Lynnwood Link Extension Look for Sound Transit in your community this summer! Spring 2014 1 Lynnwood Link Extension Stay informed about the Lynnwood Link Extension: Visit our website: www.soundtransit.org/LLE Sign up for project updates: www.soundtransit.org/subscribe Email the project: [email protected] Have specific questions or a community group we should visit? Call Roger Iwata, Sound Transit Community Outreach: 206-689-4904 4 Link in service In planning/planned In design Under construction Lynnwood Link Extension Not funded for construction Not funded for construction Lynnwood Overlake Transit Center Mercer Island Rainier University of Washington SeaTac/Airport SODO Stadium Pioneer Square University Street Westlake/Seattle Intl District/Chinatown Beacon Hill Mount Baker Columbia City Othello Angle Lake Rainier Beach Tukwila/Intl Blvd Northgate Mountlake Terrace U District Roosevelt Bellevue Transit Center South Bellevue Hospital Capitol Hill 130th 120th Overlake Village SE Redmond Downtown Redmond Shoreline TBD East Main Federal Way Transit Center Kent/Des Moines S 272nd Design progressing: opportunities to learn more this summer This summer you will have several opportunities to speak with Sound Transit staff about the Lynnwood Link Extension project and get your questions answered as the preferred light rail route and station alternative is developed. Information booths and community drop-in sessions will be in communities near you. Read more about these events on pages 2 and 3. Project background The Lynnwood Link Extension is part of the voter-approved Sound Transit 2 Plan to extend mass transit throughout the region. When complete in 2023, a station in Lynnwood will be the most northern point of a light rail system with more than 50 miles of service to the north, south and east of Seattle. The Lynnwood Link Extension will add 8.5 miles of light rail, providing an alternative to congested roadways in one of the most densely developed urban areas in the Pacific Northwest. Stations are anticipated in Lynnwood, Mountlake Terrace, Shoreline and potentially Seattle. Si usted desea hablar con Sound Transit en el idioma español acerca del tren de riel ligero entre Northgate y Lynnwood llame al 1-800-823-9230. 如果您想用粵語向 Sound Transit 查詢或反映有關 Northgate Lynnwood 之間輕鐵列車的情況,請致電 1-800-823-9230 Nếu quý vị muốn nói chuyện với Sound Transit bằng tiếng Việt về hệ thống hỏa xa nhẹ từ Northgate đến Lynnwood, xin gọi số 1-800-823-9230. Kung nais niyong makipag-usap sa Sound Transit sa Tagalog na wika ukol sa tren na light rail na nasa pagitan ng Northgate at Lynnwood tawagan ang 1-800-823-9230. Northgate와Lynnwood간 라이트 레일 기차에 관하여 한국어로Sound Transit에 문의하시려면 1-800-823-9230으로 전화하시면 됩니다. Northgate እና Lynnwood መካከል ስለሚዘረጋው የቀላል ባቡር ሐዲድ (ላይትሬይል) በአማርኛ ቋንቋ Sound Transit ጋር ለመነጋገር ከፈለጉ፣ 1-800-823-9230 ይደውሉ። Transit ጋር ለመነጋገር ከፈለጉ፣ 1-800-823-9230 ይደውሉ። Ride the preferred alternative route (virtually) Sound Transit recently released a video simulation of the Lynnwood Link Extension’s preferred alignment. The video provides an animated view of the route and stations based on current designs, but is not intended to show every detail and will change as design progresses. Last year, the Sound Transit Board identified a preferred light rail route and station alternative from a number of options evaluated in the project’s Draft Environmental Impact Statement (EIS). The identification of the preferred alternative enables project staff to focus on advancing designs and refining analysis of environmental impacts and mitigation. To view the video simulation please visit: www.soundtransit.org/lynnwoodvideo Other Sound Transit projects underway Long-Range Plan update Sound Transit has begun the process of asking the public to help update the Regional Transit Long-Range Plan. This process will identify the public’s priorities for future services and destinations after the scheduled 2023 completion of current voter-approved projects. This updated plan will identify projects envisioned for inclusion in potential future ballot measures. Stay tuned -- Sound Transit will soon send information on public involvement opportunities including public hearings and an online survey. In Snohomish County an open house will be held from 5:30 to 7:30 p.m. on July 17 at the Everett Station, with a public hearing at 6 p.m. For more information, visit soundtransit.org/longrangeplan. Light Rail Operations and Maintenance Satellite Facility (OMSF) Project In May, Sound Transit released a Draft EIS concerning potential sites (Lynnwood and Bellevue) for the development and operation of a new OMSF to support the expansion of Sound Transit’s Link light rail system. This system-wide expansion is a part of the voter-approved package for transit investments and financing. For more information, visit soundtransit.org/omsf. Make sure to provide your comments by June 23, 2014. Field work continues this summer Over the past few months and continuing for the next four months or more, Sound Transit representatives are conducting noise monitoring, vibration testing, geotechnical drilling, wetland delineation and survey work in the public right of way and on private property with permission from property owners. Information obtained from this work is needed to study, evaluate and document potential impacts of the planned Link light rail expansion, complete the environmental review process and publish the Final EIS in early 2015. It also directly informs detailed engineering work. This work will continue on private and public properties along the Interstate 5 corridor between Northgate and Lynnwood.

Upload: others

Post on 11-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Field work continues this summer Look for Sound Transit in ... · EARLY 2015 MID 2015 2015-2018 2018-2023 LATE 2023* DRAFT EIS PREPARE PUBLISHED DRAFT EIS ALTERNATIVES ANALYSIS AND

Lynnwood Link Extension

Look for Sound Transit in your community this summer!

Spring 2014

1

Lynnwood Link Extension

Stay informed about the Lynnwood Link Extension:

Visit our website: www.soundtransit.org/LLE

Sign up for project updates: www.soundtransit.org/subscribe Email the project: [email protected]

Have specific questions or a community group we should visit?

Call Roger Iwata, Sound Transit Community Outreach: 206-689-4904

4

Link in service

In planning/planned

In design

Under construction

Lynnwood Link Extension

Not funded for construction

Not funded for construction

Lynnwood

OverlakeTransit Center

MercerIsland

Rainier

University ofWashington

SeaTac/Airport

SODOStadium

Pioneer SquareUniversity Street

Westlake/Seattle

Intl District/Chinatown

Beacon HillMount Baker

Columbia CityOthello

Angle Lake

Rainier BeachTukwila/Intl Blvd

Northgate

Mountlake Terrace

U District

Roosevelt

Bellevue Transit Center

South Bellevue

HospitalCapitol Hill

130th 120th

Overlake Village

SE Redmond

Downtown Redmond

Shoreline

TBD

East Main

Federal Way Transit Center

Kent/Des Moines

S 272nd

Design progressing: opportunities to learn more this summerThis summer you will have several opportunities to speak with Sound Transit staff about the Lynnwood Link Extension project and get your questions answered as the preferred light rail route and station alternative is developed. Information booths and community drop-in sessions will be in communities near you. Read more about these events on pages 2 and 3.

Project background The Lynnwood Link Extension is part of the voter-approved Sound Transit 2 Plan to extend mass transit throughout the region. When complete in 2023, a station in Lynnwood will be the most northern point of a light rail system with more than 50 miles of service to the north, south and east of Seattle. The Lynnwood Link Extension will add 8.5 miles of light rail, providing an alternative to congested roadways in one of the most densely developed urban areas in the Pacific Northwest. Stations are anticipated in Lynnwood, Mountlake Terrace, Shoreline and potentially Seattle.

Si usted desea hablar con Sound Transit en el idioma español acerca del tren de riel ligero entre Northgate y Lynnwood llame al 1-800-823-9230.

如果您想用粵語向 Sound Transit 查詢或反映有關 Northgate 和 Lynnwood 之間輕鐵列車的情況,請致電 1-800-823-9230

Nếu quý vị muốn nói chuyện với Sound Transit bằng tiếng Việt về hệ thống hỏa xa nhẹ từ Northgate đến Lynnwood, xin gọi số 1-800-823-9230.Kung nais niyong makipag-usap sa Sound Transit sa Tagalog na wika ukol sa tren na light rail na nasa pagitan ng Northgate at Lynnwood tawagan ang 1-800-823-9230.

Northgate와Lynnwood간 라이트 레일 기차에 관하여 한국어로Sound Transit에 문의하시려면 1-800-823-9230으로 전화하시면 됩니다.

English: If you want to speak with Sound Transit in language about the light rail train between Northgate and Lynnwood call 1-800-823-9230. Spanish: Si usted desea hablar con Sound Transit en el idioma español acerca del tren de riel ligero entre Northgate y Lynnwood llame al 1-800-823-9230. Chinese – Traditional: 如果您想用粵語向 Sound Transit 查詢或反映有關 Northgate 和 Lynnwood 之間輕鐵列車的

情況,請致電 1-800-823-9230。 Vietnamese: Nếu quý vị muốn nói chuyện với Sound Transit bằng tiếng Việt về hệ thống hỏa xa nhẹtừ Northgate đến Lynnwood, xin gọi số 1-800-823-9230. Tagalog: Kung nais niyong makipag-usap sa Sound Transit sa Tagalog na wika ukol sa tren na light rail na nasa pagitan ng Northgate at Lynnwood tawagan ang 1-800-823-9230. Korean: Northgate와Lynnwood간 라이트 레일 기차에 관하여 한국어로Sound Transit에 문의하시려면 1-800-823-9230으로 전화하시면 됩니다. Amharic: በ Northgate እና በ Lynnwood መካከል ስለሚዘረጋው የቀላል ባቡር ሐዲድ (ላይትሬይል) በአማርኛ ቋንቋ ከ Sound Transit ጋር ለመነጋገር ከፈለጉ፣ 1-800-823-9230 ይደውሉ።

English: If you want to speak with Sound Transit in language about the light rail train between Northgate and Lynnwood call 1-800-823-9230. Spanish: Si usted desea hablar con Sound Transit en el idioma español acerca del tren de riel ligero entre Northgate y Lynnwood llame al 1-800-823-9230. Chinese – Traditional: 如果您想用粵語向 Sound Transit 查詢或反映有關 Northgate 和 Lynnwood 之間輕鐵列車的

情況,請致電 1-800-823-9230。 Vietnamese: Nếu quý vị muốn nói chuyện với Sound Transit bằng tiếng Việt về hệ thống hỏa xa nhẹtừ Northgate đến Lynnwood, xin gọi số 1-800-823-9230. Tagalog: Kung nais niyong makipag-usap sa Sound Transit sa Tagalog na wika ukol sa tren na light rail na nasa pagitan ng Northgate at Lynnwood tawagan ang 1-800-823-9230. Korean: Northgate와Lynnwood간 라이트 레일 기차에 관하여 한국어로Sound Transit에 문의하시려면 1-800-823-9230으로 전화하시면 됩니다. Amharic: በ Northgate እና በ Lynnwood መካከል ስለሚዘረጋው የቀላል ባቡር ሐዲድ (ላይትሬይል) በአማርኛ ቋንቋ ከ Sound Transit ጋር ለመነጋገር ከፈለጉ፣ 1-800-823-9230 ይደውሉ።

Ride the preferred alternative route (virtually)Sound Transit recently released a video simulation of the Lynnwood Link Extension’s preferred alignment. The video provides an animated view of the route and stations based on current designs, but is not intended to show every detail and will change as design progresses. Last year, the Sound Transit Board identified a preferred light rail route and station alternative from a number of options evaluated in the project’s Draft Environmental Impact Statement (EIS). The identification of the preferred alternative enables project staff to focus on advancing designs and refining analysis of environmental impacts and mitigation.

To view the video simulation please visit: www.soundtransit.org/lynnwoodvideo

Other Sound Transit projects underway

Long-Range Plan updateSound Transit has begun the process of asking the public to help update the Regional Transit Long-Range Plan. This process will identify the public’s priorities for future services and destinations after the scheduled 2023 completion of current voter-approved projects. This updated plan will identify projects envisioned for inclusion in potential future ballot measures. Stay tuned -- Sound Transit will soon send information on public involvement opportunities including public hearings and an online survey. In Snohomish County an open house will be held from 5:30 to 7:30 p.m. on July 17 at the Everett Station, with a public hearing at 6 p.m. For more information, visit soundtransit.org/longrangeplan.

Light Rail Operations and Maintenance Satellite Facility (OMSF) ProjectIn May, Sound Transit released a Draft EIS concerning potential sites (Lynnwood and Bellevue) for the development and operation of a new OMSF to support the expansion of Sound Transit’s Link light rail system. This system-wide expansion is a part of the voter-approved package for transit investments and financing. For more information, visit soundtransit.org/omsf. Make sure to provide your comments by June 23, 2014.

Field work continues this summerOver the past few months and continuing for the next four months or more, Sound Transit representatives are conducting noise monitoring, vibration testing, geotechnical drilling, wetland delineation and survey work in the public right of way and on private property with permission from property owners. Information obtained from this work is needed to study, evaluate and document potential impacts of the planned Link light rail expansion, complete the environmental review process and publish the Final EIS in early 2015. It also directly informs detailed engineering work. This work will continue on private and public properties along the Interstate 5 corridor between Northgate and Lynnwood.

Page 2: Field work continues this summer Look for Sound Transit in ... · EARLY 2015 MID 2015 2015-2018 2018-2023 LATE 2023* DRAFT EIS PREPARE PUBLISHED DRAFT EIS ALTERNATIVES ANALYSIS AND

Project milestones reviewSince 2011 Sound Transit has been gathering input from the public, local community groups, stakeholders and jurisdictions including the cities of Seattle, Shoreline, Mountlake Terrace, Edmonds and Lynnwood as well as King and Snohomish counties.

•In July 2013, the project released a Draft Environmental Impact Statement (EIS) for public review.

•In November 2013, the Sound Transit Board identified a preferred light rail route and station alternative.

•Now in 2014, staff are working on refinements and conducting further studies of the preferred light rail route and station alternative based on the Board’s direction.

•The final decision on the route and stations is expected in 2015 after the Final EIS is published–all alternatives in the Draft EIS are under consideration until then.

See you at the fair!Come visit with us at a Sound Transit booth to learn more about the project this summer:

Pinehurst Fest July 12

Shoreline Farmers Market July 19

Tour de Terrace July 26 - 27

Lynnwood Farmers Market August 7

Celebrate Shoreline Festival August 16

Edmonds Farmers Market August 23

SEATTLE June 18Northgate Community Center10510 5th Avenue NE4:00 p.m. - 6:30 p.m.

LYNNWOOD June 19Lynnwood Library19200 44th Avenue W 4:00 p.m - 6:30 p.m.

SHORELINE June 25 Shoreline Library345 NE 175th Street 11:00 a.m. - 2:00 p.m.

MOUNTLAKE TERRACE June 26 Mountlake Terrace Library23300 58th Avenue W11:00 a.m. - 2:00 p.m.

Get updates on:

“C3 – Modified” (route near Lynnwood)Sound Transit and the City of Lynnwood are working together to evaluate a modified version of the C3 alternative explored in the Draft EIS in 2013. The C3-Modified route and station location would be located farther west of the C3 route.

Route alignment near 220th in Mountlake TerraceSound Transit is exploring two route and station options on the west side of I-5 for a potential station at 220th Street SW.

Route alignment near Latvian Church, SeattleSound Transit has been making progress to design and maintain access to the Latvian Evangelical Lutheran Church and Cultural Center. See the latest plan that provides access to the church and avoids relocation. Find out about changes to the pedestrian path nearby that leads to the 1st Avenue NE/N 117th Street freeway overpass.

Station site plans and more We will also have preliminary information related to station locations and site plans, route alignment along the entire route and property owner interests.

Want to learn more about the preferred alternative?

Lynnwood Link Extension

2 3

3

2

1

What is the preferred alternative?Northgate to NE 185th Street: At-grade and elevated with stations at NE 145th and NE 185th streets (Alternative A1)

NE 185th Street through Mountlake Terrace: East side of I-5 to Mountlake Terrace Transit Center station to west side of I-5 (Alternative B2)

Lynnwood: West side of I-5 to Lynnwood Park and Ride station (Alternative C3-Modified)

LakeBallinger

LakeWashington

King-SnohomishCounty Line

I-5 Median Study Option

Tail track location TBD

NE 185th St

NE 175th St

N 145th St

N 130th St

236th St SW

244th St SW

220th St SW

200th St SW

52nd

Ave

W

44th

Ave

W

Edmonds

Shoreline

MountlakeTerrace

Lynnwood

Seattle

Transit Center

Shoreline Conference Center

Jackson ParkGolf Course

Northgate MallNorth SeattleCommunity College

Transit Center

Premera

SwedishMedical Center

NorthgateTransit Center

P

P

P

P

P

P

NE 185th

NE 145th

Lynnwood

Mountlake Terrace

P

Map Key

StationPotential stationPotential added parkingElevated routeSurface routeLight rail under construction

not to scale, representative only

Preferred alternative route and stations

1

2

3

Project timeline

*Schedule subject to change

RECORD OF DECISIONIssued by Federal Transit Admin.

OPEN FOR SERVICECONSTRUCTION

FINAL DESIGN & PERMITTING

EARLY 2015 MID 2015 2015-2018 2018-2023 LATE 2023*

DRAFT EIS PUBLISHEDPREPARE

DRAFT EIS

ALTERNATIVES ANALYSIS AND SCOPING

PREFERRED ALTERNATIVE Identified by the Board

PROJECT DESIGN REFINEMENT

FINAL EIS PUBLISHED

EARLY 20132010-2012 NOV. 2013 2014SUMMER 2013

Comment period and public meetings

Responds to DEIS comments

We are here

BOARD SELECTS PROJECT TO BE BUILT

Come visit us at an upcoming community drop-in session!

Stop by one of our community drop-in sessions to talk to project staff, ask questions, see project maps and learn more:

What’s next? Project design progressWork will continue to refine designs and document potential impacts and mitigation for the preferred alternative as part of the Final EIS.

Continued fieldwork Over the next four months or more, Sound Transit is continuing to get information from the field; you may see teams with vests and hardhats in the vicinity of the Interstate 5 corridor between Northgate and Lynnwood.

Property owners Sound Transit will continue to contact people who own properties that may be impacted by the project prior to the release of the Final EIS. Contact Roger Iwata at 206-689-4904 if you have any questions.

Project outreachStop by one of the community drop-in sessions at community centers and libraries or visit Sound Transit’s information booth at local fairs and festivals to learn more about the project (details below).