![Page 1: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/1.jpg)
Field Operational Test Planning
Presented by:
Dave LeBlanc
UMTRIITS America 2007 Annual Meeting &
Exposition
Palm Springs, CA
June 6, 2007
![Page 2: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/2.jpg)
2ITS America 2007 Annual Meeting June 6, 2007
Topics
• Objectives of FOT
• Experimental design
• Data collection
• Challenges
![Page 3: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/3.jpg)
3ITS America 2007 Annual Meeting June 6, 2007
Objectives of FOT
• Impacts on safety– Interactions during conflicts, near-crashes– Influences on driver behavior – Unintended consequences– Support safety benefits calculations by independent
evaluator
• Driver acceptance– Usability, satisfaction, willingness to purchase
• Data archive of driving – “360 deg” sensor coverage
![Page 4: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/4.jpg)
4ITS America 2007 Annual Meeting June 6, 2007
Preliminary Experimental Design –
Light Vehicle Platform• 108 drivers from southeast Michigan
– 80 x 100 mile area – gender balance, 3 age groups
• 16 vehicles ‘as their own’ • Nominal exposure: 6 weeks
– 2 weeks baseline (IVBSS ‘silent’)– 4 weeks IVBSS enabled
• 12 months, 275,000 miles• Exploring: targeting sub-populations &/or mixing
in longer exposures to increase system exposure to near-crashes
2007-8 Honda Accord EX
![Page 5: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/5.jpg)
5ITS America 2007 Annual Meeting June 6, 2007
Preliminary Experimental Design – Heavy Vehicle Platform
• Conway Freight (7,786 tractors; 30,449 trailers )• Terminal in Romulus, MI
(near Detroit metro airport) :– Line hauls– Local pickup/delivery
• 15-20 drivers• 11 tractors (10 in field, 1 spare) • Long box, pup, double-pup trailers• 740,000 miles and 30,000 hours of driving
International 8600 series
![Page 6: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/6.jpg)
6ITS America 2007 Annual Meeting June 6, 2007
FOT Data Archive
• Biographical & demographic data
• Onboard data– Numerical– Video– Audio
• Offline-data– Weather– Roadway– Crash data
• Pre-drive questionnaires – Attitudes, behavior,
style
• Post-drive questionnaires
• Focus groups
Objective Data Subjective Data
![Page 7: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/7.jpg)
7ITS America 2007 Annual Meeting June 6, 2007
Onboard Data Collection
• Continuous data from IVBSS system, vehicle, and FOT sensors* – 10 Hz to 50 Hz– Hundreds of data signals, plus:
• 5 cameras with adaptive frame rates and compression
• 7 radars (LV), 6 radars (HT)• Audio• Cell modem for remote monitoring
* Sensors installed for analysis purposes but not used for IVBSS function0
![Page 8: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/8.jpg)
8ITS America 2007 Annual Meeting June 6, 2007
FOT sensors
• Cameras:– Forward scene (may share
with LDW)– Driver face– Over-shoulder– Left side (may share with
LCM)– Right side (may share with
LCM)
• Cabin microphone• Differential GPS• Tri-axial accelerometer
GPS receiver
![Page 9: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/9.jpg)
9ITS America 2007 Annual Meeting June 6, 2007
Monitoring Vehicles in the Field– Light Vehicle Platform
Individualdriver trips
Cell modem data automatically loaded every ~15 minutes into database to allow team to monitor fleet over the Web
Automatichighlightsto assist
reviewers
![Page 10: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/10.jpg)
10ITS America 2007 Annual Meeting June 6, 2007
10
Con-way Freight Romulus Terminal
Maintenance Facility
Re-distribution
Center
Tractor Parking
200 ft
400 ft
600 ft
![Page 11: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/11.jpg)
11ITS America 2007 Annual Meeting June 6, 2007
DAS data networking
![Page 12: Field Operational Test Planning Presented by: Dave LeBlanc UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649e695503460f94b6590b/html5/thumbnails/12.jpg)
12ITS America 2007 Annual Meeting June 6, 2007
Concluding Remarks
• Accomplishments to Date:– Identified objectives of FOT experiment– Established scope of FOT– Secured trucking fleet partner– Developed onboard data system requirements– Developed network concepts and prototype for off-site data servers
• Activities in 2007– Complete experimental design– Complete prototype data collection systems– Complete preliminary subjective instrument design