file structure for ilrs productsdaily asi combined values from “eop” sinex file have been...
TRANSCRIPT
![Page 1: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/1.jpg)
File structure for ILRS productsOutline of CDDIS and EDC directories
The ILRS generates weekly, unconstrained solutions for:
•station coordinates(epoch the mid-point of each 7-day interval); •EOPs (x-pole, y-pole and Length-Of-Day (LoD) at 1-day intervals).
These results are stored in subdirectories "pos+eop/YYMMDD",where "YYMMDD" is the date of the end of each 7-day interval. Within each subdirectory are individual solutions and combination solutions.
![Page 2: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/2.jpg)
File structure for ILRS productsdetails (1)
for the individual contributions to our pos+eop project:/pub/slr/products/pos+eop/YYMMDD/deos.pos+eop.YYMMDD.v1.snx
for the official ILRS primary product on pos+eop:/pub/slr/products/pos+eop/YYMMDD/ilrsa.pos+eop.YYMMDD.v1.snx
idem, for eop only:/pub/slr/products/pos+eop/YYMMDD/ilrsa.eop.YYMMDD.v1.snx
for the official ILRS backup product on pos+eop:/pub/slr/products/pos+eop/YYMMDD/ilrsb.pos+eop.YYMMDD.v1.snx
idem, for eop only:/pub/slr/products/pos+eop/YYMMDD/ilrsb.eop.YYMMDD.v1.snx
![Page 3: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/3.jpg)
File structure for ILRS products details (2)
for possible new combination solutions that are not official: /pub/slr/products/pos+eop/YYMMDD/deos.combination.pos+eop.YYMMDD.v1.snxand/pub/slr/products/pos+eop/YYMMDD/deos.combination.eop.YYMMDD.v1.snx
If necessary, directories /pub/slr/products/orbits;/pub/slr/products/…;
or whatever, parallel to "/pub/slr/products/pos+eop
A README file will be placed in /pub/slr/products/
![Page 4: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/4.jpg)
ILRS Pilot Project ‘POS+EOP’ - status
• Weekly station coordinates (epoch mid GPS week)and daily EOPs (Xpole, Ypole, LoD), unconstrained;
• SINEX files available from 5 ACs each Tuesday;
• Combined products available from 2 combinationcentres each Wednesday:– Unconstrained station coordinates;
– EOPs mapped to ITRF2000
![Page 5: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/5.jpg)
ILRS Pilot Project ‘POS+EOP’ – status (2)
• Operational and on-going since November 2003;
• Official Primary Combination Centre – ASI;
• Official Backup Combination Centre – DGFI.
• Ongoing comparisons between the 2 combinedsolutions;
• (At least) one new AC wishing to join project.
![Page 6: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/6.jpg)
ILRS Analysis Working Group
IERS Combination Pilot Project:Status of ILRS contributions
AWG meeting, 2004 Dec 13, San Francisco, USA
![Page 7: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/7.jpg)
The IERS Combination Pilot Project
・ Motivation:・IERS to develop a successor for the current ITRF2000;・Derived from weekly inter-technique combinations;・Back in time as far as possible.
・ILRS response:・AC and AACs currently involved in ‘pos+eop’ weeklysolutions:・Agreed to generate weekly SINEX solutions from ̃1983 orbefore;・Combination centres to form ILRS Official and Back upsolutions;・End of January 2005.
![Page 8: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/8.jpg)
Status of ILRS solutions
ASI DGFI GFZ JCET NSGF---------------------------------------------------------------------how far back? 1984 1981 1993 at least 19831992
what satellites? L1+L2+E1+E2 L1+L2 L1+L2 L1+L2+E1+E2L1+L2+E1+E2
current status? 1992-> now ready "ready" 1993-> now L1+L2to 1999
when finished? end Jan 2005 now now end Jan 2005 end Jan2005
any problems? quality of EOP 6 bad weeks 3 bad weeks cleaning early1990s pre-1986 poor; pre-1992 site ids, DOMES for old sites
![Page 9: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/9.jpg)
Call for submissions from IERS
・ Very soon a call for submissions willbe made
・ Important that the ILRS combinedsolutions are available _ othersolutions known to be ready to go
・ Unfortunate if product from ILRS notincluded.
・ Ideally ready by end January 2005.
![Page 10: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/10.jpg)
Other ILRS Official Products?
・ Consider:
_Weekly station coordinates mapped toITRF2000? _ the current unconstrainedproduct is not ‘user friendly’, beingdesigned for further inter-techniquecombination;
_Orbits? _ suggest the geodeticsatellites
![Page 11: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/11.jpg)
Benchmark Project: status
• New ACs wishing to contribute to ‘pos+eop’need to submit orbits and residuals forcomparison with ‘standard’
• Need a speedy response, not least becauseAC’s funding may depend on acceptance oftheir product;
• Who will carry out analysis?
![Page 12: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/12.jpg)
SLR Global Coverage
Worrying is the situation in the Pacific and South America - loss of Hollas and no data from TIGO at present.
![Page 13: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/13.jpg)
Snapshot of geodetic trackingSix days ending Dec 6 2004
![Page 14: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/14.jpg)
Snapshot of geodetic trackingSix days ending Dec 6 2004
![Page 15: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/15.jpg)
Snapshot of geodetic trackingSix days ending Dec 6 2004
![Page 16: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/16.jpg)
Snapshot of geodetic trackingSix days ending Dec 6 2004
![Page 17: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/17.jpg)
Snapshot of geodetic trackingSix days ending Dec 6 2004
![Page 18: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/18.jpg)
Analysis Centre Categorisation
・ Question _ should AACs that havecommitted to the ‘pos+eop’ project
・ AWG Recommendation to GB?
![Page 19: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/19.jpg)
Quality assessment for new station
・ AWG has the responsibility for thisimportant task;
・ Need to be able to recommend to GBacceptance of station within ILRS;
・ Currently only ad-hoc procedures in place:_ e.g. for recent Stromlo re-birth: late data, non-standard filenames, extra effort for analysts ->no formal recommendation.
・ Ideas? _ recommendations to analystsand prospective stations?
![Page 20: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/20.jpg)
Action Items
• AC/AACs involved in pos+eop – keep runningsolutions, making combinations
• AC/AACs involved in IERS PP – get ‘back’solutions done to allow Combination Centres tosubmit ILRS solution asap
• AC/AAC work towards implementingatmospheric loading – application date?
![Page 21: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/21.jpg)
The ASI/CGS The ASI/CGS operational combinationoperational combinationforfor the ILRS the ILRS Pos+EOPPos+EOP Pilot Project Pilot Project
ILRS AWG Meeting, 13 December 2004, S. Francisco
C. Sciarretta, V. Luceri
![Page 22: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/22.jpg)
ScopeScope
Illustrate the ASI/CGS weekly combined solutions interms of:
-Comparisons with IERS EOP (USNO finals.data) and withEOP from DGFI combined solution
-ITRF2000 consistency evaluation: 3D wrms on the CoreSites estimations, Tx, Ty, Tz and scale time series
Summary and remarks conclude the presentation.
![Page 23: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/23.jpg)
IssuedIssued productsproducts
• EOP only SINEX file (ITRF2000 constrainedsolution)
Header, File/Reference, Input/History, Solution/Statistics,Solution/Estimate, Solution/Matrix_Estimate L Cova
• Pos+EOP SINEX file (loose solution)Header, File/Reference, Input/History, Solution/Statistics,Solution/Epochs, Site/Id, Site/Eccentricity, Solution/Estimate,Solution/Matrix_Estimate L Cova
• Summary Report
![Page 24: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/24.jpg)
ASI ASI combinedcombined solutionsolution vsvs IERS EOP IERS EOP
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
asi: WMean: 0.05, Wstd: 0.25
28 dec 03 27 nov 04-2
0
2
Y- P
ole
(m
as)
asi: WMean: 0.19, Wstd: 0.25
28 dec 03 27 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
asi: WMean: -0.00, Wstd: 0.06
ASI - USNO finals.data
28 dec 03 27 nov 04-2
0
2
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
asi: WMean: 0.05, Wstd: 0.25
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
asi: WMean: 0.05, Wstd: 0.25
28 dec 03 27 nov 04-2
0
2
Y- P
ole
(m
as)
asi: WMean: 0.19, Wstd: 0.25
28 dec 03 27 nov 04-0.5
0
0.5
Y- P
ole
(m
as)
asi: WMean: 0.19, Wstd: 0.25
28 dec 03 27 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
asi: WMean: -0.00, Wstd: 0.06
ASI - USNO finals.data
![Page 25: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/25.jpg)
Daily ASI combined values from “eop” sinex file have beendifferentiated with USNO “finals.data” values (interpolated at thecorresponding points; declared accuracy for USNO values x,y: 0.1mas, lod: 0.02 ms)
Data span: December 28th, 2003 – November 27th, 2004
Wmean, wstd are bias and standard deviation of the differencesweighted by the ASI estimation uncertainties
Typical SLR y-”bias” is evident (0.2 mas in the analysed period) ; nobias in x-pole and LOD; scatter (x, y, LOD) of 0.25 mas (x,y) and0.06 ms (LOD)
ASI ASI combinedcombined solutionsolution vsvs IERS EOP ( IERS EOP (contcont’’d)d)
![Page 26: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/26.jpg)
ASI ASI combinedcombined solutionsolution vsvs DGFI DGFI combinedcombined solutionsolution
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
asi: WMean: -0.05, Wstd: 0.17
28 dec 03 27 nov 04-2
0
2
Y- P
ole
(m
as)
asi: WMean: -0.05, Wstd: 0.19
28 dec 03 27 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
asi: WMean: -0.00, Wstd: 0.02
ASI - DGFI
28 dec 03 27 nov 04-2
0
2
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
asi: WMean: -0.05, Wstd: 0.17
28 dec 03 27 nov 04-2
0
2
Y- P
ole
(m
as)
asi: WMean: -0.05, Wstd: 0.19
28 dec 03 27 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
asi: WMean: -0.00, Wstd: 0.02
ASI - DGFI
![Page 27: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/27.jpg)
Daily ASI combined values from “eop” sinex file have beendifferentiated with daily DGFI combined values from “eop” sinexfile
Data span: December 28th, 2003 – November 27th, 2004
Wmean, wstd are bias and standard deviation of the differencesweighted by the ASI estimation uncertainties
no bias in x-pole, y-pole and LOD; scatter (x, y, LOD) below the0.20 mas (x,y) and 0.02 ms (LOD)
ASI ASI combinedcombined solutionsolution vsvs DGFI DGFI combinedcombined solutionsolution ((contcont’’d)d)
![Page 28: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/28.jpg)
DGFI DGFI combinedcombined solution vssolution vs IERS EOP IERS EOP
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
dgfi: WMean: 0.10, Wstd: 0.26
28 dec 03 27 nov 04-2
0
2
Y-P
ole
(m
as)
dgfi: WMean: 0.26, Wstd: 0.30
27 dec 03 28 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
dgfi: WMean: 0.00, Wstd: 0.06
DGFI - USNO finals.data
28 dec 03 27 nov 04-2
0
2
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
dgfi: WMean: 0.10, Wstd: 0.26
28 dec 03 27 nov 04-2
0
2
X-P
ole
(m
as)
dgfi: WMean: 0.10, Wstd: 0.26
28 dec 03 27 nov 04-2
0
2
Y-P
ole
(m
as)
dgfi: WMean: 0.26, Wstd: 0.30
27 dec 03 28 nov 04-0.5
0
0.5
Y-P
ole
(m
as)
dgfi: WMean: 0.26, Wstd: 0.30
27 dec 03 28 nov 04-0.5
0
0.5
LO
D (
ms
)
Time
dgfi: WMean: 0.00, Wstd: 0.06
DGFI - USNO finals.data
![Page 29: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/29.jpg)
Core sites: 3-D Core sites: 3-D wrms wrms of differences w.r.t. ITRF2000of differences w.r.t. ITRF2000
0
5
10
15
20
25
30
35
28 dec 03 - 04 dec 04
mm
ASI
DGFI
JCET
NSFG
GFZ
ASI Comb
0
5
10
15
20
25
30
35
28 dec 03 - 04 dec 04
mm
ASI
DGFI
JCET
NSFG
GFZ
ASI Comb
![Page 30: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/30.jpg)
ITRF2000 consistencyITRF2000 consistency
Core Sites: 3D weighted RMS of differences w.r.t. ITRF2000 ofthe ASI Combined solution, over the period 28 dec 03 – 04 dec04, is 9.3 +/- 2.3 mm
The same values for the individual solutions are: ASI 10.1 +/- 2.8; DGFI 11.1 +/- 2.9; GFZ 11.0+/- 4.4; JCET 9.7 +/- 3.9; NSFG 15.1 +/- 4.6
Plots of Tx, Ty, Tz, Scale w.r.t. ITRF2000 follow
![Page 31: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/31.jpg)
Tx wrt ITRF2000
-15
-5
5
15
25
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Tx wrt ITRF2000
-15
-5
5
15
25
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Ty wrt ITRF2000
-15
-5
5
15
25
35
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Ty wrt ITRF2000
-15
-5
5
15
25
35
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
ITRF2000 consistencyITRF2000 consistency
![Page 32: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/32.jpg)
Tz wrt ITRF2000
-20
-10
0
10
20
30
40
50
60
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Tz wrt ITRF2000
-20
-10
0
10
20
30
40
50
60
28 dec 03 - 04 dec 04
mm
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Scale wrt ITRF2000
-3
-2
-1
0
1
2
3
28 dec 03 - 04 dec 04
ppb
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
Scale wrt ITRF2000
-3
-2
-1
0
1
2
3
28 dec 03 - 04 dec 04
ppb
ASI
DGFI
GFZ
JCET
NSGF
ASI Comb
ITRF2000 consistencyITRF2000 consistency
![Page 33: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/33.jpg)
SummarySummary
The comparison of the EOP time series w.r.t. the USNO valuesshows:
- typical SLR y-”bias”: 0.2 mas in the analysed period ;- no bias in x-pole and LOD;- scatter (x, y, LOD) of 0.25 mas (x,y) and 0.06 ms (LOD)
The comparison of the EOP time series w.r.t. the DGFI valuesshows:
- no bias in x-pole, y-pole and LOD;- scatter (x, y, LOD) below the 0.20 mas (x,y) and 0.02 ms
(LOD)
ASI combined solutions show a 10mm consistency with theITRF2000 in terms of 3D core sites WRMS
![Page 34: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/34.jpg)
RemarksRemarks
ASI combined solutions, consistent with ITRF2000 at 10 mmlevel, are capable to provide a quick EOP SLR product for theIERS operational aims
ASI combined solutions are regularly uploaded as ILRScontribution to the IERS Combination Pilot Project
ASI and DGFI, at the moment primary and back-up ILRScombination centers, are cooperating to compare results andprocedures; tests and compared analyses cases have beencarried out: a dedicated report, under revision, will be enclosedas appendix to the minute of the present meeting.
![Page 35: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/35.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004ILRS AWG meeting, San Francisco, USA,, December 13, 2004
First Experiences with the Official ILRSCombination Solutions
Rainer KelmDeutsches Geodätisches Forschungsinstitut
presented by
Detlef AngermannDeutsches Geodätisches Forschungsinstitut
![Page 36: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/36.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Status of official products (1)
pos+eop.snx file:
* ASI: loose constraints solution, no apriori information
* DGFI: minimal constraints solution, full apriori information, normal equation system
eop.snx file:
* ASI: Helmert transformation of loose contraints parameters (pos+eop) w.r.t. ITRF2000 with full minimal constraints covariance matrix
* DGFI: eop part of pos+eop.snx, because minimal constraints parameters are already aligned to ITRF2000
![Page 37: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/37.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Status of official products (2)
pos+eop.sum file:
* ASI: solution statistics of individual solutionsHelmert transformation of individual and combined solutions w.r.t.
ITRF2000 with stationwise coordinate residualsEOP residuals w.r.t. „finals.daily“relative scale factorspos+eop residuals w.r.t. combined solutionHelmert transformation of individual coordinates w.r.t. combined solution
with stationwise coordinate residuals
* DGFI: solution statistics of individual solutionssmallest eigenvalues of deconstrained normal equationsRank type analysis for individual and combined solutions:
diag( ET Ndeconstrained E) = 0 ? and sqrt(diag[(ET (Cloose-1) E)-1)] >> 0
?Helmert transformation of individual and combined coordinates w.r.t.
ITRF2000 and stationwise coordinate residualsEOP residuals w.r.t. „finals.daily“EOP jumps between last and actual week
![Page 38: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/38.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Operational quality control (1)
* starting with plot control as basis for the development of analytical criteria
* weekly: here for last week 041204
first smallest eigenvalues of individual deconstrained normal matrices
comparison of pos+eop:
loose: direct comparison of given ASI loose constraints solution andDGFI minimal constraints solution
minimal: minimal constraints solution af ASI with the same set of core stations and comparison of both minimal constraints solutions
![Page 39: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/39.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
First smallest eigenvalues week 041204
![Page 40: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/40.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
EOP week 041204
X pole loose Y pole loose LOD loose
X pole minimal Y pole minimal LOD minimal
![Page 41: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/41.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Station coordinates week 041204
X loose Y loose Z loose
X minimal Y minimal Z minimal
![Page 42: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/42.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Operational quality control (2)
* time series of Helmert parameters starting 040103 up to actual week:individual and DGFI combined solutions
* time series of Helmert parameters starting 040103 up to actual week:ASI and DGFI combined solutions
![Page 43: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/43.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Individual and DGFI combined solutions: X translation
![Page 44: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/44.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Individual and DGFI combined solutions: Y translation
![Page 45: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/45.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Individual and DGFI combined solutions: Z translation
![Page 46: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/46.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Individual and DGFI combined solutions: scale
![Page 47: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/47.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Individual and DGFI combined solutions: wrms
![Page 48: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/48.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
ASI and DGFI combined solutions: X tranlation
![Page 49: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/49.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
ASI and DGFI combined solutions: Y tranlation
![Page 50: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/50.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
ASI and DGFI combined solutions: Z tranlation
![Page 51: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/51.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
ASI and DGFI combined solutions: scale
![Page 52: File structure for ILRS productsDaily ASI combined values from “eop” sinex file have been differentiated with USNO “finals.data” values (interpolated at the corresponding points;](https://reader035.vdocuments.mx/reader035/viewer/2022071213/60419e5c770489670c5bf585/html5/thumbnails/52.jpg)
ILRS AWG Meeting, San Francisco, USA,, December 13, 2004
Discussion items
* pos+eop.snx:normal equations and minimal constraints solution or loose constraints solution:
What is more suited for further combination projects?
* pos+eop.sum:Which kind of information should be equal in both summary files?Note: No change of format, because the analysis tools are developed w.r.t.that
format
* operational quality control:Which analytical quality control criteria are preferred?Other quality control plots? Station time series plots are in preperation.
* communication:How to handle significant differences in combined solutions?How to improve communication between individual and combined solution centers?
On email basis or more automated?