finishing auditorium

Upload: eva-farahdiba-nurul-adha

Post on 12-Jul-2015

36 views

Category:

Documents


1 download

TRANSCRIPT

Method Of Work Finishing Auditorium I. Installation Partition 1. Steel ftrame 2. AAC block wall without plaster 3. Frame partition 4. Install Insulation rock wall t=50 density 60 kg/m3 5. Install sound proof gypsum jayabelt t = 12 m 6. Install front partition frame C 75, dinabolt, metal stud, plate 6 m/ 7. Install insulation 8. Install sound proof gypsum 9. Install fabric panel a. Panel Plywood frame t=9 m/ , lem Aica Aibon (Keliling). Fabric Ateja type Ice land 050 dan 140 b. Ceiling Fabric panel dipasang dengan cara di tempel pada permukaan gypsum dengan memakai lem Aica pada plester cord an gypsum II. Installation Ceiling 1. Install steel frame for ceiling hanger C 75 @ 1200, siku L 40 x 40 x 4 C 2400 2. Marking di lantai sesuai dengan pola ceiling 3. Pasang scaffolding (untuk stage H-3400), tinggi ceiling H-500 = 5750 4. Pasang metal furing mulai dari level tertinggi (FL+5750) 5. Potong sesuai dengan pola yang telah di marking 6. Pasang gypsum, buat fdf 100 dari pinggir garis pola, potong gypsum, pasang cornis Lakukan sampai semua gypsum dan cornice terpasang 7. Pasang Accoustic dengan lem fox dan stapler @150 8. M. E Works a. Ducting, lighting support, dipasang sebelum pasang metal furing. Kabel AC fan dipasang bersamaan dengan pasang metal furing b. Lubang lampu, AC, Fan dibuat setelah gypsum terpasang c. Finishing lampu dan Accoustic bersama dengan Finishing Lantai 1. Vinyl Floor a. Concrete Floor = FL -5 m/n atau 2 FL 5 m/n b. Leveling by flatter t-3 m/n c. Install vinyl t-2 m/n (Toli & Tajima) 2. Carpet Floor a. Concrete Floor 2 FL 18 m/n

b. Install underlayer t- 8 m/n c. Install carpet sheet t-10 m/n 3. Acces Floor a. Concrete Floor 2 FL -100 b. Install Acces Floor h-100 c. Install carpet tile 500x500 t-5 m/n 4. Niro Granite Floor a. Concrete floor FL 30 atau 2FL 30 b. Sweding dengan PM 600 t-15 m/n c. Install Niro granite tile (t-10 m/n) perekat PM 450 t-5 m/n Steel Structure A. Toilet Area 1. TOS Toilet 2 FL -360 2. Steel deck dan concrete 2 F t-150 3. Water proofing 3 layer (3 m/n) 4. Cover mortar water proofing PM 600 t-10 m/n 5. Screeding t 120 = 150 with wiremesh 1 layer MS level FL 40=50, K250 6. Install Niro granite t 10 m/n with PM 420 t 10 m/n B. Expansion Joint 1. Steel structure to existing floor, wall, and roof 100 m/n 2. Dimension dan level in conection with existing building must be checked properly.

CURTAIN WALL METHODE OF WORK. 1.Pasang bracket di bagian bawah untuk dudukan mullion di concrete Beam sesuai dengan marking di posisi level FL-50 2.Setelah Steel Structure kondisi sudah lot & baut sudah di momen, pasang bracket di bagian tengah curtain wall pada posisi level 2nd Floor + 3.950. 3.Truss dicek menggunakan Teodholite untuk memastikan alignment steel .

4.Pasang braket dudukan Mullion sesuai dengan marking di posisi level FL+9.467 dan FL+10.467(Top curtain wall FL+11.000) 5.Setting Mallion satu persatu diikuti dengan pengecekan verticality/ alignment dengan menggunakan teodholite. 6.Setting transom dan di check elevasinya 7.Pasang kaca dari posisi yang paling atas menuju kebawah dengan menggunakan alat bantu Winch(Motor seling) 8.Finishing dengan silen kontruksi.