    Chapter2: Ecological study

    Ecology is basically the study of co-relation between the manmade structure and

    the environment.ecology is the only science which can provide ideas to examine

    and plan for physical and social environment.it is an important investment in

    getting knowledge about nature and creating urban form.Nature reacts on suitablevalues and opportunities of human consumption in limited manner.hence it is

    necessary to know how the nature (biosphere ) works. Eco-system,bio-land-

    chemical-cycle,energy flow and food chain are decided because of balanced

    activities of nature. The ecology of biosphere is distributed in the following manner.

    1. Ocean

    2. Sea beach and bank of river

    3. Forest

    4. Pond

    5. Rivers and water fall

    6. Non-salty water marshy land

    7. Grass land

    8. Desert

    aircycle,watercycle, carbon cycle and mineral cycle etc bio-land-chemical

    cycles helps the ecosystem to work properly. The effect of ecosystem and

    ecocycle on each other can be understood with the example of water cycle.

    In water cycle the water gets into atmosphere due to vaporization and after

    condensation it returns again to water cycle. Apart from waterfall the ground

    water is brought to the surface by artificial means. The river water either

    percolates directly or from the canals. The interdependency of different

    ecological systems is essential. If any component of the eco system is

    disturbed the entire eco system is effected adversely. For example if the

    vegetation is depleting then the land erosion takes place, imbalance in

    miniral cycle, and imbalance in oxygen cycle is evident. The elements and

    the principles involved in natural process, has to be identified and the

    opportunities ,boundries and limitations has to be essentially formulated. The

    nature changes according to physics, geology, soil, vegetation, climate,

    animals, fundamental neccecities and present human activities. Hence for

    the use of mankind the evaluation and estimation of the value and relation of

    natural resources is a big hindrance.

  • 8/7/2019 Final Korba Translation

    2/23

    For the study of Korba Investment area the following methodology is used :

    1. City :

    I. Physical process

    II. Mutual effect

    III. Valuation method

    Physical process :

    a. Opportunity

    b. Control/Prevention

    c. Constraints

    Opportunity Intrinsic suitability for different land uses

  • 8/7/2019 Final Korba Translation

    3/23

    Decide the options to achieve the planning aim.

    Data :

    I. Physical

    II. Mutual effect

    III. Organic

    Mutual effect :

    i. Geology

    ii. Geo-structure science

    iii. Hydrology

    iv. Soil

    v. Vegetation

    vi. Climate

    vii. Wildlife

    viii. Pollution

    ix. Inner resources

    x. Health & health science

    xi. Land-use - present & proposed

    Geology:

    Nonmetallic mining area of Korba is divided into various geological groups.The

    maximum variation is in Shehdol distict (consisit of 9 different zone) and the

  • 8/7/2019 Final Korba Translation

    4/23

    minimum variation is in Bilaspur (consist of 3 different zones).Gondvana,dharwad

    and kuppa zones are found in Bilaspur district.older granular igneous rocks and

    sedimentary rocks are found in Korba Investment area.The sequence are as

    followes :

    1. Refused land

    2. Sandy stone with small chips Barakar

    3. Rock & sand stone at lowlying area Talcher

    4. Irrelevancy

    5. Granite and related old igneous rocks : Archeyan

    Granite has medium to large particles and feldspar has large size particles.

    Weathering and decomposition is found at 2m depth from the surface. Because of

    uncertaitity of weathering and decomposition, standard rock surfaces are difficult toget.Granite are used in foundation of buildings because of its rigid & soft nature.

    Shells generally have soft and thin cracks. As there is low compression force in it

    so it is not suitable for the foundation of large industries. Special precautions should

    be taken for the foundation of large industries at these places. Sand stones are of

    soft, amorphous & porous in nature. These stones are useful for the foundation of

    low stories buildings and they are suitable for the casting of multistoried buildings.

    Korba Investment Area is situated in zone no.2, in the map of earthquake prone

    area in India. Recently, there is no any incidence of earthquake in the radius of

    100Km.The construction of building should be according to the guidelines providedfor the zone -2 of earthquake prone zone map of india.

    Coal deposition area :

    Korba is situated in the lower Gondwana of important coal area. There are 3410

    lakh tons of coal deposition in these area. These coals are suitable for thermal

    power generation.The deposion of coals are at the depth of 609 m.There are

    21types of stratum at 900 ft. depth which has 8 to 150 ft thickness.

    The important stratums are :

    1. Jatraj

    2. Rajgaamar

    3. Ghordeva

  • 8/7/2019 Final Korba Translation

    5/23

    Table no. 2.1 Korba : disscription of mines according

    to blocks

    Sr.no Name of mining

    blocks

    Area ofmining

    in sqm

    Deposits inlakh tonnes Yearly

    minin

    g

    capac

    ity

    Surcharge in lakh

    tonnes

    Time inyears

    1 korba 17.531 135 ug

    2 manikpu

    r

    18.128 500 20 87.50 25

    3 balgi 41.647 Baanki 142

    Surakchar

    363.4

    Balgi 175.6

    5

    11

    6

    wg 28

    35

    29

    4 kusumun

    da

    26.594 3650 60 514.65 60

    5 gevra 31.859 6225.9 100 623 65

    6 rajgama

    ar

    28.961 266.25 7 wg 38

    7 dipka 17.014 2385 20 180 120

    The available amount of ash in Korba is 40%.The following problems arises in the

    city because of coal mines.

    1. Abondend area

    2. Flood prone area

    3. Probable land sliding area

    4. Because of prvious minning activity,permanently unsuitable area for the

    development.

  • 8/7/2019 Final Korba Translation

    6/23

    5. The necessary area for the pile of garbages produced by mining activity.

    Mining process are divided in to two parts :

    a. Mining from open mines :

    There are so much heaps are accumulated around mines during mining fromopen mines.

    b. Mining from surface mines :

    After mining from the surface mines the empty space are filled up by sand.

    There are 5 % concavity can be seen after filling the sand.

    There are likely to be mining activity in Korba city and E-N & south area of the city.

    2.2. Land-water science:

    Korba has 80% soft and 20% hard rocks. Rocks are classified in the following

    manne:

    a. Soft rocks :

    These are unified,breakable,granular and porous in nature.

    b. Hard rocks

    Soft rocks

    Stones are porous and pores retain the ground water. These kind of granular

    particles are present in appropriate amount in Korba. Ground water levels are high

    in this region. Land with granite, retain water in their cracks and joints. Similarly the

    land with sedimentary rocks. This is evident from the wells of the following villages.

    In these areas 9.5 -8 m deep ground water. Present land form and the possibility of

    ground water below sandstone present in Hasdeo river. The river slope south west,

    east and west. Wells can retain water up to a depth of 5-20 m. Dengur nala in the

    east of Hasdeo river and ahiran nala in the west of Hasdeo river have water

    through out the year.

    2.3 Land structure

    The geographical area consists of hard and soft rocks. Low lying plain areas which

    divides further into smaller hilly sub regions. The hilly region generally slope

    towards north to south situated in east west direction. The hilly regions are situated

    in the North, North-east, South, South-East directions. Other hilly regions have steep

    slope upto 50-70 ft while in the plains it is only 9-15 ft.

  • 8/7/2019 Final Korba Translation

    7/23

    2.4 Soil

    Chattisgarh area is having light soil. In Korba soil, phosphorus, humas and nitrogen

    are present in low amounts. Due to hydration of ferric acid ,the color for soil is red-

    yellow. Soil has both acidic and Basic nature. PH value is between 5.5 5.8. the soil

    is slightly red and infertile upto 4 depth and has traces of calcium and iron.

    2.5 Vegetation

    Korba has a variety of species and vegetation. Due to urbanization and

    industrialization in Korba, over the last few decades there has been a decline in the

    vegetation cover. In comparison to east, west is has more vegetation cover. The MP

    electric division and BALCO in their residential areas have developed gardens as

    part of the vegetation cover. At the western bank of the river there is a prevalent

    forest. The settlement situated at the east and west of the river can be developed if

    the forest on the western bank is developed. To prevent the ills of the pollution it is

    necessary to afforest the eastern bank of the river. In the developed areas and

    along the roads there are very few plantation and vegetation. In the developing

    areas locally available plantation will be put to use.

    The following trees are found in this area-

    Tree name local name

    1. Syria Robusta Sal

    2. Termanilia Tonentosa saja

    3. Hengisra Letipolia havra

    4. Delbergia Letiphoria Shisham

    5. Preticapas Marsupia Bija

    Trees available near villages

    1. Acacia Babul

    2. Albirigia -

    3. Bantia Firdosa -

    4. Iugramia -

    5. Malia indica Neem

  • 8/7/2019 Final Korba Translation

    8/23

    2.6 Landscape

    Depending on the citizens activities, the design of landscape has been proposed

    also keeping in mind the ecology of the place. This will help people to mutually

    interact. If citizens activities are well defined then landscape portrait of the place

    can be determined. Regional plan will have layout of each zone. The aim for makinglayout for each zone is as follows

    For cities development it is necessary to develop road and infrastructure. Plantation

    along the roads gardens and playgrounds is the first stage so that there is

    maximum utilization of the amenities.

    Development is effected by the following elements-

    1) Surface water runoff

    2) Slope of the land

    3) Amt of sunrays

    4) Wind direction

    5) Naturescape and its points

    6) Present vegetation coverage

    For betterment of the Korba landscape,the following measures have been taken:

    A) Alignment of roads:

    Depends on:

    Position of surface land,movement of sun,percentage of slope.The drainage lines should

    be aligned according to the natural slope of water.As far as possible southwest-

    northwest and west-east direction,road alignment shouldnt be done.

    If this cant be avoided,it is necessary to increase the road width by 25% for plantation

    along so that it can be protected from sun rays.

    B) Construction of buildings:

    Sun path should be taken into consideration.The kitchen should be avoided from

    southwest and west sunrays.North-South and west-east are the main wind directions

    and should be seen that rooms are aligned accordingly.Hence south and west building

    facades should have no openings.

    C) Plantation along roads:

  • 8/7/2019 Final Korba Translation

    9/23

    Roads connecting different areas to city create corridors.So,it is necessary to protect

    them from sunrays.

    D) Regional and gardens:

    While designing these gardens,care should be taken of sunpath,wind direction and

    external noise etc.Urban and regional gardens should have the provision of large

    lawns.To enrich the environment,fruit bearing trees and bushes should be prevalent in

    industries.

    E) Bank of river:

    Scenic beauty can be experienced from bank of river.Weathering of banks can be

    prevented by plantations along the banks and also to beautiful.Due to the presence of

    Largestramia and other fruit bearing trees adds to the beauty.During zonal planning,it

    should be taken care that the roads are of such width that the trees along both the

    sides give adequate amount of shade.25% overlap should be there between the trees.

    2.7)Climate and microclimate:

    Change in weather everyday is known as climate.According to physical science,the

    reaction of human beings to warm and cold climate is difficult to comprehend.The body

    heat of human are balanced because of the following climatic reasons:wind

    speed,humidity,air temperature.

    For tension free human behaviour it is very important it is very important to retain

    climatic balance.For proper climatic balance in Korba,it is essential to study and

    understand the microclimate properly.Classification of climate and their results and

    expected improvement in the upcoming passages.

    1)Climatic elements:Air temperature,relative humidity and wind speed is explained in

    the following table:

    Korba: Value of climatic elements

    Srno.

    month Avg maxtemperature

    Relativehumidity(morning)

    Relativehumidity(evening)

    Avgwindspeed

    air

    A

    summer

  • 8/7/2019 Final Korba Translation

    10/23

    1

    march 35.3 38 22 5.4 hot

    2

    april 39.9 36 18 5.7

    3

    may 43.0 36 18 6.7

    B

    monsoon

    4

    june 38.9 60 45 8.1 Hot&humid

    5

    july 31.4 86 75 8.3

    6

    august 30.8 87 79 7.4

    7

    september

    31.5 73 75 5.4

    C

    Aftermonsson

    8

    october 31.4 78 63 3.9 hot

    9

    november

    29.3 67 45 4.9

    D

    cold

    10

    december

    27.8 69 44 3.9

    11

    january 27.5 68 39 4.5 cold

    12

    february

    31.1 55 26 5.3

    2)Air temperature:

    Air temperature depends on movement of sun,latitude,longitude and height and

    type of surface and geographical conditions.

    Korba:sun path:

    Maximum transverse is on 21 june and minimium is in 22 december.When sun is

    at 75 degree inclination,then maximum temperature is at 1 noon and at an

  • 8/7/2019 Final Korba Translation

    11/23

    angle of 49 degree,temperature is maximum at 3 o clock.The maximum solar

    azimuth is 257 degree and 283 degree.

    3)Radiation:

    Radiation depends on land structure and surface.Surface with vegetationreduces radiation effect and also air temperature and as air becomes hotter

    humidity reduces.By the help of vegetation cover,humidity is produced which

    makes air cooler.When outside temperature is hot,it becomes uncomfortable for

    human beings and hence trees should be planted for shade and comfort.

    In 257-283 solar azimuth,too heavy traffic road construction is unsuitable

    because in this zone,the sun ray is perpendicular to the ground.To decrease the

    temperature,outside recreational space and open spaces should be planted with

    trees and the presence of lawns is of utmost necessity.Due to low temperature

    in air during rainy season,maximum humidity is formed.When humidity is morethan 50%,the speed of wind is more in the latter case.Humidity is more in the

    morning and less in the evening.In the summer season,provision of water related

    recreation activities should be provided for the comfort of citizens.

    2.8)Wind direction and speed:

    To make the climate gentle,the flow of air or wind plays an important role.Airy

    day:593.67days(morning and evening together)

    Table:Korba:Wind distribution according to

    direction

    Sr no. Winddirection

    % daymorning

    %dayevening

    toatal

    1 North tosouth

    15.25 13.44 28.69

    2 Northeast-south

    andtowardswest

    3.47 2.82 6.29

    3 East-west 4.78 3.14 7.924 South

    east-northwest

    2.41 2.12 4.53

  • 8/7/2019 Final Korba Translation

    12/23

    5 Southeast-north

    2.40 2.60 5.00

    6 Southwest-

    northeast

    5.81 2.37 8.18

    7 West-east

    9.16 12.38 21.54

    8 Northwest-southeast

    7.36 10.49 17.85

    Korba:wind direction and speed

    Srno.

    Month Winddirection-north

    Winddirection-west

    Winddirection-North west

    Calmperiod

    Avgspeedkm/hr

    1. January Morning54.44Evening38.35

    Morning7.13Evening8.37

    4.5

    2. February

    Morning59.48

    Evening27.95

    Evening31.18

    Morning5.32Evening4.76

    5.3

    3. March Morning41.55

    Evening32.22

    Morning7.13Evening8.10

    5.4

    4. April - Evening31.03

    Morning7.20Evening4.50

    5.7

    5. May - Evening29.34

    Evening27.17

    Morning4.34Evening2.48

    6.7

    6. June - Morning40.90

    Evening21.97

    Morning3.60Evening2.70

    8.1

  • 8/7/2019 Final Korba Translation

    13/23

    7. July - Morning41.75Evening30.00

    Morning2.79Evening3.10

    8.3

    8. August - Morning47.19

    Evening36.78

    Morning3.41

    Evening4.03

    7.4

    9. September

    - Morning28.04

    Morning5.40Evening5.21

    5.4

    10.

    October Morning43.03Evening31.16

    Evening7.13

    11.

    November

    Morning53.73Evening60.80

    Morning9.90Evening7.80

    4.9

    12.

    December

    Morning69.23

    Morning6.82Evening4.03

    3.6

    January-march and October-december months have winds from north to south

    direction.While,wind flow from the west takes place for 7 months from February-

    september.

    During this period,the wind flow during the evenings is important.Min-max calm

    periods are found in the month of

    November,January,march,October,December,September,February and

    april.Exceedingly calm periods are found in November and minimum calm period

    in april.Throughout the year,total 127 days(17.65%) are found to be calm.Calm

    period is defined as a condition when the wind speed is negligible and man cant

    feel the movement of wind.

    City gets,light wind in june,july and august. In other months it gets light movement of

    air.buildings should be designed such that,it creats minimum obstruction to windmovement.

    Korba-wind speed its physical result

    Sr no objectives Physical effects Wind speed

  • 8/7/2019 Final Korba Translation

    14/23

    limits

    1 calm Smoke rising

    above

  • 8/7/2019 Final Korba Translation

    15/23

    industrial environment has destroyed rapidly.mining and electricity generation has

    changed the scene completely. Traffic condition has increased. Hasdev river was

    main source of cool air. Now the river was deriorated to a layer of sand only.

    Hasdev barrage gives good scenery . Barrage and hill of foot are important places in

    point of view of scenery.

    2.11 Minning of coal :

    Korba has 3410 lakh ton deposited coal. This coal is very good for thermal power

    generation.There are two methods for minings.

    1. Open cast mining :

    From open minings,it is important to mine completely the deposits of coal

    finishes.the empty mines requires filling.Some places are reserved for piling

    of coal. After removal of these piles only greenery can grown. So after

    removal of deposited coal near river, beautification can be done. Dust makesair polluted, which comes from open mines. These are the location of present

    and proposed open mines.

    a. Manikpur in South of Korba

    b. Banki

    c. Surakchhar

    d. Balgee

    2. Mining from surface mines:

    Minings are done in following areas

    a. Manikpur

    b. Korba

    c. Rajgaamar

    d. Deepka

    Problems created by surface mines :

    a. Probability to land slidding

    b. Foods affected the area

    The area completely disabled for the urban development.

  • 8/7/2019 Final Korba Translation

    16/23

    M.P. electricity board and present Korba city has some unsuitable area for

    development.

    2.12.Thermal power generation :

    This area gets cheap electricity,due to presence of coal mines and thermal power

    centre.On the otherside, health of people getting deiorated.in 1959,100 mega watt

    power station was established. In 1966,200MW powerstation was established. With

    the establishment of Balco 120MW power station was established on the estern

    side,thermal power will have total capacity of 540MW. On north side of Korba,near

    Balco factory,120 MW powerstation is established.After this on the western side of

    the river,1000 MW power station is established by M.P. electricity board and 2100

    MW power station ,is established by NTPC.

    In 1980, National engineering research institute, studied air pollution of Korba .The

    study was done at following places :

    1. Kadambari bhavan

    2. PWD guesthouse at C hampa road.

    3. Balco clubs.

    4. S.E.C.L. office

    5. Inspection building near Hasdev barrage.

    6. Vikas Bhawan

    7. Sada colony

    Impact of wind and its quality evaluation

    Sr

    no

    Position of

    extracted

    mines

    supply(

    gm)

    Demand

    Mg/cum

    m

    Sulphur

    ic acid

    Maximu

    m

    supply

    Mg/cumm

    Directio

    n of

    wind

    during

    survey

    1 Kadambari

    bhavan

    191 150 11 30 North to

    south

    2 Pwd rest

    house

    213 20

  • 8/7/2019 Final Korba Translation

    17/23

  • 8/7/2019 Final Korba Translation

    18/23

    i. Ash on surface and protected flyash 3.6 x 100000

    Forecast:

    There are 3000000 tones of coals burns in the plant by which 1000MW electricity is

    produced which is equal to 8.7 x 1000000 KW.

    There are 42 to 50 % of amount f ash found in Kusumunda area of KORBA.

    Because of 3000MW thermal power station at west side the resident activity of

    southern part is affected by air pollution.by the study of National mechanical

    research institute it is clear that there are so much amount of dust particle in the

    air.The study also show that this is only related to 1/5 area of electctric generating

    capacity. By the establishment of these plants the problems are solved and the

    working capacity is increased.

    Effect of air pollution:

    Although there is no data available on bronchitis diseases but on the basis of

    previous knowledge it is found in this type of environment.There is also possibility

    to get damage of open eyes .so it is necessary to protect residential areas.As the air

    flow is very less in W-S & S-N and S-N-W direction of the city so west and north area

    of thermal power plant is suitable for residential use.

    Effect of pollution on vegetation:

    Because of industrial and commercial activity and specialy coal based thermal

    power plants are adding SO2 to the environment. In India the expected growth of

    SO2 is 21 % from 1966 to 1980 while in America it is 8 %.

    According to study done by National engeenering research institute the Sada colony

    and PWD resthouse area has maximum SO2 amount.The bad effect can be seen on

    photosynthesis, breathing and other vegetation activities because of increase in

    SO2.Practicaly , the concentration of 429 U.G.S. O2 par M.3(0.15 PPM ) indicates the

    signal for danger.

    Hence, it necessary to prepare programs for plantaion for the north of Hasdev river

    and west of NTPC.

    Effect on the road transport management:

    For the transporatation of coal use of trucks will be continue. At present the road

    conditions are not good.so it is necessary to improve. Besides this it is necessary to

    form new tourist spot so that the division between passenger and fright corridor

    will be possible.and thetraffic load on Darri bandh will be reduced.

  • 8/7/2019 Final Korba Translation

    19/23

    Transmission line:

    These type of lines are initiated from thermal power station and distributed all

    around. The laying of these lines are so that it may creat problems in development

    at present and in future.This problem seems to be more in west of Korba at super

    thermal power.It is good to lay along coal construction a corridor area so that there

    will be less problem in future.

    From above study we got the following result :

    1. Limitation of the area for services and ameneties of the settelements .

    2. Limitation of area for the future industrial activity.

    3. Provision of new transportation infrastruvture.

    4. Limitation of prohibited area for residential industrial and building

    construction.

    5. Limitation of area for the disposal of dry ash and liquid solution.

    6. Making of policies for the development of Korba.

    7. Permanent setup for the measurement of air and water quality.

    Analysis

    On the basis of study and analysis the objectives for the landuse plan has been

    jotted down below.

    1. Use of abandoned areas- This land is not suitable for construction. For the use

    of such land the permission should be taken from the director general of

    mines and safety.

    2. Space for ash piles- Suitable and porous land should be chosen for the

    disposal of ash slurry. Porous and high water table areas are not suitable are

    not suitable for ash piling. For the conservation of ground water it is

    necessary.

  • 8/7/2019 Final Korba Translation

    20/23

    3. Transmission lines it is expected that minimum six extra lines will be

    delivered from the thermal power plant. Presently there is only one circuit

    form there. There must be open spaces for this. Hence it is proposed that for

    the laying of high tension lines there must be appropriate lane width using

    multi circuit turner technology.

    4. Use of areas for ground water replenishment these areas should not be

    used for the making of bridge or any other kind of urban use. It can be used

    for future development. It can be used for recreational purpose.

    5. Problems due to wind direction the flow of air is from N-S & N-W area to S-E

    & West to east. During monsoons due to humidity the wind direction isprevalent. The areas in the west of the Korba are more prone to the hazards

    of pollution. Hence these areas are not suitable for any heavy development.

    The design of the buildings in this area should be according to situation. It is

    suggested that for the regular monitoring of the air pollution a monitoring

    station should be established.

    6. Problems due to geological stratum and faults faults are shown according to

    the geology. These areas are not suitable for building and road construction.

    The land which have become geologically stable are used for future urbandevelopment.

    7. Suitable space for future expansion according to analysis it is clear that

    south and north area of Katghora Margh is suitable for urban development

    activities. In the south of BALCO there is a strip of land available which can

    be used . for industrial development the land is available in the east of the

    city.

    8. Urban level circulation Hasdeo dam is the one link which connect city from

    east to west. It is very necessary to connect east west area of city to main

    road. For efficient circulation and to reduce the movement across the Hasdeo

    dam this road is essential. East and west Korba should be connected by

    railline for transportation. Korba till now has been developed as an

    independent zone.

  • 8/7/2019 Final Korba Translation

    21/23

    Hence for urban development activities proper planning and scheduling is

    necessary.

    CH 9 Pollution

    If the qauantity of impure and discarded material goes inside the human body,

    more than the tolerance capacity , then it affects the inhabitants of that place.

    In the town of Korba , there is substantial amount of air and water pollution. The

    population of the town as well as those of 10-12 villagers around, suffer from

    various illness, related to air and water pollution.

    9.1 Air pollution :-

    The main reason of air pollution in Korba are :-

    1. Smoke from thermal power plants.

    2. Mining

    3. Transporting coal

    4. Household

    These factors are elaborated below :-

    9.1.1 Generation of smoke :

    The thermal power plants located on the west bank of Hasdeo river continuouslygenerate smoke. Mainly M.P. elec. Board , SECL Colony and Korba slum area mainly

    effected by pollution As far as we consider the other thermal power stations of M.P.

    ---- pollution control mechanisms have been applied.

    Inspite of all these efforts it has been observed that 5-10% of the pollutants and

    they are polluting the environment . 60% of the people in the NW are effected by

    the smoke.

  • 8/7/2019 Final Korba Translation

    22/23

    9.1.2 Mining :

    A lot of mining activities happen in Manikpur village and other villages at the west

    of Hasdeo river like Kusumuda and Gewra. In mining areas big piles of coal are

    there. Apart from these beside open mines heavy depositions are situated. Coal

    particles fly from these depositions and pollute the atmosphere. Apart from thesethe heaps of ash after drying pollute the atmosphere when particles fly from it.

    9.1.3 Transporting Coal

    More than 50% of the coal transported from the mines to the electro thermal plants

    is done in open trucks. Bauxite is also transported in open trucks.

    9.1.4 Household activities

    Since coal is easily available here, it is used as a fuel in daily household activities,

    this also creates air pollution hazards.

    Fly ash and fly ash slurry

    The fly ash and fly ash slurry should be disposed of in nearby areas. For this work

    wells should be dug.

    For this work special area development authority and other concerned offices

    should be consulted and a step by step program should be developed. Fly ash slurry

    should be disposed off using pipes.

    Transportation of coal

    Coal should be transported through conveyer belt. In this relation the information isprovided in the development plan. By this plan it is expected that the no. of trucks

    transporting the coal will reduce. Special care has been taken in the proposal of

    roads in the plan, because the no of coal carrying trucks cannot be reduced to a

    greater extent.

    9.3.2 Ways to reduce water pollution

    Detailed description of the reasons of water pollution has been discussed before. It

    is necessary to have a detailed study of the different types and quantity of

    chemical pollutants and effluents coming out of various industrial establishments.

    MP pollution control board should govern the NOC to be given to the industries todispose off the impurities in the rivers. It is necessary to have a check of the

    effluents of the industry that is asking for NOC.

    9.4 Previous plans

    The air pollution causing industries in present and in the future and the effected

    areas has been indicated in the plan. This development plan indicates the areas in

  • 8/7/2019 Final Korba Translation

    23/23

    which no housing development should take place. And the areas are indicated

    below-

    1- Within 2 km radius of Present location of Plants .

    2- Within 2 km radius of Present location SE of 100MW thermal power plant .

    3- Within 3 km radius of Present location of Fertilizer plant.