files.transtutors.com · the main aim of the project was to install, commission, integrate and...

6

Upload: others

Post on 18-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible
Page 2: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible
Page 3: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible
Page 4: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible
Page 5: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible
Page 6: files.transtutors.com · The main aim of the project was to install, commission, integrate and optimize 1200 BTS Sites, 10 BSC and 2 MSC in UP East. As a BSS Engineer I was responsible