FIVE POINTS ACTION PLAN UPDATENeighborhood Transportation Management ProgramDenver Public WorksSeptember 5, 2019
-
Past Studies Review NE Neighborhoods Next Steps Study (2015) Progress NTMP: Five Points Updateo What is the Neighborhood Transportation Management Program?o NTMP Action Plan Process Reviewo Five Points Timeline Updateo Action Plan Onlineo NTMP: Five Points Installation Status Looking Forward Questions
TOPICS
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
PAST STUDIES:Curtis Park Neighborhood
Assessment (2007)
38th & BlakeStation Area Plan (2009)
Next Steps (2011)
NE Downtown Neighborhoods
Study (2011)Next Steps (2015)
NTMP: Five PointsAction Plan(2019)
-
NE DOWNTOWN STUDY (2011),NEXT STEPS (2015),
OFVO O T
ERE R
VIEW Expands on the Curtis
Park Neighborhood Assessment (2007) Process:o Identify & Prioritize a
Project ListoPrioritized by four key
elements
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
oCost Estimates Produced
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NE DOWNTOWN NEXT STEPS STUDY (2015)TIER 1 PROJECT STATUS
1 Welton St: One to Two Way Conversion (Park Ave to Downing) Needs Additional Study2 Larimer St: Ped/Bike Crossing at Broadway Elevate Denver Bond Program3 21st St: Festival St/Bike Boulevard (Blake to 20th Avenue) Study/Design Starts 20204 31st St Bicycle/Pedestrian Bridge (over UPRR tracks) RiNo Railroad Connectivity Study5 21st St: Ped/Bike Crossing at Broadway Complete6 Broadway Study: Ped/Bike Crossings (Welton to Larimer) Study Starts 20207 Blake St: One to Two Way Conversion (38th St to Broadway) Complete8 Larimer St: One to Two Way Conversion (Broadway to 18th St) Needs Additional Study9 Broadway: Study to Evaluate Alternatives (Arapahoe to Welton) Study Starts 2020
10 Welton St: Ped/Bike Crossing at Broadway Study Starts 2020
Sheet1
Project NameStatus
1Welton St: One to Two Way Conversion (Park Ave to Downing)Needs Additional Study
2Larimer St: Ped/Bike Crossing at BroadwayElevate Denver Bond Program
321st St: Festival St/Bike Boulevard (Blake to 20th Avenue)Study/Design Starts 2020
431st St Bicycle/Pedestrian Bridge (over UPRR tracks)RiNo Railroad Connectivity Study
521st St: Ped/Bike Crossing at BroadwayComplete
6Broadway Study: Ped/Bike Crossings (Welton to Larimer)Study Starts 2020
7Blake St: One to Two Way Conversion (38th St to Broadway)Complete
8Larimer St: One to Two Way Conversion (Broadway to 18th St)Needs Additional Study
9Broadway: Study to Evaluate Alternatives (Arapahoe to Welton)Study Starts 2020
10Welton St: Ped/Bike Crossing at BroadwayStudy Starts 2020
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NE DOWNTOWN NEXT STEPS STUDY (2015)TIER 2 PROJECT STATUS
Project Name Status11 Blake St: One to Two Way Conversion (Broadway to 18th St) Needs Additional Study12 Curtis Park Traffic Calming Opportunities NTMP, Neighborhood Bikeways13 Lawrence St: Ped/Bike Crossing at Broadway Improved14 River North and Ballpark Complete Sidewalk Network Needs Additional Study15 Arapahoe St: Ped/Bike Crossing at Broadway Improved16 Champa St: Ped/Bike Crossing at Broadway Improved17 Curtis St: Ped/Bike Crossing at Broadway Not Started, Study Starts 202018 Stout St: Ped/Bike Crossing at Broadway Improved19 28th St: One to Two Way Conversion (Welton to Glenarm) NTMP Project20 24th St: Ped/Bike Crossing at Broadway Not Started, Study Starts 202021 27th St: One to Two Way Conversion (Welton to California) Needs Additional Study22 Study Connecting Parks to Destination Areas Needs Additional Study23 Curtis St Enhance Pedestrian Environment Needs Additional Study
Sheet1
Project NameStatus
11Blake St: One to Two Way Conversion (Broadway to 18th St)Needs Additional Study
12Curtis Park Traffic Calming OpportunitiesNTMP, Neighborhood Bikeways
13Lawrence St: Ped/Bike Crossing at BroadwayImproved
14River North and Ballpark Complete Sidewalk NetworkNeeds Additional Study
15Arapahoe St: Ped/Bike Crossing at BroadwayImproved
16Champa St: Ped/Bike Crossing at BroadwayImproved
17Curtis St: Ped/Bike Crossing at BroadwayNot Started, Study Starts 2020
18Stout St: Ped/Bike Crossing at BroadwayImproved
1928th St: One to Two Way Conversion (Welton to Glenarm)NTMP Project
2024th St: Ped/Bike Crossing at BroadwayNot Started, Study Starts 2020
2127th St: One to Two Way Conversion (Welton to California)Needs Additional Study
22Study Connecting Parks to Destination AreasNeeds Additional Study
23Curtis St Enhance Pedestrian EnvironmentNeeds Additional Study
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NE DOWNTOWN NEXT STEPS STUDY (2015)TIER 3 PROJECT STATUS
Project Name Status24 22nd St: One to Two Way Conversion (Champa to Stout) Needs Additional Study25 Glenarm Pl: One to Two Way Conversion (29th Street to Downing) Needs Additional Study26 Walnut St: One to Two Way Conversion (18th to Downing) Design 2020: Broadway to Downing27 Downtown Strategic Transportation Plan Travelshed Analysis DM: Downtown 2019-202028 Curtis St: One Way to Two Way Conversion (18th St to Broadway) Needs Additional Study29 California St: One Way to Two Way Conversion (Park Ave to Broadway) Needs Additional Study30 Champa St: One to Two Way Conversion (Downing to Broadway) Needs Additional Study31 Stout St: One to Two Way Conversion (Broadway to Downing) Needs Additional Study32 33rd St Multimodal Bridge (across UPRR tracks) RiNo Railroad Connectivity Study
Sheet1
Project NameStatus
2422nd St: One to Two Way Conversion (Champa to Stout)Needs Additional Study
25Glenarm Pl: One to Two Way Conversion (29th Street to Downing)Needs Additional Study
26Walnut St: One to Two Way Conversion (18th to Downing)Design 2020: Broadway to Downing
27Downtown Strategic Transportation Plan Travelshed AnalysisDM: Downtown 2019-2020
28Curtis St: One Way to Two Way Conversion (18th St to Broadway)Needs Additional Study
29California St: One Way to Two Way Conversion (Park Ave to Broadway)Needs Additional Study
30Champa St: One to Two Way Conversion (Downing to Broadway)Needs Additional Study
31Stout St: One to Two Way Conversion (Broadway to Downing)Needs Additional Study
3233rd St Multimodal Bridge (across UPRR tracks)RiNo Railroad Connectivity Study
-
F O O T E R
The NTMP is a new program from Public Works that identifies
and delivers solutions to holistically address our neighborhood’s transportation priorities and challenges, through proactive outreach to residents. The program thoughtfully identifies operational improvements and longer-term projects.
WHAT IS THE NEIGHBORHOOD TRANSPORTATION MANAGEMENT PROGRAM?
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
-
FIVE POINTS ACTION PLAN PROCESS
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
Spring/Summer 2018 Fall to Winter 2018 Summer 2019, Ongoing
-
FIVE POINTSACTION PLAN TIMELINE The timeline for the NTMP Five Points Action Plan has been
updated to reflect up-to-date information:
-
Plan is completed and uploaded to the NTMP Website NTMP Operational
Improvements are being installed/reviewed/designed NTMP Projects - Designs are in
the process of or planned to get underway over next 2 months.
FIVE POINTSACTION PLAN UPDATE
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
FINAL NTMP PROJECT MAP, PART 1
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
FINAL NTMP PROJECT MAP, PART 2
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NTMP PROJECT LIST & DESCRIPTIONSImprovement Type
Improvement Type
12 Larimer St and 31st St Intersection Daylighting, Crosswalks and Stop Bars18 Larimer St and 25th St Crosswalks and Stop Bars21 Arapahoe St and 32nd St New 4-Way Stop, Crosswalks and Stop Bars22 Arapahoe St and 31st St Crosswalks and Stop Bars24 Curtis St and 31st St New 4-Way Stop, Crosswalks and Stop Bars28 Curtis St and 25th St Intersection Daylighting37 Clarkson St and 26th Ave Intersection Daylighting38 Clarkson St and 25th Ave Intersection Daylighting39 Clarkson St and 23rd Ave Intersection Daylighting40 Emerson St and 26th Ave/28th St. New 4-Way Stop, Crosswalks and Stop Bars42 Emerson St and 23rd Ave Intersection Daylighting43 Washington St and 23rd Ave Crosswalks and Stop Bars44 Washington St and 22nd Ave Daylighting, Crosswalks
NTMP Operational Project Number & Project Name
2019 Installed
2019 Coming Soon
14 Larimer St and 29th St New 4-Way Stop, Crosswalks and Stop Bars, Intersect 16 Larimer St and 27th St Crosswalks and Stop Bars17 Larimer St and 26th St Crosswalks and Stop Bars
NTMP Operational Project Number & Project Name
Sheet1
NTMP Operational Project Number & Project NameImprovement Type
12Larimer St and 31st StIntersection Daylighting, Crosswalks and Stop Bars
18Larimer St and 25th StCrosswalks and Stop Bars
21Arapahoe St and 32nd StNew 4-Way Stop, Crosswalks and Stop Bars
22Arapahoe St and 31st StCrosswalks and Stop Bars
24Curtis St and 31st StNew 4-Way Stop, Crosswalks and Stop Bars
28Curtis St and 25th StIntersection Daylighting
37Clarkson St and 26th AveIntersection Daylighting
38Clarkson St and 25th AveIntersection Daylighting
39Clarkson St and 23rd AveIntersection Daylighting
40Emerson St and 26th Ave/28th St.New 4-Way Stop, Crosswalks and Stop Bars
42Emerson St and 23rd AveIntersection Daylighting
43Washington St and 23rd AveCrosswalks and Stop Bars
44Washington St and 22nd AveDaylighting, Crosswalks
Sheet1
NTMP Operational Project Number & Project NameImprovement Type
14Larimer St and 29th StNew 4-Way Stop, Crosswalks and Stop Bars, Intersection Daylighting
16Larimer St and 27th StCrosswalks and Stop Bars
17Larimer St and 26th StCrosswalks and Stop Bars
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NTMP PROJECT LIST & DESCRIPTIONS
NTMP Operational Project Number & Project Name Improvement Type
11 Larimer St and 32nd St Intersection Daylighting, Crosswalks and Stop Bars26 Curtis St and 27th St New All-Way Stop31 California St and 26th St Crosswalks and Stop Bars8 Larimer St and 35th St Intersection Daylighting, Crosswalks and Stop Bars9 Larimer St and 34th St Crosswalks and Pedestrian Crossing Signs, Intersection Daylighting10 Larimer St and 33rd St Intersection Daylighting, Crosswalks and Stop Bars13 Larimer St and 30th St Crosswalks and Pedestrian Crossing Signs, Intersection Daylighting15 Larimer St and 28th St Crosswalks and Stop Bars19 Lawrence St and 30th St Crosswalks and Pedestrian Crossing Signs41 Emerson St and 25th Ave Intersection Daylighting, Study Reverse 2-Way Stop (Stop Sign Flip Study)
2019 Coming Soon, continued
Sheet1
NTMP Operational Project Number & Project NameImprovement Type
11Larimer St and 32nd StIntersection Daylighting, Crosswalks and Stop Bars
26Curtis St and 27th StNew All-Way Stop
31California St and 26th StCrosswalks and Stop Bars
8Larimer St and 35th StIntersection Daylighting, Crosswalks and Stop Bars
9Larimer St and 34th StCrosswalks and Pedestrian Crossing Signs, Intersection Daylighting
10Larimer St and 33rd StIntersection Daylighting, Crosswalks and Stop Bars
13Larimer St and 30th StCrosswalks and Pedestrian Crossing Signs, Intersection Daylighting
15Larimer St and 28th StCrosswalks and Stop Bars
19Lawrence St and 30th StCrosswalks and Pedestrian Crossing Signs
41Emerson St and 25th AveIntersection Daylighting, Study Reverse 2-Way Stop (Stop Sign Flip Study)
-
LOOKING FORWARD
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
NTMP Five Points:oContinue to install Operational
ImprovementsoComplete designs on Five Points Projects,
advance constructionContinue study & design of NE
Downtown Neighborhoods Projects w/ fundingoUse data-driven decision makingoFunding needed for many projectsoCoordinate transportation improvements
with other City-led projects when feasible
-
N E I G H B O R H O O D T R A N S P O R T A T I O N M A N A G E M E N T P R O G R A M D E N V E R P U B L I C W O R K S
Brittany Price, PEEngineering [email protected]
Karen GoodCommunity Designer, Area [email protected]
FIVE POINTS ACTION PLAN UPDATETOPICSPast Studies:Ne downtown study (2011),�Next Steps (2015), �OverviewSlide Number 5Slide Number 6Slide Number 7�what is the neighborhood transportation management program?FIVE POINTS action plan PROCESSFiVE POINTS�action plan TIMELINEFiVE POINTS�action plan UpdateSlide Number 12Slide Number 13Slide Number 14Slide Number 15Looking ForwardSlide Number 17