Fishbeck, Thompson, Carr & Huber, Inc.
Porous Pavement Up North
Meijer – Manistee, Michigan
Northern Michigan Green Infrastructure Conference
![Page 2: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/2.jpg)
Project Location – Manistee
![Page 3: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/3.jpg)
Project Site Looking East
![Page 4: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/4.jpg)
Project Site Looking East
![Page 5: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/5.jpg)
Design Focus: Stormwater Quality
� Porous paving� Catch basin
sediment sumps� Mechanical
sediment removal� Infiltration basins� Low-velocity
discharge� Maintenance plan
![Page 6: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/6.jpg)
North Team Member Parking Area
About 20% of the site pavement area is porous
![Page 7: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/7.jpg)
East Team Member Parking Area
![Page 8: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/8.jpg)
Stormwater Treatment Unit
Vortech: 80% sediment removalof first 1-inch rainfall
![Page 9: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/9.jpg)
Infiltration Areas
Two infiltration areas infiltrate 1.5- to 2-inch rainfalls
![Page 10: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/10.jpg)
Level Spreaders
Reduce discharge velocity to wetlands
Discharge velocity < 1fps
![Page 11: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/11.jpg)
Porous Mix Design is Critical
� Stone gradation� Removal of all fines� Smaller crushed stone in
pavement (1/2-inch)� Larger crushed stone in
reservoir (3/4-inch)� Modified binders and anti-
strippers in pavement to prevent drain down and raveling
� Asphalt content (5.5 to 6.5%)
� Air voids (18 to 22%)
![Page 12: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/12.jpg)
Preconstruction Test Strip
Installed at Elmer’s Traverse City office� Reviewed mix design� Tested reservoir stone
gradation� Determined rolling
temperature� Determined rolling
pattern and roller size� Compaction density
targets� Testing requirements
![Page 13: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/13.jpg)
Preconstruction Test Strip
Infiltration testing:� ASTM C1701 test
requires 150”/hour
� Results: 270”/hour
![Page 14: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/14.jpg)
Benefits of Porous Pavement
� Infiltration of stormwater� Less discharge to surface waters
(volume and quality)� Recharge groundwater
� Water removed from pavement structure� Much less cracking or potholing in pavement� Reduced ice/slip problems� Reduced salt application in winter
� Fewer stormwater inlet structures in parking lot� Fewer and smaller storm sewers on project� Possible elimination of detention ponds on sites
![Page 15: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/15.jpg)
Maintenance
� Maintenance staff education� Sediment clogging� Snow plowing
![Page 16: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/16.jpg)
Questions?
![Page 17: Fishbeck, Thompson, Carr & Huber, Inc. - Michigan · 2016. 2. 26. · Fishbeck, Thompson, Carr & Huber, Inc. Thank You! Anthony Mourand, PE Vice President – Civil Engineering/Land](https://reader036.vdocuments.mx/reader036/viewer/2022071114/5feaed37db93fe169c0d515a/html5/thumbnails/17.jpg)
Fishbeck, Thompson, Carr & Huber, Inc.
Thank You!
Anthony Mourand, PEVice President – Civil Engineering/Land [email protected]