Final Year Projects in the Context of Manufacturing Process

Ian WebsterTransform Rail Interiors

May 2004

Page 2: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Overview

• Who/what is Transform Rail Interiors?

• A typical final year project outline.

• A typical manufacturing process model (ISO 9000).

• The engineering phase within the process model.

• Comparison of engineering in manufacturing and final year projects.

Page 3: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Transform Rail Interiors - The Business

• National company founded and based in Newcastle, NSW.

• Additional manufacturing/assembly sites in Cardiff, Ballarat, Melbourne (Somerton and Dandenong).

• Staff of around 110.

• 6000 square metres of manufacturing space.

• Customers are large local and international companies such as United Goninan, Downer EDI, Bombardier Transportation, Alstom and Electro Optic Systems.

Page 4: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Transform Rail Interiors - The Capability

• Primarily involved in design, supply and installation of GRP, electrical and seating components in passenger rail vehicles and large composite structures for specialist applications.

• Capability to apply advanced GRP production technology to specialist products.

• Capability to design and supply rail seating solutions.

• Capability to consolidate GRP products with associated mechanical and electrical equipment to supply modular components.

Page 5: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Transform Rail Interiors - The Engineering Group

• Approximately 16 engineering staff:

• in mechanical, materials, mathematics, electrical, electronic, computing, industrial design, business.

• ten graduates (fourteen degrees at bachelors, masters and doctorate), seven undergrads, four TAFE qualified.

Page 6: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004
Page 7: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004
Page 8: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004
Page 9: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004
Page 10: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004
Page 11: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Typical Final Year Project

• Background reading.

• Hazard analysis.

• Preliminary hardware/software design.

• Progress report.

• Design implementation.

• De-bug – redesign (repeat until ...)

• Re-evaluate scope.

• Final documentation.

Page 12: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Manufacturing Process Model

• Compliant to ISO 9000 [2001].

• Identifies individual functional processes, with ‘inputs’ and ‘outputs’.

• Accommodates:

• design, manufacture and supply

• manufacture and supply (to customer design)

• supply only (third party manufacture).

Page 13: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Financial Administration

Contract

Variations, NCR’s

Design reviewPreliminary pricing

CustomersSuppliers

Despatch

Product, Route card

Operations

Selected Materials

Supply and Stores

Product Documents

Product Development

Project Documents

Project Coord’n

Contract Documents

Business Development

Product, DA

Design proposal

(Re-)Negotiate scope

TRI capabilities

Materials

Identify suppliers

Purchase order

Accounts Payable Accounts ReceivableRoute cards

Page 14: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Product Development - Inputs

• Schedule of customer’s required milestones (definitions, reviews, approvals).

• Schedule of internal requirements (concept development, risk analysis, detailed design, verification, material procurement, manufacture, delivery).

• Budgets (product development, materials (wastage), infrastructure set-up, manufacture (efficiencies), deliveries, project management.

• Customer specifications.

Page 15: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Product Development - Outputs

• Component and general arrangement drawings.

• Bill of materials.

• Work instructions, material pick lists, QA procedures.

• Risk analyses (design, manufacturing).

• Regular reporting to management and customer.

Page 16: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Product Development – Process (1 of 2)

• Refine preliminary concepts to develop firm concepts with reference to specifications and preliminary design risk assessment.

• Review design risk associated with proposed concepts.

• Confirm acceptance of concepts by customer.

• Source or design components required.

• Finalise and freeze concept.

• Transform concepts into component and general arrangement drawings.

Page 17: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Product Development – Process (2 of 2)

• Compile ‘Bill of Materials’ (BOM), including schedule of required material deliveries.

• Determine manufacturing methods, including required tools and jigs.

• Generate route card templates, including work instructions, pick lists and production QA procedures.

• Conduct analysis of production job safety.

• Generate regular management reports on adherence to project schedules and budgets.

Page 18: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Management of Product Development Process

• Form 44 – Design Process Control Sheet:• project scope

• drawings and models

• schedules

• budget and procurement

• Adherence to customer and internal schedule.

• Adherence to design, set-up, materials and manufacturing budgets.

• Weekly and monthly cost, design and schedule reviews.

Page 19: Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004

Comparison of Final Year Project to Manufacturing Project

• FY projects do not have to produce multiple quantities, but usually only preliminary or developed concept.

• Cost is principal driver in business, but only superficial for FY projects. (Should FY project mark reflect economically viable solution?)

• FYP does not have risk of consequential damages for failure to complete contractual obligations.

• Requirement for comprehensive documentation should not be substantially diluted.