Transport Forum and Learning Week 2006 Workshop on PPP in Highways. Financial Simulation of Public-Private Partnership (PPP) Projects in Highways. Cesar Queiroz World Bank, 3 April 2006. Presentation Outline. PPIAF - WB Toolkit for PPP in Highways Toolkit modules - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/1.jpg)
Financial Simulation of Public-Private Partnership (PPP)
Projects in Highways
Cesar Queiroz
World Bank, 3 April 2006
Transport Forum and Learning Week 2006Workshop on PPP in Highways
![Page 2: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/2.jpg)
Presentation Outline
• PPIAF - WB Toolkit for PPP in Highways
• Toolkit modules
• Main financial indicators of a PPP project
• Demonstration of the PPP financial simulation model
• Case studies
• Discussions
![Page 3: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/3.jpg)
Toolkit for PPP in HighwaysObjective
To provide policy makers from developing economies with some guidance in the design and implementation of a PPP project in the highway sector
![Page 4: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/4.jpg)
![Page 5: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/5.jpg)
Toolkit for PPP in HighwaysThe toolkit is structured under five headings and includes a library and interactive financial simulation model
Available at the World Bank’s web Available at the World Bank’s web site: www.worldbank.org/highwayssite: www.worldbank.org/highways
![Page 6: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/6.jpg)
Availability of the Toolkit
• Free of charge
• A multimedia product available on a CD ROM
• Also available at the World Bank’s transport website: www.worldbank.org/transport
![Page 7: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/7.jpg)
The Highway Toolkit Includes
• over 5000 pages of reference publications and web links
• a 500 word glossary
• case studies and financial simulation software
![Page 8: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/8.jpg)
Toolkit Modules
1. Overview and Diagnosis
2. Project Characteristics
3. Public Sector Functions
4. Laws, Rules and Contracts
5. Implementation
![Page 9: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/9.jpg)
Toolkit Modules
1. Overview and Diagnosis: rationale for private participation in the highway sector, alternative contractual forms, guide to conduct a diagnostic of the sector
2. Project Characteristics3. Public Sector Functions4. Laws, Rules and Contracts5. Implementation
![Page 10: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/10.jpg)
Toolkit Modules
1. Overview and Diagnosis2. Project Characteristics:
key considerations in the design of a public-private partnership, discussions of well-known PPPs
3. Public Sector Functions4. Laws, Rules and Contracts5. Implementation
![Page 11: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/11.jpg)
Toolkit Modules
1. Overview and Diagnosis2. Project Characteristics3. Public Sector Functions:
analyzes the roles of the public sector and presents the tools at Government's disposal for performing such roles
4. Laws, Rules and Contracts5. Implementation
![Page 12: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/12.jpg)
Toolkit Modules
1. Overview and Diagnosis2. Project Characteristics3. Public Sector Functions4. Laws, Rules and Contracts:
guidance on the design of legal and contractual frameworks for private participation in highways, with boilerplate provisions
5. Implementation
![Page 13: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/13.jpg)
Toolkit Modules
1. Overview and Diagnosis2. Project Characteristics3. Public Sector Functions4. Laws, Rules and Contracts5. Implementation: outlines the key
steps in introducing PSP, bringing elements from previous modules and distinguishing by type of private sector contract
![Page 14: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/14.jpg)
1. Overview and DiagnosisWhy Embark on PPP?
• Context and Key Issues • Expected Benefits from PPP • Why (and where) is the Private Sector
more efficient than the Public Sector? • Overview of PPP experience
• PPI project data base Choosing the right option • Forms of PPP • Making the diagnosis • PPP policy and strategy
![Page 15: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/15.jpg)
2. Project Characteristics
• Tailoring appropriate PPP: A continuum of alternatives
• Examples of well-known PPPs
![Page 16: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/16.jpg)
3. Public Sector Functions
• Facilitator
• Provide adequate framework
• Planning and policy making
• Protect community welfare
• Contract award
• Regulation
![Page 17: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/17.jpg)
4. Laws, Rules and Contracts• Legislation
• Contracts
Legislative framework Adjust legal framework Regulatory framework Standards
Maintenance contracts Operation and maintenance concessions BOT type projects
![Page 18: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/18.jpg)
5. Implementation
• Actors
• Selection of Concessionaires and Contract Award
• Managing the Reform
• Main Steps
![Page 19: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/19.jpg)
![Page 20: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/20.jpg)
Public Private Partnerships
Full Privatization
Works & Services Contracts
Management &
Maintenance Contracts
Operation & Maintenance Concessions
Build Operate Transfer
Concessions
Low High
Extent of private sector participation
![Page 21: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/21.jpg)
In addition to the five modules, the Toolkit also includes:
• Financial simulation tool
• Graphic simulation tool
• Case study
• CD Map
• Documentation
• Glossary
![Page 22: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/22.jpg)
Toolkit for Public-Private Partnership in Highways
Main Financial Indicators
![Page 23: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/23.jpg)
Debt Service Cover Ratio (DSCR)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
21
wherei = number of tranches, 1≤ i ≤3n = current year(Debt Service) i,n = (Principal) i,n + (Interest) i,n CAFDS= Cash Available for Debt Service
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
n Service)i,(Debt
)(
i
nn
CAFDSDSCR
![Page 24: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/24.jpg)
Loan Life Cover Ratio (LLCR)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
21n = current yearCAFDS= Cash Available for Debt ServiceOutstanding debtn end of period The Net Present Value of the Cash Available for Debt Service from year n+1 to the end of the maturity is discounted at the debt interest rate The financial tool provides the user with the minimum LLCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
period of end Debt gOutstandin
(CAFDS)ValuePresent Net
n
tranches three theofmaturity maximum
njn
nLLCR
![Page 25: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/25.jpg)
Return on Equity (ROE)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
21
where:Equity injectedi is the equity provided by the sponsors in year iDividendsi are the dividends distributed to shareholders in year iROE is calculated in real terms through deflated flow (equity - dividends)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
0)1(
)dividends- injected(Equity concession theof end
1i
iROE
![Page 26: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/26.jpg)
Project Financial InternalRate of Return (IRR)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
21
i = year OCFBF = Operating Cash Flow Before Financing
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
0)1(
)(OCFBFconcession theof end
onconstructi ofyear first i
ii
IRR
![Page 27: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/27.jpg)
Project Net Present Value:Present Value of Taxes minus
Subsidies (NPV)
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
21
where:OCFBF = Operating Cash Flow Before Financingt = weighted average of the three rates on the tranches of debt The NPV is calculated for the first year of the construction period
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR
3
1
,
)(
i
nn
neDebtServic
CAFDSADSCR studyofyeari
i
t
)1(
)(OCFBFNPVProject
concession of end
onconstructi ofyear first i
![Page 28: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/28.jpg)
Financial Simulation Case Study
The Government of Farland is considering to build a road between the cities of Farport and Farcapital (located 50 km apart) through a Public Private Partnership (PPP) scheme.
![Page 29: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/29.jpg)
Financial Simulation Case Study
Basic data include:Construction cost: US$150 million
Source of funds: Subsidies, equity and credit
Real interest rate: 5%
Concession duration: 25 years
Initial traffic: 8,000 vpd
Toll rate: US$7.00 (indexed on inflation)
Inflation rate: 6% per year
![Page 30: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/30.jpg)
Financial Simulation Case Study
Using the above information and other default data in the Graphic Financial Simulation tool of the Toolkit for Public-Private Partnership in Highways, please answer the questions below:
![Page 31: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/31.jpg)
Financial Simulation Case StudyQuestion 1: In the absence of Government subsidies, ceteris paribus, what would be the return on equity (ROE)? What would be the change in the internal rate of return (IRR) of the project?
![Page 32: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/32.jpg)
Financial Simulation Case StudyQuestion 2. While subsidies may be paid by the Government during the construction period, it recovers some of this payment through taxes during the operation period. What would be the Government contribution to this project that would lead to a financial balance for the government throughout the concession period?
![Page 33: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/33.jpg)
Financial Simulation Case StudyQuestion 3. In the absence of Government subsidies, ceteris paribus, what would be the required initial toll rate to yield a return on equity (ROE) of 20%?
![Page 34: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/34.jpg)
Financial Simulation of an Availability BOT Concession
Using the Toolkit default values, please estimate the minimum annual availability fee that the Government would have to pay to attract potential private sector concessionaires. Please consider as minimum requirement a ROE of 15%.
![Page 35: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/35.jpg)
Basic Assumptions to Estimate the Minimum Toll Rate to Attract Private
Investors for a PPP Project
• Concession term: 20 yrs
• Construction Cost: $1M/km to $5M/km
• Operation cost: $500,000/km/yr
• Equity: 14%• Subsidies: 0• Interest rate: 5%/yr• Grace period: 4 yrs• Repayment period:
14 years• Discount rate: 10%
• Initial traffic: 5,000 vpd to 20,000 vpd
• Traffic growth: 3%• Inflation: 6%• Tax: 18%• IRR ≥ 12%• ROE ≥ 16%• LLCR ≥ 1.0• DSCR ≥ 1.0
![Page 36: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/36.jpg)
Estimated Minimum Toll Rate to Attract Private Investment for a
PPP Project
0
0.1
0.2
0.3
0.4
0.5
1 1.5 2 2.5 3 3.5 4 4.5 5
$/km
Construction cost, $ million/km
20,000 vpd
15,000 vpd
10,000 vpd
5,000 vpd
![Page 37: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/37.jpg)
![Page 38: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/38.jpg)
Thank you!
![Page 39: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/39.jpg)
Some Basic ReferencesWorld Bank (2001). “World Bank-Financed Procurement Manual [Draft].” Washington, D.C. http://siteresources.worldbank.org/PROCUREMENT/Resources/pm7-3-01.pdf
Guasch, J. Luis (2004). Granting and Renegotiating Infrastructure Concessions Doing It Right. Washington, D.C.: World Bank.http://www-wds.worldbank.org/servlet/WDSContentServer/WDSP/IB/2004/05/06/000090341_20040506150118/Rendered/PDF/288160PAPER0Granting010renegotiating.pdf
World Bank (2004). “Guidelines: Procurement Under IBRD Loans and IDA Credits.” (May). Washington, D.C. http://siteresources.worldbank.org/INTPROCUREMENT/Resources/Procurement-May-2004.pdf
Queiroz, Cesar (2005). “Launching Public Private Partnerships for Highways in Transition Economies.” Transport Paper TP-9. (September). Washington, D.C.: World Bank.
Kerf and et al. (1998). “Concessions for Infrastructure: A Guide to Their Design and Award.” Technical Paper no. 389.
World Bank (1998). “Bidding for Private Concessions. The Use of World Bank Guarantees.” RMC Discussion Paper Series, no 120. Washington, D.C.
![Page 40: Financial Simulation of Public-Private Partnership (PPP) Projects in Highways](https://reader035.vdocuments.mx/reader035/viewer/2022082211/568157a7550346895dc53708/html5/thumbnails/40.jpg)
Cesar QueirozWorld Bank, 1818 H Street NW
Washington DC 20433 USATel +1 202-473 8053Fax +1 202 522 3223
Email: [email protected]://www.worldbank.org/transporthttp://www.worldbank.org/highways