Page 1: Final pla presentation
Page 2: Final pla presentation
Page 3: Final pla presentation

INTRODUCTION

Power Link Arabian Co. Ltd. is a leading contracting company involved mainly with civil, electrical and instrumentation projects. The company is dedicated to operate with high safety measure and complies with local and international standards. Power Link Arabian Co. Ltd. is determined to provide supreme engineering design, supply, erection, testing and commissioning of substation.

Page 4: Final pla presentation

INTRODUCTION

Power Link Arabian Co. Ltd. offers services with compliments growing range of integrated services that enable us to take any industrial or public works project from concept through planning, financing, design, construction, operations and maintenance. Every element of the firm is structured to ensure that we can leverage our global resources and know-how to satisfy each client’s particular needs.

Page 5: Final pla presentation

VENDOR REGISTRATIONS

• SEC V. ID 6235953274 • SAUDI ARAMCO V.ID 10041734

• SABIC VENDOR V.ID 505786 • MARAFIQ

• TASNEE V.ID. 101991 • AL ROWAD

Page 6: Final pla presentation

SCOP OF ACTIVITIES

• Layout of Sub-stations • All associated Civil works• Installation of Cable Ladders and trays• Erection of Gantries• Installation of Power transformers• Installation of Switchgear, Control and Protection system,• Installation of GIS type switchgear and Protection system.• Testing & Commissioning. • Laying of XLPE Power Cables for all voltages 11KV, 33KV, and 132KV.• Cable jointing, Indoor & Outdoor terminations.• HV DC Testing of Cables.• Testing & Commissioning.• Installations of Overhead lines, Conductors and Underground Cables.• Installation of Cables for internal Electrification in trenches, ducts, etc.• Installation of MCB , MCCB protection system• DBS & Panels

Main Activities Of The Electrical Contracting Include

Page 7: Final pla presentation

SCOP OF ACTIVITIES

• Design survey & Profiling • Networking Solutions• Supply, Installation& configuration of CISCO switches• Supply & Installation of patch panels, media converters etc.• Design, Supply & installation of Fibre Optical Cables• Splicing of Fibre optic cables• Connectorization• Power Meter Testing• OTDR testing• Complete Installation of Automation Equipment• Complete Installation of Field devices

Page 8: Final pla presentation

Power Link Hierarchy GENERAL MANAGER

HR & Admin Dept.Sales &

Marketing Dept.Operation Dept

Estimation QA/QC Dept.

Safety Dept.Civil Dept.

Electrical Dept.

Project Eng.Planning

Eng.Protection

Eng.

Site Eng.

Site Supervisor

Technician

Helper

Project Eng.Planning

Eng.

Site Eng.

Site Supervisor

Technician

Helper

Site Manager

Site Eng.

Site Supervisor

Forman

Load man

Project Eng.

DocumentController

Carpenter

SteelFixer

Scaffolder

Painter

Masons

Instrumentation Dept

Page 9: Final pla presentation

CIVIL CONSTRUCTION

A combination of flexibility, quality, special skills and adherence to budgets have ensured a pre-eminent position when clients require a single source contractor with capabilities in project development, management, construction services, installation and commissioning.

Power Link Arabian Co. Ltd. is fully capable to perform of handling all kinds of Civil Construction

• Earthwork• Roads• Sidewalks• Curbs • Gutters• Industrial Constructions• Commercial Buildings Constructions

Page 10: Final pla presentation

Hierarchy for Civil work

Planning Engineer

Safety Officer Document Control Permit ReceiverBackhoe Project Engineer

Project Manager

Project Supervisor

Foreman

Carpenter

Steel Fixer

Painter

Mason

Tile Fixer

Labor

Dump Truck

Loader

Crane

Bobcat

Boom Truck

Operator & Driver

Page 11: Final pla presentation

CLINT: SAUDI ARAMCO (AL-WASEA BULK PLANT)

CUSTOMER : GBN (GULF BUSINESS NETWORK)

INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ ELECTRICAL/ INSTRUMENTATION/ FEBRICATION

Page 12: Final pla presentation

CLINT: SECCUSTOMER : GBN (GULF BUSINESS NETWORK)

INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ELECTRICAL/ INSTRUMENTATION/ FEBRICATION

Page 13: Final pla presentation

PICTURES OF CIVIL JOBPICTURES OF CIVIL JOB

Page 14: Final pla presentation

CLINT: TASNEE (AL-ROWAD)

Page 15: Final pla presentation

Rowad Under Ground Tank

Page 16: Final pla presentation

Rowad Under Ground Tank

Page 17: Final pla presentation

Rowad Under Ground Tank

Page 18: Final pla presentation

Rowad Under Ground Tank

Page 19: Final pla presentation

Rowad Under Ground Tank

Page 20: Final pla presentation

Rowad Under Ground Tank

Page 21: Final pla presentation

CLINT: SABIC (YANBU)

Page 22: Final pla presentation

Yansib Yanbu BMS Project

Page 23: Final pla presentation

Yansib Yanbu BMS Project

Page 24: Final pla presentation

Yansib Yanbu BMS Project

Page 25: Final pla presentation

Yansab Yambu BMS Project

Page 26: Final pla presentation

CLINT: MARAFIQ SWTP-9SUB-STATION

CUSTOMER : SAUDI E-PHASE

Page 27: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 28: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 29: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 30: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 31: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 32: Final pla presentation

Marafiq SWTP 9 (substation) Project

Page 33: Final pla presentation

ELECTRICAL & COMMISSIONING - Installation, Testing, Commissioning and Maintenance

We will continue to meet the challenging needs of our clients with our quality services delivered by the most qualified people.

Power Link Arabian Co. Ltd. has successfully accomplished the job of all kinds of Electrical work with the appreciation letter of from our client TASNEE

• Installation, Testing, Commissioning and Maintenance• Underground and overhead distribution network. • Electrification of Buildings and Plant facilities. • Telecommunication works and security alarm system. • Power system, Substation, Switchgears and MCC. • Plant equipment, facilities and controls. • Calibration of System protection and monitoring devices.

Page 34: Final pla presentation

Hierarchy for Electrical work

Planning Engineer

Safety Officer Document Control Permit ReceiverProject Engineer

Project Manager

Project Supervisor

Foreman

Electrical Technician

InstrumentTechnician

Helper

Labor

Page 35: Final pla presentation

PICTURES OF PICTURES OF ELECTRICAL JOBELECTRICAL JOB

Page 36: Final pla presentation

CLINT: TASNEE AL-ROWAD

Page 37: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 38: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 39: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 40: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 41: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 42: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 43: Final pla presentation

LETTER OF APPRECATION

Page 44: Final pla presentation

CLINT: SAUDI ARAMCOCUSTOMER : ABHASAIN

SYNCHRONIZATION OF THREE EXISTING GENERATORS WITH AUTOMATIC SHIFTING (SUPPLY & INSTALLATION)

Page 45: Final pla presentation

Petro Rabic Project

Page 46: Final pla presentation

Petro Rabic Project

Page 47: Final pla presentation

Petro Rabic Project

Page 48: Final pla presentation

MECHANICAL, STEEL STRUCTURE & FEBRICATION

We hope that you will find the enclosed information of benefit in assessing our organization and we look forward to having the opportunity of putting our Mechanical & Fabrication skill to work for you.

Mechanical Works, Steel Structure & Fabrication

• HVAC Design and installations. • Steel Fabrication and Installation. • Fabrication, Installation and Erection of Steel Structure, GSM Towers.

Page 49: Final pla presentation

Hierarchy for Civil work

Planning Engineer

Safety Officer Document Control Permit ReceiverBackhoe Project Engineer

Project Manager

Project Supervisor

Foreman

Steel & PipeFabricator

Ducting Fabricator

Welder

Plumber

Pipe Fitter

Erector

Dump Truck

Loader

Crane

Bobcat

Boom Truck

Operator & Driver

Page 50: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 51: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 52: Final pla presentation

PICTURES OF PICTURES OF MECHANICAL, STEEL MECHANICAL, STEEL STRUCTURE STRUCTURE & & FEBRICATION JOBFEBRICATION JOB

Page 53: Final pla presentation

CLINT: SAUDI ARAMCOCUSTOMER : JOHNSONS CONTROL

Page 54: Final pla presentation

NPOC Project Saudi Aramco

Page 55: Final pla presentation

NPOC Project Saudi Aramco

Page 56: Final pla presentation

NPOC Project Saudi Aramco

Page 57: Final pla presentation

NPOC Project Saudi Aramco

Page 58: Final pla presentation

NPOC Project Saudi Aramco

Page 59: Final pla presentation

NPOC Project Saudi Aramco

Page 60: Final pla presentation

NPOC Project Saudi Aramco

Page 61: Final pla presentation

NPOC Project

Page 62: Final pla presentation

NPOC Project

Page 63: Final pla presentation

INSTRUMENTATION & AUTOMATION

It is the underlying policy of Power Link Arabian Co. Ltd. to develop and train the indigenous labor force and retain this staff within the subsidiary operation, providing Technology Transfer in the specialist areas of Instrumentation & Automation. In this regard we believe that we have been very successful

Instrumentation & Automation Works: • Installation, process equipment / facilities, piping controls, testing &

commissioning Instrumentation devices. • Calibration of Flow control system and supervisory instruments, Tanks /

pipe probers, storage tanks, and gauging devices. • Plant automation for process operation enhancement. • In-house testing commissioning of Plant / refinery instruments.

Page 64: Final pla presentation

Hierarchy for Instrumentation & Automation

Planning Engineer

Safety Officer Document Control Permit ReceiverProject Engineer

Project Manager

Project Supervisor

Foreman

Electrical Technician

InstrumentTechnician

Helper

Labor

Page 65: Final pla presentation

PICTURES OF PICTURES OF INSTRUMENTATION & INSTRUMENTATION & AUTOMATION JOBAUTOMATION JOB

Page 66: Final pla presentation

CLINT: TASNEE AL-ROWAD

POWER MANAGEMENT OF 18 x 1.6 MW POWER STATION WITH SCADA

Page 67: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 68: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 69: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 70: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 71: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 72: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 73: Final pla presentation

TASNEE Group Rowad Power Station Project

Page 74: Final pla presentation

CLINT: SAUDI ARAMCOCUSTOMER: AL ASWAD

SUPPLY INSTALLATION COMMISIONING OF FUEL MANAGEMENT SYSTEM WITH SCADA AT SAUDI ARAMCO CORPORATE DATA CENTER

Page 75: Final pla presentation

Master Control Pannel for Fuel Management at CDC

Page 76: Final pla presentation

Master Control Pannel for Fuel Management at CDC

Page 77: Final pla presentation

Master Control Pannel for Fuel Management at CDC

Page 78: Final pla presentation

CLINT: SABIC – ALBAYRONIEXPANSION PLANT

SUPPLY & INSTALLATION CIVIL MACHINCAL ELECTRICAL

Page 79: Final pla presentation
Page 80: Final pla presentation
Page 81: Final pla presentation
Page 82: Final pla presentation
Page 83: Final pla presentation
Page 84: Final pla presentation
Page 85: Final pla presentation
Page 86: Final pla presentation
Page 87: Final pla presentation
Page 88: Final pla presentation
Page 89: Final pla presentation
Page 90: Final pla presentation
Page 91: Final pla presentation
Page 92: Final pla presentation
Page 93: Final pla presentation
Page 94: Final pla presentation
Page 95: Final pla presentation
Page 96: Final pla presentation
Page 97: Final pla presentation

AL-HASA PROJECTSEC - OHTL

Page 98: Final pla presentation
Page 99: Final pla presentation
Page 100: Final pla presentation
Page 101: Final pla presentation
Page 102: Final pla presentation
Page 103: Final pla presentation
Page 104: Final pla presentation
Page 105: Final pla presentation
Page 106: Final pla presentation
Page 107: Final pla presentation
Page 108: Final pla presentation
Page 109: Final pla presentation
Page 110: Final pla presentation
Page 111: Final pla presentation
Page 112: Final pla presentation
Page 113: Final pla presentation
Page 114: Final pla presentation
Page 115: Final pla presentation
Page 116: Final pla presentation
Page 117: Final pla presentation
Page 118: Final pla presentation
Page 119: Final pla presentation
Page 120: Final pla presentation
Page 121: Final pla presentation
Page 122: Final pla presentation
Page 123: Final pla presentation
Page 124: Final pla presentation
Page 125: Final pla presentation
Page 126: Final pla presentation
Page 127: Final pla presentation
Page 128: Final pla presentation
Page 129: Final pla presentation
Page 130: Final pla presentation

THE END