Page 1: First Street Corridor Final

First Street CorridorMike Rizzitiello, Jen Weizeorick, Dennis Latto, Sal Villardita, Ed Lelo, and Bobby Higgins

Page 2: First Street Corridor Final

Arial Map

Page 3: First Street Corridor Final

Zoning and Land Uses

Page 4: First Street Corridor Final

Past Zoning1950

Zoning1986 Zoning

Page 5: First Street Corridor Final

Existing Zoning

Page 6: First Street Corridor Final

Existing Land Uses

Page 7: First Street Corridor Final

Existing Conditions

Page 8: First Street Corridor Final

Sewer and Drainage• Most city streets in area have

storm sewer. • Some streets like sections of

Marshall, Willow, Bailey, and Water lack proper drainage.

• Boneyard Creek and Healey Street Detention Basin are where the majority of surface storm water is drained.

• Springfield Ave and Logan Street viaducts flood frequently.

• Adequate sanitary sewer serves area. (located in middle of most city streets.)

Page 9: First Street Corridor Final

Utilities•Fourteen Fire Hydrants in the study area.

•Natural Energy and Electricity Provider is AmerenIP. Most gas mains located on west side of the street.

•Electricity lines are above ground.

•Public water supply is operated by a private company: Illinois American Water. Most mains are on east side of street.

Page 10: First Street Corridor Final

Building Conditions• Manually walked every

street in the area and recorded a numerical point value for each building.

• 1=Perfect Condition• 2=Good Condition• 3 = Fair Condition• 4 = Poor Condition• 5 = Very Poor Condition.

Page 11: First Street Corridor Final

Road Conditions and Lighting

Page 12: First Street Corridor Final

Parking• Many parking options:

▫Metered Parking: along University Ave, portions of Locust St. and Chester St, and some on the east side of Second St.

▫2-Hour Parking: exist along White St.▫Free Parking: exists along all thoroughfares

south of Logan and west of First St.▫Lots: metered parking lot owned by the city on

southwest corner of Second and University Ave.

▫Large leased lot owned by the CU Metro Transit District locate on the west side of Water St. at Baily

Page 13: First Street Corridor Final

Parking Standards

Page 14: First Street Corridor Final

Transportation•Trains: two railroad tracks border the

western boundary of site. •Bicycling: routes along Logan and White

St. as well as the full extent of First St. through this corridor.

•Buses: many bus routes service the area due to the areas proximity to the Illinois Terminal.

•Vehicular: First St. and University Ave. handles the majority of traffic in the.

Page 15: First Street Corridor Final
Page 16: First Street Corridor Final

Crime/Public Safety•Area led by Lt. Brad Yohnka.

•Crime has decreased in past few years.

•Corridor is directly south of police department.

•Local businesses main concern is vandalism on buildings.

•Most crime occurs on western section near railroad tracks.

• Lack of lighting• Vacant/Storage lots

First Street Corridor Total Citations

0

200

400

600

800

1000

1200

1400

1600

1800

2000 2001 2002 2003 2004 2005 2006 2007

Year

Crim

es

Displayed graph covers University to Springfield and Neil to Fourth.

Page 17: First Street Corridor Final

TIF Districts

Page 18: First Street Corridor Final

Issues

Page 19: First Street Corridor Final

Issues and Forces Map•Purple arrows represent forces• West-People wanting to live

close to downtown• East-Boneyard completion

may result in demand• North-Proximity to I-74

allows for First St connection

•Green grid lines show underutilized land• Abandoned buildings along

western half• Murphy’s Deli

•Bold green lines along First Street represent poor streetscape• Lighting• Walkway condition

•Brown grid lines display vacant land

Page 20: First Street Corridor Final

Strengths

Page 21: First Street Corridor Final

Weaknesses

Page 22: First Street Corridor Final

Opportunities

Page 23: First Street Corridor Final

Threats

Page 24: First Street Corridor Final

Major Issues•Poor Infrastructure•Underutilized Land•Vacant Buildings•Absentee Owners•Poor Connectivity •Lack of Green Space•Parking

Page 25: First Street Corridor Final

Vision StatementThe First St. Corridor is a vital link between downtown Champaign and Campustown. In addition, its proximity to the Illini Terminal and local bus routes, attracts traffic through the area providing it with a high potential for growth. By promoting new mixed use development that is compatible to the surrounding land uses and improving the overall infrastructure of the study area, we hope to capitalize on the proximity to growing developments and to draw attention to the area.

Page 26: First Street Corridor Final

Goals

Page 27: First Street Corridor Final

Goals•Complete Streets•Encourage New Investment•Attract New Development•Create Dynamic Business Environment•Insist on Design Quality•Enhance Public Facilities•Promote Connectivity

Page 28: First Street Corridor Final

Land Use Alternatives

Page 29: First Street Corridor Final

Alternative 1

•Zone area in promotion of Land Use Districts

•Eliminate vacant and underutilized land through registration tax

•Improve infrastructure to facilitate these uses

Page 30: First Street Corridor Final
Page 31: First Street Corridor Final

Alternative 2•Infrastructure improvements

concentrated on First and Logan Streets – complete streets

•Leave current zoning•Promote a business association to prevent

incompatible new developments in corridor

Page 32: First Street Corridor Final

Recommended AlternativeMix of two alternatives1 - Division of the area into several

districts and taxation of underutilized land

2 - Improve basic infrastructure in order to provide for new developments and zoning, beginning with First and Logan as described in alternative 2.

Page 33: First Street Corridor Final

Implementation Strategies

Page 34: First Street Corridor Final

Phase 1 – North First Street

• Wider sidewalks• Landscaping• Overall Beautification

▫ Trash screens▫ Newer/More Attractive

LightingEstimated Design Cost: $376,423.69Estimated Construction Cost:$2,016,172.34

Page 35: First Street Corridor Final

Phase 2 – South First Street• Estimated Design Cost:

$585,035.67• Estimated Construction

Cost: $3,133,524.14

Page 36: First Street Corridor Final

Phase 3 – Logan Street• Bridge Improvements• Public Art• Pavement markings -

center turn lane• Reconfigure

intersection with First St.

• Estimated Design Cost: $1,271,966.68

• Estimated Construction Cost: $3,558,040.00

Page 37: First Street Corridor Final

Phase 4 – Sub-Streets• More street lighting• Curbing and gutters• Additional stop signs on

Marshall, Willow, and Bailey Streets.

• Proper traffic markings• Estimated Design Cost:

$3,360,062.11• Estimated Construction

Cost: $17,995,980.59

Page 38: First Street Corridor Final

Funding Strategies•Extension East University Ave. TIF

District – Business Improvement District•Service Area Assessments

Page 39: First Street Corridor Final

The End – Questions?