fitman short presentation
DESCRIPTION
Overview of the FITMAN FI-PPP PHase II ProjectTRANSCRIPT
1
FITMAN PROJECT PRESENTATION
TXT PROJECT COORDINATION [email protected]
FITMAN Project Presentation 1
FITMAN Project Presentation 2
FITMAN Factsheet
Project No: 604674 Project Full Name:Future Internet Technologies for
MANufacturing
Duration: 24 months
Start date: April 1st 2013
Partnership:28 partners, 9 countries
Strategic Objective: FP7-2012-ICT-FI FI.ICT-2011.1.8: Use Case scenarios and early trials
Total Eligible Cost: 18.034.000 EURO
EC Contribution: 12.890.000 EURO
FITMAN Project Presentation 3
FITMAN Beneficiaries
Core Consortium (10 partners)
Original Equipment Manufacturers (4 partners)
SME Networks and Associated S/T (14 partners)
FITMAN Project Presentation 4
Mission and Objectives
The mission of the FITMAN (Future Internet Technologies for MANufacturing industries) project is to provide the FI PPP with a set of industry-led use case trials in the Smart, Digital and Virtual Factories of the Future domains, in order to test and assess the suitability, openness and flexibility of FI-WARE Generic Enablers, this way contributing to the social-technological-economical-environmental-political sustainability of EU Manufacturing Industries.
In order to accomplish the mission statement, the FITMAN project will deliver:• FITMAN Generic Platform for Manufacturing Industries, as a collection of
several Generic Enablers Implementations of Fi-WARE Chapters (WP1);• FITMAN Specific Platforms for Smart, Digital and Virtual Factories, as a
collection of several Specific Enablers Implementations belonging to Factories of the Future and Future Internet Enterprise Systems research (WP3)
• FITMAN Trials Platforms as instantiation of the selected Generic and Specific Enablers for 11 industry-driven multi-sectorial Trials (WP4-5-6)
• Generic and flexible Trials Verification and Validation Framework, encompassing concepts, methods and tools for Manufacturing Trials (WP2);
• Open-to-all FITMAN Phase III Package, to support FI-WARE PPP Phase III obj 1.8, Expansion of Use Cases, access to FITMAN Reports / Prototypes (WP8)
FITMAN Project Presentation 5
Industrial Trials and Impact
• Ten FITMAN Trial Experimentations and Lessons Learned by deploying and evaluating the FITMAN Trials Platforms in realistic Smart-Digital-Virtual Factories IT and business cases:
• Smart Factories Trials: TRW (LE) automotive supplier – Safe & Healthy Workplace, WHIRLPOOL (LE) white goods manufacturer – Mobile workforce, PIACENZA (SME) textile/clothing – Cloud Manufacturing.
• Digital Factories Trials: VOLKSWAGEN (LE) automotive manufacturer – PLM ramp-up for reduced Time to Market , AGUSTAWESTLAND (LE) aeronautics manufacturer – Training services for blue collar workers, AIDIMA (SME) furniture – Mass Customised Production, CONSULGAL (SME) construction – As-designed vs. As-built Interoperability.
• Virtual Factories Trials: APR (SME) plastic industry – Collaboration valorisation, TANet (SME) manufacturing resource management – Networked Business Innovation, COMPLUS (SME) LED smart lighting – Collaborative Production.
FITMAN Project Presentation 6
FITMAN Trials Galaxy
FITMAN Project Presentation 7
Automotive Supplier (Spain; led by: TRW Automotive + Innovalia; LE) White Goods OEM (Italy; led by: WHIRLPOOL + Politecnico Milano; LE) Textile/Clothing (Italy; led by: Piacenza + Softeco; SME)
Automotive OEM (Germany; led by: Volkswagen + Fraunhofer IPK ; LE) Aeronautics OEM (Italy; led by: AGUSTA WESTLAND and TXT e-Solutions
; LE) Construction Industry (Portugal; led by: Consulgal + Uninova; SME) Furniture (Spain; led by: AIDIMA + Universitat Politecnica de Valencia;
SME)
Plastic Industry (France; led by: A.P.R. + University Lumiere Lyon 2;
SME) Manufacturing Resource Management (UK; led by: TANet and
Coventry University ; SME) LED Lighting (Germany; led by: COMPlus Automation GmbH +
Fraunhofer Institute; SME)
FITMAN smart-digital-virtual Trials
Digital Factory
Virtual Factory
Smart Factory
FITMAN Project Presentation 8
Draft Reference Architecture for Trials
Cloud ManufacturingKnowledge
Future Internet Core PlatformGeneric Enablers
Applications/Services EcosystemsService Delivery FrameworkCloud Hosting and I/face to Network Devices
Internet of Things and Data/Context MgmtSecurity, Privacy and Trust
Business Ecosystem
Individual Factory/Enterprise
Future Internet Cloud
Interoperability ofServices/Platforms
Alignment of Knowledge/Models
Human-centric Manuf. Models
IoT-based Intelligent Manufacturing
Ecosystem Skills& Knowledge
Ecosystem Manuf. Capacity
Domain Ontologiesand Models
Ecosystem Collaboration &Innovation Platform & ServicesProduct Life Cycle Management PlatformService Life Cycle Management PlatformInnovation Life Cycle Management Platform
Collaborative Business Process / Project MgmtProduction Planning and Scheduling
Smart Factory (In)Tangible Assets
Digital Factory (In)Tangible Assets
Virtual Factory (In)Tangible Assets
Enterprise [Mobile] ApplicationsPlatform & Services
Enterprise Resource Planning ERP SystemCustomer Relations Management CRM SystemSupply Chain Management SCM System
Manufacturing Excution System MESAutomation, Control and SCADA System
FI PPPNetworksStorageCompute
FITMAN SEs:COINMSEEIOT@WorkCOMMIUSOpen source
Trials Specific Legacy Systems Integration as a Service
Visit our web site for more information about the project www.fitman-fi.eu
Contact: [email protected]
www.fitman.fi-eu 9
Follow us on