

Estimated Cost: 3,800,000$ PROJECT DESCRIPTION:

County: Bartow

15534

Project Type: Bridge

P.I. #:

PROJECT LOCATION MAP

Page 3: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

# of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: GDOT

2015 2,840

Z001 600,000

Z001 250,000 250,000$

Z001 -$

Z001 -$

-$

120,000 50,000 170,000$

480,000 200,000 680,000$

NEED AND PURPOSE:

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

SOURCE 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

2018 2019 2020

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: SR 3/US 41 SB @ SR 293 Bridge PROJECT #: CB-108B

Estimated Cost: 3,800,000$ PROJECT DESCRIPTION:

County: Bartow

15535

Project Type: Bridge

P.I. #:

PROJECT LOCATION MAP

Page 4: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

0.4 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: GDOT

2015 6,510

M210 AUTH

M210 AUTH -$

M210 AUTH -$

HB170 300,000 300,000$

-$

300,000 300,000$

-$

PROJECT NAME: I-75 @ CR 630/Cass-White Road PROJECT #: CB-109

Estimated Cost: 300,000$ PROJECT DESCRIPTION: The project consists of minor

roadway widening, striping to add east and west bound

left turn lanes and an east bound right turn lane, as well

as signalization. Rights-of-way are not anticipated.

County: Bartow

13296

Project Type: Safety

P.I. #:

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

NEED AND PURPOSE: The project will improve traffic flows and the safety of left and right turns

at the intersection.

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

SOURCE 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

2018 2019 2020

PROJECT LOCATION MAP

Page 5: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2016-2019

n/a # of Existing Lanes: n/a # of Lanes Planned: n/a

6 11 RC: NWG Sponsor: Bartow

-$ -$ -$ -$

45,238$ 199,313$ 199,313$ 199,313$

22,619$ 148,659$ 148,659$ 148,659$

13,967$ 13,697$ 13,697$

22,619$ 36,687$ 36,687$ 36,687$

Length:

PROJECT NAME: Transit Operating Funding PROJECT #: CB-300

Estimated Cost: $ PROJECT DESCRIPTION: Funding available for operating

expenses (personnel, supplies, etc.) necessary to operate the

Bartow Transit Department.

County: Bartow

Project Type: Operating

P.I. #:

FTA Lg Urban 5307

2021

T006124

2020

T006113

2019

T006102

Congressional District:GDOT District:

2018

T006041TOTAL

-$

NEED AND PURPOSE: To maintain and expand current levels of service.

468,596$

132,680$

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

FTA 5311

Transportation Alliance

FTA Sm Urban 5307 643,177$

-$

-$

PROJECT PHASE

Page 6: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2016-2019

n/a # of Existing Lanes: n/a # of Lanes Planned: n/a

6 11 RC: NWG Sponsor: NWGRC

-$ -$ -$ -$

3,419$ 3,419$ 3,419$ 3,419$

2,735$ 2,735$ 2,735$ 2,735$

-$ -$ -$

684$ 684$ 684$ 684$

NEED AND PURPOSE: Assist GDOT in regional data collection and monitoring of transit activities.

10,940$

-$

2,736$

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

13,676$

-$

-$ FTA 5311

Transit Alliance

FTA Sm Urban 5307

PROJECT PHASE TOTAL

FTA Lg Urban 5307 -$

2018

T006057

2019

T006070

2020

T006082

2021

T006093

Length:

Congressional District:GDOT District:

PROJECT NAME: Regional Transit Planning PROJECT #: CB-300-5304

Estimated Cost: 13,676$ PROJECT DESCRIPTION: Provide assistance to GDOT in

collecting data for transit operations in Northwest

Georgia Regional Commission Service Area.

County: Bartow

Project Type: Study

P.I. #:

Page 7: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2016-2019

n/a # of Existing Lanes: n/a # of Lanes Planned: n/a

6 11 RC: NWG Sponsor: Bartow

-$ -$ -$ -$

154,075$

123,260$ -$ -$ -$

15,407$ -$ -$ -$

15,408$ -$ -$ -$

PROJECT NAME: Transit Capital - Feasibility Study PROJECT #: CB-307

Estimated Cost: 90,000$ PROJECT DESCRIPTION: Conduct a study of the Bartow

Transit System to consider expansion of the services

offered.

County: Bartow

Project Type: Study

P.I. #:

Length:

Congressional District:GDOT District:

TOTAL

FTA Lg Urban 5307 -$

2018

T0060412019 2020 2021

NEED AND PURPOSE: To examine the feasibility of expanding current levels of service.

123,260$

15,407$

15,408$

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

154,075$

-$

-$ FTA 5311

Transit Alliance

FTA Sm Urban 5307

PROJECT PHASE

Page 8: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

0.2 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: Bartow Co

2014 4300

AUTH-Z230 275,000$ Z230 -$

Z230 125,000 125,000$

Z230 1,913,836 1,913,836$

1,540,000 1,540,000$

-$

498,836 498,836$

NEED AND PURPOSE: Improve horizontal and vertical alignments of this section of roadway to

allow safe travel at posted speed of 35 mph. Network: 2020

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

SOURCE 2018 2019 2020 2021 TOTAL

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: Glade Road realignment PROJECT #: CB-401

Estimated Cost: 2,038,836$ PROJECT DESCRIPTION: Realign portion of CR

633/Glade Road between Wildflower Trail and

Camp Drive. Project limits are within former PI

0003770.

County: Bartow

12599

Project Type: Reconstruction

P.I. #:

PROJECT LOCATION MAP

Page 9: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

5.35 # of Existing Lanes: 2 # of Lanes Planned: 4

6 11 RC: NWG Sponsor: GDOT

2014 N/A Z240

AUTH-Z240 -$

AUTH-Z240 -$

Z240 2,181,780 2,181,780$

Z240 61,644,123 61,644,123$

51,060,722 51,060,722$

12,765,181 12,765,181$

-$

State Cost ($):

Local Cost ($):

PROJECT COST:

Right-of-Way ($)

Construction ($)

Utilities ($)

NEED AND PURPOSE: To improve road alignment for new designated SR 113 route. Network: 2020

Federal Cost ($):

PROJECT PHASE

Preliminary Engineering ($)

TOTAL2021202020192018SOURCE

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: SR 113/Old Alabama Rd relocation PROJECT #: CB-504

Estimated Cost: 63,825,903$ PROJECT DESCRIPTION: Relocation of SR 113 from

Pumpkinvine Creek to CR 699 County: Bartow

621410

GDOT Project #

P.I. #:

PROJECT LOCATION MAP

Page 10: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

17.1 # of Existing Lanes: 2 # of Lanes Planned: 4

6 11 RC: NWG Sponsor: GDOT

2014 14800

HB170 2,188,175 2,188,175$

Z001 -$

Z001 -$

Z001 -$

-$

2,188,175 2,188,175$

-$

NEED AND PURPOSE: Improve east-west access through northern tier of Atlanta metro counties.

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

2020 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

SOURCE 2018 2019

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: SR 20 (Canton Highway) widening PROJECT #: CB-507

Estimated Cost: $217,717,045PROJECT DESCRIPTION: Widen to four lanes from I-

75 in Bartow County to the Cherokee County line

(and beyond to I-575). Figures shown reflect portion

of project within Bartow County (35%)

County: Bartow

7836

Project Type: Widening

P.I. #:

PROJECT LOCATION MAP

Page 11: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

2.5 # of Existing Lanes: 2 # of Lanes Planned: 4

6 11 RC: NWG Sponsor: Cartersville

2014 N/A

AUTH-Z231 -$

LOCAL 4,293,731 4,293,731$

LOCAL -$

Z231 -$

-$

-$

4,293,731 4,293,731$

NEED AND PURPOSE: Provide connection to SR 113 bypass corridor from downtown Cartersville. 2030

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

2020 2021 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

SOURCE 2018 2019

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: Douthit Ferry Road widening PROJECT #: CB-508

Estimated Cost: $22,320,283PROJECT DESCRIPTION: Widen Douthit Ferry Road from

Old Alabama Road to SR 113 including the bridge over the

Etowah River

County: Bartow

7494

Project Type: Widening

P.I. #:

PROJECT LOCATION MAP

Page 12: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

0.7 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: Bartow Co

2014 2180 LOCAL

AUTH-Local -$ LOCAL -$

LOCAL -$

LMIG/Local 6,200,000 6,200,000$

-$

-$

6,200,000 6,200,000$

PROJECT NAME: Cass-White Road Ph I widening PROJECT #: CB-510A

Estimated Cost: $6,200,000PROJECT DESCRIPTION: Widen Cass-White Road

between Colonel Way and US 411 to standard-width

2-lane roadway with construction of railroad

overpass and relocation of intersection with US 411

County: Bartow

15144

GDOT Project #

P.I. #:

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

NEED AND PURPOSE: To improve road alignment and improve safety.

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

TOTAL2021202020192018SOURCE

PROJECT LOCATION MAP

Page 13: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

1.3 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 RC: NWG Sponsor: Bartow Co

2014 2180

AUTH-Local -$ LOCAL 1,921,000 1,921,000$

LOCAL 900,000 900,000$

LOCAL 10,851,000 10,851,000$

-$

-$

1,921,000 900,000 10,851,000 13,672,000$

PROJECT NAME: Cass-White Ph II widening PROJECT #: CB-510B

Estimated Cost: 13,672,000$ PROJECT DESCRIPTION: Improve Cass-White Road

from 2- to 4-lanes with divided median on 400' ROW

between Busch Drive and 250' east of Great Valley

Parkway/Highland 75 Industrial Park

County: Bartow

15145

GDOT Project #

P.I. #:

NEED AND PURPOSE: To improve safety and handle addition of 1,000 employees and 270 freight trips as

this corridor develops into industrial center for the community.

Federal Cost ($):

PROJECT PHASE

Preliminary Engineering ($)

TOTAL2021202020192018SOURCE

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

State Cost ($):

Local Cost ($):

PROJECT COST:

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT LOCATION MAP

Page 14: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2018-2021

7.31 # of Existing Lanes: 0 # of Lanes Planned: 4

6 11 RC: NWG Sponsor: GDOT

2014 N/A Z240

Z240 2,000,000 2,000,000$

-$

-$

-$

1,600,000 1,600,000$

400,000 400,000$

-$

State Cost ($):

Local Cost ($):

PROJECT COST:

Right-of-Way ($)

Construction ($)

Utilities ($)

NEED AND PURPOSE: Provide connection to 1-75 for Memphis-Atlanta corridor and for economic

development.

Federal Cost ($):

PROJECT PHASE

Preliminary Engineering ($)

TOTAL2021202020192018SOURCE

Length:

Congressional District:GDOT District:

Average Daily Traffic Volume:

PROJECT NAME: Rome-Cartersville Development Corridor PROJECT #: CB-512

Estimated Cost: 98,468,279$ PROJECT DESCRIPTION: On new alignment connect US

411 to I-75 from its intersection at MacJohnson Road and

US 41.County: Bartow

13238

GDOT Project #

P.I. #:

PROJECT LOCATION MAP

Page 15: FLAP 1,890,000 $ 1,890,000 CARTERSVILLE-BARTOW ... TIP 2018-2021 Update.pdf · $ 2,735 $ 2,735 $ 2,735 $ 2,735 $ 684 $ 684 $ 684 $ 684 NEED AND PURPOSE: Assist GDOT in regional data

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 2016-2019

3.7 # of Existing Lanes: 2 # of Lanes Planned: 2

6 11 NWGRC

2014 4,300

M210 AUTH 40,000 40,000 40,000 160,000$

M210 -$

M210 -$

LOCAL -$

-$

-$

40,000 40,000 40,000 40,000 160,000$

PROJECT NAME: Glade Road Corridor Safety Impr. PROJECT #: CB-609

Estimated Cost: 14,550,000$ PROJECT DESCRIPTION: Glade Road (CR 633) safety

improvements from Homestead Drive (CR 605)/Apache

Drive (CR 377) to Ryan Road (CR 810)/Yacht Club Road

(CR 386), formerly GDOT P.I. No. 0003770.

County: Bartow

Project Type: Safety

P.I. #:

Length:

Congressional District:GDOT District: RC:

Average Daily Traffic Volume:

NEED AND PURPOSE: Correct geometric deficiencies in order to reduce crash frequency and severity.

The project incorporates, and includes the limits of, PI# 12599 and PI# 13321. Network Year: 2035

Federal Cost ($):

State Cost ($):

Local Cost ($):

PROJECT COST:

SOURCE 2019 TOTAL

Right-of-Way ($)

Construction ($)

Utilities ($)

PROJECT PHASE

Preliminary Engineering ($)

2016 2017 2018

PROJECT LOCATION MAP