field performance report on pvc pipe campbell county

43
Research Report KTC-95-2 FIELD PERFORMANCE REPORT ON PVC PIPE CAMPBELL COUNTY by L. John Fleckenstein Senior Research Investigator and David L. Alien Chief Research Engineer Kentucky Transportation Center College of Engineering University of Kentucky Lexington, Kentucky in cooperation with Transportation Cabinet Commonwealth of Kentucky and Federal Highway Administration U.S. Department of Transportation The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Cabinet, nor the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and trade names are for identification purposes and are not to be considered as endorsements. March 1995

Upload: others

Post on 08-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Field Performance Report on PVC Pipe Campbell County

Research Report KTC-95-2

FIELD PERFORMANCE REPORT ON PVC PIPE CAMPBELL COUNTY

by

L. John Fleckenstein Senior Research Investigator

and

David L. Alien Chief Research Engineer

Kentucky Transportation Center College of Engineering University of Kentucky

Lexington, Kentucky

in cooperation with Transportation Cabinet

Commonwealth of Kentucky

and

Federal Highway Administration U.S. Department of Transportation

The contents of this report reflect the views of the authors who are responsible for the facts and accuracy

of the data presented herein. The contents do not necessarily reflect the official views or policies of

the University of Kentucky, the Kentucky Transportation Cabinet, nor the Federal Highway Administration. This report

does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and trade names are for

identification purposes and are not to be considered as endorsements.

March 1995

Page 2: Field Performance Report on PVC Pipe Campbell County

Technical Report Documentation Page

' 1. Report No. KTC-95-2 2. Government Accession No. 3. Recipient's Cata!og No.

4. Title and Subtitle 5. Report Date March 1995

FIELD PERFORMANCE REPORT ON PVC PIPE, CAMPBELL COUNTY 6. Perlorming Organization Code

7. Author(s) L. John Fleckenstein and David L. Alien 8. Performing Organization Report No.6

KTC-95-2

9. Performing Organization Name and Address 10. Work Umt No. (TRAIS)

Kentucky Transportation Center College of Engineering 11. Contract or Grant No.

Federal Aid Research Task 61 University of Kentucky

13. Type ol Report and Period Covered

12. Sponsoring Agency Name and Address

Kentucky Transportation Cabinet State Office Building 14. Sponsoring Agency Code

15. Supplementary Notes Publication of this report was sponsored by the Kentucky Transportation Cabinet in cooperation with the U.S. Department ofT ransportation, Federal Highway Administration

16. Abstract

This report documents the installation and performance of PVC pipe installed on KY 9 in Campbell County. The pipe installed was Perma-Loc, manufactured by J-M Manufacturing Company, Inc.

Pipes appear to be performing well with the clean coarse sand backfill.lt is apparent the pipe is brittle at lower temperatures. and caution should be exercised during cold weather construction.

lt is apparent that the contractor achieved substantial compaction around the haunches and the side ol the pipe which is helping to reduce pipe dellection.

In July 1995, the pipes wiU have been installed for approximately two years. Minor changes in pipe deflection are still occurring in approximately 40 percent of the pipes. The other 60 percent appear to be stabilized.

17. KeyWords

Backfill Compaction Deflection

19. Security Classil. (of this report)

Form DOT 1700.7 (8-72)

18. Distribution Statement

Unlimited

20. Security Classil. (of this page)

Reproduction of completed page authorized

1

21. No. of Pages 22. Price

38

-

Page 3: Field Performance Report on PVC Pipe Campbell County

EXECUTIVE SUMMARY

This report documents the installation and performance of PVC pipe installed during construction ofKY 9 in Campbell County. The pipe installed was Perma-Loc pipe manufactured by J-M Manufacturing Company, Inc ..

It is apparent the pipe is brittle at lower temperatures, and caution should be exercised during cold weather construction.

The pipes appear to be performing well with the clean coarse sand backfill. It is also apparent that the contractor achieved substantial compaction around the haunches and the side of the pipe which is likely helping to reduce pipe deflection.

In July of 1995, the pipes will have been installed for approximately 2 years. Minor changes in pipe deflection are still occurring in approximately 40 percent of the pipes. The other 60 percent appear to be stabilized.

11

Page 4: Field Performance Report on PVC Pipe Campbell County

TABLE OF CONTENTS

FORM DOT 1700.7 (8-72) ........................................ 1

EXECUTIVE SUMMARY ........................................ ii

TABLE OF CONTENTS ........................................ m

LIST OF FIGURES ............................................ iv

INTRODUCTION .............................................. 1

CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

PERFORMANCE .............................................. 1

PIPE DEFLECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

CONCLUSIONS ............................................... 2

RECOMMENDATIONS ......................................... 2

REFERENCES ................................................ 2

APPENDIX A (Pipe Deflection Measurements) ...................... 9

iii

Page 5: Field Performance Report on PVC Pipe Campbell County

LIST OF FIGURES

Figure 1. Severely Damaged PVC Pipe

Figure 2. Damaged Exterior Rib

Figure 3. Impact Strength of PVC Pipe

Figure 4. Installation of 1.2 m Pipe at Station 104+ 70

Figure 5. Installation of 0. 76 m Pipe at Station 162+00

Figure 6. Elevation Profiles

Figure 7. Outlet End of PVC Pipe at Station 129+72

Figure 8. Outlet End of PVC Pipe at Station 129+72

Figure 9. Crack in Wall of PVC Pipe at Station 129+72

IV

Page 6: Field Performance Report on PVC Pipe Campbell County

INTRODUCTION

The Kentucky Transportation Center was requested by the Kentucky Transportation Cabinet to monitor the field performance of Polyvinyl Chloride (PVC) Pipe on KY 9 in Campbell County (Project NO. FSP 019 0009 013-015 C-DE-STPM 0020 (804)).

Included in this report are construction and performance information. A video tape is also provided showing the final inspection of the pipe with a Cues Mini Camera.

CONSTRUCTION

Prior to installation, on December 11, 1992 the PVC pipe was inspected in the stockyard at the construction site on KY 9 shortly after delivery. Approximately 19 out of 65 pipe sections had been slightly to significantly damaged during delivery (Figures 1 and 2). The Resident Engineer indicated that several of the pipes had fallen off the truck during unloading. The pipes were fairly brittle at the time they were being unloaded due to the cold temperatures (approximately -9'C ( 15'F)). Figure 3 was derived from the Uni-Bell Handbook (1) and extrapolated to colder temperatures. Figure 3 indicates the impact strength of the pipe could be as much as 40 percent lower when comparing strength properties at 23'C and -9'C (73c4'F and 15'F).

The construction project was postponed due to unstable embankment conditions and only a portion of the pipes were installed. Prior to the project being postponed, six cross drains had been installed. The pipes were backfilled with a clean sand slightly over the crown of the pipe (Figures 4 and 5) .. Since the final fill elevations were not achieved, the fill heights were established by survey (Figure 6). The maximum fill height obtained during construction was approximately 4 meters (12 feet) at Station 160+00.

PERFORMANCE

The cross drains were monitored during construction, and have been visually inspected several times since installation. The pipes were last inspected in December 1994 with a Cues Mini Camera. A majority of the cross drains appear to performing well.. Significant distress was observed in one of the cross drains. The distress was observed in a 0.61 m (24 inch) cross drain at Station 129+ 72. Distress was observed toward the outlet end of the cross drain. During a visual inspection shortly after installation, approximately 2.4 meters (8 feet) of pipe on the outlet end was unsupported (Figure 7). It was apparent that the pipe had not been cut off and/or the fill around the pipe had eroded. In October, 1993, at a later inspection, it was apparent that this section of pipe had been covered during the reshaping of a sliding embankment (Figure 8). It appears that in this process the pipe was bent down causing the pipe to crack and deflect approximately 8.3 percent (Figure 9).

1

Page 7: Field Performance Report on PVC Pipe Campbell County

Pipe Deflections

Pipe deflection measurements have been taken on the six cross drains since installation (Appendix A). Pipe deflections were monitored at 29 locations. In approximately 67 percent of the pipes that were monitored, the vertical dimension was greater than the horizontal after installation. It is apparent that the pipe was compressed horizontally during the backfilling around the sides and haunches of the pipe. The average pipe deflection recorded was 2. 7 4 percent.

CONCLUSIONS

It is apparent the pipe is brittle at lower temperatures, and caution should be exercised during cold weather construction.

The pipes appear to be performing well with the clean coarse sand backfill. It is also apparent that the contractor achieved substantial compaction around the haunches and the springline of the pipe. This has helped to keep pipe deflection at a minimum.

In July of 1995, the pipes will have been installed for approximately 2 years. Minor changes in pipe deflection are still occurring in approximately 40 percent of the pipes. The other 60 percent appear to be stabilized.

RECOMMENDATIONS

It is recommended that these pipes continue to be monitored for long-term performance.

It is recommended that this pipe be used as an alternative to concrete, steel, aluminum, and polyethylene pipe .

It is also recommended that future installations be monitored for short-and long-term performance.

REFERENCES

1. "Handbook of PVC Pipe, Design and Construction", Third Edition, Uni-Bell PVC Pipe Association, Dallas, September 1991, pp. 213.

2

Page 8: Field Performance Report on PVC Pipe Campbell County

Figure 1. Severely Dalllaged PVC Pipe

Figure 2. Damaged E:rterior Rib

3

Page 9: Field Performance Report on PVC Pipe Campbell County

....

100

80 ,........, ~ e_.,

0,) 60 ::.... ::J ...., ti:1 ::.... 0,)

0.. 40 s ~

20

0 0

Figure 3. Effect of Cool Temperatures on Impact Strength of PVC Pipes

..... - ........... -.- ....... -- ... - ....... -- ..... - .. -.-.-- .. -

..... ----- ..... -- .. -- .. -- .. - ... --- ...... -.- .... ----- .....

..... --.- ... - ..... . - ..... ---.-

Values vary widely ........... due to compounding

30

,........, 20 u

e_., 0,)

~ 10 ~

::.... 0,)

0.. s 0 ~

-10

20 40 60 80 100 120

% of Rated Impact Strength

Page 10: Field Performance Report on PVC Pipe Campbell County

Figure 4. Installation of 1.2m Pipe at Station 104+70

Figure 5. Installation of 0. 76 m Pipe at Station 162+00

5

Page 11: Field Performance Report on PVC Pipe Campbell County

Figure 6.

Station 1 oo + 72 (0.61 m pipe diameter) (Installed 7·1·93)

••.-----------------------------,

2o0"-------2~0-------,~0-------6~0c-----~00 DISTANCE jmoltlrs)

Station 129 + 72 (0.61 m pipe diameter) (Installed 6·28·93)

••.---------------------------,

20~--~--~~~7---~---7~--7. 0 10 16 20 25 30

DISTANCE (mOIRr.)

Station 160 + 00 (0.61 m pipe diameter) (Installed 4·23·93)

••.---------------------------,

\

20o~--~,~oc---720o---~,~o----7,,c---~,~.----~ •• DISTANCE (mcuar11)

Elevation Profiles

6

Station 104 + 70 (1.22 m pipe diameter) (Installed 7·6·93)

••.-----------------------------,

200"---------~20~--------.~oc---------",0

Station 132 + 94 (0.46 m pipe diameter) (Installed 6·21·93)

••.---------------------------,

20"-----~----~----~----~----" 0 10 20 30 40 50

Station 162 • 00 (0.76 m pipe diameter) (Installed 7·14·93)

••.---------------------------,

200~------7,-------,~.~-----,~.~-----:20" DISTANCE (moiDr•)

Page 12: Field Performance Report on PVC Pipe Campbell County

Figure 7. Outlet End of PVC Pipe at Station 129+72

Figure 8. Outlet End of PVC Pipe at Station 129+72

7

Page 13: Field Performance Report on PVC Pipe Campbell County

Figure 9. Crack in Interior Wall of Pipe at Station 129+72

8

Page 14: Field Performance Report on PVC Pipe Campbell County

APPENDIX A (PIPE DEFLECTION MEASUREMENTS)

9

Page 15: Field Performance Report on PVC Pipe Campbell County

~

"' 0.)

.c u c: '-'

0:: [.I,J E-[.I,J

~ -Cl

(Station 100+ 72) 24.5 r----------------------------. 61.0

24.0 59.7

23.5 /"' 58.4

23.0 57.2

l.

22.5 55.9

22.0 L----------------~------..... · ------...154.6 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- lX: VERTICAL -- 2X: HORIZONTAL

Note: Measurements for day 0 are assumed.

10

c > s:: :::; r-: ,...,

r. '"' ~

" ~ " ~

Page 16: Field Performance Report on PVC Pipe Campbell County

(Station 100+ 72) 24.5 .--------------------------...... 61.0

24.0 59.7 c > .-..

"' s: '"' ~ ..c u 23.5 58.4 c:::

t ~

~

"' c::: r.rJ -E- '"' r.rJ :2 23.0 57.2 ~ '"' -Q G

ui

22.5 55.9

22.0 l..--------.:.· ______ ..;,_ ______ ..;._ _____ ....154.6

0 100 ZOO 300 400 TIME SINCE INSTALlATION (days)

-- 1 Y: VERTICAL -+- ZY: HORIZONTAL

Note: Measurements for day 0 are assumed.

11

Page 17: Field Performance Report on PVC Pipe Campbell County

....... "' 0) ..::

24.5

24.0

.5 23.5 ~

22.5

22.0

... /

:r

l ""-.

0

(Station 100+ 72)

'

lOO 200 300 TIME SINCE INSTALLATION (days)

--lZ: VERTICAL -+- 2Z: HORIZONTAL

Note: Measurements for day 0 are assumed.

12

61.0

~

59.7

58.4

57.2

55.9

54.6

400

c > s: § ~ ~

r.

~

-r. ~

r. ;;;

Page 18: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0

48.0 ..-"' '-'

.. ! -= u c:

;::, 0:::

47.0 ClJ E- +-ClJ ::;: < -Cl

46.0

45.0 '

0 100 200 300 TIME SINCE INSTALlATION (days)

-- C3: VERTICAL -- C4: HORIZONTAL

Note: Measurements for day 0 are assumed.

13

124.5

121.9

119.4

116.8

114.3 400

0 > :::: ~

r-:: ""' -;::: "' ~

-(") ~

"' .::!.

Page 19: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0

48.0 ~

"' Q.) ..<:: u c:

;::., ~ 47.0 ll.l E-ll.l

~ -Cl 46.0

45.0 ' ' 0 100 200 300

TIMESmCE INSTALLATION (days)

-- D3: VERTICAL -+- D4: HORIZONTf\1-

14

124.5

121.9

119.4

116.8

114.3 400

'-~

~

~ r --'. r-

~

(";

-(";

(";

(/;

Page 20: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0 r---------------------------.124.5

48.0 • 121.9 c ...._ ~ > "' s: :u ;; C"=i

.s r-: ~ ;::: 0:: CIJ 47.0 119.4 r. E- r. CIJ z ~

< ;:; -Q ~

r.

46.0 116.8 ;;i

45.0 ~------------~----------~--------------~----------~114.3 0 100 200 300 400

TIME SINCE INSTALLATION (days)

---El: VERTICAL -- E2: HORIZONTAL

15

Page 21: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0

48.0 ~

"' ., .c '-'

"' :.::,

0:: 47.0 UJ E-UJ

f\& .

\

~ -0 46.0

45.0 ' '

0 100 200 300 TIME SINCE INSTALLATION (days)

-- F3: VERTICAL -- F4: HORIZONTAL

Note: Measurements for day 0 are assumed.

16

124.5

121.9

119.4

116.8

114.3 400

0 > s: 5 ~ "' 2

" -~ -;::; ~

" ..., Ul

Page 22: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0 124.5

48.0 121.9 c ~ > "' .... :::: "' ..::: ~ u ..., 0: ~ (": ;::., ;;;

c::: 47.0 C!.l 119.4 r. E- (")

C!.l ~

:2: < " -Cl

~

(")

46.0 116.8 ;;;

45.0 L.,_ _____ __.:. ______ ~ ______ ..:,_ _____ .....~ 114.3

0 100 200 300 400 TIME SINCE INSTALLATION (days)

-- G3: VERTICAL -+- G4: HORIZONTAL

Note: Measurements for day 0 are assumed.

17

Page 23: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0 r---------------------------.124.5

48.0 121.9 Cl

~ ... s;: "' T s: " .c r-l u ..., c r-l :.:=.. ~ -Cl:!

,V

UJ 47.0 119.4 "' E- "' UJ ;:l

::::: ~ -< --- "' 0 ,.... "' ..,

46.0 116.8 Ul

45.0 ~-----------~----------~--------------~----------~114.3 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- Hl: VERTICAL -+- H2: HORIZONTAL

18

Page 24: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0 ~-----------------------------------------------------, 124.5

48.0 121.9 r-

tr--~

~ > "' !:: 3d r-; u c: r=: '-' \. ,... 0::: w 47.0 119.4 '"' f- '"' w ~

~ < -- '"' Cl

~

'"' 46.0 116.8 .:!:._

45.0 L------___.;. ______ ....;_ ______ ...:._ _____ .....J 114.3

0 100 200 300 400 TIME SINCE INSTALlATION (days)

-- I3: VERTICAL --+- I4: HORIZONTAL

Note: Measurements for day 0 are assumed.

19

Page 25: Field Performance Report on PVC Pipe Campbell County

49.0

~

48.0 ~ r ,...._ "' <U .c u = :.=,

"' 47.0 iJ;J f-iJ;J ;:;s < ~ -0

46.0

45.0 0

(Station 104+ 70)

' '

100 200 300 TIME SINCE INSTALLATION (days)

-- K3: VERTICAL -- K4: HORIZONTAL

Note: Measurements for day 0 are assumed.

20

124.5

121.9

119.4

116.8

114.3 400

c > $: C=J

~ .,....

(""; (")

~

-(") ~

:::: ~

Page 26: Field Performance Report on PVC Pipe Campbell County

(Station 104+ 70) 49.0 124.5

48.0 121.9 c ~ > "' s: <U ..c ~ '-' c: ;=., t=: 0::

;:::: ClJ 47.0

If 119.4 r. E- !:: ClJ .. -::;; ~ -· < :::; - ;; Cl .....

" 46.0

.., 116.8 .:!:.

45.0 ~------------~------------~----------------~-----------~ 114.3 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- 03: VERTICAL -+- 04: HORIZONTAL

Note: Measurements for day 0 are assumed.

21

Page 27: Field Performance Report on PVC Pipe Campbell County

~

"' t.l .:: '-' c:: v ~ UJ E-UJ ~ :::; 0

(Station 104+ 70) 49.0 124.5

48.0 ' 121.9

47.0 119.4

46.0 116.8

45.0 1..--------'"---------.,:.._--------'--------' 114.3 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- P3: VERTICAL -- P4: HORIZONTAL

Note: Measurements for day 0 are assumed.

22

c > ::: ~ r-: "" r: r: ~

" ~ " ui

Page 28: Field Performance Report on PVC Pipe Campbell County

~

"' "' ..c '-' .s ~

0::: UJ E-UJ

~ -0

(Station 104+ 70) 49.0 r--------------------------......, 124.5

48.0 121.9

,..

47.0 119.4

\..

46.0 116.8

45.0 '----------------'-' -------..:.---------"114.3 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- Q3: VERTICAL -+- Q4: HORIZONTAL

Note: Measurements for day 0 are assumed.

23

c > :::: ("!1 ...;:

t"'i ;;:

(;'

" -~ ::; ~

" "1

!:E.

Page 29: Field Performance Report on PVC Pipe Campbell County

25.0

24.0

'""' "' "' ..c ;\

u c :.::, c::

23.0 C1J f-C1J

~

\

~& -0

22.0

21.0 0

(Station 129+ 72)

' '

lOO 200 300 TIME SINCE INSTALLATION (days)

--A V: VERTICAL -+- AH: HORIZONTAL

Note: Measurements for day 0 are assumed.

24

63.5

61.0

58.4

55.9

53.3

400

~

~

<' ["' -r r·

-----("; -u:

Page 30: Field Performance Report on PVC Pipe Campbell County

25.0

24.0 ,...._ "' 0

_.-/

/ ..c: u c:

:::.-0::: 23.0 U.J E-U.J :2: ~

\

\__ -0

22.0

21.0 0

(Station 129+ 72)

' '

100 200 300 TIMES1'\fCE INSTALLATION (days)

-- BV: VERTICAL -- BH: HORIZONTAL

Note: Measurements for day 0 are assumed.

25

63.5

61.0

58.4

55.9

53.3

400

c > $

5 r-: ;:::

'2 '"' -(; ~

'"' ~

Page 31: Field Performance Report on PVC Pipe Campbell County

(Station 129+ 72) 25.0 ,..-------------------------...... 63.5

24.0 61.0 c ~ ;.- .--

......._ $ "' "' r .c u

\.. r 0::: ;::., ,._ 0::: 58.4 C.Ll 23.0 (":

~ (":

~

::2: < (": - ~

0 (';

55.9 (/)

22.0

21.0 ~...-_____ ....._ _____ __._, ______ ..:.._ _____ ...153.3

0 lOO 200 300 400 TIME SINCE INSTALLATION (days)

--CV: VERTICAL -+-CH: HORIZONTAL

Note: Measurements for day 0 are assumed.

26

Page 32: Field Performance Report on PVC Pipe Campbell County

(Station 129+ 72) 25.0

24.0 ~

"' <U .c I u .s ~

~ 23.0 r.u ~ ~ <r.: -0

\

\ 22.0

21.0 '

0 100 200 300 TIME SINCE INSTALLATION (days)

--DV: VERTICAL -+- DH: HORIZONTAL

Note: Measurements for day 0 are assumed.

27

63.5

--61.0

58.4

55.9

~

53.3 400

c ~ ~

$ '~ -r .-"-

'"' r.

--(";

~ (f;

Page 33: Field Performance Report on PVC Pipe Campbell County

18.0 (Station 132 + 94)

r-----------------------------------------------------~45.7

17.5 \:" 44.5 0

"""" \ > "' s: J::! 1:"'1 w ..., c 1:"'1 :::,

;..

0:: [.I.J 17.0 43.2 r. ~ '"' -:::;:: --< - '"' Cl

~ (")

16.5 41.9 ;,;;

16.0 ~-------------~--------------~----------------~·--------------~·40.6 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- 1P: VERTICAL -- 2P: HORIZONTAL

Note: Measurements for day 0 are assumed.

28

Page 34: Field Performance Report on PVC Pipe Campbell County

(Station 132+94) 18.0 r----------------------------r45.7

17.5 ~ 44.5 0 >

~ :s: "' u t'l .c -l u c: t'l v -""' 0:: 17.0 43.2 ;:; t.I.I

\--E- "' ::l t.I.I ~

:2: -< -"' - ~

Cl "' 16.5 41.9

;;;

16.0 l....---------'------....;_-------"'-----__.J4Q.6 0 100 zoo 300 400

TIME SINCE INSTALLATION (days)

-- 10: VERTICAL -- 20: HORIZONTAL

Note: Measurements for day 0 are assumed.

29

Page 35: Field Performance Report on PVC Pipe Campbell County

~

"' '"' .c '"' t::

;::, 0::: CIJ E-CIJ :2: < -0

18.0 (Station 132+94)

.---------------------------,45.7

17.5 ' 44.5

~ 17.0 43.2

16.5 41.9

16.0 L.------.-..:.------....:-------...:.....-------'40.6 0 100 200 300 400

TIME SINCE INSTALLATION (days)

-- 1T: VERTICAL -- 2T: HORIZONTAL

Note: Measurements for day 0 are assumed .

. 30

0 > ::::: C'l ..., C'l ;;c

" " ~ ~ ~ ---" ~ " ...,

!!2.

Page 36: Field Performance Report on PVC Pipe Campbell County

(Station 132+94) 18.0

17.5

---"' 0)

.c u c '-'

0:: 17.0 r.IJ f-r.IJ ~ < -Cl

16.5

16.0 0 100 200 300

TIME SINCE INSTALlATION (days)

-- lV: VERTICAL --lH: HORIZONTAL

Note: Measurements for day 0 are assumed.

31

4 5.7

44.5 c > ;s:

4

~

r-: ,...

3.2 r. r.

1.9

4 0.6 400

Page 37: Field Performance Report on PVC Pipe Campbell County

0:: UJ E­UJ

24.0

23.5

~ 22.5 :::; 0

22.0

21.5

~

0

(Station 160+00)

.... -........

... ~ ~

---.:::... '

100 zoo 300 400 TIME SINCE INSTALLATION (days)

-- lB: VERTICAL --lA: HORIZONTAL

Note: Measurements for day 0 are assumed.

32

61.0

59.7

58.4

57.2

55.9

54.6 500

0 :; s: ~ ~ ;:::

r. n ~

;:; ~

n .... .!:::.

Page 38: Field Performance Report on PVC Pipe Campbell County

_...... "' " ..<::

24.0

23.5

.5 23.0 ......,

22.0

21.5

--~

0

(Station 160+00)

....

/---¥

' ' 100 200 300

TIME SINCE INSTALLATION (days)

--11- 2B: VERTICAL -+- 2A: HORIZONTAL

Note: Measurements for day 0 are assumed.

33

~

....

' 400

61.0

59.7

58.4

57.2

55.9

54.6 500

c > ~ r-: r-: ~

r: r: ~

;:; ~

r: ,.., ~

Page 39: Field Performance Report on PVC Pipe Campbell County

(Station 160+00) 24.0 61.0

-------23.5 59.7

~ c :;:

........ 3:: "' '-' 5 -= u 23.0 58.4 ~ . .s '-' :::= ~ r. (.lJ

[Ij "' 57.2

~

::::E 22.5 <r.: " - ~

Q " Cii

22.0 55.9

21.5 ~...-____ ..:.._ ____ ..:.._ ____ ....;_ ____ _..;.. ____ _. 54.6

0 100 200 300 400 500 TIME SINCE INSTALLATION (days)

-- 3B: VERTICAL -- 3A: HORIZONTAL

Note: Measurements for day 0 are assumed.

34

Page 40: Field Performance Report on PVC Pipe Campbell County

~

"' ., ..c

24.0

23.5

g 23.0 ;::, 0:: c.r.J

tu ;:;; 22.5 < -Cl

22.0

21.5 0

(Station 160+00)

..... ~

~

~

'

100 200 300 400 TIME SINCE INSTALL\TION (days)

-- 4B: VERTICAL -- 4A: HORIZONTAL

Note: Measurements for day 0 are assumed.

35

61.0

59.7

58.4

57.2

55.9

54.6 500

c ;;: ::: ~ t'1 ;::;

'"' r.

~

"' -'"' ..,

!:!2.

Page 41: Field Performance Report on PVC Pipe Campbell County

(Station 160+00) 24.0

.... 23.5 ---

22.0

21.5 '

0 100 zoo 300 400 TilYIE SINCE INSTALLATION (days)

-- 5B: VERTICAL -+-SA: HORIZONTAL

Note: Measurements for day 0 are assumed.

36

61.0

59.7

58.4

57.2

55.9

54.6

500

0 > s: ~ ~ "" r. r. ~

--" ~ ('I) ..., .!!!.

Page 42: Field Performance Report on PVC Pipe Campbell County

(Station 162 + 00) 30.0

29.5

---"' ~ u

<::: :=.- ..... 0:: 29.0 UJ E-

.-- --- -UJ :E < -0

28.5

28.0 '

0 100 200 300 TIME SINCE INSTALlATION (days)

-- Y5: VERTICAL -+- Y6: HORIZONTAL

37

.....

76.2

24.9

73.7

72.4

71.1 400

0 > :::: 1:"1 _, 1:"1 ;;:l

-;:; "' :::: -"' ~ "' ..., "'

Page 43: Field Performance Report on PVC Pipe Campbell County

(Station 162 + 00) 30.0

._ 29.5

,....... "' OJ '

..<::: ~ c::

'--'

~ 29.0 w &-w ::;: ~ -0

28.5

28.0 ' '

0 100 200 300 TIME SINCE INSTALLATION (days)

-- Z5: VERTICAL -- Z6: HORIZONTAL

38

..Ill

76.2

24.9

73.7

72.4

71.1 400

0 s: ;s: t"l ..., t"l ;:::l

c; "' ;:; :: -::: "' ..... "' .., ~