final utility report willow bend subdivision · willow bend – phase 1 february 10, 2015 page 4 t...

44
 solutions.  partnerships.  success.  t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com    FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO   February 10, 2015 Revised: October 2015 Revised: November 2016 Revised: February 2017   JN: 13023   Prepared for:  The True Life Companies 5251 DTC Parkway, Suite 1175 Greenwood Village, CO 80111   Prepared by:  Jansen Strawn Consulting Engineers 45 West 2nd Avenue Denver, CO  80223                Thomas C. Jansen, PE No. 35942 Principal   

Upload: others

Post on 07-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

 

solutions.  partnerships.  success. 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com 

  

 FINAL UTILITY REPORT 

WILLOW BEND SUBDIVISION Thornton, CO 

  

February 10, 2015 Revised: October 2015 Revised: November 2016 Revised: February 2017 

  

JN: 13023   

Prepared for:  

The True Life Companies 5251 DTC Parkway, Suite 1175 Greenwood Village, CO 80111 

  

Prepared by:  

Jansen Strawn Consulting Engineers 45 West 2nd Avenue Denver, CO  80223 

        

             Thomas C. Jansen, PE No. 35942 

Principal    

Page 2: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 2 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

CERTIFICATIONS The True Life Companies hereby certifies  that  the utilities  (water and  sanitary  sewer)  for  the Willow Bend Subdivision will be constructed to the design presented in this report.  I understand that the City of Thornton does not and shall not assume liability for the utilities designed and/or certified by my engineer.  I understand that the City of Thornton reviews utility plans but cannot, on behalf of True Life, guarantee that final utility design review will absolve True Life and/or their successors  and/or  assigns  of  future  liability  for  improper  design.    I  further  understand  that approval of the Final Plan and/or Final Development Plan does not imply of my engineer’s utility design.  

Attest:                        

              Name of Responsible Party 

 

                         

Notary Public            Authorized Signature 

 

 

I hereby certify that this report (plan) for the Final Utility design of water and sanitary sewer for the Willow Bend Subdivision was prepared by me (or under my direct supervision) in accordance with  the  provisions  of  the  City  of  Thornton  Standards  and  Specifications  for  the  Responsible Parties thereof.  I understand that the City of Thornton does not and will not assume liability for utilities designed by others.  

 

 

             

Thomas C. Jansen, PE    Date State of Colorado Registration No. 35942 For and on behalf of Jansen Strawn  Consulting Engineers, Inc.    

Page 3: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 3 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

T A B L E   O F   C O N T E N T S 

 I.  INTRODUCTION ....................................................................................................................... 4 

II.  GENERAL LOCATION AND DESCRIPTION ................................................................................. 4 

III.  EXISTING UTILITIES .................................................................................................................. 4 

IV.  PROPOSED UTILITIES ............................................................................................................... 5 

V.  REFERENCES ............................................................................................................................ 8 

 

   

A P P E N D I C E S  APPENDIX A – Maps Vicinity Map 

 APPENDIX B – Water   Water Calculations 

   APPENDIX C – Sanitary Sewer   Sanitary Sewer Calculations  APPENDIX D – Plans   Overall Utility Plan 

     

   

Page 4: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 4 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

I. INTRODUCTION 

The purpose of this Final Utility Report is to analyze the impact of the proposed Phase 1 

and  future  phases  of  the Willow Bend  subdivision  on  the  existing water  and  sanitary 

sewer infrastructure and adequately size proposed infrastructure to service the users of 

this development. 

II. GENERAL LOCATION AND DESCRIPTION 

A. Site Location The Willow Bend Subdivision (Site) is located in the southeast quarter of Section 18, 

Township  1  South,  Range 67 West  of  the  Sixth  Principal Meridian, Adams County, 

Colorado.  The site lies to the north of East 144th Avenue and west of Holly Street.  

The Lewis Pointe subdivision recently constructed is located adjacent to the South and 

existing  large  estate  residential  located  east  and  west  of  the  site.    Undeveloped 

property and  the E470 highway are  located  to  the north.    See Appendix A  for  the 

vicinity and phasing map. 

B. Description of Property The overall site consists of approximately 204 acres of land proposed to be developed 

into 543 single  family detached residential units,  two City parks, a school  site, and 

drainage improvements to the Todd Creek drainage channel. Phase 1 work consists of 

approximately  208  single  family  detached  lots,  a  portion  of  one  City  park  and 

improvements  to  the  Todd  Creek  drainage  channel.  Phase  2‐3  consists  of 

approximately 335 single  family detached  lots and a portion of one City park. This 

report addresses the site’s overall utility improvement for all phases.   

To the north of Signal Ditch Parkway and west of Holly Street lies an 18‐acre offsite 

parcel  zoned  for multifamily  and  single  family  attached  residences. At  18 du/ac,  a 

maximum of 324 multifamily units are anticipated. 

The existing site is undeveloped farmland with two farm ponds and an irrigation ditch 

in  the  northwest  corner  of  the  site.    The  site  has  experienced  limited  oil  and  gas 

development  with  five  capped  wells.    The  topography  slopes  gradually  from 

southwest to northeast. 

III. EXISTING UTILITIES 

A. Potable Water System Information  regarding  existing water  facilities  has  been  gathered  from  the  City  of 

Thornton, utilities located in the field and approved Construction Plans for the Lewis 

Pointe  subdivision  recently  constructed  to  the  South.  According  to  the  City  of 

Page 5: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 5 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

Thornton’s  Volume  1:  Wastewater  Systems  Master  Plan  (May  2010),  the  subject 

property is located within Pressure Zone 3H.  This zone has a stated hydraulic grade 

line (HGL) of 5,416 feet as shown on Exhibit VII‐3, Wastewater Systems Master Plan.  

The highest anticipated ground elevation  for  the subject site after grading  is 5,280 

feet  and  the  lowest  developable  elevation  on  the  site  is  5,200.  Based  on  this 

information, the highest static pressure on the site has been calculated to be 58.9 psi 

and the lowest static pressure is 93.5 psi.  

An existing City of Thornton 16‐inch water main is located within Holly Street which 

previously had terminated near 141st Avenue approximately 1500 feet to the south of 

the Willow  Bend  development.  The  Lewis  Pointe  subdivision  to  the  south  of  the 

subject site extended this 16‐inch water main approximately 1500 feet north along 

Holly  Street  to  the  intersection  of  144th  Avenue.  Also,  an  8‐inch  water  line  was 

constructed and extended to the  intersection of Fairfax Drive and 144th Avenue as 

part of the Lewis Pointe subdivision project. 

In addition to the City of Thornton water mains, a High Plains Water Association 4‐

inch water main line is located within both Holly Street to the east of the subject site 

and within 144th Avenue to the south of the subject site. The Lewis Pointe subdivision 

has relocated the 4‐inch main within 144th to the south side of the right‐of‐way. 

B. Sanitary Sewer The  Willow  Bend  site  is  located  in  the  Todd  Creek  sanitary  outfall  system.    As 

referenced above, the Wastewater Systems Master Plan which was completed by the 

City of Thornton includes sections related to the Willow Bend subdivision. Some of 

the  improvements  to  the  required  downstream  sanitary  system were  constructed 

through  the  Parterre Metropolitan  District  in  2016.  The  as‐built  plans  show  these 

improvements and are dated 8/24/2016, North Holly Interceptor Sanitary Sewer. The 

remaining improvements to tie the North Holly Interceptor Sanitary Sewer into the 

subject site will require approximately 1500 feet of 15‐inch PVC pipe to be installed 

and will be constructed concurrently with the Willow Bend Project. 

IV. PROPOSED UTILITIES 

The Willow Bend project is planned to be constructed in three Phases.  Each phase will 

require  looped water system and sanitary sewer outfall.   Utilities  for Willow Bend are 

addressed within this report. 

 

Page 6: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 6 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

A. Potable Water System This  project  shall  rely  on  the  existing  8‐inch  water  main  stub  located  at  the 

intersection of Fairfax Drive and 144th Avenue, as well as an existing 16‐inch water 

main  located  at  the  intersection  of  144th  Avenue  and  Holly  Street.    The  first 

connection, at 144th Avenue & Holly Street where the 16‐inch main will be continued 

north during phase 1 along Holly Street to a future roadway entrance (146th Avenue) 

and  looped back.   The Holly Street 16‐inch main will be extended north to the site 

limits during later project phases and stubbed for future tie‐in north of the project.  

The second connection will be to the 8‐inch stub in 144th Avenue and Fairfax Drive 

where the system extends from the Lewis Point subdivision.  All waterlines are looped 

except at cul‐de‐sac  locations as shown on the attached Utility Map.   All waterline 

mains will be 8‐inch PVC except in Holly Street where 16‐inch ductile iron pipe will be 

utilized.   All  fire hydrant connections will be 6‐inch ductile  iron pipe except where 

hydrants are temporarily placed at the end of waterline mains to be used in future 

phases.  

In addition, the High Plains 4‐inch water line will be relocated outside the paved limits 

of  Holly  Street  just  as  it  was  done  along  144th  Avenue  with  the  Lewis  Pointe 

Subdivision. This work was based on a sketch from High Plains dated 5/3/2016. 

Pressure Regulating Valves (PRVs) will be required at the 144th Avenue connections to 

transition from City of Thornton Zone 3A to Zone 3H. The PRVs will reduce the high 

pressure approximately 20 psi (3A high HGL of 5494 to 3H high HGL of 5416). The PRVs 

must meet the City of Thornton Standards and Specifications and initial controls set 

by city staff. 

A WaterCAD model was  prepared  for Willow Bend utilizing  the model  from  Lewis 

Point Phase 2 & 3 (pressure zone 3A) using City of Thornton criteria and the following 

scenarios within Zone 3H: 

    Average Day ‐ Max Pressure = 100 psi, Min Pressure=50 psi 

    Max Daily + Fire Flow ‐ Min Pressure = 20 psi, Max Velocity=11.2 fps (8”) 

                        Max Velocity=10.0 fps (Other) 

    Peak Hour ‐ Min Pressure = 40 psi, Max Velocity=5 fps 

    Residential Fire Flow Rate = 1,500 gpm 

    Commerical/School Fire Flow Rate=3,000 gpm 

 

 

 

Page 7: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 7 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

Design criteria used is as follows: 

    3.45 persons per dwelling – Single Family Dwelling 

    2.20 persons per dwelling – Multi Family Dwelling 

    Average Day = 150 gallons per person per day  

Maximum Monthly = 1.8 x Average Day 

Maximum Daily = 3.2 x Average Day 

Maximum Hourly = 5.76 x Average Day 

Added demands for future school site: 

Persons/school = 2,000 (Based on Brighton 27J, typical for elementary) 

    Average Day Demand = 20gpdpp 

    Maximum Daily Demand = 1.8 x Avg. Day Demand 

    Maximum hourly Demand = 3.24 x Avg. Day Demand  

Water demands for each water node were determined using the above criteria and 

scenarios.   Based on the model the peak hour max pressure is 86.6 psi and the min 

pressure is 58.0 psi. The maximum daily plus fire flow scenario yielded a min pressure 

of 29.6 psi with a max velocity of 11.20 fps. The max pressure for all scenarios is found 

in the northeast corner of the site at Junction J‐5 and the minimum pressure is found 

in  the  south‐west  portion  of  the  site  within  at  Junction  J‐63.  Based  on  the  high 

pressures, PRVs have been proposed at both points of  connection  to  Lewis Pointe 

waterlines  located near Fairfax Drive and 144th Avenue as well as Holly Street and 

144th Avenue. The proposed PRVs will reduce the pressure from zone 3A to zone 3H.  

Detailed results can be found in Appendix B. The proposed waterline will cross the 

Todd  Creek  drainage  at  144th  Lane,  148th Avenue,  Signal  Ditch  Parkway  and  Holly 

Street  at  which  point  it  will  be  encased  per  criteria.  Cathodic  protection  will  be 

installed per the geotech report. 

 

B. Sanitary Sewer The  sanitary  sewer  has  been  designed  to  meet  City  of  Thornton  Standards  and 

Specifications.   The entire Willow Bend subdivision will  tie  into a proposed 15‐inch 

sanitary sewer main that was designed and analyzed as part of the Parterre Sanitary 

Sewer Calculation where more detailed information can be found. The 1500+/‐ feet 

of  15‐inch  sewer  line  within  the  Todd  Creek  Sewer  Basin  will  be  constructed 

concurrently with the Willow Bend Project and will be connected to the North Holly 

Interceptor as shown on the plans by the Parterre Metropolitan District.  A design for 

this outfall was previously completed by Jansen Strawn Consulting Engineers. A map 

of the Todd Creek Sewer Basin can be found in Appendix C. 

Page 8: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Willow Bend – Phase 1 February 10, 2015 Page 8 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

 

Criteria used is as follows: 

    3.45 persons per single family dwelling‐ Low Density 

    2.20 persons per multi family dwelling – High Density 

    Commercial ‐ 600 gallons per acre per day 

    Average Day (F) = 80 gallons per person per day  

Peaking factor = 1.72 / (F 0.295)   [3.5 max, 2.0 min] 

Design Slope for 8‐inch pipe between 0.40% and 5.00%  

Velocity between 2 and 10 feet per second 

Design capacity for pipes smaller 15‐inch = 50% maximum capacity 

The  Willow  Bend  site,  including  a  future  school,  future  Willow  Bend  North 

developments  and  two  offsite  properties  have  been  analyzed  as  multiple  basins 

connecting to the North Holly Interceptor main on the northwest portion of the site.  

Basins #1 ‐ #4 is Willow Bend South, the subject site consisting of 543 dwelling units 

and a future school site. Basin #5 ‐ #6 is Willow Bend North, the future multi‐family 

and commercial development to the northwest of the site. The offsite properties to 

the west and south west known as Layton and Oxley respectively. Both of these offsite 

area demands have been previously calculated and can be found in Appendix C. All of 

these properties have been accounted for in the sanitary sewer design.  The average 

flow for the basin is 0.79 million gallons per day (mgd).  Eight, ten, and twelve inch 

mains shall adequately serve these basins utilizing minimum slopes as shown in the 

calculations within  the  appendix.  The proposed  sanitary  sewer will  cross  the Todd 

Creek drainage at 144th Lane, 148th Avenue, and Signal Ditch Parkway, at which points 

it will be encased per criteria. Cathodic protection will be installed per the geotech 

report. 

V. REFERENCES 

1. City of Thornton Standards and Specifications, City of Thornton, October 2012. 

2. Water and Wastewater Systems Master Plan – City of Thornton, The Engineering Company, May 2010  

3. Final  Utility  Report  –  Lewis  Pointe  Subdivision  Phase  2  &  3,  Jansen  Strawn Consulting Engineers, November 2013. 

4. Sanitary Sewer Master Plan – Parterre, City of Thornton, Jansen Strawn Consulting Engineers, April 2011. 

  

Page 9: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

APPENDIX A – Maps Vicinity and Subdivision Map

Page 10: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I
Page 11: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

SUBDIVISION LAYOUT WITH CONCEPTUAL PHASING

Page 12: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

APPENDIX B – Domestic Water

Water Demands

WaterCAD Plan View

WaterCAD Output

Page 13: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I
Page 14: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I
tjansen
Typewritten Text
Willow Bend - WaterCAD Pipe Names
tjansen
Typewritten Text
tjansen
Typewritten Text
tjansen
Typewritten Text
Page 15: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Date: 2/6/2017Prepared by: MAB

SFD Persons/Unit = 3.45 School = 2,000 PersonsMF Persons/Unit = 2.20 = 20 Gal/Day/Person

Average Day Demand = 150 gpdpp =Max Daily Demand = 3.2 x Avg Day Demand Fire Demand = 3000 gpm

Max Hourly Demand = 5.76 x Avg Day DemandSF Fire Demand = 1500 gpmMF Fire Demand = 3000 gpm

gpd gpm gpd gpm gpd gpmJ02 0 0.00 0 0.0 0 0.0 0 0.0J03 0 0.00 0 0.0 0 0.0 0 0.0J04 0 0.00 0 0.0 0 0.0 0 0.0J05 0 0.00 0 0.0 0 0.0 0 0.0J06 162 356.40 53,460 37.1 171,072 118.8 307,930 213.8 MF Future Use

J07 162 356.40 53,460 37.1 171,072 118.8 307,930 213.8 MF Future Use

J08 0 0.00 0 0.0 0 0.0 0 0.0J09 0 0.00 0 0.00 0 0.00 0 0.00J10 3 10.35 1,553 1.1 4,968 3.5 8,942 6.2J11 10 34.50 45,175 31.4 88,560 61.5 159,408 110.7 + School Use

J12 0 0.00 0 0.0 0 0.0 0 0.0J13 7 24.15 3,623 2.5 11,592 8.1 20,866 14.5J14 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6J15 10 34.50 5,175 3.6 16,560 11.5 29,808 20.7J16 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J17 16 55.20 8,280 5.8 26,496 18.4 47,693 33.1J18 19 65.55 9,833 6.8 31,464 21.9 56,635 39.3J19 21 72.45 10,868 7.5 34,776 24.2 62,597 43.5J20 17 58.65 8,798 6.1 28,152 19.6 50,674 35.2J21 6 20.70 3,105 2.2 9,936 6.9 17,885 12.4J22 4 13.80 2,070 1.4 6,624 4.6 11,923 8.3J23 13 44.85 6,728 4.7 21,528 15.0 38,750 26.9J24 12 41.40 6,210 4.3 19,872 13.8 35,770 24.8J25 11 37.95 5,693 4.0 18,216 12.7 32,789 22.8J26 6 20.70 3,105 2.2 9,936 6.9 17,885 12.4J27 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6J28 3 10.35 1,553 1.1 4,968 3.5 8,942 6.2J29 16 55.20 8,280 5.8 26,496 18.4 47,693 33.1J30 15 51.75 7,763 5.4 24,840 17.3 44,712 31.1J31 20 69.00 10,350 7.2 33,120 23.0 59,616 41.4J32 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6J33 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6J34 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J35 13 44.85 6,728 4.7 21,528 15.0 38,750 26.9J36 16 55.20 8,280 5.8 26,496 18.4 47,693 33.1J37 10 34.50 5,175 3.6 16,560 11.5 29,808 20.7J38 7 24.15 3,623 2.5 11,592 8.1 20,866 14.5J39 10 34.50 5,175 3.6 16,560 11.5 29,808 20.7J40 7 24.15 3,623 2.5 11,592 8.1 20,866 14.5J41 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J42 12 41.40 6,210 4.3 19,872 13.8 35,770 24.8J43 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6

Number of units PersonsJunction

Willow Bend - All PhasesWater Demand Calculations

DemandAverage Day Maximum Daily Maximum Hourly

Residential

40000 Gallons

1 of 2

Page 16: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Date: 2/6/2017

Willow Bend - All PhasesWater Demand Calculations

J44 7 24.15 3,623 2.5 11,592 8.1 20,866 14.5J45 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J46 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6J47 10 34.50 5,175 3.6 16,560 11.5 29,808 20.7J48 11 37.95 5,693 4.0 18,216 12.7 32,789 22.8J49 12 41.40 6,210 4.3 19,872 13.8 35,770 24.8J50 4 13.80 2,070 1.4 6,624 4.6 11,923 8.3J51 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J52 15 51.75 7,763 5.4 24,840 17.3 44,712 31.1J53 14 48.30 7,245 5.0 23,184 16.1 41,731 29.0J54 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J55 7 24.15 3,623 2.5 11,592 8.1 20,866 14.5J56 4 13.80 2,070 1.4 6,624 4.6 11,923 8.3J57 3 10.35 1,553 1.1 4,968 3.5 8,942 6.2J58 10 34.50 5,175 3.6 16,560 11.5 29,808 20.7J59 5 17.25 2,588 1.8 8,280 5.8 14,904 10.4J60 4 13.80 2,070 1.4 6,624 4.6 11,923 8.3J61 19 65.55 9,833 6.8 31,464 21.9 56,635 39.3J62 9 31.05 4,658 3.2 14,904 10.4 26,827 18.6J63 14 48.30 7,245 5.0 23,184 16.1 41,731 29.0J64 8 27.60 4,140 2.9 13,248 9.2 23,846 16.6

Totals 867 297.2 912.1 1641.7~ 543 (Willow Bend)~ 324 (Willow Bend - North Future Use)

2 of 2

Page 17: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Average DayWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

67.1461.65,415.95,273.5J-267.1463.75,416.05,268.7J-30.0080.75,415.95,229.4J-40.0088.55,415.85,211.2J-5

74.3887.45,415.65,213.5J-6102.9680.65,415.65,229.2J-7

0.0065.95,415.75,263.3J-80.0069.55,415.65,254.9J-91.0874.15,415.65,244.3J-10

31.3275.35,415.65,241.6J-110.0084.05,415.65,221.5J-122.5270.55,415.65,252.7J-132.8871.35,415.65,250.8J-143.6072.25,415.65,248.7J-153.2473.15,415.65,246.6J-165.7672.55,415.65,248.1J-176.8471.05,415.65,251.4J-187.5680.75,415.65,229.1J-196.1285.65,415.65,217.8J-202.1684.95,415.65,219.3J-211.4464.75,415.65,266.1J-224.6865.25,415.65,264.8J-234.3266.55,415.65,261.9J-243.9667.75,415.65,259.0J-253.2474.55,415.65,243.5J-511.0878.05,415.65,235.3J-285.7684.65,415.65,220.1J-295.4086.75,415.65,215.1J-307.2084.55,415.65,220.2J-312.8883.55,415.65,222.5J-322.8880.95,415.65,228.6J-333.2477.55,415.65,236.5J-344.6874.05,415.65,244.6J-355.7669.75,415.65,254.4J-363.6071.45,415.65,250.5J-372.5268.65,415.65,257.1J-383.6074.55,415.65,243.3J-392.5270.35,415.65,253.0J-403.2472.25,415.65,248.6J-414.3271.35,415.65,250.9J-423.2469.05,415.65,256.1J-432.5267.55,415.65,259.6J-443.2465.45,415.65,264.4J-452.8863.05,415.65,270.0J-463.6063.45,415.65,269.1J-473.9663.05,415.65,270.1J-484.3270.25,415.65,253.4J-49

Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 18: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Average DayWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

1.4468.95,415.65,256.4J-505.4073.65,415.65,245.5J-525.0476.55,415.65,238.8J-533.2478.75,415.65,233.6J-542.5280.75,415.65,229.1J-551.4476.45,415.65,239.0J-561.0875.55,415.65,241.0J-573.6081.85,415.65,226.4J-581.8083.05,415.65,223.7J-591.4470.75,415.65,252.1J-606.8467.45,415.65,259.7J-613.2479.65,415.65,231.5J-625.0461.85,415.65,272.7J-632.8866.25,415.65,262.6J-642.1671.15,415.65,251.2J-262.8872.65,415.65,247.7J-27

Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 19: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: A

vera

ge D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

4024

9.43

5.00

130.

0Du

ctile

Iron

16.0

25: J

-423

: J-3

1,40

8P-

20.

000

0.40

249.

435.

0013

0.0

Duct

ile Ir

on16

.027

: J-5

25: J

-41,

220

P-3

0.00

00.

7124

9.43

5.00

150.

0PV

C12

.029

: J-6

27: J

-51,

000

P-4

0.00

00.

3512

3.24

5.00

150.

0PV

C12

.031

: J-7

29: J

-681

1P-

50.

001

0.96

151.

115.

0015

0.0

PVC

8.0

33: J

-822

: J-2

492

P-6

0.00

00.

4773

.10

5.00

150.

0PV

C8.

035

: J-9

33: J

-842

9P-

70.

000

0.08

12.3

75.

0015

0.0

PVC

8.0

39: J

-11

37: J

-10

243

P-9

0.00

00.

05-8

.55

5.00

150.

0PV

C8.

041

: J-1

239

: J-1

161

1P-

100.

000

0.33

-51.

815.

0015

0.0

PVC

8.0

29: J

-641

: J-1

259

8P-

110.

000

0.26

40.8

95.

0015

0.0

PVC

8.0

44: J

-13

35: J

-919

9P-

120.

000

0.15

22.7

65.

0015

0.0

PVC

8.0

46: J

-14

44: J

-13

241

P-13

0.00

00.

0913

.53

5.00

150.

0PV

C8.

048

: J-1

546

: J-1

426

1P-

140.

000

0.11

17.2

15.

0015

0.0

PVC

8.0

50: J

-16

48: J

-15

259

P-15

0.00

00.

1523

.47

5.00

150.

0PV

C8.

052

: J-1

750

: J-1

640

0P-

160.

000

0.05

7.39

5.00

150.

0PV

C8.

054

: J-1

852

: J-1

726

0P-

170.

000

0.01

-0.8

75.

0015

0.0

PVC

8.0

56: J

-19

54: J

-18

671

P-18

0.00

00.

04-6

.77

5.00

150.

0PV

C8.

058

: J-2

056

: J-1

976

9P-

190.

000

0.01

2.16

5.00

150.

0PV

C8.

060

: J-2

158

: J-2

022

0P-

200.

000

0.01

-1.4

45.

0015

0.0

PVC

8.0

63: J

-23

62: J

-22

146

P-21

0.00

00.

069.

495.

0015

0.0

PVC

8.0

65: J

-24

63: J

-23

274

P-22

0.00

00.

0711

.52

5.00

150.

0PV

C8.

067

: J-2

565

: J-2

425

8P-

230.

000

0.10

-15.

615.

0015

0.0

PVC

8.0

44: J

-13

63: J

-23

582

P-25

0.00

00.

04-6

.35

5.00

150.

0PV

C8.

046

: J-1

465

: J-2

449

7P-

260.

000

0.02

-3.3

95.

0015

0.0

PVC

8.0

48: J

-15

67: J

-25

498

P-27

0.00

00.

07-1

0.66

5.00

150.

0PV

C8.

073

: J-5

148

: J-1

526

1P-

280.

000

0.04

5.77

5.00

150.

0PV

C8.

081

: J-3

079

: J-2

922

0P-

320.

000

0.04

-6.1

15.

0015

0.0

PVC

8.0

83: J

-31

81: J

-30

854

P-33

0.00

00.

045.

625.

0015

0.0

PVC

8.0

79: J

-29

83: J

-31

674

P-34

0.00

00.

10-1

5.05

5.00

150.

0PV

C8.

081

: J-3

058

: J-2

052

4P-

350.

000

0.05

-8.5

75.

0015

0.0

PVC

8.0

83: J

-31

81: J

-30

401

P-36

0.00

00.

18-2

7.50

5.00

150.

0PV

C8.

041

: J-1

283

: J-3

118

7P-

37

Pag

e 1

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 20: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: A

vera

ge D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

1015

.76

5.00

150.

0PV

C8.

089

: J-3

241

: J-1

218

4P-

380.

000

0.06

9.54

5.00

150.

0PV

C8.

091

: J-3

389

: J-3

222

6P-

390.

000

0.04

6.14

5.00

150.

0PV

C8.

093

: J-3

491

: J-3

327

8P-

400.

000

0.01

2.10

5.00

150.

0PV

C8.

095

: J-3

593

: J-3

428

4P-

410.

000

0.02

2.59

5.00

150.

0PV

C8.

097

: J-3

695

: J-3

527

0P-

420.

000

0.01

-1.6

45.

0015

0.0

PVC

8.0

99: J

-37

97: J

-36

502

P-43

0.00

00.

022.

525.

0015

0.0

PVC

8.0

101:

J-3

899

: J-3

729

5P-

440.

000

0.10

-16.

305.

0015

0.0

PVC

8.0

103:

J-3

939

: J-1

122

6P-

450.

000

0.01

-0.9

65.

0015

0.0

PVC

8.0

105:

J-4

010

3: J

-39

277

P-46

0.00

00.

1116

.88

5.00

150.

0PV

C8.

010

7: J

-41

105:

J-4

036

9P-

470.

000

0.05

7.76

5.00

150.

0PV

C8.

099

: J-3

710

7: J

-41

268

P-48

0.00

00.

12-1

8.94

5.00

150.

0PV

C8.

011

0: J

-42

103:

J-3

961

9P-

490.

000

0.19

-29.

755.

0015

0.0

PVC

8.0

112:

J-4

311

0: J

-42

368

P-50

0.00

00.

20-3

0.89

5.00

150.

0PV

C8.

011

4: J

-44

112:

J-4

327

0P-

510.

000

0.24

-38.

235.

0015

0.0

PVC

8.0

116:

J-4

511

4: J

-44

244

P-52

0.00

00.

1828

.62

5.00

150.

0PV

C8.

012

0: J

-47

118:

J-4

627

2P-

540.

000

0.19

29.8

35.

0015

0.0

PVC

8.0

122:

J-4

812

0: J

-47

269

P-55

0.00

00.

1320

.36

5.00

150.

0PV

C8.

010

5: J

-40

124:

J-4

947

8P-

570.

000

0.50

78.0

15.

0015

0.0

PVC

8.0

116:

J-4

533

: J-8

187

P-58

0.00

00.

1320

.70

5.00

150.

0PV

C8.

011

8: J

-46

116:

J-4

536

1P-

590.

000

0.03

4.81

5.00

150.

0PV

C8.

012

0: J

-47

114:

J-4

441

2P-

600.

000

0.01

-1.2

65.

0015

0.0

PVC

8.0

112:

J-4

335

: J-9

188

P-61

0.00

00.

02-3

.36

5.00

150.

0PV

C8.

012

2: J

-48

112:

J-4

353

2P-

620.

000

0.04

6.49

5.00

150.

0PV

C8.

012

4: J

-49

110:

J-4

226

9P-

630.

000

0.01

1.44

5.00

150.

0PV

C8.

013

3: J

-50

124:

J-4

918

3P-

640.

000

0.01

-1.0

85.

0015

0.0

PVC

8.0

37: J

-10

75: J

-28

225

P-68

0.00

00.

01-1

.52

5.00

150.

0PV

C8.

014

1: J

-52

97: J

-36

732

P-70

0.00

00.

01-2

.06

5.00

150.

0PV

C8.

014

3: J

-53

141:

J-5

226

4P-

710.

000

0.04

-6.3

05.

0015

0.0

PVC

8.0

145:

J-5

414

3: J

-53

269

P-72

0.00

00.

06-9

.03

5.00

150.

0PV

C8.

014

7: J

-55

145:

J-5

419

0P-

730.

000

0.13

-20.

285.

0015

0.0

PVC

8.0

31: J

-714

7: J

-55

200

P-74

Pag

e 2

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 21: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: A

vera

ge D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

046.

675.

0015

0.0

PVC

8.0

150:

J-5

614

7: J

-55

633

P-75

0.00

00.

011.

085.

0015

0.0

PVC

8.0

152:

J-5

715

0: J

-56

274

P-76

0.00

00.

012.

065.

0015

0.0

PVC

8.0

154:

J-5

814

7: J

-55

366

P-77

0.00

00.

011.

805.

0015

0.0

PVC

8.0

156:

J-5

915

4: J

-58

190

P-78

0.00

00.

023.

345.

0015

0.0

PVC

8.0

154:

J-5

889

: J-3

257

4P-

790.

000

0.00

0.52

5.00

150.

0PV

C8.

014

5: J

-54

91: J

-33

593

P-80

0.00

00.

010.

805.

0015

0.0

PVC

8.0

143:

J-5

393

: J-3

465

2P-

810.

000

0.04

5.88

5.00

150.

0PV

C8.

095

: J-3

510

7: J

-41

504

P-82

0.00

00.

000.

715.

0015

0.0

PVC

8.0

141:

J-5

295

: J-3

558

1P-

830.

000

0.03

-4.1

55.

0015

0.0

PVC

8.0

150:

J-5

614

1: J

-52

300

P-84

0.00

00.

5131

6.57

5.00

130.

0Du

ctile

Iron

16.0

23: J

-316

4: R

-126

5P-

850.

000

0.07

10.9

45.

0015

0.0

PVC

8.0

173:

J-6

067

: J-2

535

7P-

870.

000

0.06

9.50

5.00

150.

0PV

C8.

050

: J-1

617

3: J

-60

334

P-88

0.00

00.

035.

415.

0015

0.0

PVC

8.0

176:

J-6

152

: J-1

761

3P-

890.

000

0.01

-1.4

35.

0015

0.0

PVC

8.0

54: J

-18

176:

J-6

161

6P-

900.

000

0.01

-1.6

75.

0015

0.0

PVC

8.0

179:

J-6

256

: J-1

924

9P-

910.

000

0.03

-4.9

15.

0015

0.0

PVC

8.0

52: J

-17

179:

J-6

261

0P-

920.

000

0.10

15.8

45.

0015

0.0

PVC

8.0

182:

J-6

311

6: J

-45

421

P-93

0.00

00.

0710

.80

5.00

150.

0PV

C8.

011

8: J

-46

182:

J-6

340

9P-

940.

000

0.14

22.5

15.

0015

0.0

PVC

8.0

185:

J-6

412

2: J

-48

338

P-95

0.00

00.

1319

.63

5.00

150.

0PV

C8.

012

4: J

-49

185:

J-6

443

0P-

960.

000

0.62

218.

255.

0015

0.0

PVC

12.0

22: J

-219

7: R

-223

9P-

970.

000

0.21

33.4

85.

0015

0.0

PVC

8.0

210:

J-2

635

: J-9

292

P-98

0.00

00.

1421

.97

5.00

150.

0PV

C8.

021

3: J

-27

210:

J-2

627

5P-

100

0.00

00.

0914

.53

5.00

150.

0PV

C8.

037

: J-1

021

3: J

-27

271

P-10

10.

000

0.11

-9.3

50.

0013

0.0

Duct

ile Ir

on6.

021

0: J

-26

73: J

-51

542

P-10

20.

000

0.05

4.55

0.00

130.

0Du

ctile

Iron

6.0

73: J

-51

213:

J-2

764

8P-

103

0.00

00.

075.

910.

0013

0.0

Duct

ile Ir

on6.

079

: J-2

939

: J-1

190

3P-

104

Pag

e 3

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 22: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Max DayWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

214.4761.55,415.65,273.5J-2214.4763.65,415.85,268.7J-3

0.0080.55,415.45,229.4J-40.0088.25,415.15,211.2J-5

118.9186.95,414.35,213.5J-6118.9180.05,414.15,229.2J-7

0.0065.35,414.25,263.3J-80.0068.85,413.95,254.9J-93.4573.45,413.85,244.3J-10

60.9574.55,413.85,241.6J-110.0083.25,413.95,221.5J-128.0569.75,413.85,252.7J-139.2070.55,413.85,250.8J-14

11.5071.45,413.85,248.7J-1510.3572.35,413.85,246.6J-1618.4071.75,413.75,248.1J-1721.8570.25,413.75,251.4J-1824.1579.95,413.75,229.1J-1919.5584.85,413.75,217.8J-206.9084.15,413.75,219.3J-214.6063.95,413.85,266.1J-22

14.9564.55,413.85,264.8J-2313.8065.75,413.85,261.9J-2412.6567.05,413.85,259.0J-2510.3573.75,413.85,243.5J-513.4577.25,413.85,235.3J-28

18.4083.85,413.85,220.1J-2917.2586.05,413.85,215.1J-3023.0083.85,413.85,220.2J-319.2082.85,413.95,222.5J-329.2080.25,413.95,228.6J-33

10.3576.75,413.95,236.5J-3414.9573.25,413.95,244.6J-3518.4069.05,413.95,254.4J-3611.5070.75,413.95,250.5J-378.0567.85,413.85,257.1J-38

11.5073.85,413.85,243.3J-398.0569.65,413.95,253.0J-40

10.3571.55,413.95,248.6J-4113.8070.55,413.95,250.9J-4210.3568.35,413.95,256.1J-438.0566.85,413.95,259.6J-44

10.3564.75,414.05,264.4J-459.2062.35,414.05,270.0J-46

11.5062.75,413.95,269.1J-4712.6562.25,413.95,270.1J-4813.8069.45,413.95,253.4J-49

Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 23: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Max DayWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

4.6068.15,413.95,256.4J-5017.2572.85,413.95,245.5J-5216.1075.75,413.95,238.8J-5310.3578.05,413.95,233.6J-548.0580.05,413.95,229.1J-554.6075.75,413.95,239.0J-563.4574.85,413.95,241.0J-57

11.5081.15,413.95,226.4J-585.7582.35,413.95,223.7J-594.6069.95,413.85,252.1J-60

21.8566.65,413.75,259.7J-6110.3578.85,413.75,231.5J-6216.1061.15,414.05,272.7J-639.2065.55,413.95,262.6J-646.9070.45,413.85,251.2J-269.2071.95,413.85,247.7J-27

Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 24: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

8955

6.02

5.00

130.

0Du

ctile

Iron

16.0

25: J

-423

: J-3

1,40

8P-

20.

000

0.89

556.

025.

0013

0.0

Duct

ile Ir

on16

.027

: J-5

25: J

-41,

220

P-3

0.00

11.

5855

6.02

5.00

150.

0PV

C12

.029

: J-6

27: J

-51,

000

P-4

0.00

00.

7827

3.31

5.00

150.

0PV

C12

.031

: J-7

29: J

-681

1P-

50.

003

2.27

355.

705.

0015

0.0

PVC

8.0

33: J

-822

: J-2

492

P-6

0.00

11.

0917

1.07

5.00

150.

0PV

C8.

035

: J-9

33: J

-842

9P-

70.

000

0.03

-4.5

95.

0015

0.0

PVC

8.0

39: J

-11

37: J

-10

243

P-9

0.00

00.

31-4

9.30

5.00

150.

0PV

C8.

041

: J-1

239

: J-1

161

1P-

100.

001

1.05

-163

.80

5.00

150.

0PV

C8.

029

: J-6

41: J

-12

598

P-11

0.00

00.

6910

8.48

5.00

150.

0PV

C8.

044

: J-1

335

: J-9

199

P-12

0.00

00.

3758

.39

5.00

150.

0PV

C8.

046

: J-1

444

: J-1

324

1P-

130.

000

0.20

30.7

95.

0015

0.0

PVC

8.0

48: J

-15

46: J

-14

261

P-14

0.00

00.

3047

.08

5.00

150.

0PV

C8.

050

: J-1

648

: J-1

525

9P-

150.

000

0.39

60.9

65.

0015

0.0

PVC

8.0

52: J

-17

50: J

-16

400

P-16

0.00

00.

1218

.88

5.00

150.

0PV

C8.

054

: J-1

852

: J-1

726

0P-

170.

000

0.06

-9.6

45.

0015

0.0

PVC

8.0

56: J

-19

54: J

-18

671

P-18

0.00

00.

23-3

5.64

5.00

150.

0PV

C8.

058

: J-2

056

: J-1

976

9P-

190.

000

0.04

6.90

5.00

150.

0PV

C8.

060

: J-2

158

: J-2

022

0P-

200.

000

0.03

-4.6

05.

0015

0.0

PVC

8.0

63: J

-23

62: J

-22

146

P-21

0.00

00.

1422

.48

5.00

150.

0PV

C8.

065

: J-2

463

: J-2

327

4P-

220.

000

0.17

27.0

85.

0015

0.0

PVC

8.0

67: J

-25

65: J

-24

258

P-23

0.00

00.

27-4

2.03

5.00

150.

0PV

C8.

044

: J-1

363

: J-2

358

2P-

250.

000

0.12

-18.

405.

0015

0.0

PVC

8.0

46: J

-14

65: J

-24

497

P-26

0.00

00.

09-1

4.39

5.00

150.

0PV

C8.

048

: J-1

567

: J-2

549

8P-

270.

000

0.27

-42.

185.

0015

0.0

PVC

8.0

73: J

-51

48: J

-15

261

P-28

0.00

00.

1422

.06

5.00

150.

0PV

C8.

081

: J-3

079

: J-2

922

0P-

320.

000

0.15

-24.

005.

0015

0.0

PVC

8.0

83: J

-31

81: J

-30

854

P-33

0.00

00.

1422

.05

5.00

150.

0PV

C8.

079

: J-2

983

: J-3

167

4P-

340.

000

0.40

-62.

095.

0015

0.0

PVC

8.0

81: J

-30

58: J

-20

524

P-35

0.00

00.

21-3

3.28

5.00

150.

0PV

C8.

083

: J-3

181

: J-3

040

1P-

360.

000

0.65

-102

.34

5.00

150.

0PV

C8.

041

: J-1

283

: J-3

118

7P-

37

Pag

e 1

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 25: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

0812

.16

5.00

150.

0PV

C8.

089

: J-3

241

: J-1

218

4P-

380.

000

0.16

25.7

15.

0015

0.0

PVC

8.0

91: J

-33

89: J

-32

226

P-39

0.00

00.

2031

.60

5.00

150.

0PV

C8.

093

: J-3

491

: J-3

327

8P-

400.

000

0.17

26.5

45.

0015

0.0

PVC

8.0

95: J

-35

93: J

-34

284

P-41

0.00

00.

0813

.09

5.00

150.

0PV

C8.

097

: J-3

695

: J-3

527

0P-

420.

000

0.08

12.3

05.

0015

0.0

PVC

8.0

99: J

-37

97: J

-36

502

P-43

0.00

00.

058.

055.

0015

0.0

PVC

8.0

101:

J-3

899

: J-3

729

5P-

440.

000

0.22

-34.

645.

0015

0.0

PVC

8.0

103:

J-3

939

: J-1

122

6P-

450.

000

0.11

-16.

865.

0015

0.0

PVC

8.0

105:

J-4

010

3: J

-39

277

P-46

0.00

00.

022.

495.

0015

0.0

PVC

8.0

107:

J-4

110

5: J

-40

369

P-47

0.00

00.

057.

255.

0015

0.0

PVC

8.0

99: J

-37

107:

J-4

126

8P-

480.

000

0.19

-29.

285.

0015

0.0

PVC

8.0

110:

J-4

210

3: J

-39

619

P-49

0.00

00.

35-5

4.65

5.00

150.

0PV

C8.

011

2: J

-43

110:

J-4

236

8P-

500.

000

0.42

-66.

075.

0015

0.0

PVC

8.0

114:

J-4

411

2: J

-43

270

P-51

0.00

00.

55-8

6.07

5.00

150.

0PV

C8.

011

6: J

-45

114:

J-4

424

4P-

520.

000

0.40

62.9

15.

0015

0.0

PVC

8.0

120:

J-4

711

8: J

-46

272

P-54

0.00

00.

4063

.36

5.00

150.

0PV

C8.

012

2: J

-48

120:

J-4

726

9P-

550.

000

0.17

27.4

05.

0015

0.0

PVC

8.0

105:

J-4

012

4: J

-49

478

P-57

0.00

11.

1818

4.63

5.00

150.

0PV

C8.

011

6: J

-45

33: J

-818

7P-

580.

000

0.31

48.9

95.

0015

0.0

PVC

8.0

118:

J-4

611

6: J

-45

361

P-59

0.00

00.

0811

.94

5.00

150.

0PV

C8.

012

0: J

-47

114:

J-4

441

2P-

600.

000

0.05

-8.3

55.

0015

0.0

PVC

8.0

112:

J-4

335

: J-9

188

P-61

0.00

00.

05-7

.28

5.00

150.

0PV

C8.

012

2: J

-48

112:

J-4

353

2P-

620.

000

0.07

11.5

75.

0015

0.0

PVC

8.0

124:

J-4

911

0: J

-42

269

P-63

0.00

00.

034.

605.

0015

0.0

PVC

8.0

133:

J-5

012

4: J

-49

183

P-64

0.00

00.

02-3

.45

5.00

150.

0PV

C8.

037

: J-1

075

: J-2

822

5P-

680.

000

0.11

-17.

615.

0015

0.0

PVC

8.0

141:

J-5

297

: J-3

673

2P-

700.

000

0.10

-16.

385.

0015

0.0

PVC

8.0

143:

J-5

314

1: J

-52

264

P-71

0.00

00.

24-3

7.78

5.00

150.

0PV

C8.

014

5: J

-54

143:

J-5

326

9P-

720.

000

0.40

-63.

225.

0015

0.0

PVC

8.0

147:

J-5

514

5: J

-54

190

P-73

0.00

10.

99-1

54.4

05.

0015

0.0

PVC

8.0

31: J

-714

7: J

-55

200

P-74

Pag

e 2

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 26: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ayW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

2843

.14

5.00

150.

0PV

C8.

015

0: J

-56

147:

J-5

563

3P-

750.

000

0.02

3.45

5.00

150.

0PV

C8.

015

2: J

-57

150:

J-5

627

4P-

760.

000

0.26

39.9

95.

0015

0.0

PVC

8.0

154:

J-5

814

7: J

-55

366

P-77

0.00

00.

045.

755.

0015

0.0

PVC

8.0

156:

J-5

915

4: J

-58

190

P-78

0.00

00.

15-2

2.74

5.00

150.

0PV

C8.

015

4: J

-58

89: J

-32

574

P-79

0.00

00.

10-1

5.09

5.00

150.

0PV

C8.

014

5: J

-54

91: J

-33

593

P-80

0.00

00.

03-5

.29

5.00

150.

0PV

C8.

014

3: J

-53

93: J

-34

652

P-81

0.00

00.

10-1

5.11

5.00

150.

0PV

C8.

095

: J-3

510

7: J

-41

504

P-82

0.00

00.

11-1

6.61

5.00

150.

0PV

C8.

014

1: J

-52

95: J

-35

581

P-83

0.00

00.

22-3

5.09

5.00

150.

0PV

C8.

015

0: J

-56

141:

J-5

230

0P-

840.

001

1.23

770.

495.

0013

0.0

Duct

ile Ir

on16

.023

: J-3

164:

R-1

265

P-85

0.00

00.

1828

.83

5.00

150.

0PV

C8.

017

3: J

-60

67: J

-25

357

P-87

0.00

00.

1524

.23

5.00

150.

0PV

C8.

050

: J-1

617

3: J

-60

334

P-88

0.00

00.

1015

.18

5.00

150.

0PV

C8.

017

6: J

-61

52: J

-17

613

P-89

0.00

00.

04-6

.67

5.00

150.

0PV

C8.

054

: J-1

817

6: J

-61

616

P-90

0.00

00.

011.

855.

0015

0.0

PVC

8.0

179:

J-6

256

: J-1

924

9P-

910.

000

0.05

-8.5

05.

0015

0.0

PVC

8.0

52: J

-17

179:

J-6

261

0P-

920.

000

0.25

39.2

25.

0015

0.0

PVC

8.0

182:

J-6

311

6: J

-45

421

P-93

0.00

00.

1523

.12

5.00

150.

0PV

C8.

011

8: J

-46

182:

J-6

340

9P-

940.

000

0.28

43.4

35.

0015

0.0

PVC

8.0

185:

J-6

412

2: J

-48

338

P-95

0.00

00.

2234

.23

5.00

150.

0PV

C8.

012

4: J

-49

185:

J-6

443

0P-

960.

002

1.62

570.

185.

0015

0.0

PVC

12.0

22: J

-219

7: R

-223

9P-

970.

000

0.45

70.9

45.

0015

0.0

PVC

8.0

210:

J-2

635

: J-9

292

P-98

0.00

00.

2234

.93

5.00

150.

0PV

C8.

021

3: J

-27

210:

J-2

627

5P-

100

0.00

00.

012.

315.

0015

0.0

PVC

8.0

37: J

-10

213:

J-2

727

1P-

101

0.00

00.

33-2

9.12

0.00

130.

0Du

ctile

Iron

6.0

210:

J-2

673

: J-5

154

2P-

102

0.00

00.

2723

.41

0.00

130.

0Du

ctile

Iron

6.0

73: J

-51

213:

J-2

764

8P-

103

0.00

00.

2118

.40

0.00

130.

0Du

ctile

Iron

6.0

79: J

-29

39: J

-11

903

P-10

4

Pag

e 3

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 27: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Peak HourWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

386.0561.25,414.95,273.5J-2386.0563.45,415.35,268.7J-3

0.0080.05,414.25,229.4J-40.0087.45,413.35,211.2J-5

214.0485.35,410.75,213.5J-6214.0478.35,410.15,229.2J-7

0.0063.75,410.65,263.3J-80.0066.95,409.65,254.9J-96.2171.45,409.45,244.3J-10

109.7172.65,409.45,241.6J-110.0081.45,409.55,221.5J-12

14.4967.85,409.35,252.7J-1316.5668.65,409.25,250.8J-1420.7069.45,409.25,248.7J-1518.6370.35,409.25,246.6J-1633.1269.65,409.05,248.1J-1739.3368.25,409.05,251.4J-1843.4777.85,409.05,229.1J-1935.1982.85,409.15,217.8J-2012.4282.15,409.15,219.3J-218.2861.95,409.25,266.1J-22

26.9162.55,409.25,264.8J-2324.8463.75,409.25,261.9J-2422.7765.05,409.25,259.0J-2518.6371.75,409.35,243.5J-516.2175.35,409.45,235.3J-28

33.1281.85,409.35,220.1J-2931.0584.05,409.35,215.1J-3041.4081.85,409.35,220.2J-3116.5680.95,409.55,222.5J-3216.5678.35,409.55,228.6J-3318.6374.85,409.55,236.5J-3426.9171.35,409.55,244.6J-3533.1267.15,409.55,254.4J-3620.7068.85,409.45,250.5J-3714.4965.95,409.45,257.1J-3820.7071.95,409.45,243.3J-3914.4967.75,409.45,253.0J-4018.6369.65,409.45,248.6J-4124.8468.65,409.55,250.9J-4218.6366.45,409.65,256.1J-4314.4964.95,409.75,259.6J-4418.6362.95,409.95,264.4J-4516.5660.55,409.85,270.0J-4620.7060.85,409.75,269.1J-4722.7760.35,409.65,270.1J-4824.8467.55,409.55,253.4J-49

Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 28: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Active Scenario: Peak HourWillowBend

Demand(gpm)

Pressure(psi)

Hydraulic Grade(ft)

Elevation(ft)

Label

8.2866.25,409.55,256.4J-5031.0570.95,409.55,245.5J-5228.9873.85,409.55,238.8J-5318.6376.15,409.55,233.6J-5414.4978.15,409.65,229.1J-558.2873.85,409.55,239.0J-566.2172.95,409.55,241.0J-57

20.7079.25,409.65,226.4J-5810.3580.45,409.65,223.7J-598.2868.05,409.25,252.1J-60

39.3364.65,409.05,259.7J-6118.6376.85,409.05,231.5J-6228.9859.35,409.85,272.7J-6316.5663.65,409.55,262.6J-6412.4268.55,409.45,251.2J-2616.5670.05,409.45,247.7J-27

Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666

2/7/2017

Bentley WaterCAD V8i (SELECTseries 6)[08.11.06.113]

Bentley Systems, Inc. Haestad Methods Solution Center13023 - WaterCAD.wtg

Page 29: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: P

eak

Hou

rW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

11.

601,

002.

375.

0013

0.0

Duct

ile Ir

on16

.025

: J-4

23: J

-31,

408

P-2

0.00

11.

601,

002.

375.

0013

0.0

Duct

ile Ir

on16

.027

: J-5

25: J

-41,

220

P-3

0.00

32.

841,

002.

375.

0015

0.0

PVC

12.0

29: J

-627

: J-5

1,00

0P-

40.

001

1.40

491.

945.

0015

0.0

PVC

12.0

31: J

-729

: J-6

811

P-5

0.00

94.

0863

8.73

5.00

150.

0PV

C8.

033

: J-8

22: J

-249

2P-

60.

002

1.97

308.

245.

0015

0.0

PVC

8.0

35: J

-933

: J-8

429

P-7

0.00

00.

06-9

.17

5.00

150.

0PV

C8.

039

: J-1

137

: J-1

024

3P-

90.

000

0.57

-89.

955.

0015

0.0

PVC

8.0

41: J

-12

39: J

-11

611

P-10

0.00

21.

89-2

96.3

95.

0015

0.0

PVC

8.0

29: J

-641

: J-1

259

8P-

110.

001

1.24

194.

265.

0015

0.0

PVC

8.0

44: J

-13

35: J

-919

9P-

120.

000

0.67

104.

215.

0015

0.0

PVC

8.0

46: J

-14

44: J

-13

241

P-13

0.00

00.

3554

.71

5.00

150.

0PV

C8.

048

: J-1

546

: J-1

426

1P-

140.

000

0.54

84.5

45.

0015

0.0

PVC

8.0

50: J

-16

48: J

-15

259

P-15

0.00

00.

7010

9.52

5.00

150.

0PV

C8.

052

: J-1

750

: J-1

640

0P-

160.

000

0.22

33.8

15.

0015

0.0

PVC

8.0

54: J

-18

52: J

-17

260

P-17

0.00

00.

11-1

7.49

5.00

150.

0PV

C8.

056

: J-1

954

: J-1

867

1P-

180.

000

0.41

-64.

365.

0015

0.0

PVC

8.0

58: J

-20

56: J

-19

769

P-19

0.00

00.

0812

.42

5.00

150.

0PV

C8.

060

: J-2

158

: J-2

022

0P-

200.

000

0.05

-8.2

85.

0015

0.0

PVC

8.0

63: J

-23

62: J

-22

146

P-21

0.00

00.

2640

.37

5.00

150.

0PV

C8.

065

: J-2

463

: J-2

327

4P-

220.

000

0.31

48.4

75.

0015

0.0

PVC

8.0

67: J

-25

65: J

-24

258

P-23

0.00

00.

48-7

5.56

5.00

150.

0PV

C8.

044

: J-1

363

: J-2

358

2P-

250.

000

0.21

-32.

955.

0015

0.0

PVC

8.0

46: J

-14

65: J

-24

497

P-26

0.00

00.

17-2

6.19

5.00

150.

0PV

C8.

048

: J-1

567

: J-2

549

8P-

270.

000

0.49

-76.

725.

0015

0.0

PVC

8.0

73: J

-51

48: J

-15

261

P-28

0.00

00.

2639

.96

5.00

150.

0PV

C8.

081

: J-3

079

: J-2

922

0P-

320.

000

0.28

-43.

335.

0015

0.0

PVC

8.0

83: J

-31

81: J

-30

854

P-33

0.00

00.

2539

.49

5.00

150.

0PV

C8.

079

: J-2

983

: J-3

167

4P-

340.

000

0.71

-111

.97

5.00

150.

0PV

C8.

081

: J-3

058

: J-2

052

4P-

350.

000

0.38

-59.

725.

0015

0.0

PVC

8.0

83: J

-31

81: J

-30

401

P-36

0.00

11.

17-1

83.9

45.

0015

0.0

PVC

8.0

41: J

-12

83: J

-31

187

P-37

Pag

e 1

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 30: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: P

eak

Hou

rW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

1422

.49

5.00

150.

0PV

C8.

089

: J-3

241

: J-1

218

4P-

380.

000

0.30

46.8

55.

0015

0.0

PVC

8.0

91: J

-33

89: J

-32

226

P-39

0.00

00.

3657

.15

5.00

150.

0PV

C8.

093

: J-3

491

: J-3

327

8P-

400.

000

0.31

47.9

05.

0015

0.0

PVC

8.0

95: J

-35

93: J

-34

284

P-41

0.00

00.

1523

.56

5.00

150.

0PV

C8.

097

: J-3

695

: J-3

527

0P-

420.

000

0.14

22.4

05.

0015

0.0

PVC

8.0

99: J

-37

97: J

-36

502

P-43

0.00

00.

0914

.49

5.00

150.

0PV

C8.

010

1: J

-38

99: J

-37

295

P-44

0.00

00.

40-6

2.53

5.00

150.

0PV

C8.

010

3: J

-39

39: J

-11

226

P-45

0.00

00.

20-3

0.58

5.00

150.

0PV

C8.

010

5: J

-40

103:

J-3

927

7P-

460.

000

0.02

3.89

5.00

150.

0PV

C8.

010

7: J

-41

105:

J-4

036

9P-

470.

000

0.08

12.7

95.

0015

0.0

PVC

8.0

99: J

-37

107:

J-4

126

8P-

480.

000

0.34

-52.

655.

0015

0.0

PVC

8.0

110:

J-4

210

3: J

-39

619

P-49

0.00

00.

63-9

8.16

5.00

150.

0PV

C8.

011

2: J

-43

110:

J-4

236

8P-

500.

000

0.75

-117

.90

5.00

150.

0PV

C8.

011

4: J

-44

112:

J-4

327

0P-

510.

001

0.98

-153

.69

5.00

150.

0PV

C8.

011

6: J

-45

114:

J-4

424

4P-

520.

000

0.72

112.

635.

0015

0.0

PVC

8.0

120:

J-4

711

8: J

-46

272

P-54

0.00

00.

7211

3.24

5.00

150.

0PV

C8.

012

2: J

-48

120:

J-4

726

9P-

550.

000

0.31

48.9

65.

0015

0.0

PVC

8.0

105:

J-4

012

4: J

-49

478

P-57

0.00

42.

1133

0.49

5.00

150.

0PV

C8.

011

6: J

-45

33: J

-818

7P-

580.

000

0.56

87.7

55.

0015

0.0

PVC

8.0

118:

J-4

611

6: J

-45

361

P-59

0.00

00.

1421

.31

5.00

150.

0PV

C8.

012

0: J

-47

114:

J-4

441

2P-

600.

000

0.09

-13.

605.

0015

0.0

PVC

8.0

112:

J-4

335

: J-9

188

P-61

0.00

00.

08-1

2.50

5.00

150.

0PV

C8.

012

2: J

-48

112:

J-4

353

2P-

620.

000

0.13

20.6

85.

0015

0.0

PVC

8.0

124:

J-4

911

0: J

-42

269

P-63

0.00

00.

058.

285.

0015

0.0

PVC

8.0

133:

J-5

012

4: J

-49

183

P-64

0.00

00.

04-6

.21

5.00

150.

0PV

C8.

037

: J-1

075

: J-2

822

5P-

680.

000

0.20

-31.

965.

0015

0.0

PVC

8.0

141:

J-5

297

: J-3

673

2P-

700.

000

0.19

-29.

535.

0015

0.0

PVC

8.0

143:

J-5

314

1: J

-52

264

P-71

0.00

00.

43-6

7.88

5.00

150.

0PV

C8.

014

5: J

-54

143:

J-5

326

9P-

720.

000

0.72

-113

.38

5.00

150.

0PV

C8.

014

7: J

-55

145:

J-5

419

0P-

730.

003

1.77

-277

.90

5.00

150.

0PV

C8.

031

: J-7

147:

J-5

520

0P-

74

Pag

e 2

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 31: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: P

eak

Hou

rW

illow

Ben

d

Head

loss

Gr

adie

nt(ft

/ft)

Velo

city

(ft/s

)Fl

ow(g

pm)

Min

or L

oss

Coef

ficie

nt

(Loc

al)

Haze

n-W

illiam

s C

Mat

eria

lDi

amet

er(in

)St

op N

ode

Star

t Nod

eLe

ngth

(ft)

Labe

l

0.00

00.

5078

.07

5.00

150.

0PV

C8.

015

0: J

-56

147:

J-5

563

3P-

750.

000

0.04

6.21

5.00

150.

0PV

C8.

015

2: J

-57

150:

J-5

627

4P-

760.

000

0.46

71.9

65.

0015

0.0

PVC

8.0

154:

J-5

814

7: J

-55

366

P-77

0.00

00.

0710

.35

5.00

150.

0PV

C8.

015

6: J

-59

154:

J-5

819

0P-

780.

000

0.26

-40.

915.

0015

0.0

PVC

8.0

154:

J-5

889

: J-3

257

4P-

790.

000

0.17

-26.

865.

0015

0.0

PVC

8.0

145:

J-5

491

: J-3

359

3P-

800.

000

0.06

-9.3

85.

0015

0.0

PVC

8.0

143:

J-5

393

: J-3

465

2P-

810.

000

0.18

-27.

535.

0015

0.0

PVC

8.0

95: J

-35

107:

J-4

150

4P-

820.

000

0.19

-30.

105.

0015

0.0

PVC

8.0

141:

J-5

295

: J-3

558

1P-

830.

000

0.41

-63.

585.

0015

0.0

PVC

8.0

150:

J-5

614

1: J

-52

300

P-84

0.00

32.

221,

388.

425.

0013

0.0

Duct

ile Ir

on16

.023

: J-3

164:

R-1

265

P-85

0.00

00.

3351

.90

5.00

150.

0PV

C8.

017

3: J

-60

67: J

-25

357

P-87

0.00

00.

2843

.62

5.00

150.

0PV

C8.

050

: J-1

617

3: J

-60

334

P-88

0.00

00.

1727

.36

5.00

150.

0PV

C8.

017

6: J

-61

52: J

-17

613

P-89

0.00

00.

08-1

1.97

5.00

150.

0PV

C8.

054

: J-1

817

6: J

-61

616

P-90

0.00

00.

023.

405.

0015

0.0

PVC

8.0

179:

J-6

256

: J-1

924

9P-

910.

000

0.10

-15.

235.

0015

0.0

PVC

8.0

52: J

-17

179:

J-6

261

0P-

920.

000

0.45

70.4

25.

0015

0.0

PVC

8.0

182:

J-6

311

6: J

-45

421

P-93

0.00

00.

2641

.44

5.00

150.

0PV

C8.

011

8: J

-46

182:

J-6

340

9P-

940.

000

0.50

77.9

75.

0015

0.0

PVC

8.0

185:

J-6

412

2: J

-48

338

P-95

0.00

00.

3961

.41

5.00

150.

0PV

C8.

012

4: J

-49

185:

J-6

443

0P-

960.

005

2.91

1,02

4.78

5.00

150.

0PV

C12

.022

: J-2

197:

R-2

239

P-97

0.00

00.

8112

7.58

5.00

150.

0PV

C8.

021

0: J

-26

35: J

-929

2P-

980.

000

0.40

62.3

15.

0015

0.0

PVC

8.0

213:

J-2

721

0: J

-26

275

P-10

00.

000

0.02

3.25

5.00

150.

0PV

C8.

037

: J-1

021

3: J

-27

271

P-10

10.

000

0.60

-52.

850.

0013

0.0

Duct

ile Ir

on6.

021

0: J

-26

73: J

-51

542

P-10

20.

000

0.48

42.5

10.

0013

0.0

Duct

ile Ir

on6.

073

: J-5

121

3: J

-27

648

P-10

30.

000

0.38

33.5

90.

0013

0.0

Duct

ile Ir

on6.

079

: J-2

939

: J-1

190

3P-

104

Pag

e 3

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 32: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ay P

lus

Fire

Will

owB

end

Velo

city

of

Max

imum

Pi

pe(ft

/s)

Is F

ire

Flow

Run

Ba

lanc

ed?

Junc

tion

w/

Min

imum

Pr

essu

re

(Sys

tem

)

Pres

sure

(C

alcu

late

d Sy

stem

Lo

wer

Lim

it)(p

si)

Junc

tion

w/

Min

imum

Pr

essu

re

(Zon

e)

Pres

sure

(Z

one

Low

er

Limit)

(psi)

Pres

sure

(C

alcu

late

d Re

sidua

l)(p

si)

Flow

(Tot

al

Avai

labl

e)(g

pm)

Flow

(Tot

al

Need

ed)

(gpm

)

Fire

Flo

w

(Ava

ilabl

e)(g

pm)

Fire

Flo

w

(Nee

ded)

(gpm

)

Satis

fies

Fire

Flo

w

Cons

train

ts?

Labe

l

8.66

True

182:

J-6

358

.018

2: J

-63

20.0

57.5

3,21

4.47

1,71

4.47

3,00

0.00

1,50

0.00

True

J-2

5.70

True

182:

J-6

360

.118

2: J

-63

20.0

61.9

3,21

4.47

1,71

4.47

3,00

0.00

1,50

0.00

True

J-3

5.58

True

182:

J-6

357

.518

2: J

-63

20.0

75.4

3,00

0.00

1,50

0.00

3,00

0.00

1,50

0.00

True

J-4

6.71

True

182:

J-6

355

.718

2: J

-63

20.0

80.9

3,00

0.00

1,50

0.00

3,00

0.00

1,50

0.00

True

J-5

9.66

True

182:

J-6

349

.518

2: J

-63

20.0

71.4

3,61

8.91

3,11

8.91

3,50

0.00

3,00

0.00

True

J-6

9.98

True

182:

J-6

348

.818

2: J

-63

20.0

59.5

3,61

8.91

3,11

8.91

3,50

0.00

3,00

0.00

True

J-7

11.2

0Tr

ue18

2: J

-63

48.2

182:

J-6

320

.051

.72,

740.

351,

500.

002,

740.

351,

500.

00Tr

ueJ-

811

.20

True

62: J

-22

46.1

62: J

-22

20.0

50.5

2,99

8.86

1,50

0.00

2,99

8.86

1,50

0.00

True

J-9

10.9

1Tr

ue18

2: J

-63

47.1

182:

J-6

320

.048

.23,

003.

451,

503.

453,

000.

001,

500.

00Tr

ueJ-

1010

.46

True

182:

J-6

347

.518

2: J

-63

20.0

55.2

3,06

0.95

1,56

0.95

3,00

0.00

1,50

0.00

True

J-11

9.94

True

182:

J-6

348

.918

2: J

-63

20.0

66.5

3,00

0.00

1,50

0.00

3,00

0.00

1,50

0.00

True

J-12

11.2

0Tr

ue62

: J-2

240

.662

: J-2

220

.045

.42,

942.

041,

508.

052,

933.

991,

500.

00Tr

ueJ-

1310

.97

True

62: J

-22

39.8

62: J

-22

20.0

43.3

3,00

9.20

1,50

9.20

3,00

0.00

1,50

0.00

True

J-14

10.9

3Tr

ue62

: J-2

240

.762

: J-2

220

.045

.43,

011.

501,

511.

503,

000.

001,

500.

00Tr

ueJ-

1510

.85

True

176:

J-6

140

.017

6: J

-61

20.0

42.9

3,01

0.35

1,51

0.35

3,00

0.00

1,50

0.00

True

J-16

11.2

0Tr

ue17

6: J

-61

32.7

176:

J-6

120

.037

.52,

868.

651,

518.

402,

850.

251,

500.

00Tr

ueJ-

1711

.20

True

176:

J-6

129

.617

6: J

-61

20.0

30.8

2,93

9.78

1,52

1.85

2,91

7.93

1,50

0.00

True

J-18

10.8

7Tr

ue17

6: J

-61

32.1

176:

J-6

120

.040

.83,

024.

151,

524.

153,

000.

001,

500.

00Tr

ueJ-

1911

.20

True

176:

J-6

142

.917

6: J

-61

20.0

51.3

2,86

6.10

1,51

9.55

2,84

6.55

1,50

0.00

True

J-20

11.2

0Tr

ue18

2: J

-63

55.2

182:

J-6

320

.061

.51,

754.

721,

506.

901,

747.

821,

500.

00Tr

ueJ-

2111

.20

True

63: J

-23

50.9

63: J

-23

20.0

43.7

1,75

4.72

1,50

4.60

1,75

0.12

1,50

0.00

True

J-22

10.9

9Tr

ue62

: J-2

230

.262

: J-2

220

.030

.73,

014.

951,

514.

953,

000.

001,

500.

00Tr

ueJ-

2310

.96

True

62: J

-22

36.9

62: J

-22

20.0

36.5

3,01

3.80

1,51

3.80

3,00

0.00

1,50

0.00

True

J-24

10.9

4Tr

ue62

: J-2

239

.462

: J-2

220

.037

.53,

012.

651,

512.

653,

000.

001,

500.

00Tr

ueJ-

2510

.94

True

62: J

-22

43.2

62: J

-22

20.0

44.4

3,01

0.35

1,51

0.35

3,00

0.00

1,50

0.00

True

J-51

11.2

0Tr

ue18

2: J

-63

54.9

182:

J-6

320

.058

.91,

754.

721,

503.

451,

751.

271,

500.

00Tr

ueJ-

2811

.20

True

182:

J-6

348

.518

2: J

-63

20.0

56.0

2,96

8.40

1,51

8.40

2,95

0.00

1,50

0.00

True

J-29

11.2

0Tr

ue17

6: J

-61

48.6

176:

J-6

120

.061

.72,

888.

521,

517.

252,

871.

271,

500.

00Tr

ueJ-

30

Pag

e 1

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 33: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ay P

lus

Fire

Will

owB

end

Velo

city

of

Max

imum

Pi

pe(ft

/s)

Is F

ire

Flow

Run

Ba

lanc

ed?

Junc

tion

w/

Min

imum

Pr

essu

re

(Sys

tem

)

Pres

sure

(C

alcu

late

d Sy

stem

Lo

wer

Lim

it)(p

si)

Junc

tion

w/

Min

imum

Pr

essu

re

(Zon

e)

Pres

sure

(Z

one

Low

er

Limit)

(psi)

Pres

sure

(C

alcu

late

d Re

sidua

l)(p

si)

Flow

(Tot

al

Avai

labl

e)(g

pm)

Flow

(Tot

al

Need

ed)

(gpm

)

Fire

Flo

w

(Ava

ilabl

e)(g

pm)

Fire

Flo

w

(Nee

ded)

(gpm

)

Satis

fies

Fire

Flo

w

Cons

train

ts?

Labe

l

11.2

0Tr

ue18

2: J

-63

50.1

182:

J-6

320

.063

.12,

735.

221,

523.

002,

712.

221,

500.

00Tr

ueJ-

319.

82Tr

ue18

2: J

-63

49.2

182:

J-6

320

.063

.43,

009.

201,

509.

203,

000.

001,

500.

00Tr

ueJ-

329.

75Tr

ue18

2: J

-63

49.3

182:

J-6

320

.058

.93,

009.

201,

509.

203,

000.

001,

500.

00Tr

ueJ-

339.

80Tr

ue18

2: J

-63

49.2

182:

J-6

320

.054

.33,

010.

351,

510.

353,

000.

001,

500.

00Tr

ueJ-

349.

89Tr

ue10

1: J

-38

48.1

101:

J-3

820

.051

.63,

014.

951,

514.

953,

000.

001,

500.

00Tr

ueJ-

359.

91Tr

ue10

1: J

-38

46.0

101:

J-3

820

.044

.23,

018.

401,

518.

403,

000.

001,

500.

00Tr

ueJ-

3610

.72

True

101:

J-3

838

.810

1: J

-38

20.0

41.6

3,01

1.50

1,51

1.50

3,00

0.00

1,50

0.00

True

J-37

11.2

0Tr

ue18

2: J

-63

55.6

182:

J-6

320

.046

.91,

754.

721,

508.

051,

746.

671,

500.

00Tr

ueJ-

3811

.20

True

122:

J-4

845

.412

2: J

-48

20.0

51.2

3,21

7.66

3,01

1.50

3,20

6.16

3,00

0.00

True

J-39

10.5

3Tr

ue18

2: J

-63

47.2

182:

J-6

320

.048

.93,

008.

051,

508.

053,

000.

001,

500.

00Tr

ueJ-

4010

.08

True

101:

J-3

846

.210

1: J

-38

20.0

48.4

3,01

0.35

1,51

0.35

3,00

0.00

1,50

0.00

True

J-41

10.9

0Tr

ue12

2: J

-48

45.8

122:

J-4

820

.049

.53,

013.

801,

513.

803,

000.

001,

500.

00Tr

ueJ-

4211

.16

True

182:

J-6

344

.918

2: J

-63

20.0

49.8

3,01

0.35

1,51

0.35

3,00

0.00

1,50

0.00

True

J-43

11.2

0Tr

ue18

2: J

-63

43.6

182:

J-6

320

.046

.52,

943.

221,

508.

052,

935.

171,

500.

00Tr

ueJ-

4411

.20

True

182:

J-6

342

.618

2: J

-63

20.0

45.9

2,88

7.68

1,51

0.35

2,87

7.33

1,50

0.00

True

J-45

11.2

0Tr

ue18

2: J

-63

40.9

182:

J-6

320

.040

.22,

913.

881,

509.

202,

904.

681,

500.

00Tr

ueJ-

4611

.20

True

182:

J-6

343

.118

2: J

-63

20.0

41.4

2,95

5.47

1,51

1.50

2,94

3.97

1,50

0.00

True

J-47

11.1

7Tr

ue18

2: J

-63

44.3

182:

J-6

320

.040

.03,

012.

651,

512.

653,

000.

001,

500.

00Tr

ueJ-

4810

.86

True

122:

J-4

845

.612

2: J

-48

20.0

47.6

3,01

3.80

1,51

3.80

3,00

0.00

1,50

0.00

True

J-49

11.2

0Tr

ue18

2: J

-63

54.5

182:

J-6

320

.051

.71,

754.

721,

504.

601,

750.

121,

500.

00Tr

ueJ-

509.

81Tr

ue18

2: J

-63

49.2

182:

J-6

320

.051

.13,

017.

251,

517.

253,

000.

001,

500.

00Tr

ueJ-

529.

78Tr

ue18

2: J

-63

49.2

182:

J-6

320

.053

.33,

016.

101,

516.

103,

000.

001,

500.

00Tr

ueJ-

539.

70Tr

ue18

2: J

-63

49.4

182:

J-6

320

.056

.83,

010.

351,

510.

353,

000.

001,

500.

00Tr

ueJ-

549.

54Tr

ue18

2: J

-63

49.8

182:

J-6

320

.061

.73,

008.

051,

508.

053,

000.

001,

500.

00Tr

ueJ-

5510

.21

True

152:

J-5

747

.815

2: J

-57

20.0

48.6

3,00

4.60

1,50

4.60

3,00

0.00

1,50

0.00

True

J-56

11.2

0Tr

ue18

2: J

-63

55.8

182:

J-6

320

.054

.91,

754.

721,

503.

451,

751.

271,

500.

00Tr

ueJ-

5710

.42

True

182:

J-6

349

.518

2: J

-63

20.0

55.1

3,01

1.50

1,51

1.50

3,00

0.00

1,50

0.00

True

J-58

11.2

0Tr

ue18

2: J

-63

55.9

182:

J-6

320

.064

.21,

754.

721,

505.

751,

748.

971,

500.

00Tr

ueJ-

59

Pag

e 2

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 34: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Act

ive

Sce

nari

o: M

ax D

ay P

lus

Fire

Will

owB

end

Velo

city

of

Max

imum

Pi

pe(ft

/s)

Is F

ire

Flow

Run

Ba

lanc

ed?

Junc

tion

w/

Min

imum

Pr

essu

re

(Sys

tem

)

Pres

sure

(C

alcu

late

d Sy

stem

Lo

wer

Lim

it)(p

si)

Junc

tion

w/

Min

imum

Pr

essu

re

(Zon

e)

Pres

sure

(Z

one

Low

er

Limit)

(psi)

Pres

sure

(C

alcu

late

d Re

sidua

l)(p

si)

Flow

(Tot

al

Avai

labl

e)(g

pm)

Flow

(Tot

al

Need

ed)

(gpm

)

Fire

Flo

w

(Ava

ilabl

e)(g

pm)

Fire

Flo

w

(Nee

ded)

(gpm

)

Satis

fies

Fire

Flo

w

Cons

train

ts?

Labe

l

10.9

0Tr

ue67

: J-2

540

.567

: J-2

520

.035

.93,

004.

601,

504.

603,

000.

001,

500.

00Tr

ueJ-

6011

.20

True

54: J

-18

34.5

54: J

-18

20.0

21.3

2,90

0.98

1,52

1.85

2,87

9.13

1,50

0.00

True

J-61

11.2

0Tr

ue17

6: J

-61

31.5

176:

J-6

120

.035

.32,

978.

321,

510.

352,

967.

971,

500.

00Tr

ueJ-

6211

.20

True

118:

J-4

642

.711

8: J

-46

20.0

34.1

2,90

4.83

1,51

6.10

2,88

8.73

1,50

0.00

True

J-63

11.0

6Tr

ue12

2: J

-48

43.0

122:

J-4

820

.038

.53,

009.

201,

509.

203,

000.

001,

500.

00Tr

ueJ-

6411

.01

True

62: J

-22

46.2

62: J

-22

20.0

46.8

3,00

6.90

1,50

6.90

3,00

0.00

1,50

0.00

True

J-26

10.8

7Tr

ue62

: J-2

246

.862

: J-2

220

.047

.13,

009.

201,

509.

203,

000.

001,

500.

00Tr

ueJ-

27

Pag

e 3

of 3

27 S

iem

on C

ompa

ny D

rive

Sui

te 2

00 W

Wat

erto

wn,

CT

067

95 U

SA

+

1-20

3-75

5-16

662/

7/20

17

Ben

tley

Wat

erC

AD

V8i

(S

ELE

CTs

erie

s 6)

[08.

11.0

6.11

3]B

entle

y S

yste

ms,

Inc.

Hae

stad

Met

hods

Sol

utio

n C

ente

r13

023

- W

ater

CA

D.w

tg

Page 35: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

APPENDIX C – Sanitary Sewer Sanitary Demands and Flows

Page 36: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I
Page 37: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Job

No.

130

23W

illow

Ben

dS

anita

ry S

ewer

Cal

cula

tions

2/7/

2017

3:57

PM

San

itar

y S

ewer

Dem

and

s fo

r W

illo

w B

end

City

of T

horn

ton

Sta

ndar

ds

low

den

sity

(le

ss th

an 5

DU

/acr

e)3.

45pe

ople

/ un

it

mid

den

sity

(5

to 1

2 D

U/ a

cre)

2.45

peop

le /

unit

high

den

sity

(m

ore

than

12

DU

/acr

e)2.

20pe

ople

/ un

it

Res

iden

tial a

vera

ge d

eman

d:80

gal /

per

son

/ day

Com

mer

cial

ave

rage

dem

and:

600

gal /

acr

e

DU

= d

wel

ling

units

Will

ow B

end

Subd

ivis

ion

Pla

nnin

g A

rea

Land

U

se:

DU

(A

C. f

or

Sch

ool

/Com

m.)

Peo

ple

/ Uni

tN

o. o

f P

eopl

eA

vera

ge D

eman

d (g

al/p

erso

n/da

y)

Ave

rage

F

low

(g

pd)

Ave

rage

F

low

(gpm

)

Ave

rage

F

low

(cfs

)

Use

d P

ea

king

F

acto

r

Pea

k

Flo

w

(gpd

)

Pe

ak

Flo

w

(cfs

)

OS

-1 (

La

yton

)S

FD

12

63

.45

435

8034

,776

240.

053.

50

1

21,7

16

0.19

1 (W

illow

Ben

d -

Pha

se 1

)S

FD

100

3.45

345

8027

,600

190.

043.

50

96,6

00

0.15

OS

-2 (

Oxl

ey)

SF

D1

12

3.4

538

680

30,9

1221

0.05

3.50

108

,192

0.

17

2 (W

illow

Ben

d -

Pha

se 1

)S

FD

114

3.45

393

8031

,464

220.

053.

50

1

10,1

24

0.17

3 (W

illow

Ben

d -

Pha

se 2

&3)

SF

D69

3.45

238

8019

,044

130.

033.

50

66,6

54

0.10

4A (

Will

ow B

end

- P

hase

2&

3)S

FD

198

3.45

683

8054

,648

380.

083.

50

1

91,2

68

0.30

4B (

Will

ow B

end

- P

hase

2&

3)S

FD

623.

4521

480

17,1

1212

0.03

3.50

59

,892

0.

09

4C (

Fut

ure

Sch

ool S

ite)

Sch

oo

l11

0.1

Acr

es6

00

Gal

/Ac

---

---

6,0

60

40.

013.

50

21,2

10

0.03

6 (F

utur

e W

B N

orth

)M

FD

324

2.20

713

8057

,024

400.

093.

50

1

99,5

84

0.31

To

tal=

278,

640

194

0.43

2.51

698,

689

1.08

Ful

l Flo

w

Min

imum

Q

ca

p.

Qfu

ll q

/Qfu

ll

134

,776

3.50

0.19

850

%0.

50%

0.43

0.85

22.0

%2

62,3

763.

500.

348

50%

0.50

%0.

430.

8539

.5%

312

4,75

23.

180.

6110

50%

0.44

%0.

731.

4542

.2%

414

3,79

63.

050.

6810

50%

0.50

%0.

771.

5543

.8%

520

4,50

42.

750.

8712

50%

1.00

%1.

783.

5624

.4%

627

8,64

02.

511.

0812

50%

0.48

%1.

232.

4644

.0%

1. S

choo

l Ave

rage

Dem

and

Flo

w b

ased

on

600

gal/a

cre

x 10

acr

es.

2. F

utur

e M

FD

uni

ts b

ased

on

Par

terr

e S

anita

ry S

ewer

Cal

cula

tions

.

2. P

ipes

sm

alle

r th

an 1

5" a

re d

esig

ned

with

no

mor

e th

an 5

0% m

axim

um f

low

(q/

Q)

per

2012

City

of

Tho

rnto

n S

tand

ards

and

Spe

cs.

Des

ign

Pea

k fl

ow

(q

) (c

fs)

Pip

e S

ize

(in)

Avg

flow

(q

) (g

pd)

Pea

king

F

acto

r

Pag

e 1

of 1

1302

3-S

ewer

Dem

ands

Will

ow B

end.

xlsx

Page 38: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Channel Report

Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Dec 6 2016

8 Inch Sanitary Sewer

CircularDiameter (ft) = 0.67

Invert Elev (ft) = 1.00Slope (%) = 0.50N-Value = 0.013

CalculationsCompute by: Known QKnown Q (cfs) = 0.43

HighlightedDepth (ft) = 0.34Q (cfs) = 0.430Area (sqft) = 0.18Velocity (ft/s) = 2.38Wetted Perim (ft) = 1.07Crit Depth, Yc (ft) = 0.31Top Width (ft) = 0.67EGL (ft) = 0.43

0 1

Elev (ft)Section

0.75

1.00

1.25

1.50

1.75

2.00

Reach (ft)

Page 39: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Channel Report

Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Dec 6 2016

10 Inch Sanitary Sewer

CircularDiameter (ft) = 0.83

Invert Elev (ft) = 1.00Slope (%) = 0.44N-Value = 0.013

CalculationsCompute by: Known QKnown Q (cfs) = 0.77

HighlightedDepth (ft) = 0.44Q (cfs) = 0.770Area (sqft) = 0.29Velocity (ft/s) = 2.63Wetted Perim (ft) = 1.36Crit Depth, Yc (ft) = 0.39Top Width (ft) = 0.83EGL (ft) = 0.55

0 1

Elev (ft)Section

0.75

1.00

1.25

1.50

1.75

2.00

Reach (ft)

Page 40: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Channel Report

Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Dec 6 2016

12 Inch Sanitary Sewer

CircularDiameter (ft) = 1.00

Invert Elev (ft) = 1.00Slope (%) = 0.48N-Value = 0.013

CalculationsCompute by: Known QKnown Q (cfs) = 1.23

HighlightedDepth (ft) = 0.50Q (cfs) = 1.230Area (sqft) = 0.39Velocity (ft/s) = 3.12Wetted Perim (ft) = 1.57Crit Depth, Yc (ft) = 0.47Top Width (ft) = 1.00EGL (ft) = 0.65

0 1 2 3

Elev (ft) Depth (ft)Section

0.50 -0.50

1.00 0.00

1.50 0.50

2.00 1.00

2.50 1.50

3.00 2.00

Reach (ft)

Page 41: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

DE

SIG

NP

OIN

TA

VG

FLO

W(C

FS)

PE

AK

FAC

TOR

CU

ML

PE

AK

FLO

W (C

FS)

AV

G F

LOW

(CFS

)P

EA

KFA

CTO

R

CU

ML

PE

AK

FLO

W1

0.77

2.15

1.65

0.77

2.15

1.65

20.

143.

470.

500.

143.

470.

503

0.13

3.50

0.47

0.13

3.50

0.47

40.

282.

850.

800.

282.

850.

805

0.69

2.19

1.50

0.66

2.22

1.45

61.

452.

153.

121.

422.

153.

067

2.06

2.15

4.42

1.94

2.15

4.17

80.

352.

670.

930.

352.

670.

939

2.40

2.15

5.17

2.29

2.15

4.92

100.

362.

650.

950.

352.

670.

9311

0.52

2.37

1.24

0.51

2.38

1.22

120.

682.

201.

490.

672.

201.

4715

0.84

2.15

1.81

0.84

2.15

1.80

160.

902.

151.

940.

902.

151.

9217

0.94

2.15

2.01

0.93

2.15

2.00

202.

452.

155.

272.

332.

155.

0121

2.61

2.15

5.60

2.49

2.15

5.35

222.

712.

155.

832.

592.

155.

5723

3.74

2.15

8.03

3.61

2.15

7.76

ALT

. 1A

LT. 2

(Lo

wer

Den

sity

)

Alte

rnat

iveLi

ft S

tatio

nD

ensi

tyFl

ow ra

teP

eak

Flow

toD

P 9

(cfs

)P

eak

Flow

toD

P 1

5 (c

fs)

Max

. HG

Lov

er p

ipe

(ft)

Min

. HG

Lbe

low

gra

deM

ax. H

GL

over

pip

e (ft

)M

in. H

GL

belo

w g

rade

1N

oP

er Z

onin

g80

gpc

pd5.

171.

810.

511

.80.

0n.

a.2

No

Low

ered

80 g

pcpd

4.92

1.80

0.2

12.1

0.0

n.a.

Inte

rcep

tor

Inte

ral E

ast

Page 42: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

Job No. 3612 ParterreSanitary Sewer Calculations

12/6/2016

12:17 PM

City of Thornton Standards

Residential (100 gal/person/day)

low density (less than 5 DU/acre) 3.45 people / unit

Sanitary Sewer Demands for Parterre mid density (5 to 12 DU/ acre) 2.45 people / unit

high density (more than 12 DU/acre) 2.20 people / unit

Average demand: 80 gal / person / day

Commercial & Industrial: 600 gal / per acre / day

DU = dwelling units

Design Area B-1 - Parterre

Planning

Area

Land

Use:

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

4A PARK - - 8.2 - - - 80 0 0 0.00

4B PARK - - 9.7 - - - 80 0 0 0.00

4C SFD4 - 125 16.6 7.5 2.45 305 80 24,402 17 0.04

4D-1 MF - 301 15.1 20.0 2.20 662 80 52,976 37 0.08

4D-2 SFA - 335 28.0 12.0 2.45 822 80 65,738 46 0.10

4E MF - 340 17.0 20.0 2.20 748 80 59,840 42 0.09

5A-1 HC 600 - 22.2 - - - - 13,314 9 0.02

Total= 216,270 150 0.33 2.70 2.70 584,388 406 0.90

Design Area B-2 - Parterre

Planning

Area

Land

Use:

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

1A SFD2 - 300 75.0 4.0 3.45 1035 80 82,800 58 0.13

1B SFD3 - 165 33.0 5.0 2.45 404 80 32,340 22 0.05

2A-1 SFD4 - 128 17.0 7.5 2.45 312 80 24,990 17 0.04

2A-2 SFA - 204 17.0 12.0 2.45 500 80 39,984 28 0.06

2A-3 MF - 340 17.0 20.0 2.20 748 80 59,840 42 0.09

2B-1 SFD4 - 300 40.0 7.5 2.45 735 80 58,800 41 0.09

2B-2 SFA - 180 15.0 12.0 2.45 441 80 35,280 25 0.05

2C-1 NC 600 - 7.9 - - - - 4,746 3 0.01

2C-2 MF - 294 14.7 20.0 2.20 646 80 51,709 36 0.08

2D PARK 600 - 2.0 - - - - 1,200 1 0.00

Total= 391,689 272 0.61 2.27 2.27 888,284 617 1.37

Off-Site Area OS-A1 - Willow Bend South

Land Use:

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

SFD - 499 157.7 2.45 1223 80 97,804 68 0.15

SCHOOL 600 - 10.0 - - - - 6,000 4 0.01

Total= 103,804 72 0.16 3.36 3.36 348,305 242 0.54

Off-Site Area OS-A2a - Willow Bend North

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

MF - 324 18.0 18 2.20 713 80 57,024 40 0.09

Total= 57,024 40 0.09 4.00 3.50 199,584 139 0.31

Off-Site Area OS-A2b - Willow Bend North

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

MF - 274 15.2 18 2.20 602 80 48,154 33 0.07

RETAIL 600 - 6.6 - - - - 3,960 3 0.01

Total= 52,114 36 0.08 4.11 3.50 182,398 127 0.28

Off-Site Area OS-A3 - Layton

Land Use:

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

Res. SFD - 126 36.0 3.5 3.45 435 80 34,776 24 0.05

Total= 34,776 24 0.05 4.63 3.50 121,716 85 0.19

Off-Site Area OS-B1 - Holly Hills

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

Res. SFD - 316 137.4 2.3 3.45 1090 80 87,216 61 0.13

Total= 87,216 61 0.13 3.53 3.50 305,256 212 0.472

Off-Site Area OS-B2 - Holly Street Estates

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

Res. SFD - 67 19.2 3.5 3.45 232 80 18,547 13 0.03

Total= 18,547 13 0.03 5.58 3.50 64,915 45 0.10

Off-Site Area OS-B3 - Lewis Pointe

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

Res. SFD - 300 160.0 1.9 3.45 1035 80 82,800 58 0.13

Total= 82,800 58 0.13 3.59 3.50 289,800 201 0.45

Off-Site Area OS-B4 - Oxley

Demand

(gpd/acre)DU Acres

DU /

Acre

People /

Unit

No. of

People

Average

Demand

(gal/person/d

ay)

Average Flow

(gpd)

Average

Flow

(gpm)

Average

Flow

(cfs)

Calc.

Peaking

Factor

Used

Peak

Factor

Peak

Flow

(gpd)

Peak

Flow

(gpm)

Peak

Flow (cfs)

Res. SFD - 112 32.0 3.5 3.45 386 80 30,912 21 0.05

Total= 30,912 21 0.05 4.80 3.50 108,192 75 0.17

Page 1 of 1 20161130_City Reimb Sewer Demands.xls

Page 43: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com

APPENDIX D – Plans

Overall Utility Plan

Page 44: FINAL UTILITY REPORT WILLOW BEND SUBDIVISION · Willow Bend – Phase 1 February 10, 2015 Page 4 t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | I