fire safety inspection report - alliance groupalliancegroupbd.com/accord fire safety inspection...
TRANSCRIPT
FIRE SAFETY INSPECTION REPORT
ALLIANCE GARMENTS LTDHOUSE # 8 & 10, ROAD # 3, SECTION # 7, MIRPUR
INDUSTRIAL AREA, DHAKA-1216
May 5, 2014
Other Factories: None
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 2
Fire Safety Inspection ReportAlliance Garments Ltd
IntroductionAlliance Garments Ltd manufacturing complex was surveyed for fire safety on5/5/2014 by Hughes Associates, Inc.
The purpose of the survey was to identify significant fire safety issues and toprovide recommendations for remediation based on applicable standardsspecified by the Accord. The scope of this initial fire safety inspection waslimited to the review and identification of major fire safety issues. Theinspection did not include identification of minor deficiencies, which will befurther addressed as part of follow-up inspections.
LimitationsThe information in this fire safety inspection report was obtained during a visitto the facility and during interviews with local factory management. It has notbeen possible to provide independent verification for all the information anddata collected, and, therefore, Hughes cannot accept general responsibility foromissions or errors arising from inaccuracies in this report from the informationobtained.
The findings and recommendations in this report are not intended to imply,guarantee, ensure or warrant compliance with any government regulations.Additionally, the results do not imply in any way that compliance with thefindings or recommendations as stated in this report will eliminate all hazards,risks or exposures or that hazards, risks or exposures not referred to in thisreport do not exist. Compliance with the findings and recommendations statedin this report does not relieve the factory owner from obligation to comply withspecific project requirements, industry standards, or the provisions of any localgovernment regulations.
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 3
Factory name(s):Alliance Garments Ltd
Factory Address:House # 8 & 10, Road # 3, Section # 7, Mirpur Industrial Area, Dhaka-1216
Points of Contact:Tarikul Islam Rajib,Managing DirectorAlliance Garments Ltd88-01678 [email protected]
Md. Kamruzzaman Khan (Zaman),Admin & Compliance ManagerAlliance Garments [email protected]
General Factory Information
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 4
General Building Information - Alliance Garments LtdNo. of Stories Below /Above Grade
0 / 6
High Rise No
High Rise Comments: 15.25 meters height to highest occupiable floor.
Occupancy Classification G2 Industrial
Floor Plans Available Yes
Ground Floor Plan 1st Floor Plan
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 5
3rd Floor Plan Building Section
Date Of Construction 1996
Major Renovations No
Other Tenants No
Floors Occupied ByFactory
All floors.
Use
Storage/Day Care/DiningOffice/Cutting/SampleSewingFinishingSewingSewing/Finish
Floor Occupant Load
G12345
1568
20214718491
Construction FeaturesNon-Combustible Yes
Fire-Resistive Yes
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 6
Building SurroundingsNorth Open to road
South Open to road
East No separation to a building at all floors.
West Approx. 5' separation to a building at all floors.
Vertical OpeningsStairs Enclosed in Fire-Rated Construction?
Yes
Unsealed Penetrations inStairs
No
Unprotected OpeningsFrom Stairs
Yes
Shafts Enclosed in Fire-Rated Construction
Yes
Floors withOpenings/Penetrations
No
Other Vertical Openings No
Egress FeaturesTwo (2) exit stairs serve the building. Egress from the ground floor is provided by three (3)exits. Each floor had an adequate number of exits with sufficient exit capacity based onoccupant load. All exit stairs were not remotely located. All exits discharge to the exterior of thebuilding. All exit stairs are open to the floors due to unprotected openings.Sliding gates or roll-up doors were used at building exits, exit stairs and exit discharge. Egressdoors with locking features were present at exit stairs and exit discharge. All gates and doorswere open and unlocked during the inspection. Emergency evacuation plans were located atexit stairs. Fire drills are conducted monthly and records were maintained.
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 7
Floor Exit Capacity
G12345
600350350350350350
No. Exits
322222
Occupant Load
1568
20214718491
General
Number of ExitsAdequate
Yes
Exits Remote No
Exit Doors
Sliding Gates/DoorsUsed?
Yes
Egress Doors SwingCorrectly?
Yes
Egress Doors Lockable? Yes
Exit Stairs
All Stairs Discharge tothe Exterior?
Yes
Handrails on at least OneSide?
Yes
Storage Located inStairs?
No
Exit Access From Factory Areas
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 8
Storage in Egress Paths? No
Egress Paths ofAdequate Width?
Yes
Excessive TravelDistances, CPT, DE's
No
Emergency Planning
Emergency EvacuationPlans Provided?
Yes
Fire Drills Conducted Yes
Records Maintained Yes
Sample of evacuation plan Sample of evacuation map.
Fire Protection Features
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 9
Sprinkler SystemNo automatic sprinkler protection was provided in the building nor is it required.
Fire Hose SystemHose reels with 1 in. hoses were provided adjacent to the west stair.
Hose Size(s) Provided 1 in.
Locations Adjacent to west stair.
Example of fire hose
Fire Water SupplyThe fire hose system is supplied by gravity from a roof tank having a reported capacity of 5,000L. The tank is fed by an underground cistern (with reported capacity of 35,000 L.). There wasno fire pump connected to the system.
Source(s) Tanks.
Location Roof.
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 10
Capacity Underground reservoir 35,000 L. / Roof tanks 5,000 L.
Fire Pump No
Fire Alarm SystemA manual fire alarm system was provided in the building. It consisted of manual notificationswitches. A single horn unit were provided at the second floor. It was asserted that theactivation devices are interconnected so the activation of a single device provides audiblenotification for the whole building. There is no fire alarm panel or system supervision. Therewere no records or assertions of regular testing or maintenance of the fire alarm system.
Type of System Manual fire alarm (audible & visual)
Fire Panel Location None
Visible NotificationAppliances?
Yes
Audible NotificationAppliances?
Yes
Alarm Annunciation ManualWhole Building
Functional TestConducted
No
Regular Inspection,Testing, & Maintenance?
No
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 11
Fire alarm switch Sound notification.
Fire Detection SystemSingle station smoke alarms are located in various places throughout the factory. These smokealarms are not tied into the fire alarm system. In the event they detect smoke, they will providea local alert sound. There were no records or assertions of regular testing or maintenance ofthe fire detection system.
Type of Detectors Single Station Smoke Alarms
Regular Inspection,Testing, & Maintenance?
No
Single station smoke alarms
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 12
Portable Fire ExtinguishersPortable fire extinguishers, consisting of a mix of CO2 and dry chemical extinguishers, areprovided throughout the building. Inspection tags show recent and up-to-date inspections.
Types Provided CO2, Dry chemeical
AdequateNumber/Spacing?
Yes
Sample of Fire Extinguisher Sample of Fire Extinguishers
Manual Fire Fighting EquipmentEach floor had firefighting equipment staged outside the main floor entrances. Types of manualfirefighting equipment provided included: buckets, escape hoods, bolt/lock cutters, shovels,stretchers and personal protection equipment.
Types of EquipmentProvided
Buckets, escape hoods, bolt/lock cutters, shovels, stretchersand personal protection equipment.
Location of Equipment Adjacent to stairs.
Other Features
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 13
Emergency Lighting & Exit SignsEmergency lighting was located inside and outside the exit enclosure walls. Lighting consistedof multiple compact florescent lights that have an alternate “Instant Power Supply” (IPS). Eachfloor had a number of illuminated exit signs (a mix of directional and non-directional) locatedalong the exit access and at exits on each floor. The factory reports that these are serviced bynormal electricity as well as “Instant Power Supply” (IPS). There were no records or assertionsof regular testing or maintenance of the emergency lighting system.Emergency lighting has on/off switches throughout the factory.
Exits and Exit AccessProperly Marked withExit Signage
Yes
Emergency Power IPSBattery
Emergency Lighting forExits & Exit Access
Yes
Regular Inspection,Testing, & Maintenance?
No
Sample of emergency light. Sample of exit sign
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 14
Sample of emergency light
ElevatorsNo elevator was provided in the building.
GeneratorsOne (1) diesel powered generator serves the building. These generator is located in a separatestructure located north of the building. The roof structure is not fire rated.
Location(s) Ground floor
Inside Fuel Storage No
Fire Rated SeparationsProvided?
Yes
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 15
Generator Room Generator Room
BoilersA boiler is located on the ground floor of the building. The boiler is surrounded by partial-heightwalls without full separation from the factory floor.
Location(s) Ground floor
Fire Rated SeparationsProvided?
No
Boiler room open to floor Boiler room open to floor
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 16
TransformersA transformer is located on the ground floor of the building. The transformer is surrounded bypartial-height walls without full separation from the factory floor.
Location(s) Ground Floor
Fire Rated SeparationsProvided?
No
Transformer room Transformer room
Storage AreasA storage area was located in the 5th floor, fire rated separation to the factory floor was notprovided.The storage room on the ground floor had ventilation ports along the north wall thatcompromise the fire barrier; also the openings are unprotected.
Fire Rated SeparationsProvided?
No
Open to Factory Floors? Yes
Open to Exit Discharge? No
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 17
Additional InformationChild care is provided and located next to an exit.
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 19
Findings & Recommendations
Table 1 summarizes the major fire safety issues identified during the inspection.Recommendations have been provided to address each issue.
An implementation schedule shall be developed by the factory to remediate each of thefindings. The specific timing of improvements, including any requested extensions due todesign / installation constraints, shall be submitted to the Accord for approval.
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 19
No. Category Finding RecommendationRemediationTimeframe
Table 1. Findings And Recommendations
Fire RatedConstruction
The boiler room is notseparated by fire-ratedconstruction.
The boiler room islocated in the groundfloor next to the diningarea.
Separate the boiler room by aminimum 1-hr fire-ratedconstruction. Seal and/orprotected all openings tomaintain the required fireseparations
Within 3months
F-1
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 20
Fire RatedConstruction
The exit stairs are notseparated from workareas, on each floor byfire-rated construction.
Provide minimum 1.5-hr firerated doors and seal allunprotected openings toseparate the exit stairs fromwork areas and other buildingspaces on all floor levels.Ensure that the fire doors areself-closing and positivelatching and that they areprovided with fire exit (panic)hardware where servingproduction floors.
If fire doors are required to beheld open for functionalreasons, provide automatic-closing devices tied to the firealarm system.
Within 3months
F-2
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 21
Fire RatedConstruction
Areas used forcombustible storage arenot separated by fire-rated construction.
Storage area is locatedin the 5th floor.
Provide dedicated storagerooms separated by minimum1-hr fire-rated construction.
Where separate storagerooms are not feasible,provide defined storage areasand limit the storagearrangement as follows:- Maximum height of 2.4m andmaximum area of 23m2- If sprinkler protected:maximum height of 3.66m andmaximum area of 93m2
Separate areas of unenclosedcombustible storage by aminimum clear distance of 3m.
Within 3months
F-3
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 22
Fire RatedConstruction
The transformer room isnot separated by fire-rated construction.
The transformer room islocated in the groundfloor next to the storageroom.
Separate the transformer roomby a minimum 2-hr fire-ratedconstruction. Seal and/orprotected all openings tomaintain the required fireseparations
Within 3months
F-4
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 23
Fire RatedConstruction
Storage rooms withcombustible materials atground floor were notfire separated or hadunprotected openings.
Separate the storage roomsby a minimum 1-hr fire-ratedconstruction.
Provide minimum .75-hr firerated doors and seal allunprotected openings toseparate the storage roomsfrom work areas and otherbuilding spaces at the groundfloor.
Within 3months
F-5
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 24
Egress Egress doors / gateswith locking features areprovided at west exitstairs and exitdischarge.
Remove locking features fromall egress doors / gates.
If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.
ImmediateF-6
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 25
Egress Collapsible gates androll-up doors areprovided at buildingexits, exit stairs and exitdischarge.
Lockable sliding gatesare provided at weststair and exit dischargeand roll-up doors at eastexit stair.
Replace all gates and roll-updoors along the means ofegress with side-hinged,swinging egress doors.
If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.
Within 1month
F-7
Egress The exits are notremotely located fromeach other such that asingle fire event couldcompromise both exits.
At all floors the approx.separation of exit stairsis 46' and the minimumseparation requiredbased on the diagonaldistance of the floors isapprox. 52'.
Modify exit arrangement. Within 6months
F-8
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 26
Fire Protection The fire alarm system isantiquated, not a listedsystem, and does notprovide alarm andnotification featuresconsistent withacceptable standards.
Replace the fire alarm systemwith a new, listed addressablefire alarm system inaccordance with NFPA 72.
Designwithin 4months,install
within 9months
F-9
Fire Protection Inspection, testing, andmaintenance for the firealarm system was not inaccordance with NFPA72.
Inspect, test and maintain thefire alarm system, and keepwritten records on-site, inaccordance with NFPA 72.
Within 3months
F-10
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 27
Fire Protection The building is equippedwith single-stationsmoke alarms. Smokealarm activation soundsonly a local alarm anddoes not provideautomatic fire alarmnotification ofoccupants.
Replace the single-stationsmoke alarms. Provideautomatic smoke detectionthroughout the building inaccordance with NFPA 72.
Within 6months
F-11
Accord - Bangladesh RMG Fire Safety InspectionAlliance Garments Ltd
Page 28
EgressLighting
Inspection, testing, andmaintenance records forthe emergency lightingsystem were notavailable.
Inspect, test and maintain theemergency lighting system inaccordance with TheACCORD standard. Keepwritten records on-site.
Within 3months
F-12