FINAL MINUTES
6 June 2012
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21378
Table of Contents
Folio Date Particulars 21379 06.06.12 Ordinary Meeting Minutes 21424 06.06.12 List of Members of Boards, Special Purpose Advisory
Committees and External Committees 21426 30.04.12 Engineering Services Highlights and Significant Issues for
April 2012 21462 03.04.12 Natural Environment Advisory Committee Minutes 21468 20.04.12 Traffic Advisory Committee Minutes 21473 24.04.12 Mackay Matsuura Sister City Advisory Committee Minutes 21475 14.05.12 Mackay Matsuura Sister City Advisory Committee Minutes 21478 19.04.12 City Focus Advisory Committee Minutes 21480 13.03.12 Sarina Sugar Shed Advisory Committee Minutes
Declaration of Potential Conflict of Interest
Crs C Bonanno, L Bonaventura, R Walker (Item 9.4) Crs C Bonanno, B Martin (Item 9.5)
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21379
ORDINARY MEETING MINUTES
1. ATTENDANCE:
Her Worship the Mayor, Cr D T Comerford (Chairperson), K J Casey, P F Steindl, D J Perkins, C J Bonanno, L G Bonaventura, F A Gilbert, G J Martin, A N Jones, T A Morgan and R D Walker were in attendance at the commencement of the meeting. Also present was Mr P Franks (Chief Executive Officer) and Ms M Edwards (Minute Secretary). The meeting commenced at 10.01 am.
2. OPENING PRAYER:
Rev Ann Dittmar-McCollim led those present in Prayer.
3. ABSENT ON COUNCIL BUSINESS:
Nil.
4. APOLOGIES:
THAT Cr Perkins' leave of absence be accepted.
Moved Cr Casey Seconded Cr Steindl
CARRIED
5. CONDOLENCES:
Nil.
6. CONFIRMATION OF MINUTES:
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21380
6.1 POST ELECTION MEETING MINUTES
THAT the Minutes of the Post Election Meeting held on 16 May 2012 be confirmed.
Moved Cr Steindl Seconded Cr Walker.
CARRIED
7. BUSINESS ARISING OUT OF MINUTES OF PREVIOUS MEETING:
Nil.
8. MAYORAL MINUTES:
Nil.
9. CORRESPONDENCE AND OFFICERS’ REPORTS:
9.1 APPOINTMENT OF MEMBERS OF BOARDS, SPECIAL PURPOSE ADVISORY COMMITTEES AND EXTERNAL COMMITTEES
Author Chief Executive Officer
Purpose
To establish Councillor membership to Boards, Special Purpose Advisory Committees and External Committees in support of the governance arrangements for Mackay Regional Council.
Background/Discussion
The appointment of Councillors to Boards, Special Purpose Advisory Committees and External Committees will ensure good governance and/or enable community or special interest group inputs into significant ongoing activities of Council. The Advisory Committees do not have decision making powers but make recommendations, as required, to Council or to the Chief Executive Officer. The level of membership of Councillors will provide opportunities for Councillors to participate in the development of recommendations on matters on which they have a particular interest. All Councillors will have access to Minutes of Advisory Committee Meetings as part of the agenda of Council.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21381
Consultation and Communication
Councillors, Chief Executive Officer and Directors.
Resource Implications
NIL
Risk Management Implications
NIL
Conclusion
As detailed in the report, the appointment of Councillors to Boards, Special Purpose Advisory Committees and External Committees will ensure good governance and/or enable community or special interest group inputs into significant ongoing activities of Council.
Officer's Recommendation
THAT the attached list of Councillor membership to Boards, Special Purpose Advisory Committees and External Committees be adopted.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Casey Seconded Cr Gilbert.
CARRIED
9.2 COUNCILLOR PORTFOLIO APPOINTMENTS
Author Chief Executive Officer
Purpose
To allocate Councillor Portfolio Areas to differing aspects of Council services, and also appoint Councillors to different Rural Portfolio Areas.
Background/Discussion
The appointment of Portfolio Areas for Councillors enables specific concentrated interest to be given to different aspects of services delivered by Council. As a large Regional Council, it is very difficult for all Councillors to be across every aspect of each operation of Council. By the
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21382
allocation of a Portfolio Area, it enables Councillors to focus interest in certain aspects and in doing so be able to provide a better standard of information and service to residents. Under such an arrangement, residents are still able to contact any Councillor with any issue, however those Councillors holding the particular Portfolio related to the matter will be better positioned to provide an immediate and informed response. The Portfolio system, which mirrors in some respects the system in the State and Federal Government areas, was operated successfully by Council during the 2008-2012 term. As such, and with some revision of applicable Portfolios, it is expected that this system could again provide a very good service delivery to residents. Following review the proposed Portfolio Areas, and the recommended Councillor for each are:-
Councillor Portfolio Area
Mayor Cr Deirdre Comerford Emergency Management
Cr Alison Jones Community Development & Libraries Cr Chris Bonanno Festival, Events & The Arts Cr Ross Walker Finance & Technology Cr Theresa Morgan Parks & Environment Cr Dave Perkins Planning & Development Deputy Mayor Cr Kevin Casey Roads & Drainage Cr Paul Steindl Sports, Recreation & Facilities Cr Greg Martin Tourism & Economic Development Cr Laurence Bonaventura Waste, Health & Regulatory Cr Frank Gilbert Water & Sewerage
As well as Portfolio Areas, with an Undivided Council area regarding Councillor representatives, the recommendation is that Councillors(with the exception of the Mayor who will hold overall interest) be appointed to a Rural geographical area within the Council area. Previously there was a single Rural Portfolio held by a single Councillor. Suggestion being that such a large Rural area as covered by Council cannot be covered by a single Councillor. Also, it is believed that the general Urban area already has easy access to all Councillors, therefore does not need any specific Councillor allocation. Under such a system, as with the Portfolio Area system, Councillors will be able to better concentrate on specific Rural geographical areas and build up an experience and knowledge base of these areas. Like the Portfolio Area system, residents from any Rural area are still able to contact any Councillor with any issue, however those Councillors appointed to their geographical area will be better positioned to provide an immediate and informed response. The recommended Councillor for each Rural Portfolio Area of the Council area is –
Councillor Rural Portfolio Area Cr Alison Jones Yalboroo North (Bloomsbury/Midge Point) Cr Chris Bonanno South of Sarina (Armstrongs Beach, Koumala,
Swayneville, Sarina Range) Cr Ross Walker Marian//Mirani Cr Theresa Morgan Calen/Kuttabul/Seaforth and beaches/Hampden Cr Dave Perkins Upper Pioneer Valley (Gargett to Eungella)
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21383
Councillor Rural Portfolio Area Deputy Mayor Cr Kevin Casey Homebush, Eton and McEwans Beach Cr Paul Steindl Sarina Beaches Cr Greg Martin Sarina Urban Cr Laurence Bonaventura Farleigh/Habana/The Leap Cr Frank Gilbert Walkerston, Alexandra, Pleystowe, Greenmount,
Wallingford
Consultation and Communication
Mayor, Councillors, Chief Executive Officer and Directors.
Resource Implications
NIL
Risk Management Implications
NIL
Conclusion
As detailed in the report, the appointment of Councillors to Portfolio Areas and Rural Portfolio Areas is believed to provide the best service provision to residents, as well as providing ready and informed access to Councillors by all residents. Adoption of these Portfolio allocations is recommended.
Officer's Recommendation
THAT the following Portfolio Areas, and Rural Portfolio Areas, be allocated –
Councillor Portfolio Area
Mayor Cr Deirdre Comerford Emergency Management
Cr Alison Jones Community Development & Libraries Cr Chris Bonanno Festival, Events & The Arts Cr Ross Walker Finance & Technology Cr Theresa Morgan Parks & Environment Cr Dave Perkins Planning & Development Deputy Mayor Cr Kevin Casey Roads & Drainage Cr Paul Steindl Sports, Recreation & Facilities Cr Greg Martin Tourism & Economic Development Cr Laurence Bonaventura Waste, Health & Regulatory Cr Frank Gilbert Water & Sewerage
Councillor Rural Portfolio Area
Cr Alison Jones Yalboroo North (Bloomsbury/Midge Point) Cr Chris Bonanno South of Sarina (Armstrongs Beach, Koumala,
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21384
Councillor Rural Portfolio Area Swayneville, Sarina Range)
Cr Ross Walker Marian//Mirani Cr Theresa Morgan Calen/Kuttabul/Seaforth and beaches/Hampden Cr Dave Perkins Upper Pioneer Valley (Gargett to Eungella) Deputy Mayor Cr Kevin Casey Homebush, Eton and McEwans Beach Cr Paul Steindl Sarina Beaches Cr Greg Martin Sarina Urban Cr Laurence Bonaventura Farleigh/Habana/The Leap Cr Frank Gilbert Walkerston, Alexandra, Pleystowe, Greenmount,
Wallingford That this be reviewed after 12 months.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Walker Seconded Cr Steindl.
CARRIED
9.3 ENGINEERING SERVICES HIGHLIGHTS AND SIGNIFICANT ISSUES FOR APRIL 2012
Author Director Engineering Services
Purpose
The Engineering Services Highlights and Significant Issues Report for April 2012 is attached for information purposes.
Officer's Recommendation
THAT this report be received. Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Casey Seconded Cr Morgan.
CARRIED
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21385
Crs Bonanno, Bonaventura and Walker, declared a perceived conflict of interest (as per section 173 of the Local Government Act 2009) on this matter and left the room at 10.21am, taking no part in the debate or decision of the meeting.
9.4 INKIND ASSISTANCE REQUEST - MACKAY SHOW ASSOCIATION
Author MANAGER COMMUNITY DEVELOPMENT AND LIBRARIES
Purpose
An inkind assistance request has been received from the Mackay Show Association.
Background/Discussion
Mackay Regional Council's Inkind Assistance Policy provides a mechanism for relevant community groups and organizations to access Council resources free of charge. The policy provides that the Director of Community Services has delegated authority to approve applications up to a value of $2,000 and to refuse requests of any value. Where approval is recommended and the cost to Council exceeds $2,000, Council must decide whether to approve the application or not. Council has traditionally supported the Show Society through this program and the request for this year is virtually identical to that approved in previous years. For this year the organisation has requested Council provide the following assistance prior to the annual show being held from 19-21 June 2012.
assist by grading the roadway at the Mackay Show grounds
loan of 50 traffic cones
loan of potted plants and palms for use in the pavilions, animal nursery & beef cattle presentation area.
Consultation and Communication
The current request has been costed by the Central Area Maintenance Coordinator Civil Operations, Warehouse Supervisor and Horticulture Supervisor and discussions have been held between the Directors of Engineering and Community Services regarding the feasibility of competing this work..
Resource Implications
The cost to Council for this request is $5,875.00. The Central Area Maintenance Coordinator Civil Operations advises that due to their current workload from the latest declared natural disaster event their resources will be limited to complete the grading of the roadway in the timeframe required, however it will be made a priority should Council approve this application. .
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21386
The Warehouse Supervisor advises that the traffic cones can be provided for pickup from the Council Depot and will be free of charge. However, if items are not returned they will be charged to the Inkind Assistance Budget. The Horticulture Supervisor advises that the potted plants and palms will be delivered as per previous years. $36,000.00 is the budget for the 11/12 financial year to cover inkind assistance requests. The current balance of the inkind vote is $16,591.09.
Risk Management Implications
Nil.
Conclusion
In the past Council has supported this event through the inkind assistance program and the event continues to attract crowds exceeding 20,000 per year. The Mackay Regional Show is one of the premier events in regional Central Queensland, attracting significant urban and rural patronage, as well as generating an enormous economic benefit to the local community.
Officer's Recommendation
THAT the request be approved this year to support the Mackay Show Association.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Jones Seconded Cr Steindl.
CARRIED
Voting then recorded as per usual. 10.23am – Crs Bonaventura and Walker returned to the Meeting Chamber. Crs Bonanno and Martin, declared a perceived conflict of interest (as per section 173 of the Local Government Act 2009) on this matter and left the room at 10.23am, taking no part in the debate or decision of the meeting.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21387
9.5 PROPOSED HARBOUR BEACH HORSE RIDING CLASSIC
File No 120246-068-SP Author MANAGER PROPERTY SERVICES
Purpose
To approve the holding of The Harbour Beach Horse Racing Classic, at Harbour Beach on Sunday, 26 August 2012.
Background/Discussion
Council was contacted in November 2011 by representatives from the Mackay Harbour Beach Race Association in regards to gaining approval for the holding of the Harbour Beach Horse Racing Classic. The event was promoted as a family friendly event “Picnic Race” program with six horse fields cantering over a 600m track along the beach, with the Association hoping to emulate the famous Barramedia Beach racing in Spain and the Laytown Beach Racing Festival in Ireland to create a national tourist attraction to be hosted annually in Mackay. The association is planning to utilise the skills and resources of local groups and clubs to assist with running the event and anticipate a crowd of 5,000 to 10,000 people attending the initial event. The event will be run on a commercial basis with profits if achieved from the initial event to be used for branding and improving the event. Approval for the event will be subject to the following conditions that have been compiled through discussions with relevant Council officers:
1. Area needs to be cleaned both prior to and after event, with remediation work to the site after the event to be undertaken by the event organisers to Council’s satisfaction.
2. Horses to be restricted to specific areas only so as not to damage dunes, park or
access tracks. (Areas to be approved by Council)
3. Approved Temporary Entertainment Permit and Temporary Food Permit to be obtained with such permits to include but not be limited to the following:
Timeframe for full event including set up time prior to the event and clean
up after the event. Traffic Management Plan. Areas that will be restricted from general public access during the event. Police and security involvement. Toilet and waste management arrangements. Fencing/barrier description and location.
4. Public liability and indemnity to Council clauses to be prepared for event.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21388
5. Payment of Council charge for the use of the area and facilities for the event.
6. Council will require a bond to be paid for the event.
7. Confirmation that Liquor Licensing of the entire area with the exception of the Kids Kingdom area has been approved by the Office of Liquor, Gaming and Racing.
8. Coastal sand dune and vegetation systems in and around the event area to be
protected from damage.
9. All relevant stakeholders provide approval for the event to proceed.
Consultation and Communication
The proposal has been reviewed by the Director Community Services and relevant Program Managers with Mr Mick Pope a representative from the Mackay Harbour Beach Race Association presenting information to Council on the 15 February 2012.
Resource Implications
Council has been asked to provide assistance with the preparation of the Traffic Management Plan and Council officers will be required to inspect the area to be utilised by the event both prior to and after the event to ascertain the associated impact and rehabilitation requirements if needed.
Risk Management Implications
Council’s main risks are the safety of the general public utilising Harbour Beach outside of the event area and damage that may be caused to the coastal sand dune and vegetation systems.
Conclusion
That approving the Harbour Beach Horse Racing Classic subject to mentioned conditions will assist in the development of a new event that will encourage local resident’s participation and attract tourists to the Mackay Region.
Officer's Recommendation
THAT Council grant approval for the Mackay Harbour Beach Race Association to hold The Harbour Beach Horse Racing Classic at Mackay’s Harbour Beach on Sunday, 26 August 2012 subject to the following conditions:
1. Area needs to be cleaned both prior to and after event, with remediation work to the site after the event to be undertaken by the event organisers to Council’s satisfaction.
2. Horses to be restricted to specific areas only so as not to damage dunes, park or
access tracks. (Areas to be approved by Council)
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21389
3. Approved Temporary Entertainment Permit and Temporary Food Permit to be obtained with such permits to include but not be limited to the following:
Timeframe for full event including set up time prior to the event and clean
up after the event. Traffic Management Plan. Areas that will be restricted from general public access during the event. Police and security involvement. Toilet and waste management arrangements. Fencing/barrier description and location.
4. Public liability and indemnity to Council clauses to be prepared for event.
5. Payment of Council charge for the use of the area and facilities for the event.
6. Council will require a bond to be paid for the event.
7. Confirmation that Liquor Licensing of the entire area with the exception of the
Kids Kingdom area has been approved by the Office of Liquor, Gaming and Racing.
8. Coastal sand dune and vegetation systems in and around the event area to be
protected from damage. 9. All relevant stakeholders provide approval for the event to proceed
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Steindl Seconded Cr Jones.
CARRIED
Voting then recorded as per usual. 10.25am – Crs Bonanno and Martin returned to the Meeting Chamber.
10. CONSIDERATION OF COMMITTEE REPORTS:
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21390
10.1 3 APRIL 2012 - DRAFT NATURAL ENVIRONMENT ADVISORY COMMITTEE MEETING MINUTES
File No NEAC Minutes Author Co-ordinator Natural Environment
Purpose
To present to Council the Draft Natural Environment Advisory Committee Meeting Minutes dated 3 April 2012, for information purposes.
Background/Discussion
The Committee is recommending that Council acquit funding to the SLCMA on 1 July 2012 of $4,000 to fund two water tanks for the nursery and $656 to purchase tools and equipment for the nursery and volunteers. The Committee supports the inclusion of a representative from MRPMG into the Natural Environment Advisory Committee. A review of the Terms of Reference will need to be undertaken to allow this to take place. Director's Comment The recommendations of the Committee are endorsed.
Officer's Recommendation
THAT Council acquit funding to the SLCMA on 1 July 2012 of $4,000 to fund two water tanks for the nursery and $656 to purchase tools and equipment for the nursery and volunteers. THAT Council support the inclusion of a representative from MRPMG onto the Committee and a review of the Terms of Reference will need to be undertaken to formalise the inclusion of the MRPMG representative. AND THAT the Draft Minutes of the Natural Environment Advisory Committee be noted.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Walker Seconded Cr Morgan.
CARRIED
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21391
10.2 20 APRIL 2012 - DRAFT TRAFFIC ADVISORY COMMITTEE MEETING MINUTES
File No Advisory, Regulated Parking and Bicycle Advisory Committee Author Manager Technical Services
Purpose
To present to Council the draft Traffic Advisory Committee Meeting Minutes dated 20 April 2012, for information purposes.
Officer's Recommendation
THAT the Draft Minutes of the Traffic Advisory Committee be noted. Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Casey Seconded Cr Bonaventura.
CARRIED
10.3 DRAFT MINUTES MACKAY MATSUURA SISTER CITYADVISORY COMMITTEE
Author MANAGER COMMUNITY DEVELOPMENT AND LIBRARIES
Purpose
Attached are copies of the draft minutes of the Mackay Matsuura Sister City Advisory Committee meetings held 24 April 2012 and 14 May 2012 for information purposes.
Officer's Recommendation
THAT the minutes be received. Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Jones Seconded Cr Steindl.
CARRIED
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21392
10.4 DRAFT MINUTES CITY FOCUS ADVISORY COMMITTEE
Author MANAGER ECONOMIC DEVELOPMENT
Purpose
Attached is a copy of the draft minutes of the City Focus Advisory Committee meeting held 19 April 2012, for information purposes and consideration of recommendations. Advisory Committee's Recommendations THAT Council consider the following:
4) The City Focus Advisory Committee endorses the draft budget with the above recommended changes
Officer's Comments At its meeting on 19 April 2012 the City Focus Advisory Committee considered a draft budget which was presented by the Director of Community Services in advance of Council considering its 2012/13 budget. The committee provided some very valuable feedback regarding proposed expenditure of city centre levy funds which will be considered in the development of Council's 2012/13 budget.
Officer's Recommendation
THAT the minutes be received. AND THAT Council notes the City Focus recommendations regarding the 2012/13 budget and considers these matters as part of Council's 2012/13 budget.:
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Martin Seconded Cr Jones.
CARRIED
1) The city centre levy funds no longer contribute to the River to Reef Festival. 2) The city centre levy funds, up to an amount of $25,000 or 30% of the total cost
whichever is less, are used to purchase naming rights sponsorship for the New Years Eve event.
3) Available levy funds be allocated for resources for future city centre promotional
development.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21393
10.5 DRAFT MINUTES SARINA SUGAR SHED ADVISORY COMMITTEE
Author MANAGER PROPERTY SERVICES
Purpose
Attached is a copy of the draft minutes of the Sarina Sugar Shed Advisory Committee meeting held 13 March 2012, for information purposes.
Officer's Recommendation
THAT the minutes be received.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Steindl Seconded Cr Walker.
CARRIED
11. RECEIPT OF PETITIONS:
11.1 PETITION REGARDING THE CEDARS BORAL QUARRY
Author Chief Executive Officer
Purpose
A petition was delivered to Council on the 21 May 2012
Background/Discussion
In terms of Council’s Standing Orders Council has three options with regard to Petitions that are tabled and these are;
the petition be received and consideration stand as an order of the day for the meeting; or for a future meeting; or
the petition be received and referred to a committee or officer for consideration and a report to the local government; or
the petition not be received. This petition relates to a request that the Cedars Boral Quarry be refused its request to increase its operating hours or double its capacity of production.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21394
The petitioners have concerns relating to health issues (dust, toxic gases in blasting operation), excessive noise, potential damage to houses from blasting ground vibrations, and the devaluation of surrounding properties. They are also concerned with the increase of heavy vehicular traffic within a residential area. There is also apprehension regarding buffer zones and possible non-compliance. The petition meets the requirements as per the Standing Orders, in that it is legible and has more than 10 signatures in that it has 157 signatures. As the petition was received in the time frame during which submissions may be made, it has been accepted as a formal submission.
Consultation and Communication
That the petitioners, through their representative, be informed that Council acknowledges receipt of the Petition and that it has been accepted as a formal submission on the Development Application and the issues raised will be addressed in the report that is tabled before Council.
Resource Implications
NIL
Risk Management Implications
NIL
Conclusion
It is proposed that Council consider the action it wishes to take with regard to the Petition ie;
the petition be received and consideration stand as an order of the day for the meeting or for a future meeting or
the petition be received and referred to a committee or officer for consideration and a report to the local government
the petition not be received.
Officer's Recommendation
THAT Council receive the petition and that the issues raised be addressed as part of the report on the Development Application that is to be tabled before Council.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Casey Seconded Cr Bonaventura.
CARRIED
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21395
12. TENDERS:
12.1 MRC 2012-074 REGISTER OF PREQUALIFIED SUPPLIERS - PLANNING AND PROJECT DEVELOPMENT
File No MRC 2012-074 Author Executive Manager Water Services
Purpose
To present a report to Council demonstrating the benefit of calling Expressions of Interest for the creation of a Register of Prequalified Suppliers for the provision of Planning and Project Development Services, as per Section 181 of the Local Government (Finance, Plans and Reporting) Regulation 2010.
Background/Discussion
In accordance with the Long Term Financial Plan, it is estimated that approximately $600 million dollars (present value) will be spent on new water and wastewater infrastructure over the next 10 years. The first stage of the delivery of these projects is to undertake planning and project development activities. To ensure the timely and successful delivery of these projects Council is required to outsource specialist planning and project development skills. Due to the current and projected work load, it has been identified that the formation of a panel of appropriately qualified and experienced providers would enable Council to most effectively source expert resources as well as abiding by all legislative requirements. Respondents to the Request for Tender will be assessed based upon their technical, financial and managerial ability to perform the services under the various planning and project development disciplines. It is proposed that panel members be awarded projects based upon their expertise, availability, pricing and previous experience in similar projects.
Consultation and Communication
Director Water and Waste Services, Executive Manager Water Services, Manager Procurement and Plant, Manager Infrastructure Delivery, Manager Planning and Sustainability and Manager Operations collectively considered the formation of the register of prequalified suppliers. Briefings to SLT and Councillors have also occurred.
Resource Implications
The budget for the project management expenditure is included in the annual operating budget and the capital budget for each project.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21396
Risk Management Implications
N/A
Conclusion
THAT calling Expressions of Interest for the provision of Planning and Project Development will be of benefit to the Mackay Regional Council community on the basis that projects would be delivered in a timelier manner and the considerable tendering and compliance costs would be minimised.
Officer's Recommendation
THAT Expressions of Interest are called from suitably qualified, resourced and experienced providers with the intention of creating a Register of Prequalified Suppliers for the Provision of Planning and Project Development for a term of twenty-four months with the option for two 12 month extension periods, as per Section 181 of the Local Government (Finance, Plans and Reporting) Regulation 2010.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Gilbert Seconded Cr Bonanno.
CARRIED
12.2 MRC 2010-064 LANDFILL GAS MANAGEMENT AND ENERGY UTILISATION SERVICES
File No MRC 2010-064 Author Manager Waste Services
Purpose
To seek Council approval to install a gas collection and flare system at Hogan’s Pocket Landfill.
Background/Discussion
Council’s Waste Management Strategy 2010 -2019 identified the requirement of landfill gas management at operating and some specific closed waste facilities. The strategy outlined in the 10 Year Capital Works Programme, the installation of landfill gas systems and this was subsequently adopted into Council’s Long Term Financial Strategy. Following the adoption of the strategies, Council called for tenders for Landfill Gas Management and Energy Utilisation Services. At its Ordinary meeting held on 16 February
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21397
2011, Council resolved to award contract MRC 2010-064 Landfill Gas Management and Energy Utilisation Services to Landfill Gas and Power Pty Ltd. The minute from the Council meeting was: “Officer Recommendation 1. THAT The tender as submitted by Landfill Gas and Power for Stage 1 and Stage 2 be accepted for the provision of MRC 2010-064 Landfill Gas Management and Energy Utilisation Services at the price and for the term outlined in the Resource Implications Section above. 2. The Economic Analysis Report be presented to Council for its consideration and approval prior to commencement of Stage 2. 3. The tender as submitted by Landfill Gas and Power for Stage 2 and Stage 3 be accepted subject to the findings of the Stage 1 Economic Analysis Report. 4. Prior to awarding any extension to the initial term of the contract a further report be presented to Council for its consideration and approval. Council Resolution THAT the Officer Recommendation be adopted.” Landfill Gas and Power Pty Ltd undertook Stage 1 work which was for the monitoring, assessment and the provision of the Economic Report for the landfill gas management at Hogan’s Pocket and Sarina landfills and the former landfills at Bayersville, Hay Point and Otterburn. Landfill Gas and Power Pty Ltd completed the Economic Analysis Report on July 2011 (please see attachment). The Economic Analysis Report provided a summary of their work and is as follows: Landfill Tendered
Works LGP Suggested Works at tender
CPM Effects (from 1 July 2012)
LGP Report Recommendation
Alternate Action
Bayersville (Closed large site)
Well-field, large flare and 0.77MW generation from 2012 to 2018 (subject to gas flows)
As tendered Nil, as closed prior to commencement date of mechanism
Re-monitor following capping and dry season. Probable outcome is well-field and flare
Hogan’s Pocket (Active large site with long life)
Well-field, large flare and initial 0.77MW generation (from 2013) and further 0.77MW (from Bayersville in 2018) (subject to gas flows)
As tendered Exceeds threshold and will be included
Install sacrificial wells and flare in 2012FY to minimise carbon price and add 1MW generation at time of final well-field after capping. Further 1MW installed in future. (Subject to grid upgrade costs)
Otterburn (Closed small site)
Well-field and small flare
No landfill gas management works required
Nil, as closed prior to commencement date of mechanism
No landfill gas management works required
Well-field with passive extraction and micro flare
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21398
Landfill Tendered Works
LGP Suggested Works at tender
CPM Effects (from 1 July 2012)
LGP Report Recommendation
Alternate Action
Sarina (Small site scheduled for closure)
Well-field and small flare
No landfill gas management works required
Close prior to 30 June 2012 to be excluded from CPM
No landfill gas management works required
Well-field with passive extraction and micro flare
Hay’s Point (Closed small site)
Well-field and small flare
No landfill gas management works required
Nil, as closed prior to commencement date of mechanism
No landfill gas management works required
Well-field with passive extraction and micro flare
Following the submission of the Report, Council was briefed on the Economic Report on Wednesday, 3 August 2011 by Landfill Gas and Power Pty Ltd. At the Briefing Session, Council supported the Report recommendations for each site. Subsequently at the end of 2011, the Australian Government passed the Clean Energy Act 2011 and regulations that has introduced the Carbon Pricing Scheme. Hogan’s Pocket landfill will trigger the 25,000 CO2–e tonnes/year threshold and the operator will be liable for the legislated gases emitted at the facility from 1 July 2012. The Clean Energy Legislation also introduced the Carbon Farming Initiative (C.F.I.). As part of the C.F.I., landfill gases produced by legacy wastes (i.e. gas from waste landfilled prior to 1 July 2012) which is flared could earn carbon credits. In addition to the tender, Landfill Gas and Power Pty Ltd submitted pricing for supplementary works. In summary, Landfill Gas and Power Pty Ltd state that Hogan’s Pocket, being an active landfill site, has a very high gas percentage and will require treatment initially by flaring and ultimately by electricity generation, depending on costs to upgrade the grid connection to the site. They suggested the installation of a well-field and flare on the current operational Cell 1 as soon as practical to reduce Council’s potential carbon price liabilities and participation in C.F.I. A permanent gas flaring system will need to be installed once the final capping of Cell 1 has been completed. The capping of Cell 1 is due to commence in the 2012/2013 financial year. The majority of the initial supplementary gas flaring system infrastructure can be used in the final arrangement, however, further costs will be required to complete the permanent gas flaring system. In recognition of the impact of the new Legislation, on 22 February 2012 Council adopted the December 2011 second quarter budget review and as part of this review Council brought forward an allocation towards the proposed landfill gas works. This action is to urgently reduce Council’s potential Carbon Price Liability and participate in the C.F.I. for landfill gases. To enable this to occur, Council needs to formally endorse the Economic Analysis Report provided by Landfill Gas and Power Pty Ltd and approve proceeding with the next stage of gas flaring.
Consultation and Communication
Director Water and Waste Services Landfill Gas and Power Pty Ltd Manager Procurement and Plant
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21399
Council Briefing Sessions
Resource Implications
In the 10 year Waste Services Capital Works Plan, allocation for funding Hogan’s Pocket has been identified in the Long Term Financial Strategy for 2012/2013 budget. As outlined above approval was given to bring forward the expenditure to 2011/2012. A budget of $520,000 now exists for this project. The proposal by Landfill Gas and Power Pty Ltd for Stage 1 is the installation of a sacrificial well field, manifold and flare which has a total cost of $409,530. This is within the available budget. The final gas flaring works, Stage 2, are conditional on the final capping works of Cell 1 being completed. Total capping is not projected to be completed for at least 2 to 3 years as an uncapped section of Cell 1 will be used as part of the airspace for Cell 2 operations. The majority of the infrastructure installed as part of Stage 1, will be used as part of the final gas flaring system. The forecast expenditure for this final phase of the project is $142,860 (plus applicable contract price escalation since the tender bid). The 10 Year Waste Services Capital Works Plan also identifies funding being available for a gas flaring system at Bayersville Landfill as part of the 2012/2013 budget. The decision on whether to proceed with these works is conditional on some additional monitoring being undertaken. The current proposal is for this monitoring to be completed once the current Bayersville Landfill remediation contract has been completed. This remediation project is currently forecast for completion in July 2012. Once the additional monitoring has been completed a separate Report on the findings along with recommendations will be presented to Council for further consideration.
Risk Management Implications
As a requirement of the Clean Energy Act 2011, Hogan’s Pocket Landfill will trigger the 25,000 CO2-e tonne/year threshold and Council will be liable for carbon price liabilities from 1 July 2012. To reduce this financial risk, Council should introduce actions that reduce the emission of landfill gases to the atmosphere. This proposal would meet this goal. There is the added benefit with the project in that landfill gases at Hogan’s Pocket will be controlled on site and reduce risks to employees and contractors working on the site.
Conclusion
The proposal by LGP to install sacrificial landfill gas wells and flare at Hogan’s Pocket will reduce Council’s potential Carbon Price Liability and could enable Council to participate in the C.F.I.
Officer's Recommendation
THAT Council receive the Economic Analysis Report provided by Landfill Gas and Power Pty Ltd dated July 2011.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21400
THAT Council award the contract for the installation of a landfill gas flare and sacrificial well at Hogan’s Pocket Landfill Cell 1 to Landfill Gas and Power Pty Ltd as per their tendered price. THAT as per Landfill Gas and Power Pty Ltd’s recommendation, no further landfill gas management works are to be carried out at the former landfills at Hay Point, Otterburn and Sarina. THAT further Reports be provided to Council for consideration, in relation to the energy utilisation at Hogan’s Pocket once the costs of connection are known and for Bayersville former landfill once the moisture content levels are known following the completion of the capping works at that site.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Bonaventura Seconded Cr Morgan.
CARRIED
12.3 MRC 2012-041 NEBO ROAD TRUNK WATER MAIN
File No MRC 2012-041 Author Manager Infrastructure Delivery - Water Services
Purpose
To present to Council for approval of tenders submitted for the MRC 2012-041 Nebo Road Trunk Water Main.
Background/Discussion
Tenders were invited on 7 January 2012, via Council’s website, and advertised locally in The Daily Mercury. Council is seeking submissions to construct a new 200mm trunk water main on the south-eastern side of Nebo Road. The new pipe is to run from Thorning Street north to Shakespeare Street. The scope of works also includes the construction of cross connections at many of the side streets to link the new 200mm pipe with the existing network. In total this project requires the installation of approximately 2.26km of 200mm DICL trunk water main as well as a combination of 200mm, 150mm and 100mm cross connections and provisions for residential, commercial and Council service connections. The following submissions were received by the closing date of 7 February 2012:
Christopher Contracting Pty Ltd Davbridge Properties Pty Ltd T/A Davbridge Constructions G & MA Lemura Pty Ltd
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21401
Shamrock Civil Engineering Pty Ltd The following late submission was received at 4.00pm on Tuesday, 7 February 2012.
NQ Excavations Pty Ltd An initial compliance check was conducted by the Evaluation Panel on 10 February 2012 to identify submissions that were non-conforming with the immediate requirements of the RFT. This included compliance with contractual requirements and provision of requested information. Tender Information Requests were issued to Davbridge Constructions Pty Ltd, Shamrock Civil Engineering Pty Ltd, Christopher Contracting Pty Ltd and G & MA Lemura Pty Ltd seeking clarification on various aspects of their submissions. Upon receipt of Shamrock Civil Engineering Pty Ltd’s response, a further Tender Information Request was issued to seek additional clarification of their understanding of Council’s requirements. During the evaluation, Tenderers were assessed against the nominated qualitative criteria. The weighting attributed to each qualitative criteria was:
Relevant Experience 25% Key Personnel Skills and Experience 25% Tenderer's Resources 20% Demonstrated Understanding 20% Local Content 10%
The tendered Lump Sum Fixed Prices are listed below, excluding GST:
Davbridge Constructions Pty Ltd $3,389,783.00 Shamrock Civil Engineering $3,590,429.90 Christopher Contracting Pty Ltd $3,836,203.00 G & MA Lemura Pty Ltd $4,319,746.09 NQ Excavations Pty Ltd $4,832,225.00
After the initial evaluation, further Tender Information Requests (TIR’s) were issued as detailed below:
All Tenderers were issued with a request to extend the validity of their submissions to 15 June 2012 due to the Local Government Caretaker Period.
Shamrock Civil Engineering was also requested to address further queries in regard to their submission identified throughout the evaluation process.
All responses were received within the specified timeframes, however, Shamrock Civil Engineering failed to address the additional requested information on Qualitative Criteria. The failure to fully address Council’s numerous requests for further information pertaining to relevant experience of works of a similar nature resulted in the Evaluation Panel being unable
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21402
to fully assess Shamrock Civil Engineering’s capabilities to perform the scope of works identified. After the Evaluation Panel conducted a Risk Analysis of the Shamrock Civil Engineering submission regarding their construction program together with the pricing structure, the tendered price was deemed variable due to the inclusion of provisional items. These items were included within the fixed price of all other Tenderers' submissions and, therefore, an accurate price comparison was unable to be determined and any price variance may be negated through these provisional items. The Evaluation Panel reviewed all previous experience as noted by Davbridge Constructions Pty Ltd in their tender response and although they have extensive experience in bridge construction and nominated minimal projects involving civil works, the Tenderer demonstrated no experience in managing a complex pipeline project as detailed in the Tender documents. Based on this, the utilisation of this contractor for these high profile works may have the potential to expose Council to significant risks. While evaluating the details provided in Christopher Contracting Pty Ltd's submission, the Evaluation Panel noted that the contractor demonstrated a comprehensive understanding of Council’s requirements. This coupled with their extensive previous experience on projects of a similar nature and of a much larger scale in high volume traffic areas, led the Evaluation Panel to a decision that awarding the contract to Christopher Contracting Pty Ltd would provide Council with the most advantageous outcome in terms of proven quality of works and reducing Council's potential level of risk.
Consultation and Communication
The evaluation of the tenders was conducted by:
Manager Infrastructure Delivery - Water Services Project Engineer, Infrastructure Delivery - Water Services Contracts Officer – Procurement and Plant
Resource Implications
The funding for this Project is in the Waste Water Services (WWS) Capital Budget, Nebo Road Trunk Main Replacement. The works have been planned to be spread over two financial years 2011/2012 ($1,390,000) and 2012/2013 ($3,415,000). The pipe procurement of $318,836.10 was awarded in March 2012 and procurement has occurred with delivery to site dependent on the preferred contractor's timetable. The recommended tender price aligns with the budget provision for this component of the Project. Commencement of the works is unlikely within the current financial year due to timing of Local Government Elections and the majority of the cash flow will extend into FY 2012/2013. No amendment is required to the FY 2011/2012 budget but there will be a need to carry over unspent funds.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21403
Total Budget $4,805,000 Expenditure to Date $503,326 to End of April 2012 Contract Price $3,836,203 Balance $465,471
Risk Management Implications
The Water Main Replacement Project is required to address concerns with regard to impact of proposed roadworks on the reliability of the existing 300mm cast iron trunk water main situated under the eastern traffic lane of Nebo Road that was installed in 1929. The need to replace the main arises as it is nearing the end of its useable life and it is in poor physical condition affecting customer serviceability levels. In addition, proposed roadworks will impact the pipe increasing the existing high risk of failure that will cause damage to a major arterial highway which carries a high traffic load including a high number of heavy vehicles and result in extensive repairs costs. The removal of this water main from the traffic lane of Nebo Road also removes an ongoing issue of noise complaints associated with the hydrants and valves located along the length of the trunk main.
Conclusion
That awarding the contract to Christopher Contracting Pty Ltd represents the most advantageous outcome to Mackay Regional Council based on their demonstration of a comprehensive understanding of Council’s requirements and their previous experience outlined indicates that they have extensive experience working on projects similar in nature, which are located in high volume traffic areas, and they demonstrate value for money.
Officer's Recommendation
THAT the fixed price tender submitted by Christopher Contracting Pty Ltd of $3,836,203.00 (excluding GST) be accepted for the provision of MRC 2012-041 Nebo Road Trunk Water Main.
Council Resolution
THAT the Officer's Recommendation be adopted. Moved Cr Gilbert Seconded Cr Steindl.
CARRIED
13. CONSIDERATION OF NOTIFIED MOTIONS
Nil.
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21404
14. LATE BUSINESS:
Deputy Mayor Cr Kevin Casey advised that on the afternoon of Friday 1 June 2012 he hosted an afternoon tea on behalf of the Mayor to welcome Major General John Raymond to Mackay. Major General John Raymond was in Mackay to participate in a memorial service to commemorate the 69th Anniversary of the Bakers Creek Air Crash and the 20th Anniversary of Bakers Creek Memorial. Cr Casey presented the Mayor with a medallion and a book in remembrance of the occasion.
15. PUBLIC PARTICIPATION:
Nil
16. CONFIDENTIAL REPORTS:
16.1 CONNORS ROAD REALIGNMENT - ARCHIBALD STREET INTERSECTION
Council Resolution
THAT Council approve the issuing of "Notices of Realignment" for property in Connors Road at the Archibald Street intersection reflecting requirements in accordance with plan A1-15875
Moved Cr Casey Seconded Cr Jones
CARRIED
16.2 PLANNING & ENVIRONMENT COURT APPEAL NO. 1786 OF 2012 - MACKAY SHOPPING CENTRE PTY LTD AS TRUSTEE FOR THE MSC UNIT TRUST - 245 BRIDGE ROAD, WEST MACKAY
Council Resolution
THAT the Chief Executive Officer and Director Development Services be delegated to:
A. Retain legal representation and appropriate experts as required. B. Settle the appeal in consultation with the Mayor and/or Planning Portfolio
Councillor should an acceptable solution arise.
Moved Cr Steindl Seconded Cr Bonanno
CARRIED
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21405
16.3 PLANNING & ENVIRONMENT COURT APPEAL NO. 1890 OF 2012 - JUSTIN ROBERT SMITH PTY. LTD. AND JEFFERY D. DODDS AND MICHELE A. DODDS - 8 RIVER STREET, MACKAY
Council Resolution
THAT the Chief Executive Officer and Director Development Services be delegated to: A. Retain legal representation and appropriate experts as required. B. Settle the appeal in consultation with the Mayor and/or Planning Portfolio
Councillor should an acceptable solution arise. Moved Cr Casey Seconded Cr Walker
CARRIED
17. MEETING CLOSURE
The meeting closed at 10.43am.
18. FOR INFORMATION ONLY
18.1 DEVELOPMENT APPLICATION INFORMATION
For Council Information Only - No Decision Required. DEVELOPMENT APPLICATION INFORMATION 09.04.2012 to 15.04.2012 Development Applications Received
App no
Code/ Impact
Address Applicant Description Officer
MCUI-2012-94
Impact 8 Malin Road, SARINA
Caroline M Phillips Community Faciclity (Crematorium)
CON-2012-62
1/8 Greenwood Drive, GLENELLA
Michael Ross Certification Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
CON-2012-63
2 Bjelke Circuit, RURAL VIEW
Cavalier Homes (Mackay) Pty Ltd
Building Work - Boundary Setback for House
Matthew Ingram
MCUC-2012-96
Code 26 Ungerer Street, NORTH MACKAY
Michael P Breen Dual Occupancy
MCUI-2012-95
Impact 9 Sophia Street, MACKAY
Loudon Super Pty Ltd Local Community Facility Josephine McCann
CON-2012-65
1 Shellcove Court, BLACKS BEACH
Garage World Building Work - Boundary Shed Brogan Jones
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21406
App no
Code/ Impact
Address Applicant Description Officer
CON-2012-64
75 Gingham Street, GLENELLA
Garage World Building Work - Boundary Setback for Carport
CA-2008-281
L 2 Sarina Beach Road, SARINA
RPS Group (Mackay) Pty Ltd
Generally in Accordance - Material Change of Use (Urban residential) AND Reconfiguration of 2 Lots to create 73 Lots.
CON-2012-53
1/16 Carbeen Street, ANDERGROVE
Brett A White Building Work - Boundary Setback for Shed, Patio and Carport
Darryl Bibay
CON-2012-56
33 Redcliffe Avenue, SEAFORTH
Linda E Nicolai Building Work - Boundary Setback for Pool Fence
Brogan Jones
CON-2012-57
35 Eileen Street, WALKERSTON
Dixon Homes Mackay Building Work - Boundary Steback for House
Andrea McPherson
CON-2012-59
2 Andrew Milne Drive, MOUNT PLEASANT
GMA Certification Group Pty Ltd
Building Work - Variation for Garage and Open Carport Exceeding 9m on Side Boundary and Setback Variation for Open Carport.
Josephine McCann
MCUC-2012-93
Code 34 Danmaar Drive, HABANA
Joanne L Galea Dwelling House (Steep Land Overlay) and Home Based Business
Darryl Bibay
CON-2012-60
22 Vassallo Drive, GLENELLA
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for Shed
Darryl Bibay
CON-2012-58
44 Zelma Street, GRASSTREE BEACH
Michael I Barba and Janelle A Barba
Building Work - Boundary Setback for Porch
Josephine McCann
CON-2012-61
8 Aviland Drive, SEAFORTH
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for Dwelling
Andrea McPherson
Development Applications Entering Decision Making Period
Number Code
/Impact Address Applicant Description Primary Officer
MCUI-2010-296
Impact 0 Glenella-Richmond Road GLENELLA
Landsolve (Mackay) Pty Ltd
Material Change of Use S242 SPA 2009 Preliminary Approval to vary the assessment processes and applicable codes for development within the subject land to facilitate future use for use for Urban Residential, Higher Density Residential, Commercial and Open Space purposes
Shane Kleve
MCUI-2010-296
Impact 0 Glenella-Richmond Road GLENELLA
Landsolve (Mackay) Pty Ltd
Material Change of Use S242 SPA 2009 Preliminary Approval to vary the assessment processes and applicable codes for development within the subject land to facilitate future use for use for Urban Residential, Higher Density Residential, Commercial and Open Space purposes
Shane Kleve
MCUI-2010-296
Impact 0 Glenella-Richmond Road GLENELLA
Landsolve (Mackay) Pty Ltd
Material Change of Use S242 SPA 2009 Preliminary Approval to vary the assessment processes and applicable codes for development within the subject land to facilitate future use for use for Urban Residential, Higher Density Residential, Commercial and Open Space purposes
Shane Kleve
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21407
Development Applications Finalised.
App No
Code/ Impact
Location Applicant Description Officer
Approved Subject to Conditions
CON-ASPA-2012/51
19 Ramp Road ST HELENS BEACH QLD 4798
Neal R Bryan Building Work - Boundary Setback for Garage
Andrea McPherson
MCUC-ASPA-2012/63
Code 185 Ian Reddacliff Drive THE LEAP QLD 4740
Benjamin F Duffy Dwelling House, Shed & Swimming Pool (Steep Land Overlay)
Andrea McPherson
CON-ASPA-2012/44
21 Lakeview Drive BEACONSFIELD QLD 4740
Esprit Constructions Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
MCUC-ASPA-2012/60
Code 34 Mdina Drive HABANA QLD 4740
Lucinda J Lawn Residential Storage Shed Darryl Bibay
MCUC-ASPA-2012/55
Code 8 Reef Drive SARINA QLD 4737
Pacific Homes Mackay Dual Occupancy Josephine McCann
CON-ASPA-2012/52
21 Sonoran Street RURAL VIEW QLD 4740
River City Homes (Mackay) Pty Ltd
CON - Building Work - Dwelling House not complying with acceptable solutions - Site Coverage
Julie Brook
MCUC-ASPA-2012/43
Code 9 Ernest Street NORTH MACKAY QLD 4740
Pauline J Place Dwelling House (Flood & Inundation Overlay)
Matthew Ingram
MCUC-ASPA-2012/44
Code 56 Canberra Street NORTH MACKAY QLD 4740
Jason A Place Dwelling House (Flood & Inundation Overlay)
Matthew Ingram
ROLC-ASPA-2011/296
Code 11 Norris Street MACKAY QLD 4740
Mackstar Pty Ltd 1 Higher Density Residential into 2 Lots
Matthew Ingram
Refused
MCUCD-IDAS-2007/60A
Code 29 McCready Street RURAL VIEW QLD 4740
Urban Strategies Pty Ltd Extension of Relevant Period - Material Change of Use - 8 x Multiple Dwelling Units
Darryl Bibay
Negotiated Decision
MCUC-ASPA-2011/227
Code 217-241 Farrellys Road PAGET QLD 4740
Paget Developers Pty Ltd
Transport Depot Matthew Ingram
Generally in Accordance With
CAC-ASPA-2010/93B
Code 2B East Gordon Street EAST MACKAY QLD 4740
Vasco Projects Pty Ltd Request for Plans to be 'Generally in Accordance' - Material Change of Use for Motel (57 units and Caretakers Residence), Multiple Dwelling Units (maximum of 149 units), Dwelling Houses (14 dwellings) and Catering Shop/s (483m2 GFA) and Reconfiguration of a Lot (1 into 35 Lots)
Shane Kleve
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21408
DEVELOPMENT APPLICATION INFORMATION 16.04.2012 to 21.04.2012 Development Applications Received
App no
Code/ Impact
Address Applicant Description Officer
MCUC-2012-91
Code L 900 Eaglemount Road, BEACONSFIELD
Brad Kirkpatrick Builder Pty Ltd
Dual Occupancy Brogan Jones
MCUCD-2008-525
Code 5-11 Margaret Vella Drive, PAGET
Foot Investment Trust Request to Change Development Approval - Material Change of Use - General Industry (Warehouse)
Darryl Bibay
CON-2012-71
29 O'Neill Place, MARIAN
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Andrea McPherson
MCUC-2012-96
Code 26 Ungerer Street, NORTH MACKAY
Michael P Breen Dual Occupancy Brogan Jones
MCUI-2012-97
Impact 19A Banksia Avenue, ANDERGROVE
Arnold Park Pty Ltd Muliple Dwelling Units (10) Kathryn Goodman
CON-2012-66
94 Bedford Road, ANDERGROVE
Shane H Smith Building Work - Boundary Setback for Shed
Julie Brook
ROLC-2011-7
Code 1080 Mackay-Eungella Road, MARIAN
Kevin G Zarb and Linda K Zarb
Generally in Accordance - 1 Rural Lot into 3 Lots
Matthew Ingram
MCUIMP-2007-60
Impact 29 McCready Street, RURAL VIEW
Neil Cooke Extension of Relevant Period and Permissible Change - Material Change of Use - 8 x Multiple Dwelling Units
Darryl Bibay
CA-2004-175
27 Gordon Street, MACKAY
Shelley Pty Ltd Extension of Relevant Period & Change of Existing Development Approval - Combined Application for Material Change of Use - Code Assessment - Shops, AND Material Change of Use - Impact Assessment - 50 Units - Latitude
Julie Brook
CON-2012-67
5-7 Kingslea Court, OORALEA
Buildsmart Building Work - Boundary Setback for House
Matthew Ingram
MCUC-2012-98
Code 10 Fernleigh Avenue, ANDERGROVE
Lachlan D Robins 1 Urban Residential Lot into 2 Lots
CON-2012-69
87 Zelma Street, GRASSTREE BEACH
Development Certification
Building Work - Boundary Setback for House & Shed
Andrea McPherson
CON-2012-70
7-15 Kerrisdale Crescent, BEACONSFIELD
Esprit Constructions Pty Ltd
Building Work - Boundary Setback for House
Development Applications Entering Decision Making Period
App Number
Code/ Impact
Address Applicant Description Primary Officer
MCUC-2012-73
Code 0 Ian Reddacliff Drive THE LEAP
Mark E Farrell and Lynette G Lawton
Residential Storage Shed (Steep land Overlay)
Julie Brook
MCUC-2012-75
Code 454 Grasstree Road SARINA
Dawson Surveying Second House Josephine McCann
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21409
App Number
Code/ Impact
Address Applicant Description Primary Officer
MCUC-2012-91
Code 0 Eaglemount Road BEACONSFIELD
Brad Kirkpatrick Builder Pty Ltd
Dual Occupancy Brogan Jones
MCUC-2012-99
Code 26 Heidi Street PAGET
Laurence Gill Warehouse Brogan Jones
MCUCD-2008-525A
Code 5 Margaret Vella Drive PAGET
Foot Investment Trust Request to Change Development Approval - Material Change of Use - General Industry (Warehouse)
Darryl Bibay
MCUI-2012-33
Impact 21 Canberra Street NORTH MACKAY
Craig E McGifford Multiple Dwelling Units (4) Julie Brook
Development Applications Finalised.
App No
Code/ Impact
Location Applicant Description Officer
Approved Subject to Conditions
MCUC-ASPA-2012/58
Code 1 Hook Court SARINA QLD 4737
Pacific Homes Mackay Dual Occupancy Andrea McPherson
CON-ASPA-2012/56
33 Redcliffe Avenue SEAFORTH QLD 4741
Linda E Nicolai Building Work - Boundary Setback for Pool Fence
Brogan Jones
MCUC-ASPA-2012/83
Code 5 Sapphire Court NORTH MACKAY QLD 4740
Gemini Homes (QLD) Pty Ltd
Dwelling House (Flood and Inundation Overlay)
Brogan Jones
ROLC-ASPA-2012/67
Code 281 Shakespeare Street MACKAY QLD 4740
Dunwold Farming Pty Ltd
Boundary Realignment 2 Higher Density Residential Lots in to 2 Lots
Brogan Jones
CON-ASPA-2012/59
2 Andrew Milne Drive MOUNT PLEASANT QLD 4740
GMA Certification Group Pty Ltd
Building Work - Variation for Garage and Open Carport Exceeding 9m on Side Boundary and Setback Variation for Open Carport.
Josephine McCann
MCUC-ASPA-2011/107A
Code 74 Rasmussen Avenue HAY POINT QLD 4740
Jonathon E Symons and Sally A Symons
Request to Change Development Approval - Multiple Dwelling Units (Duplex)
Josephine McCann
CA-IDAS-2008/42C
L 3 Eimeo Road RURAL VIEW QLD 4740
WS Group Generally in Accordance with - Material Change of Use - Preliminary Approval for Locality Concept Plan No. 8 AND Material Change of Use - Preliminary Approval for Site Development Plan (Residential Subdivision) AND Reconfiguration of a Lot - Creation of 314 Urban Residential Lots plus 2 Parkland Lots in compliance with the provisions of the Eulbertie Park Plan of Development as approved by Council (MCI-2000-30) issued 17 December, 2003
Julie Brook
CON-ASPA-2012/54
10 Bluewater Court BUCASIA QLD 4750
Geoffrey D Pacey Building Work - Residential Storage Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
ROLC-ASPA-2010/206A
Code 44 Bruce Highway BAKERS CREEK QLD 4740
Cougar Developments Pty Ltd
Change Development Approval - Reconfiguration of a Lot - 2 Rural Lots into 262 Urban Residential Lots, 1 Open Space Lot and 2 Balance Lots
Leah Harris
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21410
App No
Code/ Impact
Location Applicant Description Officer
MCUC-ASPA-2011/261A
Code 40-42 Caterpillar Drive PAGET QLD 4740
GHD Pty Ptd Generally in Accordance - General Industry, Warehouse & Outdoor Sales Premises
Matthew Ingram
MCUC-ASPA-2011/304
Code 4 Lester Hansen Street SLADE POINT QLD 4740
Northern Beaches Holdings Pty Ltd
General Industry (Kit Home Fabrication Workshop)
Matthew Ingram
MCUC-ASPA-2012/57
Code 30-36 Bundesen Avenue MIDGE POINT QLD 4799
Paul M Rogers Residential Storage Shed Matthew Ingram
ROLC-ASPA-2012/66
Code 97 Sydney Street MACKAY QLD 4740
Alan J Venturi 1 Mixed Use Lot into 2 Lots Matthew Ingram
Negotiated Decision
ROLC-ASPA-2011/136
Code 1-9 Mackay-Bucasia Road RURAL VIEW QLD 4740
Australian Capital Holdings Pty Ltd
1 Urban Residential Lot into 62 Lots Matthew Ingram
DEVELOPMENT APPLICATION INFORMATION 22.04.2012 to 28.4.2012 Development Applications Received
App no
Code Impact
Address Applicant Description Officer
MCUI-2012-76
Impact 27 Brooksfield Drive, SARINA BEACH
River City Homes (Mackay) Pty Ltd
Dual Occupancy - 2 Units Josephine McCann
ROLC-2012-103
Code L 1 Yakapari-Habana Road, HABANA
Boomerang Holdings Pty Ltd and Epsom Pastoral Company Pty Ltd
Access Easement
MCUCD-2007-54
Code 5 Nelson Street, MACKAY
RPS Group (Mackay) Pty Ltd
Extension of Relevant Period - Material Change of Use - 38 Multiple Dwelling Units
Shane Kleve
CA-2006-202
L 906 Blacks Beach Road, BLACKS BEACH
Blacks Beach Cove No 2 Pty Ltd
Extension of Relevant Period - Combined Application for a Material Change of Use for Urban Residential and Higher Density Residential ( Dual Occupancy and Multiple Dwelling ) Uses over the Site as shown on the Concept plan for Blacks Beach Cove Estate Stage 7-13 AND a Reconfiguration of 1 Lot to create 245 Urban Residential Lots, 2 Higher Density Residential Lots, Parkland Lot and Drainage Lots plus 2 balance Urban Expansion Zone lots Now amended to 245 residential lots - see decision notice
Julie Brook
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21411
App no
Code Impact
Address Applicant Description Officer
CAC-2010-341
146-150 Shoal Point Road, SHOAL POINT
Acquilla Investments Pty Ltd
Request for Change of Development Approval - Combined Application - Material Change of Use - Dwelling House (19 Houses) and Reconfiguration of a Lot - 1 High Density Residential Lot into 19 Lots
Darryl Bibay
CON-2012-61
8 Aviland Drive, SEAFORTH
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for Dwelling
Andrea McPherson
CON-2012-68
1A Eulbertie Avenue, EIMEO
Garage World Building Work - Boundary Setback for Shed
Darryl Bibay
CON-2012-77
14 Cable Court, BLACKS BEACH
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Josephine McCann
CON-2012-81
8 Cable Court, BLACKS BEACH
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Josephine McCann
CON-2012-72
1 Lucinda Street, GLENELLA
Rebetzke Homes Building Work - Boundary Setback for dwelling house
Shane Kleve
CON-2012-73
10 Bangalow Court, ANDERGROVE
Andrew W Chavasse Building Work - Boundary Setback for Shed
Brogan Jones
ROLC-2012-100
Code 87 Grasstree Beach Road, GRASSTREE BEACH
Allan E Hore 1 Rural Residential Lot into 2 Lots Josephine McCann
MCUC-2012-101
Code 23 Transport Avenue, PAGET
Pilcher Developments Pty Ltd
Warehouse Brogan Jones
Development Applications Entering Decision Making Period
App Number
Code /Impact
Address Applicant Description Primary Officer
MCUC-2012-101
Code 23 Transport Avenue PAGET
Pilcher Developments Pty Ltd
Warehouse Brogan Jones
MCUI-2012-4
Impact 0 Kennys Road MARIAN
Benjamin Illes Community Facilitiy - Child Care Centre (75 Children)
Matthew Ingram
ROLC-2012-100
Code 87 Grasstree Beach Road GRASSTREE BEACH
Allan E Hore 1 Rural Residential Lot into 2 Lots Josephine McCann
ROLC-2012-37
Code 0 Newbury-Mount Vince Road MARIAN
George A Micallef Boundary Realignment 2 Rural Lots into 2 Lots
Matthew Ingram
Development Applications Finalised.
App No Code/
Impact Location Applicant Description Officer
Approved Subject to Conditions
CON-ASPA-2012/58
44 Zelma Street GRASSTREE BEACH QLD 4740
Michael I Barba and Janelle A Barba
Building Work Road Boundary Setback Variation for Front Porch
Josephine McCann
CON-ASPA-2012/66
94 Bedford Road ANDERGROVE QLD 4740
Shane H Smith Building Work - Boundary Setback for Shed
Julie Brook
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21412
App No Code/ Impact
Location Applicant Description Officer
ROLC-ASPA-2011/322
Code 7 Herrigan Street GLENELLA QLD 4740
Cardno Humphreys Reynolds Perkins
1 Urban Residential Lot into 2 Lots Julie Brook
ROLC-ASPA-2011/42
Code 239 Nebo Road MACKAY QLD 4740
Nebo Road Pty Ltd 2 Public Purposes Lots into 4 Lots Leah Harris
MCUC-ASPA-2012/56
Code 102 Farrellys Road PAGET QLD 4740
Marion S Lourens Transport Depot Extension Matthew Ingram
Application Withdrawn
CON-ASPA-2012/72
1 Lucinda Street GLENELLA QLD 4740
Rebetzke Homes Building Work - Boundary Setback for dwelling house
Shane Kleve
Application Refused
MCUI-ASPA-2010/296
Impact L 1 Glenella-Richmond Road GLENELLA QLD 4740
Landsolve (Mackay) Pty Ltd
Material Change of Use S242 SPA 2009 Preliminary Approval to vary the assessment processes and applicable codes for development within the subject land to facilitate future use for use for Urban Residential, Higher Density Residential, Commercial and Open Space purposes
Shane Kleve
DEVELOPMENT APPLICATION INFORMATION 30.04.2012 TO 06.05.2012 Development Applications Received
App no Code/
Impact Address Applicant Description Officer
CON-2012-64
75 Gingham Street, GLENELLA
Garage World Building Work - Residential Storage Shed (Carport) not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
CA-2009-311
L 57 Flaherty Street, ETON
Champion Engineers Reqest to Consider Plans 'Generally in Accordance' - Material Change of Use - Public Utility (Extension to office and carparking area) AND Operational Works - Construction of Carparking area
Peter Bratt
RECONF-2009-462
L 4 Hodges Road, SHOAL POINT
Projex North Request for Change of Development Approval - 1 Lot into 312 Lots comprising 302 Residential Lots Plus 9 Park/Open Space/Conservation Lots Plus Balance Lot
Kathryn Goodman
MCUC-2012-110
Code 34 Lilian Avenue, EIMEO
Paul E Lewis and Anita L Lewis
Dual Occupancy Josephine McCann
CON-2012-74
13 Mengel Street, SOUTH MACKAY
Philip H Jones Building Work - Road and Side Boundary Setback Variation for Carports and Structure Exceeding 9 metres on a Side Boundary.
Josephine McCann
CON-2012-75
L 2 Badger-Wales Road, MIA MIA
Mackay House Removals
Amenity & Aesthetics Bruce Lenahan
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21413
App no Code/ Impact
Address Applicant Description Officer
CON-2012-76
23 Dorothy Place, MIRANI
The Shed Company Building Work - Oversized Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
CON-2012-80
4 Edmonds Street, BUCASIA
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for House
Brogan Jones
ROLC-2012-104
Code 46 Rasmussen Avenue, HAY POINT
Ella Titternes 1 Village Lot into 2 Lots Josephine McCann
CON-2012-78
35 Raffia Street, RURAL VIEW
Ricciardi Builders Building Work - Boundary Setback for House
Julie Brook
CON-2012-79
1 Matilda Court, EIMEO
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for Awning
Andrea McPherson
CON-2012-84
3 Burton Street, MIDGE POINT
Development Planning & Approvals
Building Work - Boundary Setback for Shed
Brogan Jones
CA-2007-534
5 Eulbertie Avenue, EIMEO
HHTan Architects Pty Ltd
Generally in Accordance - Combined Application for a Material Change of Use AND a Reconfiguration of 1 lot to create 14 Rural Residential lots under the superseded transitional planning scheme
John Caldwel
ROLC-2012-107
Code 30 Benson Road, ALLIGATOR CREEK
James W Turner and Yvonne J Turner
1 Rural Residential Lot into 2 Lots Julie Brook
MCUI-2011-192
Impact L 2 Pinevale Road, PINEVALE
Holcim (Australia) Pty Ltd
Request to Change of Condition - Extractive Industry
Matthew Ingram
CA-2008-386
56 Stone Drive, SHOAL POINT
Raceview Developments Pty Ltd
Change Development Approval - Material Change of Use (Urban Residential development on Urban Expansion zoned land) and Reconfiguration of a Lot (1 into 417 Urban Residential lots) (Royal Sands Estate - Development of Balance Area)
Matthew Ingram
MCUC-2012-106
Code 12-20 Gateway Drive, PAGET
Orionstone Pty Ltd General Industry (Hardstand) Matthew Ingram
CON-2012-82
14 Berkshire Lane, OORALEA
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
CON-2012-83
34 Dickens Avenue, OORALEA
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
Development Applications Entering Decision Making Period
App Number
Code/ Impact
Address Applicant Description Primary Officer
CA-2009-311A
0 Flaherty Street ETON
Champion Engineers Reqest to Consider Plans 'Generally in Accordance' - Material Change of Use - Public Utility (Extension to office and carparking area) AND Operational Works - Construction of Carparking area
Peter Bratt
CAC-2010-341A
Code 146 Shoal Point Road SHOAL POINT
Acquilla Investments Pty Ltd
Request for Change of Development Approval - Combined Application - Material Change of Use - Dwelling House (19 Houses) and
Darryl Bibay
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21414
Reconfiguration of a Lot - 1 High Density Residential Lot into 19 Lots
CAC-2012-21
Code 13 Belangason Way SHOAL POINT
Pioneer Projects No. 1 Pty Ltd and Mangerton Pty Ltd
1 Higher Density Residential Lot into 5 Lots and Building Work - Boundary Setback
Darryl Bibay
MCUC-2012-106
Code 12 Gateway Drive PAGET
Orionstone Pty Ltd General Industry (Hardstand) Matthew Ingram
MCUC-2012-82
Code 40 Burnell Drive ALLIGATOR CREEK
Kevin J Rebetzke Second House Julie Brook
ROLC-2012-51
Code 0 Leichhardt Road MIRANI
Pioneer Lakes Pty Ltd Boundary Realignment - 2 Rural Lots into 2 lots
Kathryn Goodman
Development Applications Finalised
App No Code/
Impact Location Applicant Description Officer
Approved Subject to Conditions
CON-ASPA-2012/69
87 Zelma Street GRASSTREE BEACH QLD 4740
Development Certification
Building Work - Boundary Setback for House & Shed
Andrea McPherson
CON-ASPA-2012/71
29 O'Neill Place MARIAN QLD 4753
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Andrea McPherson
CON-ASPA-2012/73
10 Bangalow Court ANDERGROVE QLD 4740
Andrew W Chavasse Building Work - Boundary Setback for Shed
Brogan Jones
ROLC-ASPA-2012/42
Code 22 Emu Street SLADE POINT QLD 4740
Steven O Turner 1 Urban Residential Lot into 2 Lots
Brogan Jones
CON-ASPA-2012/62
1/8 Greenwood Drive GLENELLA QLD 4740
Michael Ross Certification Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
CON-ASPA-2012/74
13 Mengel Street SOUTH MACKAY QLD 4740
Philip H Jones Building Work - Road and Side Boundary Setback Variation for Carports and Structure Exceeding 9 metres on a Side Boundary.
Josephine McCann
CA-IDAS-2004/175B
27 Gordon Street MACKAY QLD 4740
Shelley Pty Ltd Extension of Relevant Period & Change of Existing Development Approval - Combined Application for Material Change of Use - Code Assessment - Shops, AND Material Change of Use - Impact Assessment 66 Units including 57 Dual Key (123 Keys) and 516m2 commercial and catering shop use
Julie Brook
MCUC-ASPA-2012/88
Code 2A Pound Street WALKERSTON QLD 4751
Lindsay Kippen Dwelling House (Flood & Inundation Overlay)
Julie Brook
MCUCD-IDAS-2008/489A
Code 63 River Street MACKAY QLD 4740
Reed Property Group Request to Change Development Approval - Material Change of Use - 91 Dual Key Multiple Dwelling Units (152 Keys) and Catering Shop/Commercial Premises (349m2)
Julie Brook
ROLC-ASPA-2011/266
Code 2 Muscats Access Road HABANA QLD 4740
Klaas Meekel Boundary Realignment 2 Rural Lots into 2 Rural Lots
Julie Brook
CON-ASPA-2012/64
75 Gingham Street GLENELLA QLD 4740
Garage World Building Work - Residential Storage Shed (Carport) not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21415
App No Code/ Impact
Location Applicant Description Officer
ROLC-ASPA-2012/24
Code 67-79 Boundary Road OORALEA QLD 4740
Fabcot Pty Ltd 1 Urban Residential Lot into 2 Lots & Easements
Kathryn Goodman
ROLC-ASPA-2012/90
Code L 42 Peak Downs Highway VICTORIA PLAINS QLD 4751
Neil A Blackburn Access Easement Kathryn Goodman
CON-ASPA-2012/63
2 Bjelke Circuit RURAL VIEW QLD 4740
Cavalier Homes (Mackay) Pty Ltd
Building Work - Boundary Setback for House
Matthew Ingram
CON-ASPA-2012/67
5-7 Kingslea Court OORALEA QLD 4740
Buildsmart Building Work - Boundary Setback for House
Matthew Ingram
MCUC-ASPA-2012/70
Code 14C David Muir Street SLADE POINT QLD 4740
Queensland Complete Contracting Services
General Industry (Industrial Administration Building) & Operational Works - Civil Works - Industrial
Matthew Ingram
ROLC-ASPA-2012/81
Code 6 Knobel Street NORTH MACKAY QLD 4740
Lachlan C Condon 1 Urban Residential Lot into 2 Lots
Matthew Ingram
Application Withdrawn
CA-IDAS-2008/281A
L 2 Sarina Beach Road SARINA QLD 4737
RPS Group (Mackay) Pty Ltd
Generally in Accordance - Material Change of Use (Urban residential) AND Reconfiguration of 2 Lots to create 73 Lots.
Julie Brook
MCUI-ASPA-2011/325
Impact 99 Armstrong Beach Road SARINA QLD 4737
Wolter Consulting Group Undefined Use (Non-Resident Workforce Accommodation) and Commercial Premises (Office)
Shane Kleve
Generally in Accordance With
MCUCD-IDAS-2006/109B
Code 2 Rosewood Drive RURAL VIEW QLD 4740
Bartley Burns Certifiers & Planners
Generally in Accordance - Material Change of Use - Alterations and additions to existing licenced club
Kathryn Goodman
DEVELOPMENT APPLICATION INFORMATION 07.05.2012 TO 13.05.2012 Development Applications Received App no Code/
Impact Address Applicant Description Officer
ROLC-2012-116
Code L 1 Dunnrock Road, CHELONA
Bruce M Drysdale and Hilary A Drysdale
Boundary Realignment 2 Rural Lots into 2 Lots
Brogan Jones
ROLC-2012-117
Code 40 Pratt Street, SOUTH MACKAY
Formosa Corporation Pty Ltd
1 Urban Residential Lot into 2 Lots
Kathryn Goodman
CON-2012-87
1 Roma Court, BEACONSFIELD
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for Dwelling
Julie Brook
CON-2012-86
18 Newport Parade, BLACKS BEACH
Development Certification
Building Work - Road Boundary Setback Variation for Dwelling House/Garage
Josephine McCann
CON-2012-88
14 Kingslea Court, OORALEA
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for Dwelling
Kathryn Goodman
CON-2012-90
45 Owens Creek Loop Road, GARGETT
Rockhampton Building Approvals
Amenity & Aesthetics Bruce Lenahan
CON-2012-89
28 Poulsen Drive, MARIAN
Travis B Ness Building Work - Boundary Setback for Shed
Kathryn Goodman
MCUC-2012-111
Code 2-6 Makybe Diva Drive, OORALEA
Haba Property Projects Pty Ltd
Multiple Dwelling Units (3) Darryl Bibay
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21416
App no Code/ Impact
Address Applicant Description Officer
MCUC-2012-112
Code 32/40 Southgate Drive, PAGET
Liebherr Australia Pty Ltd
Warehouse (Expansion) Matthew Ingram
ROLC-2012-113
Code 22 Reef Drive, SARINA
Pacific Homes Mackay 1 Town Lot into 2 Lots Josephine McCann
MCUC-2012-115
Code 30 Campbell Street, SLADE POINT
C & C Building Contractors
Detached Industrial Buildings (4) Kathryn Goodman
OW-2009-116
19 Dennis Street, SOUTH MACKAY
BMD Consulting Pty Ltd Request to Extend Relevant Period - Operational Works - 2 community lots
Peter Bratt
CON-2012-85
30 Sheedy Crescent, MARIAN
Raymond J Hansen and Joanne Hansen
Building Work - Oversized Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
ROLC-2012-114
Code 12-14 Reef Drive, SARINA
Pacific Homes Mackay 1 Town Lot into 2 Lots Josephine McCann
RECONF-2008-210
424 Pacific Drive, HAY POINT
Kylemore Pty Ltd Request to Extend Period of Approval - Reconfiguration of 1 lot to create 42 Village Residential lots
Julie Brook
Development Application Entering Decision Making Period
App Number
Code/ Impact
Address Applicant Description Primary Officer
MCUC-2011-166
Code 103 Shakespeare Street MACKAY
MJM Developments Material Change of Use - Multiple Dwelling Units (4)
Julie Brook
MCUC-2012-13
Code 3 Oloughlin Street NORTH MACKAY
McCarthy Panel Works Pty Ltd
Car Repair Workshop Julie Brook
MCUC-2012-96
Code 26 Ungerer Street NORTH MACKAY
Michael P Breen Dual Occupancy Brogan Jones
MCUI-2012-34
Impact 0 Norman Street ANDERGROVE
Craig E McGifford Mulitple Dwelling Units (4) Julie Brook
ROLC-2011-335
Code 195 Starkeys Road MOUNT OSSA
John S Kilcullen and Lorraine J Kilcullen
Boundary Realignment 2 Rural Lots into 2 Lots
Darryl Bibay
ROLC-2012-113
Code 22 Reef Drive SARINA
Pacific Homes Mackay Reconfiguration of a Lot - 1 Town Zone -Residential Precinct Lot into 2 Lots.
Josephine McCann
ROLC-2012-114
Code 12 Reef Drive SARINA
Pacific Homes Mackay Reconfiguration of a Lot - 1 Town Zone -Residential Precinct Lot into 2 Lots.
Josephine McCann
Development Applications Finalised
App No Location Applicant Description Officer
Approved Subject to Conditions
CON-ASPA-2012/79
1 Matilda Court EIMEO QLD 4740
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for Awning
Andrea McPherson
CON-ASPA-2012/80
4 Edmonds Street BUCASIA QLD 4750
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for House
Brogan Jones
MCUC-ASPA-2012/68
Code 30 Summerhill Rise HABANA QLD 4740
Glen N Lamb Residential Storage Shed (Steep Land Overlay)
Brogan Jones
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21417
App No Location Applicant Description Officer
MCUC-ASPA-2012/87
Code 224 Victoria Street MACKAY QLD 4740
VIC 224 Pty Ltd Commercial Premises Brogan Jones
CON-ASPA-2012/60
22 Vassallo Drive GLENELLA QLD 4740
Mackay and Whitsunday Building Certification
Building Work - Boundary Setback for Shed
Darryl Bibay
CON-ASPA-2012/68
1A Eulbertie Avenue EIMEO QLD 4740
Garage World Building Work - Boundary Setback for Shed
Darryl Bibay
CON-ASPA-2012/55
1 Camellen Street BEACONSFIELD QLD 4740
Fergus Builders Building Work - Boundary Setback for House
Julie Brook
MCUC-ASPA-2012/92
Code 9 Gregory Street MACKAY QLD 4740
Mainscar Pty Ltd Hotel (comprising two licensed areas over two stages)
Julie Brook
MCUC-ASPA-2011/210
Code 3 Wellington Street MACKAY QLD 4740
Marcus Ng Multiple Dwelling Units (8) Shane Kleve
Approved
CON-ASPA-2012/75
L 2 Badger-Wales Road MIA MIA QLD 4754
Mackay House Removals Amenity & Aesthetics Bruce Lenahan
ROLC-ASPA-2011/7A
Code 1080 Mackay-Eungella Road MARIAN QLD 4753
Kevin G Zarb and Linda K Zarb
Generally in Accordance - 1 Rural Lot into 3 Lots
Matthew Ingram
Application Withdrawn
CON-ASPA-2012/45
12 Amelia Drive MIRANI QLD 4754
Garage World Building Work - Boundary Setback for Shed
Darryl Bibay
Deemed Refusal
CON-ASPA-2010/193
4-6 Corella Way BLACKS BEACH QLD 4740
Neil L Hartley Building Work - Boundary Setback for House
Josephine McCann
Application Lapsed
CON-ASPA-2011/59
6 Urarii Crescent SHOAL POINT QLD 4750
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for Carport and Exceeding 50% Site Coverage.
Josephine McCann
MCUI-ASPA-2012/61
Impact 371 Connors Road BAKERS CREEK QLD 4740
Diversified Mining Services
General Industry (Industrial Abrasive Blasting and Painting Facility)
Julie Brook
Negotiated Decision
ROLC-ASPA-2011/309
Code 923 Stockroute Road GREENMOUNT QLD 4751
Darren J North Boundary Realignment 3 Rural Lots into 3 Rural Lots
Julie Brook
DEVELOPMENT APPLICATION INFORMATION 14.05.2012 TO 20.05.2012 Development Applications Received
App no Code/
Impact Address Applicant Description Officer
CON-2012-98
40 Macartney Drive, MARIAN
Garage World Building Work - Boundary Setback for Shed
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21418
App no Code/ Impact
Address Applicant Description Officer
CON-2012-100
16 Bridge Road, EAST MACKAY
Michael J Boss-Walker and Jennifer R Boss-Walker
Building Work - Side Boundary Setback Variation for Shed Exceeding 9metres in Length.
Josephine McCann
CON-2012-99
17 Tulloch Street, OORALEA
Building Approvals & Consultancy Pty Ltd
Building Work - Boundary Setback for Carport
Kathryn Goodman
MCUC-2012-118
Code 12-14 Heidi Street, PAGET
Black Duck Kitchens General Industry & Warehouse (Including Ancillary Offices)
Brogan Jones
CON-2012-96
21 Peak Downs Highway, WALKERSTON
Mackay House Removals Amenity & Aesthetics
MCUI-2012-119
Impact 9-11 Campwin Beach Road, CAMPWIN BEACH
Racesea Pty Ltd Multiple Dwelling Units (18) and ERA 63.
Josephine McCann
CON-2012-97
93 Grendon Street, NORTH MACKAY
Rockhampton Building Approvals
Amenity & Aesthetics
ROLC-2012-120
Code 7 Savannah Drive, KINCHANT DAM
Victor C Deguara and Dianne C Deguara
1 Rural Residential Lot into 2 Lots
Kathryn Goodman
CON-2012-91
6 Carbeen Street, ANDERGROVE
Casey W Warren Building Work - Boundary Setback for Shed
Darryl Bibay
CON-2012-92
10 Wallace Court, SOUTH MACKAY
Holt Industries Building Work - Boundary Setback for Patio Roof
Kathryn Goodman
CON-2012-93
82 Mdina Drive, HABANA
Mackay House Removals Amenity & Aesthetics Bruce Lenahan
MCUIMP-2005-28
Impact 329 Bridge Road, WEST MACKAY
Mackay Shopping Centre Pty Ltd
Change Development Approval - Material Change of Use - Shopping Centre
Matthew Ingram
CON-2012-95
27 Hangan Street, BUCASIA
Dixon Homes Mackay Building Work - Boundary Setback for House
Darryl Bibay
CON-2012-94
7 Credlin Court, SARINA
Katrina M Williams Building Work - Side Boundary Setback Variation for Shed exceeding 9m in Length.
Josephine McCann
MCUI-2011-267
Impact 323-331 Bridge Road, WEST MACKAY
Mackay Shopping Centre Pty Ltd
Change of Development Approval - Motel (88 units inc. Managers Residence, Meeting Rooms & Restaurant to 92 Units)
Matthew Ingram
Development Applications Entering Decision Making Period.
App Number
Code/ Impact
Address Applicant Description Primary Officer
MCUI-2012-7
Impact 33 Norris Road Park Access NORTH MACKAY
Police Citizens Youth Club Defined Land Use - Local Community Facility (extension to existing building)
Darryl Bibay
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21419
Development Applications Finalised.
App No Code/ Impact
Location Applicant Description Officer
Approved Subject to Conditions
MCUC-ASPA-2012/105
Code 25 Logan Crescent ERAKALA QLD 4740
Grant D Moss Residential Storage Shed Brogan Jones
MCUC-ASPA-2012/91
Code L 900 Eaglemount Road BEACONSFIELD QLD 4740
Brad Kirkpatrick Builder Pty Ltd
Dual Occupancy Brogan Jones
MCUC-ASPA-2012/99
Code 26-28 Heidi Street PAGET QLD 4740
Laurence Gill Warehouse Brogan Jones
CON-ASPA-2012/82
14 Berkshire Lane OORALEA QLD 4740
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
CON-ASPA-2012/83
34 Dickens Avenue OORALEA QLD 4740
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for House
Darryl Bibay
ROLC-ASPA-2012/64
Code 14 Stayts Road MARIAN QLD 4753
Kyle A Daniel and Nicole L Daniel
1 Residential Lot into 2 Lots Darryl Bibay
CON-ASPA-2012/61
8 Aviland Drive SEAFORTH QLD 4741
Mackay and Whitsunday Building Certification
Building Work - Road Boundary Setback Variation for Dwelling House.
Josephine McCann
CON-ASPA-2012/77
14 Cable Court BLACKS BEACH QLD 4740
GMA Certification Group Pty Ltd
Building Work -Side Boundary Setback Variation for House
Josephine McCann
CON-ASPA-2012/81
8 Cable Court BLACKS BEACH QLD 4740
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Josephine McCann
CON-ASPA-2012/86
18 Newport Parade BLACKS BEACH QLD 4740
Development Certification Building Work - Road Boundary Setback Variation for Dwelling House/Garage
Josephine McCann
CON-ASPA-2012/94
7 Credlin Court SARINA QLD 4737
Katrina M Williams Building Work - Side Boundary Setback Variation for Shed exceeding 9m in Length.
Josephine McCann
MCUC-ASPA-2012/110
Code 34 Lilian Avenue EIMEO QLD 4740
Paul E Lewis and Anita L Lewis
Dual Occupancy Josephine McCann
MCUC-ASPA-2012/75
Code 454 Grasstree Road SARINA QLD 4737
Dawson Surveying Second House Josephine McCann
ROLC-ASPA-2012/100
Code 87 Grasstree Beach Road GRASSTREE BEACH QLD 4740
Allan E Hore 1 Rural Residential Lot into 2 Lots
Josephine McCann
CON-ASPA-2012/87
1 Roma Court BEACONSFIELD QLD 4740
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for Dwelling
Julie Brook
MCUC-ASPA-2012/73
Code L 25 Ian Reddacliff Drive THE LEAP QLD 4740
Mark E Farrell and Lynette G Lawton
Residential Storage Shed (Steep land Overlay)
Julie Brook
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21420
App No Code/ Impact
Location Applicant Description Officer
MCUC-ASPA-2012/82
Code 40 Burnell Drive ALLIGATOR CREEK QLD 4740
Kevin J Rebetzke Second House Julie Brook
CON-ASPA-2012/76
23 Dorothy Place MIRANI QLD 4754
The Shed Company Building Work - Oversized Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
CON-ASPA-2012/85
30 Sheedy Crescent MARIAN QLD 4753
Raymond J Hansen and Joanne Hansen
Building Work - Oversized Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
MCUC-ASPA-2012/98
Code 10 Fernleigh Avenue ANDERGROVE QLD 4740
Lachlan D Robins Compliance Assessment - 1 Urban Residential Lot into 2 Lots and Associated Operational Works
Matthew Ingram
ROLC-ASPA-2012/69
Code 6 Kidston Avenue RURAL VIEW QLD 4740
Lagoon Estate Developments Pty Ltd
1 Urban Residential Lot into 7 Lots
Matthew Ingram
Application Withdrawn
MCUI-ASPA-2012/95
Impact 9 Sophia Street MACKAY QLD 4740
Loudon Super Pty Ltd Local Community Facility Josephine McCann
ROLC-ASPA-2012/104
Code 46 Rasmussen Avenue HAY POINT QLD 4740
Ella Titternes 1 Village Lot into 2 Lots Josephine McCann
Extension to Relevant Period Refused
CA-IDAS-2006/202E
L 906 Blacks Beach Road BLACKS BEACH QLD 4740
Blacks Beach Cove No 2 Pty Ltd
Extension of Relevant Period - Combined Application for a Material Change of Use for Urban Residential and Higher Density Residential ( Dual Occupancy and Multiple Dwelling ) Uses over the Site as shown on the Concept plan for Blacks Beach Cove Estate Stage 7-13 AND a Reconfiguration of 1 Lot to create 245 Urban Residential Lots, 2 Higher Density Residential Lots, Parkland Lot and Drainage Lots plus 2 balance Urban Expansion Zone lots Now amended to 245 residential lots - see decision notice
Julie Brook
Application Refused
CON-ASPA-2012/78
35 Raffia Street RURAL VIEW QLD 4740
Ricciardi Builders Building Work - Boundary Setback for House
Julie Brook
Consent Order Issued
ROLC-ASPA-2010/363
Code 43 Pinevale Road PINEVALE QLD 4754
WEC Hire Pty Ltd Boundary Realignment 3 Rural Lots into 3 Lots
Matthew Ingram
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21421
DEVELOPMENT APPLICATION INFORMATION 21.05.2012 TO 27.05.2012 Development Applications Received App no Code/
Impact Address Applicant Description Officer
CAC-2012-102
Code 17 Main Street, BAKERS CREEK
Charlton Best 2 Village Lots into 3 Lots & Dual Occupancy
Brogan Jones
MCUC-2012-126
Code 462 Bridge Road, WEST MACKAY
Lelewai Property Projects Pty Ltd
Multiple Dwelling Units - 7 Units Brogan Jones
MCUC-2012-127
Code 15-23 Schapers Road, GLENELLA
Pointglen Developments Pty Ltd
Multiple Dwelling Units - 52 Units
MCUC-2012-128
Code 15 Moreton Drive, RURAL VIEW
Anne Haughton Dual Occupancy Kathryn Goodman
CON-2012-103
5 Warrener Street, ANDERGROVE
Errol R Pleash and Lynda S Waye
Building Work - Boundary Setback for Shed
Darryl Bibay
CON-2012-106
17 Cable Court, BLACKS BEACH
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
CON-2012-104
7 Cable Court, BLACKS BEACH
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Julie Brook
CON-2012-105
124 Whitehaven Drive, BLACKS BEACH
GMA Certification Group Pty Ltd
Building Work - Boundary Setback for House
Julie Brook
CA-2002-9
L 1 Cape Hillsborough Road, CAPE HILLSBOROUGH
McKays Solicitors Cancel Development Approval - Combined Application - Reconfiguration of a Rural lot into 2 Rural lots and Material Change of Use Impact - Establishment of a Caravan Park
CON-2012-101
14 Ulysses Way, ARMSTRONG BEACH
Eastcoast Building Approvals
Building Work - Boundary Setback for Dwelling
Josephine McCann
MCUI-2012-122
Impact 2-6 Finch Street, SLADE POINT
Sean Hatchett and Mary L Curran
Dwelling House (Coastal Wetlands, Image Corridor, Airport Development)
Brogan Jones
MCUC-2010-169
Code 334 Slade Point Road, SLADE POINT
Lane Associates Change Development Approval - 3 x Multiple Dwelling Units
Brogan Jones
MCUIMP-2008-777
Impact 28 Quarry Street, NORTH MACKAY
Mackay District Rugby Union Inc
Request for Change of Development Approval - 11 x Multiple Dwelling Units
Julie Brook
RECONF-2008-747
28 Quarry Street, NORTH MACKAY
Mackay District Rugby Union Inc
Request for Change of Development Approval - Reconfiguration of a Lot 1 Sport and Recreation Lot into 2 Lots
Julie Brook
CON-2012-102
4867 Mackay-Eungella Road, FINCH HATTON
Mackay House Removals Amenity & Aesthetics Bruce Lenahan
MCUC-2012-123
Code 4/23-27 Sunset Drive, ERAKALA
Mark W McNichol Residential Storage Shed Matthew Ingram
MCUC-2012-124
Code 34 Bourke Street, BLACKS BEACH
RPS Group (Mackay) Pty Ltd and DOF No. 1 Pty Ltd
Multiple Dwelling Units (69) Julie Brook
ROLC-2012-125
Code 42 Whitsunday Drive, BLOOMSBURY
Kenneth Devine 1 Rural Residential Lot into 2 Lots
Brogan Jones
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21422
Development Applications Entering Decision Making Period.
App Number
Code /Impact
Address Applicant Description Primary Officer
CAC-2012-102
Code 17 Main Street BAKERS CREEK
Charlton Best 2 Village Lots into 3 Lots & Dual Occupancy
Brogan Jones
MCUC-2012-85
Code 0 Greenfields Boulevard MOUNT PLEASANT
BCC Mackay Investment Pty Ltd
Commercial Premises and Catering Shop
Julie Brook
MCUIMP-2008-777A
Impact 28 Quarry Street NORTH MACKAY
Mackay District Rugby Union Inc
Request for Change of Development Approval - 11 x Multiple Dwelling Units
Julie Brook
RECONF-2008-747A
28 Quarry Street NORTH MACKAY
Mackay District Rugby Union Inc
Request for Change of Development Approval - Reconfiguration of a Lot 1 Sport and Recreation Lot into 2 Lots
Julie Brook
ROLC-2011-98
Code 61 Balluts Road FARLEIGH
Joyce Borg Boundary Realignment 3 Rural Lots into 3 Lots
Darryl Bibay
Development Applications Finalised.
App No Code
/Impact Location Applicant Description Officer
Approved Subject to Conditions
MCUC-ASPA-2012/101
Code 23 Transport Avenue PAGET QLD 4740
Pilcher Developments Pty Ltd
Warehouse Brogan Jones
CON-ASPA-2012/90
45 Owens Creek Loop Road GARGETT QLD 4741
Rockhampton Building Approvals
Amenity & Aesthetics Bruce Lenahan
CON-ASPA-2012/93
82 Mdina Drive HABANA QLD 4740
Mackay House Removals Amenity & Aesthetics Bruce Lenahan
ROLC-ASPA-2012/77
Code 1361 Midge Point Road MIDGE POINT QLD 4799
Sylvia Busby 1 Lot into 2 Rural Residential Lots
Darryl Bibay
CON-ASPA-2012/100
16 Bridge Road EAST MACKAY QLD 4740
Michael J Boss-Walker and Jennifer R Boss-Walker
Building Work - Side Boundary Setback Variation for Shed Exceeding 9metres in Length.
Josephine McCann
ROLC-ASPA-2012/114
Code 12-14 Reef Drive SARINA QLD 4737
Pacific Homes Mackay Reconfiguration of a Lot - 1 Town Zone -Residential Precinct Lot into 2 Lots.
Josephine McCann
MCUI-ASPA-2012/33
Impact 21 Canberra Street NORTH MACKAY QLD 4740
Craig E McGifford Multiple Dwelling Units (4) Julie Brook
CON-ASPA-2012/88
14 Kingslea Court OORALEA QLD 4740
Gemini Homes (QLD) Pty Ltd
Building Work - Boundary Setback for Dwelling House
Kathryn Goodman
CON-ASPA-2012/89
28 Poulsen Drive MARIAN QLD 4753
Travis B Ness Building Work - Shed not complying with the Planning Scheme and Boundary Relaxation
Kathryn Goodman
CON-ASPA-2012/92
10 Wallace Court SOUTH MACKAY QLD 4740
Holt Industries Building Work - Boundary Setback for Patio Roof
Kathryn Goodman
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21423
App No Code /Impact
Location Applicant Description Officer
ROLC-ASPA-2012/37
Code L 4 Newbury-Mount Vince Road MARIAN QLD 4753
George A Micallef Boundary Realignment 2 Rural Lots into 2 Lots
Matthew Ingram
Confirmed on Wednesday, 13 June 2012.
………………………………………
MAYOR
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21424
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21425
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21426
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21427
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21428
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21429
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21430
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21431
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21432
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21433
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21434
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21435
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21436
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21437
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21438
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21439
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21440
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21441
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21442
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21443
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21444
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21445
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21446
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21447
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21448
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21449
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21450
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21451
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21452
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21453
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21454
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21455
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21456
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21457
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21458
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21459
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21460
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21461
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21462
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21463
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21464
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21465
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21466
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21467
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21468
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21469
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21470
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21471
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21472
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21473
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21474
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21475
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21476
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21477
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21478
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21479
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21480
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21481
FINAL MINUTES WEDNESDAY 6 JUNE 2012
MIN/06.06.2012 FOLIO 21482