final presentation josh tait

18
THE HOWARD SMITH WHARVES URBAN DESIGN PRECINCT JOSHUA TAIT DAB 510 THE PROPOSED URBAN DESIGN PRECINCT WITHIN HOWARD SMITH WHARVES AIMS AT INTEGRATING THE SURROUNDING COMMUNITY WITH LOCALLY SOURCED ARCHITECTS AND DESIGNERS, IN ORDER TO CONSTRUCT AND DESIGN FURTHER RENOVATIONS AND INNOVATIONS FOR THE SURROUNDING LOCALE.

Upload: josh-tait

Post on 06-Mar-2016

236 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Final presentation josh tait

THE HOWARD SMITH WHARVES URBAN DESIGN PRECINCTJO

SHU

A TAITD

AB 510

THE PROPOSED URBAN

DESIGN PRECINCT WITHIN

HOWARD SMITH WHARVES

AIMS AT INTEGRATING THE

SURROUNDING COMMUNITY

WITH LOCALLY SOURCED

ARCHITECTS AND DESIGNERS,

IN ORDER TO CONSTRUCT AND

DESIGN FURTHER

RENOVATIONS AND

INNOVATIONS FOR THE

SURROUNDING LOCALE.

Page 2: Final presentation josh tait

PROJECT ONE RESULTED IN AN URBAN ART NODE - SUPPLYING

THE PUBLIC WITH A SPACE IN WHICH THEY MAY CONSTRUCT

THEIR OWN SPACE TO PRODUCE WORKS OF ART INCLUDING

PHOTOGRAPHY, PAINTING AND DRAWING.

BY STUDYING THE LOCALE AND REVEALING THE SOCIAL

PROBLEMS AND MULTIPLE DEMOGRAPHIC DIFFERENCES IN THE

REGION IT WAS DECIDED THAT THE DESIGN RESPONSE OF

PROJECT TWO, WAS TO ATTEMPT TO COMBAT SUCH PROBLEMS,

PREDOMINANTLY THROUGH THE USE OF ART AND DESIGN, IN A

COLLABORATIVE WAY.

PROJECT TWO SAW THE FOCUS OF DEVELOPMENT ON

NURTURING THE EXPERIENCE AND RELATIONSHIPS FORMED

DURING THE DESIGN PROCESS OF THE REDEVELOPMENTS IN

ORDER TO ERASE SOCIAL PROBLEMS.

THIS WAS AMENDED WITHIN PROJECT THREE - ALTERNATING

THE FOCUS OF THE PROPOSAL TO THE CREATION OF A PRECINCT

IN WHICH DESIGN AND COMMUNITY INVOLVEMENT COULD BE

MAXIMIZED, WHILST PROVIDING THE LOCAL COMMUNITY WITH

A PLACE OF RELAXATION, INSPIRATION AND DESIGN.

JOSH

UA TAIT

DAB 510

PREVIOUS DESIGN FROM NODE TO PRECINCT

EXISTING ART SCHOOLS AND

COLLEGES WITHIN A 2KM RADIUS OF

THE SITE

EXISTING ART EXHIBITION CENTRES

AND GALLERIES WITHIN A 2KM

RADIUS OF THE SITE

EXISTING COMMUNITY CENTRES,

PCYC’S, AND HOMELESS SHELTERS

WITHIN A 2KM RADIUS OF THE SITE

Page 3: Final presentation josh tait

JOSH

UA TAIT

DAB 510

DESIGN PROCESS FROM NODE TO PRECINCT

THE SITE WAS DETERMINED TO BE PREDOMINANTLY ACCESSED BY FOOT, ADDITIONALLY, THE SITE ITSELF ONCE ACCESSED, WAS ONLY NEGOTIABLE ON FOOT,

THUS, IT WAS DECIDED THAT THE PROPOSED DEVELOPMENT WOULD BE OF A COMFORTABLE HUMAN SCALE AND ACCESS, WHILST INTEGRATING INTO THE SITE

SEAMLESSLY.

43.6%26.6%8.2%3.15%

WALK TO DESIRED LOCATION

DRIVE TO DESIRED LOCATION

BUS TO DESIRED LOCATION

TRAIN TO DESIRED LOCATION

HEIGHT OF STORY BRIDGE APPROXIMATELY 74 METERS

MEAN HEIGHT OF BRISBANE RIVER BELOW HOWARD SMITH WHARVES IS 3.7 METERS

HEIGHT OF CURRENT SHEDS ON-SITE IS APPROXIMATELY 7 METERS

APPROXIMATE HEIGHT OF CLIFFS IS 29 METERS

AVERAGE BUILDING HEIGHT IN CDB IS 125 METERS APPROXIMATELY

SOLEIL - BRISBANES TALLEST BUILDING IS 243 METERS IN HEIGHT

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

Page 4: Final presentation josh tait

DESIGN PROCESS INTENTJO

SHU

A TAITD

AB 510

THE PROPOSED URBAN DESIGN PRECINCT WITHIN HOWARD SMITH WHARVES AIMS AT

INTEGRATING THE SURROUNDING COMMUNITY WITH LOCALLY SOURCED ARCHITECTS

AND DESIGNERS, IN ORDER TO CONSTRUCT AND DESIGN FURTHER RENOVATIONS AND

INNOVATIONS FOR THE SURROUNDING LOCALE.

THE PROPOSED DEVELOPMENT WILL FORM A PRECINCT WITHIN WHICH LOCALE

RESIDENTS MAY UTILISE FOR THE AESTHETICALLY PLEASING, AND CONVENIENTLY

LOCATED SERVICES AND AMENITIES.

BY ATTRACTING MEMBERS OF THE ADJACENT COMMUNITIES, AND WELCOMING THEM

INTO THE RELAXED ENVIRONMENT OF THE DEVELOPMENT, THE AIM OF THE PROJECT IS

TO GAIN LOCAL KNOWLEDGE AND LOCAL HANDS ON EXPERIENCE, ADVICE, AND DESIGN

CONSIDERATIONS, THAT MAY BE IMPLEMENTED INTO FUTURE DEVELOPMENTS AND

RENOVATIONS IN THE SURROUNDING AREAS AND BEYOND.

THE BUILDING PROVIDES ALL AMENITIES AND SERVICES FOR ONE TO TWENTY

MEMBERS OF THE PUBLIC, CREATING THE OPPORTUNITY FOR THOSE WHO KNOW THE

LOCALE TO PROPOSE AND CONTRIBUTE TO FUTURE COMMUNITY REDEVELOPMENTS

WITHIN THE CITY OF BRISBANE.

FURTHERMORE, THERE ARE ASPIRATIONS THAT ALLOWING MEMBERS OF DIFFERENT

DEMOGRAPHICS TO COLLABORATE MAY REDUCE SOCIAL PROBLEMS SUCH AS THE AGE

GAP, VANDALISM AND THE LIKE.

NEVERTHELESS, THE OUTCOME WILL RESULT IN A PROPOSAL FOR THE SURROUNDING

LOCALE OR BEYOND, THAT IS TRULY CATERED TOWARDS AND MEETS THE NEEDS AND

WANTS OF THE COMMUNITY IN QUESTION.

PROPOSED LOCATION ON SITE OF THE HOWARD SMITH WHARVES URBAN DESIGN

PRECINCTREFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

Page 5: Final presentation josh tait

DESIGN PROCESS PARAMETERSJO

SHU

A TAITD

AB 510INTEGRATION

DUE TO THE LIMITED FOOTPRINT OFPROPOSAL AND THE NEED

FOR SPACE TO BE MAXIMISED, AN INITIAL MODEL WAS

CONSTRUCTED OF A SIMPLE, GROUND BASED, LINEAR

DESIGN.

IN THE PRELIMINARY STAGES, THE IDEA WAS TO INTEGRATE

THE USERS WITH THE DEVELOPMENT, BY FORCING THEIR

MOVEMENT THROUGH THE SPACE DUE TO STRATEGIC SIZING

OF THE PROPOSAL

ONCE THE INITIAL DESIGN WAS COMPLETED, LANDSCAPING

WAS COMPLETED IN AN ATTEMPT TO FURTHER INTEGRATE

THE SITE AND STRUCTURE.

THE ADDITION OF RAMPS AIMED TO ACHIEVE THIS -

HOWEVER, DUE TO THE HEIGHT OF THE LANDSCAPED LEVELS,

IT WAS FOUND THAT A PORTION OF THE RAMPS WERE OF AN

INCONVENIENT SIZE.

UPON REALIZING THAT THE RAMPS WHERE AN

INCONVENIENCE, IT WAS ALSO DISCOVERED THAT A GROUND

BASED BUILDING WOULD APPEAR CLOSED OFF, AND ALMOST

AS THOUGH IT WAS A BARRIER BETWEEN THE MOVEMENT OF

THE PEDESTRIAN.

FOR THIS REASON THE OPPORTUNITY WAS TAKEN TO RAISE

THE GROUND FLOOR, TO A DOUBLE CEILING LEVEL, AND

CONSTRUCTING A PRECINCT FOR THE COMMUNITY.

Page 6: Final presentation josh tait

INTEGRATION DESIGN PROCESS PARAMETERS

JOSH

UA TAIT

DAB 510

INTEGRATION

THIS FORM MAXIMIZED THE SUCCESSFUL CIRCULATION OF

PEDESTRIANS AND USERS AROUND THE SITE - ALLOWING

USERS TO NEGOTIATE FREELY AROUND, OR THROUGH THE

SITE UNHINDERED.

AS AN EXAMPLE, A ROUTE IS DISPLAYED, CLEARLY SHOWING THE EASE AT WHICH A PASSERBY PROGRESSING FROM THE CITY, OR

INTENDED USER OF THE PROPOSAL MAY NEGOTIATE THE SITE

Page 7: Final presentation josh tait

JOSH

UA TAIT

DAB 510

DESIGN PROCESS PARAMETERSJO

SHU

A TAITD

AB 510INTEGRATION

UNDERSTOOD WITHIN THE IDEA OF INTEGRATION, IS THE

NEED FOR THE DEVELOPMENT TO AESTHETICALLY SUIT THE

SITE. FOR THIS REASON THE FOLLOWING MATERIALS ARE

PROPOSED.

GREEN ROOFS, TYING THE DEVELOPMENT FROM THE

GROUND, BACK INTO THE CLIFF.

WOOD, AS A NATURAL ELEMENT, AIMED TO REPLICATE THE

SURROUNDING FLORA OF THE SITE.

THE CONCRETE SLAB, WHILST PERFORMING A FUNCTIONAL

ROLE, COULD EASILY HAVE BEEN RENDERED, INSTEAD, IT WAS

LEFT BARE, AS AN IMITATION OF THE SURROUNDING BUILT

ENVIRONMENT.

GREEN TINTED GLASS WAS UTILISED WHERE THE AESTHETIC

TIES MADE BY THE GREEN ROOF WERE DESRIBLE BUT

UNACHIEVABLE, SUCH AS THE ELEVATOR SHAFT, AND STAIR

BALUSTRADES

Page 8: Final presentation josh tait

PROJECT ONE RESULTED IN AN URBAN ART NODE - SUPPLYING

THE PUBLIC WITH A SPACE IN WHICH THEY MAY CONSTRUCT

THEIR OWN SPACE TO PRODUCE WORKS OF ART INCLUDING

PHOTOGRAPHY, PAINTING AND DRAWING.

BY STUDYING THE LOCALE AND REVEALING THE SOCIAL

PROBLEMS AND MULTIPLE DEMOGRAPHIC DIFFERENCES IN THE

REGION IT WAS DECIDED THAT THE DESIGN RESPONSE OF

PROJECT TWO, WAS TO ATTEMPT TO COMBAT SUCH PROBLEMS,

PREDOMINANTLY THROUGH THE USE OF ART AND DESIGN, IN A

COLLABORATIVE WAY.

PROJECT TWO SAW THE FOCUS OF DEVELOPMENT ON

NURTURING THE EXPERIENCE AND RELATIONSHIPS FORMED

DURING THE DESIGN PROCESS OF THE REDEVELOPMENTS IN

ORDER TO ERASE SOCIAL PROBLEMS.

THIS WAS AMENDED WITHIN PROJECT THREE - ALTERNATING

THE FOCUS OF THE PROPOSAL TO THE CREATION OF A PRECINCT

IN WHICH DESIGN AND COMMUNITY INVOLVEMENT COULD BE

MAXIMIZED, WHILST PROVIDING THE LOCAL COMMUNITY WITH

A PLACE OF RELAXATION, INSPIRATION AND DESIGN.

JOSH

UA TAIT

DAB 510

DESIGN PROCESS PARAMETERSJO

SHU

A TAITD

AB 510INTEGRATION

AS PREVIOUSLY MENTIONED, THE

LOCATION AND SCALE OF THE

DEVLOPMENT WAS OF THE UTMOST

IMPORTANCE. IN ORDER TO DIVULGE

THE CORRECT SIZING OF THE

PROPOSAL, THE INTERIOR SPACES

NEED BE PLANNED.

AS THE BUILDING WAS TO BE BUILT

TO A HUMAN SCALE, NO

UNNECCESSARY SPACES WHERE

ADDED, RETAINING ONLY THE SOUL

CONCERN OF NURTURING

COMMUNITY INVOLVEMENT, AND

PROVIDING THEM WITH THE

FACILITIES AND RESULTANT SERVICES

NEEDED.

INTEGRATION

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

Page 9: Final presentation josh tait

JOSH

UA TAIT

DAB 510

INTEGRATION

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

DESIGN PROCESS PARAMETERSJO

SHU

A TAITD

AB 510INTEGRATION

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

Page 10: Final presentation josh tait

JOSH

UA TAIT

PROPOSED LOCATION ON SITE OF THE HOWARD SMITH WHARVES URBAN DESIGN

PRECINCT

INTEGRATION DESIGN PROCESS PARAMETERS

JOSH

UA TAIT

DAB 510

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

INTEGRATION

Page 11: Final presentation josh tait

JOSH

UA TAIT

DAB 510DUE TO THE LIMITED FOOTPRINT OFPROPOSAL AND THE NEED

FOR SPACE TO BE MAXIMISED, AN INITIAL MODEL WAS

CONSTRUCTED OF A SIMPLE, GROUND BASED, LINEAR

DESIGN.

IN THE PRELIMINARY STAGES, THE IDEA WAS TO INTEGRATE

THE USERS WITH THE DEVELOPMENT, BY FORCING THEIR

MOVEMENT THROUGH THE SPACE DUE TO STRATEGIC SIZING

OF THE PROPOSAL

ONCE THE INITIAL DESIGN WAS COMPLETED, LANDSCAPING

WAS COMPLETED IN AN ATTEMPT TO FURTHER INTEGRATE

THE SITE AND STRUCTURE.

THE ADDITION OF RAMPS AIMED TO ACHIEVE THIS -

HOWEVER, DUE TO THE HEIGHT OF THE LANDSCAPED LEVELS,

IT WAS FOUND THAT A PORTION OF THE RAMPS WERE OF AN

INCONVENIENT SIZE.

UPON REALIZING THAT THE RAMPS WHERE AN

INCONVENIENCE, IT WAS ALSO DISCOVERED THAT A GROUND

BASED BUILDING WOULD APPEAR CLOSED OFF, AND ALMOST

AS THOUGH IT WAS A BARRIER BETWEEN THE MOVEMENT OF

THE PEDESTRIAN.

FOR THIS REASON THE OPPORTUNITY WAS TAKEN TO RAISE

THE GROUND FLOOR, TO A DOUBLE CEILING LEVEL, AND

CONSTRUCTING A PRECINCT FOR THE COMMUNITY.

JOSH

UA TAIT

DAB 510

INTEGRATION INTEGRATION DESIGN PROCESS PARAMETERS

PERSONAL REFLECTION SPACE

PUBLIC PRECINCT

CAFE AND KITCHEN

EXHIBITION AND FUNCTION SPACE

WORKSHOP AND DRAFTING SPACE

Page 12: Final presentation josh tait

JOSH

UA TAIT

DAB 510

INTEGRATION JO

SHU

A TAITD

AB 510COLLABORATION

DESIGN PROCESS COLLABORATION

VIDEO

Page 13: Final presentation josh tait

JOSH

UA TAIT

DAB 510

ENTRANCE POINT OF THE PRECINCT

SITUATED UNDER THE MAIN STRUC-

TURE ITSELF. PUBLIC SEATING AND

LANDSCAPING CAN BE SEEN.

WITHIN THE PRECINCT ARE LARGE

COMMUNITY TABLES - OVERSIZED TO

ALLOW ANY ACTIVITY TO BE

COMPLETED, INCLUDING MODELLING,

DRAWING, PAINTING, ETC.

IF A MEMBER OF THE PUBLIC DOES

CHOOSE TO CONTRIBUTE TO A

FUTURE PROPOSAL, AN INFORMAL

LECTURE THEATRE WILL PROVIDE

THEM WITH ALL THEY NEED TO

KNOW, IN A RELAXED AND

COMFORTABLE SETTING.

JOSH

UA TAIT

DAB 510

COLLABORATIONDESIGN PROCESS COLLABORATION

Page 14: Final presentation josh tait

JOSH

UA TAIT

DAB 510

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

JOSH

UA TAIT

DAB 510

PRODUCTIONPRODUCTION SECTION

Page 15: Final presentation josh tait

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

JOSH

UA TAIT

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

JOSH

UA TAIT

DAB 510

PRODUCTIONPRODUCTION PLANS

PRIVATE REFLECTION

TOP FLOOR

Page 16: Final presentation josh tait

JOSH

UA TAIT

DAB 510

REFLECTION SPACE

SKYLIGHT TO ATRIUM BELOW

ATRIUM AND RECEPTION SPACE

EXHIBITION AND FUNCTION SPACE

RESTROOMS - MALE AND FEMALE

DRAWING AND DRAFTING SPACE

PRINTING AND STORAGEWORKSHOPBRIEFING SPACE

CAFE AND KITCHEN FACILITIES

PRIMARY ENTRANCE

STAIR TO FIRST FLOOR

ELEVATOR

PUBLIC SEATING

ELE-

VATOR

PUBLIC

WORKING AREAS

SEC-

ONDARY

ENTRANCE

ORTHOGRAPHIC PROJECTION

GROUND FLOOR PROJECTION

FIRST FLOOR PROJECTION

TOP FLOOR PROJECTION

PRODUCTIONJO

SHU

A TAITD

AB 510PRODUCTION

PRODUCTION PLANS

EXHIBITION AND FUNCTION

COMPUTER AND DRAFTING

PRINTAND STORAGE

WORKSHOP

BRIEFING

CAFE AND KITCHEN

W.C.

W.C.

FIRST FLOOR

Page 17: Final presentation josh tait

JOSH

UA TAIT

DAB 510

PRODUCTIONJO

SHU

A TAITD

AB 510PRODUCTION

PRODUCTION PLANS

PUBLIC PRECINCT

GROUND FLOOR

Page 18: Final presentation josh tait

PRODUCTION