  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    1/16

    Cement plant 1.2 Mio to/yearBrand NEW

    Van Kennis / FL Smidth

    Overview plant

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    2/16

    World cement production

    2010

    Source: Wikipedia

    Van Kennis / FL. Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    3/16

    Scope of delivery:

    - Feasibility including quantity ratio development, analysis of raw materials;

    - Creating of basic engineering;

    - Creating of construction layoutas built documentation,

    - Delivery of the complete plant equipment;

    - Delivery of automation systemprocess control unit;

    - Delivery of elektrical kitsall wires and cables;

    - Delivery of a cement lab including station for quality monitoring;

    - Erection of the entire plant on civil work prepared groundings;

    - Taking in funktionset and run up the completed plant;

    - Training of the customers operating staff;

    - Handing over of operation manuals and trouble shooting guidlines;

    - One year full replacement warranty.

    Van Kennis FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    4/16

    Scope of erection:

    - Erecting of the entire plant by an experienced team of the main supplier;

    - Erecting under supervision of an experienced German engineering team;

    - Erection will be done only in safe countries;

    - The numbers of engineers and build-up staff will be paid by the seller,but have to be hosted by the purchaser;

    - In case of build-up in a unsafe country have to be veriefied separate

    instalment plans between the parties;

    Delivery does not include:

    - Delivery and transportation from the customers harbour to the erection place;

    - Civil work;

    - Any house-building work;

    - Any steel frame work, except from the supplied steel construction;

    - Lightning protection.

    Van Kennis / FL. Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    5/16

    1 Quarry

    2 Crushers

    3 Raw material homogenization

    4 Aggregates

    5 Raw material silos

    6 Chimney

    7 Electrical filter

    8 Raw material vertical mill

    9 Raw grist silo10 Evaporation cooler

    11 Filter alkali bypass

    12 Mixer for alkali bypass

    13 Cyclon preheater

    14 Coal

    15 Coal grist mill

    16 Filter for coal mill

    17 Tube cooler

    18 Filter clinker cooler

    19 Clinker cooler

    20 Rotary kiln

    21 Clinker silo

    22 Gypsum

    23 Minerals

    24 Classifier

    25 Grinding mill (vertical or ball)

    26 Packing station27 Palette control station

    Scheme

    Van Kennis / FL Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    6/16

    Main supplier PENGFEIlicensed by FL-Smidth Danmark

    Van Kennis - FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    7/16

    Latest project done

    in Aserbaidschan

    Van Kennis/Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    8/16

    Vertical mill

    Ball mill

    Rotary kiln

    The customer determines the layout,

    we just recommend

    Van Kennis/FL. Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    9/16

    Process analysing

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    10/16

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    11/16

    Test lab by market leader WUXI

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    12/16

    Energy facts:Gas consumption for rotary kiln: 6.673 m/h

    Gas consumption for calcinator: 10.010 m/h

    Electric power: 24.500 KW

    Process water consumtion: 931 m/d

    Area facts:Entire plant layout: 200.000 m

    Ground loading total: 150.000 to

    Transportation facts:20 & 40 container boxes: 11.000 to

    Open sea flats: 8.000 to

    Heaviest parts: 150 to

    Gas rate: 35.82 MJ/Nm

    28.000 KW recomm.

    or 95 KW/to acc. ISO

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    13/16

    TECHNICAL REPORT

    FOR

    4000T/D CEMENT PRODUCTION LINE

    4000t/d

    Final inspection together

    with the customer on site

    of supplier

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    14/16

    Item/Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Gen.Layout

    Geolo.Survey

    Pre-design

    Final design

    Equipment

    Training China

    Shipping

    Buildings

    Erection

    Com/Accept.

    Site Training

    Work schedule from valid contract onward to completion

    Van Kennis/FL.Smidth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    15/16

    Team work

    Van Kennis/FL.Smidth

    SuppliersSuper vision

    Erection work

    Van Kennis/FL.Smidth

    V K i /FL S idth

  • 7/25/2019 FL Smidth - Plant Overview - Water Consumption

    16/16

    Enjoying the new cement plant

    Van Kennis/FL.Smidth

    Congratulations with this plant