“fire safety in the channel tunnel” - arena international€œfire safety in the channel tunnel...

47
Caroline Wake Eric Rebeyrotte Steve Demetriou Channel Tunnel Safety Authority Fire Protection and Safety in Tunnels Conference Oslo 23-24 September 2015 “Fire Safety in the Channel Tunnel”

Upload: vuongdung

Post on 20-Apr-2018

246 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Caroline Wake Eric Rebeyrotte

Steve Demetriou

Channel Tunnel Safety Authority

Fire Protection and Safety in Tunnels Conference Oslo

23-24 September 2015

“Fire Safety in the Channel Tunnel”

Page 2: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

The Channel Tunnel:A vital link

Rome Bordeaux LYON

TOURS

LE MANS

RENNES

LAVAL

BREST

DISNEYLAND

PARIS

PARIS

LILLE

CALAIS

BRUSSELS

GHENT

THE HAGUE

AMSTERDAM

Frankfurt

ASHFORD

LONDON

Waterloo

BIRMINGHAM

The North /

Scotland

Hamburg

Zurich

Barcelona

BRUGES

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 3: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Channel Tunnel History

•1986 – Treaty of Canterbury Signed

•TML – A joint venture consortium between UK & France

•1990 – Service tunnel completed

•For the first time in 12000 years, people can walk across the channel

•8 years to design

•Cost of £9.6 billion = €13.4 billion

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 4: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Open for Business

•The Channel Tunnel was officially opened by HM the Queen and President Mitterrand on 6 May 1994

•On the 19 May 1994 the Channel Tunnel opened as a commercial business

•Eurotunnel operate the Concession

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 5: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Governance Arrangements

Inter-Governmental Commission (NSA)

Channel Tunnel Safety Authority

Rescue and Public Safety

Working Group

Emergency Planning

Committee/s

Rail Safety and Transport

Working Group

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 6: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

The Terminals

Folkestone - Kent Sangatte - Calais

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 7: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

The “Concession”

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 8: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

NVS

SVS

Fr portal

3 km Sangatte

38 km

Shakespeare Cliff

UK portal 9 km

Tunnel Ventilation

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 9: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Rail Running Tunnel [7.6m diameter]

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 10: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Service Tunnel [4.8m diameter]

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 11: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Cross Passage Door

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 12: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Eurotunnel Freight Shuttle

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 13: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Eurotunnel Passenger Shuttle

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 14: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Class 373 (Eurostar) Train

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 15: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Class E320 (Eurostar) Train (in service November 2015)

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 16: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

National Freight Trains

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 17: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Channel Tunnel and SRT TSI

The design of the CT is different from the requirements of the Safety in Railway Tunnel (SRT) TSI for very long tunnels (more than 20 km long):

The service tunnel provides a good level of safety and is not compulsory in SRT TSI.

The running tunnels have continuous water supply throughout, which can be used by fire fighters. This is not required by the SRT TSI

Installation of four “SAFE” (Station d’Attaque du Feu) stations in 2011. These are dedicated to lorry shuttles and freight trains and do not provide enough evacuation facilities to comply with the fire fighting points specified in SRT TSI 1303/2014, clause 4.2.1.7.e

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 18: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Rolling stock requirements

All trains for passengers using the tunnel must have a running capability in case of fire of 30 minutes because we want them to keep running and leave the tunnel so that passengers can be evacuated outside the tunnel.

Category B trains (LOC & PAS TSI) only have 15 minutes running capability

Specific case in the LOC & PAS TSI was agreed, on the basis of a risk analysis referring to:

In the worst case it would take 30 minutes for a train on fire to get out of the tunnel

Stopping and evacuating the passengers into the service tunnel would

not provide the equivalent level of safety to taking them out of the tunnel (although it is possible to do so if the train fails)

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 19: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Channel tunnel specific case (LOC & PAS TSI)

LOC&PAS TSI 1302/2014, clause 7.3.2.21, provides 2 possibilities for the CT:

Running capability must be 30 minutes at 100 km/h, as usual, OR

Compliance with a national rule permitting some trains with 15 minutes running capability at 80 km/h to use the tunnel

National rule has been defined and issued for consultation which ended on 28 August 2015. Need to assess the risk and maintain the level of safety in the tunnel.

Will require a change in principle – when a fire is identified on a train with only 15 minutes running capability it will have to stop and evacuate immediately as it cannot be guaranteed to reach the end of the tunnel.

Train companies will need to undertake an additional risk analysis to demonstrate the level of safety is improved or maintained.

Need to guarantee the evacuation of passengers into the Service Tunnel within 15 minutes from the fire starting.

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 20: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

The existing procedures for evacuating a passenger train:

No real case of application until now:

because of the very high level of safety of these specific passenger trains (Eurostar and ET passengers shuttles)

because there are means of fire extinction inside the engines and the carriages

The standard procedure is to drive the train out of the tunnel to an emergency siding

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 21: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

The existing procedures for evacuating a passenger train:

If a train on fire is not able to get out and stops in the tunnel, the passengers have to walk on the sidewalk until the next cross passage door (gap between two CP: 375 m; length of a HST: 400 m; length of a shuttle: 750 m). In a controlled stop the doors of the train align with the CPDs

In an uncontrolled stop the existing procedure for a fire separating the train in two parts is to use the ventilation to provide fresh air to the longest part of the train and to evacuate this part, and then to reverse the ventilation and evacuate the other part of the train

An exercise in January 2014 showed that this procedure takes too much time (1 hour)

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 22: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

The search for a new procedure of evacuation:

CTSA commissioned studies to help accelerate the passengers evacuation

The study examined:

Reports from actual fires on passenger trains,

Fire test data,

Human behaviour theories,

Modelled different evacuation procedures

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 23: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

The study concluded that:

A number of factors will have an impact on the number of people who will die or be seriously injured at these type of incidents. These factors included: Speed of fire development within the train Human management of the situation Effectiveness of evacuation systems, routes and procedures Quality of information and instruction given to the travelling

public

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 24: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

Findings regarding human behaviour included:

Railway operators should develop a standardised information strategy that sets out who gives the information, what information is given, how and how often it is given and in which languages

“Panic”, as people commonly perceives it, eventually turns out to be a much rarer phenomenon than expected when people’s actions are analysed

Existing relationships/roles between individuals are maintained when a situation of evacuation occurs (this means that train staff who are implicitly perceived as authority representatives and knowledgeable individuals are of great importance in the evacuation management).

To be able to cope with this responsibility and to deliver clear information to the public while keeping their composure, train staff have to be well prepared and trained, have a clear definition of their responsibilities and a basic notion of crowd management.

Staff should be equipped with appropriate means of communication and crowd orientation.

During the evacuation of a train, high densities of people are foreseeable. Passengers tend to behave like people surrounding them when suffering from a lack of information, therefore information given to passenger is crucial if particular actions or behaviour are expected from the public.

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 25: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Developments in passenger evacuation arrangements

Modelling of different procedures showed it was feasible to evacuate in a single phase rather than reverse the ventilation for two phase evacuation

Use of ‘all doors’ for evacuation was quicker than using ‘end doors’ but more time was spent on the evacuation walkway because it is narrow

Times to reach the Service Tunnel for both methods were equivalent but less exposure to fire products using ‘end doors’

CTSA/IGC will be considering proposals for new procedures based on these findings later in 2015

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 26: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Eurotunnel

First Line of Response (FLOR)

Personnel from KFRS & ONET Securitie from 1 January 2013]

Second Line of Response (SLOR)

UK ERO’s

Second Line of Response

(SLOR) French ERO’s

Emergency Response Management

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 27: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FLOR – First Line of Response Patrol the Service Tunnel in Service Tunnel Transportation System

(STTS) vehicles

2 teams of 4 based close to Portals.

Not restricted to mid-point boundary:

Main role: evacuation of passengers + initial fire fighting

UK FR

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 28: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Emergency Response Contractors Duties

UK (KFRS) and French (ONET Securitie) FLOR work under

contract to Eurotunnel with the primary duties of:-

- Assisting the train crew with evacuation management.

- Provide first aid treatment for injured casualties

- Provide casualty care and assist train crew with the

transfer of passengers onto an evacuation train.

Both KFRS and SDIS62, have a statutory duty to undertake SLOR

duties regardless of the FLOR contract position.

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 29: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

SLOR - Second Line of Response UK & French Emergency Response Organisations (EROs)

Deployment underground via STTS Emergency fleet

UK 2 X SLOR FIRE – Personnel & equipment

2 x Ambulances – Equipment + 2 Stretchers

Communications STTS

FR

2 X SLOR FIRE – Personnel & equipment

2 x Ambulances – 2 x Equipment + Stretchers

Communications STTS

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 30: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Channel Tunnel Fires – (Freight Shuttles)

18 November 1996 RT South, Interval 3 (France)

21 August 2006

RT North, Interval 4 (UK) 11 September 2008

RT North, Interval 6 (France)

29 November 2012 Emergency Sidings (France) 17 January 2015 RT North, Interval 4 (France)

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 31: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

1996 Fire

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 32: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

2006 Fire

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 33: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

2008 Fire

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 34: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Fire Fighting Operations

The CT presents many challenges:

Access restrictions - transfer of personnel and equipment to the incident scene.

Distance of travel to the incident scene.

Arduous conditions – extreme temperatures and high humidity.

Communications, language.

Small quantities of dangerous goods maybe present

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 35: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Cross Border Considerations Different cultures – different approach

Language Training Procedures

Different national processes

CBRN Hazmat

Organisational structures French report to Prefect – UK independent

Equipment

Hose connection Breathing Apparatus

Incident management

Command and control

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 36: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Incident Structure

UK FRANCE

INCIDENT

PCO Incident

Co-ordination

Centre

Fire Equipment

Management

Centre

Fire Equipment

Management

Centre

Communications Vehicle

Video Conferencing

Eurotunnel

Rail Control Centre

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 37: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 38: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

PROJECT SALAMANDER

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 39: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

The Two Phases of Project Salamander

Salamander Intervention SAFE

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 40: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Fire Fighting Intervention

• Project “Salamander” initiated after the fire on the 11 September 2008

• Developed by a “partnership” approach • Based on six predetermined scenarios • Catenary Earthing procedures • Deployment of water curtains to prevent longitudinal fire spread.

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 41: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FLOR Intervention

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 42: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FLOR Intervention Briefing Diagrams

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 43: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Salamander Phase Two - SAFE

• “SAFE” (Stations d’Attaque du Feu) station project

• Partnership approach to developing a innovative system for the future

• Water Mist Fire Suppression System

• Each WMFSS head – 50lpm @ 50Bar

• Still a need for a F&RS intervention to extinguish the fire

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 44: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 45: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

Page 46: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Fire 17th January 2015

FPST Conference Oslo 23 & 24 September 2015 Channel Tunnel Safety Authority

• 12:00hrs arcing of catenary at UK

portal

• 12:22hrs fire alarm actuated

• Controlled stop of Freight shuttle

• 16km from French portal

• Too late to stop in a SAFE station

• 38 passengers and 3 staff

evacuated to Service Tunnel – no

injuries

• French and UK fire services

responded

• Fire brought under control at

16:40hrs

• RAIB and BEATT investigating

Page 47: “Fire Safety in the Channel Tunnel” - Arena International€œFire Safety in the Channel Tunnel ... - Assisting the train crew with evacuation management. ... PROJECT SALAMANDER

Questions?