TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401
400 Chestnut Street Tower I1
September 10, 1982
V3M-50-390/82-M DB70-50-391/82-80
U.S. NIulear Replatoorl Comissil Regim n Attn: W. Jme s. O'l•eilly, Re•aal Administrator 101 lMlaetta Street, Bel3 3100 Atlanta, Georgia 30303-
N
b
~ y~.
fr.
Dear r. O'Reilly:
UMTT R NU-R ?LAC.- UNI. S I MD2 - LACK Or QU ICAT•F•U , RINUMI
FLATI - tND-50-390/82-.811 URD-503t1/82.B -. VIMS lliM~HRFR
The msbjeot defliommy "a- Initially %pwrted to NC-O1l0 Inspector
R, V. Crienjak on may 19, 1982 in aoeordakfm with 10 Ct 50.55(e) so NCR (A* U17. lclosew Is our first interim r port. Me expect to
suamit our next report cc or about o 1,-1 .
if 7Q" br My TOAUS. Plan. Pt~ An to.b with .1. M. Shell at
very truly yow5 1
L, Il. Hills, )m Nucolear Licensing
nclosure co: Mr. lichaerd Q- DGeYoQwu - lintor (IMlao)MPO)
Wfige of nspeotion and Inftragt UJ.3. fNt e lau.s
Wasim~ D., C. m"55
j2'm'otW&U4 6 PDR
& -A
A41I..qu.' op tw.itl1i & POe
A
.
i5•LCURB
- IE~ATT VAN-*MI5BR ThAfr MNIS i AND 2 -AKGY QUALWCATION Pall zmOWgmPA
IRDa-50-390/82-84A, WORD-0-391/82-80
In 13774 US Nuclear, Inoo, poa'r.d Nozrnosi Qeorgia, rfti[, TA-by Ute j_-0QQ1Z~xW-, of the amppletion -of- their deoign verifleetlon iftlciit roT'A awiport emedgent-plitex havire7 DSmdesiped pipe support• ids. ?4ie letter identifed several supports ft~r th Reaotar Co0Q1t -$yste! and CoWUMnt OC amat _SC pIPih&-ato-tts
-- Bar- exOeede• aWlowable joads and a4vised TVA that sepport degfVLrevistonit r being -Initsted. In 198 1 US suppl•gIL t vith
rel~ns ~ ' ~r. A.T-hda~ed ~a teoriginal Bee drawings to sit personnel, these support mvisioas rere Incorporated
intotlwplant -eutgr#i*IV-9 2W5. AnM oonstructioft peracanel-befa to iuplea•-it therequired modification. A nonconformuaoe report (E}) was MnUw ±Z6itisted =riot-thlw- tU# pa-i-ad t* itn*tifi~this -
a.? Tiv%':Y' tm %a 10 Wfl50.55(e) item Wes written to identity both the unqualitied embedment plates and the failure to w•ite a NCR.
Intone P troe
hal baaomfq~eId th is 0016riisiomt of the DS supports end Is 4wrrectly tz the preoaaa -of implementing the field modifications. At this time, TVA la Weastigating the ourse and action. required to pm.vent recuroenme.