final presentation reap technologies for sustainable material cycles
DESCRIPTION
Adrian Penalver Madrid Ida WaagoTRANSCRIPT
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
Architect: Friedel HelbrechtBuildt 1963-1968
_ci ty nord
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _sur roundings
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _ l ight ana lyse
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _facade ana lyse
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _window ana lyse cour tyard
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _or ig ina l p lans
2. floor
1. floor
Ground floor
Basement
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
Study 1 Study 2
_str uctura l s tudies
Study 3
Study 4 Study 5 Study 6
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _our propsa l
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _s tr uctura l l ines
2. floor
1. floor
Ground floor
Basement
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _new plans
WATER TANK SWIMMING POOL
WATER BOMB/
HEATING
INSTALATIONS
WATER BOMB/
HEATING
INSTALATIONS
STAFF CHANGING ROOM
OFFICES/STAFF ROOM
MEN TOILET WOMEN TOILETCLEANING
STORAGE
CAFETERIA
DINING ROOM
KITCHEN
CONFERENCE ROOM
DININD ROOM SERVICE/
KITCHEN
WATER TANK SWIMMING POOL
WATER BOMB/
HEATING
INSTALATIONS
WATER BOMB/
HEATING
INSTALATIONS
STAFF CHANGING ROOM
OFFICES/STAFF ROOM
MEN TOILET WOMEN TOILETCLEANING
STORAGE
CAFETERIA
DINING ROOM
KITCHEN
CONFERENCE ROOM
DININD ROOM SERVICE/
KITCHEN
Basement
Ground floor
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _new plans
WATER TANK SWIMMING POOL
WATER BOMB/
HEATING
INSTALATIONS
WATER BOMB/
HEATING
INSTALATIONS
STAFF CHANGING ROOM
OFFICES/STAFF ROOM
MEN TOILET WOMEN TOILETCLEANING
STORAGE
CAFETERIA
DINING ROOM
KITCHEN
CONFERENCE ROOM
DININD ROOM SERVICE/
KITCHEN
WATER TANK SWIMMING POOL
WATER BOMB/
HEATING
INSTALATIONS
WATER BOMB/
HEATING
INSTALATIONS
STAFF CHANGING ROOM
OFFICES/STAFF ROOM
MEN TOILET WOMEN TOILETCLEANING
STORAGE
CAFETERIA
DINING ROOM
KITCHEN
CONFERENCE ROOM
DININD ROOM SERVICE/
KITCHEN
1. floor
2. floor
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _sect ions
todays sections new sections
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _new cour tyard
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _changes
_staircase
_atrium
_rooms
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _rooms: br icks
Brick wall Crusher on site Rubble
Landscaping
Concrete
FLOOR BRICK WALL LENGHT (m) BRICK WALL SURFACE (m²) TOTAL AMOUNT (T)(68 bricks/m²) (1,8kg/brick)
2nd 234,22 1873 229,51st 196 1568 191,9
Ground. 195,8 1566 191,6Basem. 255,3 2042,6 250,02TOTAL 881,32 7049,6 863,02
FLOOR REMOVED BRICK WALL LENGHT (m)
REMOVED BRICK WALL SURFACE (m²)
TOTAL AMOUNT REMOVED (T)(68 bricks/m²) (1,8kg/brick)
2nd 93,95 751,6 921st 95,34 762,72 93,35
Ground. 20,75 166 20,4Basem. 79,35 634 77,6TOTAL 289,39 2314,32 283,35
TOTAL AMOUNT (T)(68 bricks/m²) (1,8kg/brick)
TOTAL AMOUNT REMOVED (T)(68 bricks/m²) (1,8kg/brick)
REMAINING AMOUNT (T)(68 bricks/m²) (1,8kg/brick)
863,02 283,35 (32,83%) 579,67 (67,17%)
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
Index Dato Beskrivelse Sign Kontr.
N
Prosjektnr.:
Prosjektnr.
Tittel:
TiltakshaverNorskprosjekteringsmal14AdressePostnr. Sted
Rådg. ing. Elektro
Målestokk:1:100Kontroll utførende
Sign.:
Godkjent:
Kontroll:
Revisjon nr.:
Filnavn:details.pln
Dato:Dato
Fase:
Prosjektfase
Type tegning:
Situasjonsplan
Prosjekteringsgruppen:
Tegningsnr.:
A10-1Prosjektnr. forprosjekterende/lev
Rådg. ing. Bygg
Rådg. ing. Vent.RIV :
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
RIE :
ARK :
RIB :.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
Arkitekt
Kontroll prosjekt
Sign.: Kontroll:
Type tegning:Situasjonsplan
Tegningsnr.:A10-1
BIM modell ArchiCAD 14 NOR Filplassering: Macintosh HD:Users:ida:Arkitektur:Materials 2011:details.pln
Lokalisering:
Index Dato Beskrivelse Sign Kontr.
N
Prosjektnr.:
Prosjektnr.
Tittel:
TiltakshaverNorskprosjekteringsmal14AdressePostnr. Sted
Rådg. ing. Elektro
Målestokk:1:100Kontroll utførende
Sign.:
Godkjent:
Kontroll:
Revisjon nr.:
Filnavn:details.pln
Dato:Dato
Fase:
Prosjektfase
Type tegning:
Situasjonsplan
Prosjekteringsgruppen:
Tegningsnr.:
A10-1Prosjektnr. forprosjekterende/lev
Rådg. ing. Bygg
Rådg. ing. Vent.RIV :
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
RIE :
ARK :
RIB :.....veien 00000 StedetTlf. 00 00 00 00Fax. 00 00 00 00
Arkitekt
Kontroll prosjekt
Sign.: Kontroll:
Type tegning:Situasjonsplan
Tegningsnr.:A10-1
BIM modell ArchiCAD 14 NOR Filplassering: Macintosh HD:Users:ida:Arkitektur:Materials 2011:details.pln
Lokalisering:
wall - floor wall - roofNew walls: Timber frame walls
_rooms: new wal l s
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
Gypsum boards Classified Grinder Gypsum powder New boards
_rooms: ce i l ing and doors
FLOOR TIMBER DOORS
SURFACE OF WOOD (m²)
CRYSTAL DOORS
SURFACE OF CRYSTAL (m²)
ALUMINIUMDOORS
SURFACE OF ALUM.
2nd 30 72 4 9,6 - -1st 17 40,8 8 19,2 - -
Ground. 22 52,8 14 33,6 8 16Basem. 30 72 14 33,6 - -TOTAL 99 237,6 40 96 8 16
REMOVED TIMBER DOORS CHANGED TIMBER DOORS ADDED TIMBER DOORS
99 61 93
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _s ta i rcase
1
2
3
Interior Courtyard
123
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
123
ELEMENT REMOVED MASONERY BLOCKS(29/floor))
TOTAL AMOUNT (T)(45kg/block)
Staircase 116 5,22
ELEMENT REMOVED WINDOWS(60/floor))+doors
TOTAL SURFACE OF GLASS (m²)(1,15 m²/window)
Staircase 177 203,55
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
REINFORCED CONCRETESLAB*
118 m³ 92,7 T
PLASTER CEILING* 11,79 m³ 5,05 T
*REINFORCED CONCRETE SLAB: 275/375 kg/m² as we asume it is a REINFORCED CONCRETE MADE ON SITE SLAB. 84,7 m² x 4floors x 275Kg/m²) = 92,7 T
*PLASTER CEILING: 84,7 m² x 4floors x 15kg/m² = 5,05 T
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
HANDRAIL OAK WOOD 1,75 m³ 1,75 T
HANDRAIL STEEL 176,4 m 1,85 T
Squared Metalic Profile 75x75 mm, 6mm thickness, 10,5kg/mOak Wood wieght: 1kg/dm³
ELEMENT NEW GLASS SURFACE ADDED
CLOSING STAIRCASE OPENING 52,2 m²
ELEMENT REMOVED MASONERY BLOCKS(29/floor))
TOTAL AMOUNT (T)(45kg/block)
Staircase 116 5,22
ELEMENT REMOVED WINDOWS(60/floor))+doors
TOTAL SURFACE OF GLASS (m²)(1,15 m²/window)
Staircase 177 203,55
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
REINFORCED CONCRETESLAB*
118 m³ 92,7 T
PLASTER CEILING* 11,79 m³ 5,05 T
*REINFORCED CONCRETE SLAB: 275/375 kg/m² as we asume it is a REINFORCED CONCRETE MADE ON SITE SLAB. 84,7 m² x 4floors x 275Kg/m²) = 92,7 T
*PLASTER CEILING: 84,7 m² x 4floors x 15kg/m² = 5,05 T
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
HANDRAIL OAK WOOD 1,75 m³ 1,75 T
HANDRAIL STEEL 176,4 m 1,85 T
Squared Metalic Profile 75x75 mm, 6mm thickness, 10,5kg/mOak Wood wieght: 1kg/dm³
ELEMENT NEW GLASS SURFACE ADDED
CLOSING STAIRCASE OPENING 52,2 m²
_sta i rcase : g lass
Rewindo.de
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
123
ELEMENT REMOVED MASONERY BLOCKS(29/floor))
TOTAL AMOUNT (T)(45kg/block)
Staircase 116 5,22
ELEMENT REMOVED WINDOWS(60/floor))+doors
TOTAL SURFACE OF GLASS (m²)(1,15 m²/window)
Staircase 177 203,55
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
REINFORCED CONCRETESLAB*
118 m³ 92,7 T
PLASTER CEILING* 11,79 m³ 5,05 T
*REINFORCED CONCRETE SLAB: 275/375 kg/m² as we asume it is a REINFORCED CONCRETE MADE ON SITE SLAB. 84,7 m² x 4floors x 275Kg/m²) = 92,7 T
*PLASTER CEILING: 84,7 m² x 4floors x 15kg/m² = 5,05 T
ELEMENT REMOVED MATERIAL TOTAL AMOUNT
HANDRAIL OAK WOOD 1,75 m³ 1,75 T
HANDRAIL STEEL 176,4 m 1,85 T
Squared Metalic Profile 75x75 mm, 6mm thickness, 10,5kg/mOak Wood wieght: 1kg/dm³
ELEMENT NEW GLASS SURFACE ADDED
CLOSING STAIRCASE OPENING 52,2 m²
_sta i rcase : mater ia l s
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles
123
_sta i rcase : masonr y
FLOOR EXISTING GRANITE BLOCKS TOTAL AMOUNT T(45kg/block)
2nd 104 4,681st 159 7,15
Ground. 58 2,61Basem. 58 2,61Basem. 379 17,05
ELEMENT REMOVED GRANITE BLOCKS(29/floor))
REMOVED TOTAL AMOUNT (T)(45kg/block)
REMAINING AMOUNT
Staircase 116 5,22 (30,61%) 110,78 (69,39%)
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _atr ium
378m3 soil Suitable for growing plants? Landscaping
-
+
+
soil
steel and glass canopy
concrete
Glass canopy covering the atrium
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles _mater ia l s : over v iew
Books:
Hendriks, F., Nijkerk,A. A., & Koppen, A. A. (2000). The Building Cycle. The Netherlands: Aeneas Technical Publishers
Addis, B. (2006). Building with Reclaimed Components and Materials. UK: Earthscan
Norges Byggeforskningsinstitutt (2001). Treteknikk - treteknologi. Trebaserte byggekonstruksjoner. Lillestrøm: Byggenæringens forlag
HCU library archives
Websites:
UK Timber Frame Acossiation. Benefits of Timber Frame. http://uktfa.com/benefits-of-timber-frame/
Gypsum Recycling International. http://www.gypsumrecycling.biz/6688-1_Whyrecycle/
Construction Materials Recycling Association. http://www.drywallrecycling.org/consite.html
Adrián Penalver Madrid & Ida WaagøTechnologies for Sustaineble Material Cycles