SCHEDULE B2
Finishing Schedule – September 2018
Walls:
Interior: Clay brick, plastered and painted with one coat Dulux Plaster Skim and two coats Dulux Acrylic washable. (Colour as per moodboards)
Exterior: Clay brick, plastered and painted with one coat Dulux Plaster Primer and two coats Dulux Weather guard. (Colour as per architect spec)
Roof sheets: Safintra corrugated roof sheeting 0.5mm thick charcoal colour bond on main roof. Garage flat roof galvanized IBR Sheets
Roof: Insulation as per SANS 10400-XA Under climensential (trusses) 75mm Rhino board skimmed
Trusses: Purpose built timber roof trusses supplied and installed as per Engineer’s design. Note: some trusses are exposed as per plan
Facias: Fibre cement painted as per architect design
Rain water goods: Aluminium gutters with Aluminium down pipes
Windows: Charcoal powder coated aluminium as per plan. Glass type: clear float glass
Door frames: Exterior – Wood 76 x 53 x 813 with cill painted Interior – Wood 76 x 53 x 813 no cill painted
Patio – Charcoal powder coated aluminium
Doors: Front Door – Hard Wood – Horizontal slatted PD 60
Sign:
____________________
pg. 2
Back Door – PD13
Interior Door – Hollowcore horizontal grooved door
Fire door – Wood – Commercial 0.5-hour 2.1 x 813 (same as per interior door) Patio door – Charcoal powder coated aluminium as per plan
Sign:
____________________
pg. 3
Ironmongery: Front door handle – Stainless Steel Pull handle with roller catch and lock
Back doors – 4 lever locks with Coupé Umea handles Internal doors – 2 lever locks with Coupé Umea handles
Ceilings: Skimmed rhino board with C005 100x100 cove cornice painted with Bergermaster Nu Kote
Sign:
____________________
pg. 4
Sanitary ware: White throughout
Bath: Zarya bath 1700 x 750 with Nikki spout and clicker waste
Toilets: DIPLOMAT with concealed cistern and TECE BRIGHT CROME dual flush plate
Basins: Guest toilet ELENI basin (wall hung) with clicker waste
Sign:
____________________
pg. 5
Kansis - on top basin for bathrooms
Shower: Square shower arm 400mm with square shower rose 200mm
Shower doors: White Aluminium shower doors, layout as per plan
Taps: All internal taps to be mixers
Kitchen: 5937/CH ISCA BORDO (Sink and prep bowl)
Sign:
____________________
Sign:
____________________
pg. 6
Bathrooms: HFAT 3340/CH Alaska Basin mixer
HFAT 3300/CH Shower mixer HFAT 3320/CH Wall mounted bath mixer with hand shower
Sign:
____________________
pg. 7
Bathroom accessories: Bathroom & Butler 8500 series Toilet roll holder (Polished 8501POLS)
Single Towel Rail (Polished 650mm)
Towel single hook (Polished 8510POLS)
Shower Rack (Polished 8520POLS)
Sign:
____________________
pg. 8
Geyser:
200L Highline Geyser with ITS 4.7 KW Heat pump
Sink: Franke under mount sink 428 x 428 x190
Prep bowl; Franke under mount prep bowl 428 x428 x190
General: Washing machine point (cold water) Dishwasher point (cold water)
Sign:
____________________
pg. 9
Floor and wall covering:
Wall tiles: Bathroom: Mosaic 400mm splashbacks to basin and bath Shower walls: Tiled up to 1.8m above floor - porcelain tiles. Shower floor: Mosiac to floor.
Kitchen: Mosaic 600mm above cupboards.
From Developer’s preferred supplier. Choice from supplied moodboards.
Floor tiles: Porcelain – to kitchen, bathroom(s) and living areas. From Developer’s preferred supplier. Choice from supplied moodboards. Listelos (borders) slate, stone, or any other designer / diagonal tiles will be charged
extra for the tiles as well as labour, cleaning and sealing.
Carpets: Carpets to bedrooms (R350 incl.vat Supply and fitment) – From Developer’s preferred supplier.
Choice from supplied moodboards
Skirting: 22mmx140mm (SK6) skirting to all rooms, except bathroom(s) and kitchen, painted Landing Cupboards:
Kitchen: Cupboards where indicated on plan
(Combination of High Gloss duco doors and Melawood Melamine doors in colour of choice with Quorts tops)
Bedroom: Cupboards where indicated on plan (Melawood Melamine doors in colour or Iceberg white)
Sign:
____________________
pg. 10
Light Fittings: Down lighters ground floor under deck as per plan (White)
First floor spots as per plan fitted onto exposed trusses (Satin Silver) Outside lights (Stainless steel)
Sign:
____________________
pg. 11
Pendants and Chandelier
Pendants
Only applicable at the
Town Houses
Chandeliers
Only in the
1, 2,3 & 6 houses Metal Chandelier – 8 x 60W SES Width: 700mm Height: 400mm Chain: 700mm
Sign:
____________________
pg. 12
Oven and hob: Defy electric oven with thermo fan DBO 431 (silver)
Defy 5 burner gas hob DHG 126 (silver)
Defy extractor DCH 308 (silver)
Sign:
____________________
pg. 13
Telephone/TV and electrical points: As per plan
Braai: Steel black build in braai
Gate: Horisontal slatted fibre cement on steel frame 1.8m high painted
Perimeter walls: Build brick wall plastered and painted
Driveway and entrance: Paving as per plan. Cement bond pavers Charcoal and grey
Garage: Steel sectional (or similar) automation Walls plastered and painted
Garden: Garden taps with wall bracket as per plan
Landscaping: Site levelled and cleared of rubble
Roll on lawn to front and back of house
Included: Transfer duty not payable (VAT included in price) Architectural fees for typical unit plans Plan approval fees NHBRC Fees Water connection Electrical connection
Not included: Transfer fees Bond registration fees Curtain rails Washing line Swimming Pool
TGP Construction Gauteng will notify you at an appropriate time during the construction of your new home, to choose the following finishes as per the supplied moodboards on site.
• Tiles
• Cupboards
• Carpets You will have 10 working days in which to make your selection. If no selection is confirmed with TGP’s head office in this time then it will be accepted that the finishes as per developer’s choice are to be used.
Sign:
____________________
pg. 14
General: 1 These specifications serve as guidelines only and the Developer and/or Contractor reserves the right
to amend and / or substitute items, at his sole discretion.
2 The employer is not permitted to do any work on site while construction is under way without the
permission of T G P Construction Gauteng (Pty) Ltd. 3 All PC amounts in this specification are inclusive of VAT. 4 Settlement cracks are regarded as a maintenance item and are not covered under the contractor’s
guarantee. 5 Foundations are designed in accordance with a geotechnical report.
NOTE: Should the above-mentioned specification differ from the final plan specification or artist impressions, then this specification will be the final ruling document. I/we the purchaser/s have read and understand the Finishing schedule as set out above in Schedule B and acknowledge the content thereof. I/we accept the content and understand that these items are included in the purchasing price and any alterations to this will be at an additional cost on written request. Further hereby the purchaser/s also confirms that the Finishes as per the Moodboards option A, B & C are included in the purchase price. The executive option or parts thereof can be obtained at an additional cost as per the extra list supplied. EMPLOYER(S): __________________________________________ DATE: ___________________ WITNESS: ______________________________________________ DATE: ___________________ SELLER: _______________________________________________ DATE: ___________________ WITNESS: ______________________________________________ DATE: ___________________
Sign:
____________________