FIELD ERECTION MANUAL

www.vulcansteel.com1-800-258-3369

Page 2: FIELD ERECTION MANUAL - Vulcan Steel

ii

DEFINITIONS

MANUFACTURER — The name MANUFACTURER in this manual is used torefer to the manufacturer, and includes all the divisions and subsidiaries ofThe Manufacturer that may supply materials to the project.

ERECTOR — The erector is the company, entity or individual who isresponsible for assembling the building at the job site. The erector may ormay not be an Authorized Builder of The Manufacturer, its divisions orsubsidiaries.

BUILDER — The builder is the company or individual who purchases thebuilding material from The Manufacturer, its divisions or subsidiaries.

MANUFACTURER RESERVES THE RIGHTTO MODIFY ANY AND ALL DETAILS ORRECOMMENDATIONS OF THIS MANUALWITHOUT INCURRING OBLIGATION.

Page 3: FIELD ERECTION MANUAL - Vulcan Steel

Important Note!All details, recommendations and suggestions inthis manual are for general guidelines only, andnot meant to be all inclusive. Industry acceptedinstallation practices with regard to all areas notspecifically discussed in this manual should befollowed. Only experienced, knowledgeableerectors familiar with accepted practices shouldbe used to assure a quality project.

iii

Page 4: FIELD ERECTION MANUAL - Vulcan Steel

iv

Table of Contents

Introduction .........................................................................................................2

Section l Foundation and Building AnchorageGeneral Information..........................................................................3Foundation Checking Procedure ......................................................4Anchor Bolt Setting...........................................................................5

Section ll Typical Erection DrawingsAnchor Bolt Plan...............................................................................6Typical Base Types ...........................................................................7Cross Section................................................................................8-9Roof Framing Plan ....................................................................10-11Sidewall Elevation .....................................................................12-13Endwall Elevation ......................................................................14-15Typical Sections And Details ..........................................................16

Section lII Pre-ErectionAccess To Site ................................................................................17Unloading Operations................................................................18-20Location of Building Parts...............................................................21

Section lV Unloading, Handling and StorageStructural ........................................................................................22Wall and Roof Panels ................................................................23-24Unloading .......................................................................................25Cable Information ...........................................................................26Structural Framing Precautions ......................................................27

Section V Erection of Primary and Secondary StructuralGeneral Information........................................................................28Recommended Tools.................................................................29-32Lifting Cables And Spreader Bars ..................................................33Raising Rigid Frame..................................................................34-37Connection Bolts .......................................................................37-38Typical Primary Connection Details...........................................39-40Typical Secondary Connection Details......................................41-46Plumbing ...................................................................................47-48Erecting Endwalls ...........................................................................49Erecting the Remaining Frames................................................50-51Installation of Wind Bracing.......................................................52-54

Page 5: FIELD ERECTION MANUAL - Vulcan Steel

v

Section Vl Primary and Secondary DetailsBearing Frame Endwall Framing ...............................................55-57Bearing Frame Eave Strut Framing ................................................58Corner Column Framing (Cold Formed).........................................59Corner Column Framing (Hot Rolled).............................................60Endwall Framing with Flush Girts ...................................................61Endwall Framing with By-Pass Girts...............................................62Main Frame Endwall .......................................................................63Main Frame Eave Strut...................................................................64Main Frame - Interior Column.........................................................65Interior Bay Purlin / Girt Framing ....................................................66Cold Formed Endwall (with Purlin Ext.) ..........................................67“Hot Rolled” Endwall with Purlin Extension ....................................68Main Frame Endwall with Purlin Extension ....................................69Eave Canopy Framing ....................................................................70Cable or Rod Brace...................................................................71-72Purlin / Eave Strut Details...............................................................73Wind Column To Main Frame .........................................................74Portal Frame To Main Frame ..........................................................75Framed Opening Framing Details...................................................76Eave Line And Below Eave Line Lean-To Connections..................77Hi - Low Condition ..........................................................................78Top Running Crane.........................................................................79Underhung Crane...........................................................................80Gable Angle....................................................................................81

Section Vll SheetingGeneral Information........................................................................82“R” Panels.......................................................................................83“PBR” Panels ..................................................................................84“A” Panels .......................................................................................85Roof Fasteners ...............................................................................86Wall Fasteners................................................................................87Recommended Drill Sizes ..............................................................88Fastener Installation ..................................................................89-90Screw Alignment .......................................................................91-92Aligning The Girts ...........................................................................93Wall Insulation ...........................................................................94-95Roof Insulation ..........................................................................96-98Installation of Wall Panels........................................................99-100Safety Precautions for Roofing Work ....................................101-102Preparing the Eave................................................................103-104

Page 6: FIELD ERECTION MANUAL - Vulcan Steel

vi

Installation Of First Roof Panel.....................................................105Section At Eave ............................................................................106Sealing The SideLap ....................................................................107Sealing The Eave .........................................................................108Sealing The Endlaps ....................................................................109Panel Endlaps ..............................................................................110Roof Sheeting Sequence .............................................................111Die Formed Ridge Installation ......................................................112Installation Of Roof Panels ...........................................................113Skylight Installations.....................................................................114Tape Sealant Application..............................................................115Installation Of Final Panel.............................................................116

Section Vlll Flashing, Gutter and TrimGeneral Information......................................................................117Rake Trim Endcap ........................................................................118Eave Flashing and Gutter.............................................................119Installing Gutter Clips ..................................................................120Downspout Detail .........................................................................121Rake Trim And Peak Box Installation............................................122Caulk and Lap Details ..................................................................123Personnel Doors...........................................................................124Overhead Door Framed Opening .................................................125Horizontal Slide Window - R Panel...............................................126Horizontal Slide Window - A Panel ...............................................128Narrow Lite Window......................................................................129Louvers.........................................................................................131Round Gravity Vents.....................................................................132Continuous Ridge Ventilators .......................................................133Ultra Vents ....................................................................................134Translucent Roof Panels...............................................................135Insulated Sky Light Panels ...........................................................136Roof Jack......................................................................................137

Page 7: FIELD ERECTION MANUAL - Vulcan Steel
Page 8: FIELD ERECTION MANUAL - Vulcan Steel

Important!!!

Read and understand this page before proceedingwith any work or further reading.

SAFETY FIRST

THE MANUFACTURER has a commitment to manufacture quality buildingcomponents that are designed to meet the structural requirements of thebuilding. However, the safety commitment and job site practices of theerector are beyond the control of THE MANUFACTURER and includeexpertise not possessed by the manufacturers.

It is urgently recommended that safe working conditions and accidentprevention practices be the top priority on the job site, and that local, stateand federal safety and health standards always be followed to help insureworker safety. These points cannot be stressed too strongly.

Job site safety is a joint responsibility of all parties present on the job site,including owners, architects, engineers, contractors, subcontractors,delivery personnel, and employees of all the above, among others. Allshould be watchful to avoid hazards which might cause damage toproperty or injury to any person, including themselves.

Always make certain all employees know the safest and most productiveway of erecting a building along with emergency telephone numbers,location of first aid stations and emergency procedures. Avoid workingduring inclement weather periods when personnel are at increased riskdue to high winds, lightning, precipitation, etc.

THE MANUFACTURER recommends daily meetings highlighting safetyprocedures, the use of hard hats, rubber sole shoes for roof work, properequipment for handling material and appropriate safety gear, includingnets where necessary.

This manual should be interpreted and administered with sound judgmentconsistent with good safety practices. Its’ information is to be disseminatedto all workers on the job site. Where any doubt exists as to the language ordirection of this manual, do not take a risk, “play it safe”.

1

Page 9: FIELD ERECTION MANUAL - Vulcan Steel

INTRODUCTION

THE MANUFACTURER manufactures high quality, pre-engineered metalbuilding packages. Quality erection is essential to complete the structureto the satisfaction of the customer.

This manual has been prepared to help guide the erection process andreflects the techniques in use in the metal building industry believed to bemost representative of good erection practices. These procedures andmethods are by necessity general in nature. The erector should always,especially in special circumstances, use proven and safe erectionmethods.

This erection manual is intended only as a supplement to the erectiondrawings that are furnished with each building. The erection drawingsshow the customer’s building as engineered and fabricated according tohis requirements. The building erection drawing will always govern withregard to construction details and specific building parts. Contact yoursales representative to resolve any matters not addressed.

The information contained in this manual is believed to be reliable,however, THE MANUFACTURER disclaims any responsibility for damageswhich may result from use of this manual since the actual erectionoperations and conditions are beyond The Manufacturer’s control. Onlyexperienced, knowledgeable erectors with trained crews and properequipment should be engaged to do the erection.

It is emphasized that The Manufacturer is only a manufacturer of metalbuildings and components and is not engaged in the erection of itsproducts. Opinions expressed by The Manufacturer about erectionpractices are intended to present only a guide as to how the componentscould be assembled to create a building. The experience, expertise andskills of the erection crews as well as the equipment available for handlingthe materials determines the quality and safety of erection and theultimate customer satisfaction with the completed building.

The MBMA’s “CODE OF STANDARD PRACTICE” shall govern withrespect to the fabrication tolerances, erection methods, and all field workassociated with the project in question

The erector should familiarize himself with the contents of this document.Additional copies may be requested at a nominal cost.

2

Page 10: FIELD ERECTION MANUAL - Vulcan Steel

SECTION l

FOUNDATION AND BUILDING ANCHORAGE

GENERAL FOUNDATION INFORMATION

THE MANUFACTURER recommends that all building foundations,including pier sizes, grade beams and floor slabs, be designed by anexperienced local foundation engineer. This engineer can also recommendexcavation procedures, drainage practices, form work, reinforcing steelrequirements and concrete proportioning. This will assure proper designs,expedite the work and reduce costs.

Proven construction techniques should be adhered to in the foundationwork. The bottoms of all excavations should be level and smooth, and careshould be taken to prevent cave-ins when utilizing the walls of theexcavations for concrete forms. Strict adherence to OSHA and other localcodes or laws governing “shoring of excavation to prevent accidental cave-ins” is critical. Where the ground surface is not level, the bottoms of thefoundations should be in steps coinciding with the piers (as shown). Fillareas should be properly compacted to prevent settling cracks. Footingshould extend below any fill material.

Care should be taken to obtain a good finish on the floor slab and tomaintain the correct elevation throughout the slab. Shrinkage cracks canbe minimized by pouring the slab in alternate sections, “checker boardfashion“. The outer corners of the foundation walls and piers should besharply formed with straight sides and level tops. This will allow neatseating and good alignment of the base angle.

3

Page 11: FIELD ERECTION MANUAL - Vulcan Steel

FOUNDATION CHECKING PROCEDURES

The importance of accurate foundation construction and anchor boltsettings cannot be over-emphasized. Foundation errors and mislocation ofanchor bolts are among the most frequent and troublesome errors made inmetal building construction. The Following procedures and methods,should help to minimize these costly errors and delays.

1. To determine that the foundation is square, measure diagonaldimensions to be sure they are of equal length.

2. To determine that the foundation is level, set up a transit or leveland use a level rod to obtain the elevation at all columns and posts.

3. Carefully check the location of all anchor bolts against the “AnchorBolt” drawing furnished by The Manufacturer. All dimensions mustbe identical to assure a proper start-up.

4

Page 12: FIELD ERECTION MANUAL - Vulcan Steel

ANCHOR BOLT SETTINGS

It is extremely important that anchor bolts be placed accurately inaccordance with the anchor bolt setting plan. All anchor bolts should beheld in place with a template or similar means, so that they will remainplumb and in the correct location during placing of the concrete. Check theconcrete forms and anchor bolt locations prior to the pouring of theconcrete. A final check should be made after the completion of theconcrete work and prior to the steel erection. This will allow any necessarycorrections to be made before the costly erection labor and equipmentarrives.

5

Page 13: FIELD ERECTION MANUAL - Vulcan Steel

A

B

B

B

B

A

A

C

C

A

D

D

(Hol

d T

his

Dim

ensi

on)

40’-3" OUT-TO-OUT OF CONCRETE

40’-3

" O

UT

-TO

-OU

T O

F C

ON

CR

ET

E

1 3

2

HA

GE

DB

HA

FC4"

V

H

V

H

0.29 0.47 -0.29 -0.53 1.43 1.35 0.06 0.10 -0.06 -0.10 -1.74 -0.23A2 -1.35 3.172 H 0.06 -3.81 -0.10 0.10 -0.06 -0.29 4.57 -0.47 0.53 0.29

-3.62

Horiz--Wind_R2---

-0.55 0.55

Horiz----Dead----ColumnFrame

LineFrame

Line22

AH

ColumnLine

Line

Vert-Seismic_L--

0.00 0.00

Vert-Collateral-

Vert

1.36 1.36

Vert

Horiz

Horiz 0.00 0.00

----Live----

Horiz-Seismic_R--

Horiz 2.70 -2.70

Vert

6.00 6.00

Vert

Vert------------

-1.74

Vert--Wind_L2---

------------

--Wind_R1-----Wind_L1---

Vert---Live_R---

-4.36 -6.43

Vert

Horiz

0.67

Horiz

Horiz

-0.67 3.62

Horiz

Horiz

0.23 -3.17

Horiz

Vert

-6.43 -4.36

Vert -3.81

BASIC COLUMN REACTIONSRIGID FRAME: 2.0

2.0

----------

A

H3

1

1 ,2

1 ,2

--- -----------------

0.9

0.9 21

0

Reactn

Bracing (k )Wall

IdCol

IdHoriz

Base Angle (lb/ft)

Panel Shear

ReactnVert Load at

BRACING REACTIONS,PANEL SHEAR

SECTION llTYPICAL ERECTION DRAWINGS

TYPICAL ANCHOR BOLT PLAN

Note! Strict adherence to your specific anchor bolt plan is required.Foundation must be square and on plane! Make certain the anchorbolt plan being used is “For Construction”, not “Preliminary” or“Approval”.

6

Page 14: FIELD ERECTION MANUAL - Vulcan Steel

OPTI

ONAL

BAS

E TR

IMBA

SE A

NGLE

WIT

H

BASE

CON

DITI

ONFL

OOR

CEE

WIT

H SH

EET

NOTC

H

#12

X 1"

S.D

.S. @

6" O

.C.

EDGE

OF

CONC

RETE

STEE

L LI

NE

WAL

L PA

NEL

EDGE

OF

CONC

RETE

MAS

ONRY

BAS

E TR

IM

WAL

L PA

NEL

TO C

ONCR

ETE

ARE

BY O

THER

S.FA

STEN

ERS

FOR

BASE

ANG

LE

BASE

ANG

LE (2

" X 4

" ANG

LE)

ANGL

E W

ITH

SHEE

T NO

TCH

BASE

CON

DITI

ON

#12

X 1"

S.D

.S. @

6" O

.C.

EDGE

OF

CONC

RETE

STEE

L LI

NE

WAL

L PA

NEL

NOTE

:

BASE

ANG

LE (2

" X 4

" ANG

LE)

FAST

ENER

S FO

R BA

SE A

NGLE

TO C

ONCR

ETE

ARE

BY O

THER

S.

NOTE

:

BASE

CON

DITI

ONLO

W G

IRT

WIT

H SH

EET

NOTC

H

EDGE

OF

CONC

RETE

WAL

L PA

NEL

STEE

L LI

NE

#12

X 1"

S.D

.S. @

6" O

.C.

FAST

ENER

S 3’-

0" O

.C.

FAST

ENER

S 3’-

0" O

.C.

FAST

ENER

S 3’-

0" O

.C.

BASE

ANG

LE (2

" X 4

" ANG

LE)

FAST

ENER

S FO

R BA

SE A

NGLE

TO C

ONCR

ETE

ARE

BY O

THER

S.

EDGE

OF

CONC

RETE

DRIP

TRI

M

WAL

L PA

NEL

NOTE

:

FAST

ENER

S 3’-

0" O

.C.

OPTI

ONAL

DRI

P TR

IMBA

SE A

NGLE

WIT

H

BASE

GIR

T

6"

BASE

CHA

NNEL

#12

X 1"

S.D

.S. @

6" O

.C.

#12

X 1"

S.D

.S. @

6" O

.C.

DELU

XE B

ASE

TRIM

BASE

CON

DITI

ON

EDGE

OF

CONC

RETE

WAL

L PA

NEL

FAST

ENER

S FO

R DE

LUXE

BAS

E TR

IMNO

TE:

TO C

ONCR

ETE

ARE

BY O

THER

S.

DELU

XE B

ASE

TRIM

FAST

ENER

S 3’-

0" O

.C.

( VBT

)

#14

X 7/

8" S

.D.S

. @ 6

" O.C

.

7

Page 15: FIELD ERECTION MANUAL - Vulcan Steel

8

RIGID FRAME CROSS SECTION

The typical section shows the column and rafter arrangement , purlin, girtand frame brace locations, bolt sizes and numbers, inside clearances andthe layout of roof panels and skylights. The following illustrates a typicalframe cross section and a description of its contents.

1. Building width (feet and inches); dimension is out to out of girt line.

2. Roof panel overhangs.

3. Girt depth (inches).

4. Depth of column at column base (feet and inches).

5. Depth of column and girt at frame knee (feet and inches).

6. Horizontal clear dimension of frame at knee connection (feet andinches).

7. Building eave height (feet and inches); dimension measured fromfinished floor to top flange of eave strut.

8. Girt spacing (feet and inches).

9. Vertical clear dimension at knee connection (feet and inches).

10. Vertical clear dimension at ridge connection (feet and inches).

11. Roof slope or bevel.

12. Built-up member sizes.

13. Purlin spacing (feet and inches).

14. Flange brace location.

15. Shop located skylite locations.

Page 16: FIELD ERECTION MANUAL - Vulcan Steel

9

26 Ga. PBR, Galvalume

FLANGE BRACES: Req~d Both Sides Unless NotedFBxxA(1): xx=inches, (1)=one side onlyA - L2X2X14G

SPLICE BOLTSSplice Top Of Plate Bottom Of PlateMark Qnt Typ Dia Len Qnt Typ Dia Len

Sp- 1 4 A325 0.750 2.50 4 A325 0.750 2.50 Sp- 2 4 A325 0.750 2.50 4 A325 0.750 2.50

MEMBER SIZE TABLE (in)

PIECEWEB DEPTHSTART/END

WEB PLATETHICK LENGTH

OUTSIDE FLANGEW x T x LEN

INSIDE FLANGEW x T x LEN

RF1-1 7.5/10.0 0.134 122.710.0/10.0 0.250 14.1

5 x 3/16" x 135.9 5 x 1/4" x 18.2

5 x 1/4" x 122.7

RF1-2 10.0/10.0 0.134 221.3 5 x 3/16" x 220.4 5 x 1/4" x 220.4

SP

-1

FB

29.5

A(1

)

1"12

1"12

SP

-2

SP

-1

FB30A(1)

FB30A(1) FB30A(1)FB30A(1)

FB30A(1)

FB30A(1)

FB

29.5

A(1

)

RF

1-1

RF1-2 RF1-2

RF

1-1

U3

U2

U3

R1 R1

Sky Light Sky Light

Cle

aran

ce

Cle

aran

ce

Cle

aran

ce

Clearance

10’-7

1/1

6"

10 7/16"8"

7’-3

1/2

"4’

-8 1

/2"

12’-0

"

4"

5’-7"4"

4"

10’-7

1/1

6"

12’-1

3/8

"

10 7/16"36’-11 1/8"

40’-0" OUT-TO-OUT OF STEEL

8"

7’-3

1/2

"4’

-8 1

/2"

12’-0

"

3 SP@ 5’-0"

4’-0 13/16"1’-0" 1’-0"

4’-0 13/16"3 SP@ 5’-0"

8" 8"

20’-1" 8 1/2" 20’-1"8 1/2"4"

5’-1"4"

8 1/2"

5’-7"4"

4"

5’-1"8 1/2"

4"

A HBUILDING CROSS SECTIONFOR FRAME LINE 2

16. Roof panel endlap dimensions measured from purlin web line (inches).

17. Bolted frame splice designation.

Page 17: FIELD ERECTION MANUAL - Vulcan Steel

10

ROOF PLAN

The roof plan shows the layout and part numbers of purlins, eave struts,panels and bracing. A description of the contents on a typical roof framingplan follows.

1. Building length shown out to out of purlins (feet and inches).

2. Building width shown out to out of eave struts (or girts) (feet andinches).

3. Roof panel type, gage, and color.

4. Sidewall column line designation (number).

5. Endwall column line designation (letter).

6. Roof member table.

7. Purlin lap dimension.

8. Primary framing part marks.

9. Purlin piece marks.

10. Roof wind bracing piece marks.

11. Eave strut piece mark.

Page 18: FIELD ERECTION MANUAL - Vulcan Steel

E-1 E-1

E-1 E-1

P-1(Typ) P-1(Typ)

P-1(Typ) P-1(Typ)

CB-4 CB-3

CB-5CB-5

CB-6 CB-6

CB-6 CB-6

CB-5CB-5

CB-3 CB-4

RA

RA

EC

-1E

C-2

EC

-3E

C-3

EC

-2E

C-4

EC

-5E

C-6

EC

-6E

C-5

RF1-1

RF1-1

ER-1

ER-2

RF1-2

RF1-2

ER-4

ER-3

1’-1 3/4"1’-1 3/4"

20’-0

"20

’-0"

20’-0" 20’-0"

40’-0" OUT-TO-OUT OF STEEL

PURLIN LAP

RO

OF

SU

RF

AC

E 2

RO

OF

SU

RF

AC

E 3

(13)

20’-1

"

(1)

5’-7

"(1

)5’

-1"

(13)

20’-1

"

(1)

5’-1

"(1

)5’

-7"

RC-R

(14)

A

H

1 3

2

ROOF FRAMING PLAN

ROOFSHEETINGPANELS: 26 Ga. PBRGalvalume

G2

Q1

Q2

LIGHTPANEL10’-8"

LIGHTPANEL10’-8"

ROOF MEMBER TABLEMARK PART LENGTH P-1 8X25Z16 21’-1 1/2" E-1 8E14 19’-11 1/2"CB-3 0.250CBL 20’-11"CB-4 0.250CBL 21’-1"CB-5 0.250CBL 22’-2"CB-6 0.250CBL 20’-5"

11

Page 19: FIELD ERECTION MANUAL - Vulcan Steel

12

SIDEWALL ELEVATION

The sidewall framing elevation shows the girts, eave struts and sidewallbracing layouts and part numbers. The contents of a typical sidewallelevation drawing are given below .

1. Sequence number of sidewall framing elevation shown used to identifymultiple sidewall framing plans associated with job.

2. Building length measured out to out of endwall girts (feet and inches).

3. Sidewall sheeting and trim layout.

4. Sidewall bay spacing (feet and inches) measured centerline to centerlineof frames.

5. Sidewall girt spacing (feet and inches).

6. Sidewall column piece mark.

7. Eave strut piece mark.

8. Sidewall girt piece mark.

9. Sidewall bracing piece mark.

10. Sidewall column line designation.

11. Sidewall member table.

Page 20: FIELD ERECTION MANUAL - Vulcan Steel

13

MEMBER TABLEFRAME LINE AMARK PART LENGTH E-1 8E14 19’-11 1/2" G-5 8X25Z16 21’-1 1/2"CB-1 0.250CBL 22’-2"CB-2 0.250CBL 21’-10"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

12’-0

"

CT

RX

12

CT

RX

12

VCBVGE

VCBVGE

VEGX20(Gutters with 2 downspouts)

RF1-1

BA

CB-2CB-1

G-5 G-5

SIDEWALL SHEETING & TRIM: FRAME LINE APANELS: 26 Ga. R - Light Stone

SIDEWALL FRAMING: LINE A

1’-1 3/4"

1’-1 3/4"

7’-3

1/2

"4’

-8 1

/2"

12’-0

"

GIRTLAPS

I6

I6J2

Q2 Q6

H2

T3

E-1 E-1

20’-0" 20’-0"

40’-0" OUT-TO-OUT OF STEEL3 1

2

Page 21: FIELD ERECTION MANUAL - Vulcan Steel

14

ENDWALL ELEVATION

The endwall elevation shows the end framing column, rafter and girtarrangements and piece marks. Typical column and beam and rigid frameendwall framing elevations are explained below .

1. Endwall framing elevation designation by frame line number.

2. Width of building measured out to out of sidewall girts (dimensionshown in feet and inches).

3. Sidewall girt depth (shown in inches).

4. Endwall exterior bay spacing shown on anchor bolt plan lesssidewall girt depth (dimension shown in feet and inches).

5. Endwall interior bay spacing (feet and inches) measured centerlineto centerline of endwall columns.

6. Building eave height (feet and inches) measured from top offinished floor to top flange of eave strut.

7. Endwall sheeting and trim layout.

8. Endwall member table.

9. Endwall girt spacing (feet and inches).

10. Corner column piece mark.

11. Endwall rafter piece mark.

12. Endwall interior column piece mark.

13. Endwall girt piece mark.

14. Endwall column line designation (letter).

Page 22: FIELD ERECTION MANUAL - Vulcan Steel

15

TRIM TABLEFRAME LINE 1ID MARK LENGTH1 JTRX10 10’-3"2 HTX10 10’-3"

MEMBER TABLEFRAME LINE 1MARK PART LENGTHEC-1 8x35C16 10’-7 5/8"EC-2 8x35C16 11’-1 15/16"EC-3 8x35C16 11’-11 15/16"EC-4 8x35C16 10’-7 5/8"ER-1 8x35c16 19’-10 3/16"ER-2 8x35c16 19’-10 3/16"DH-1 8x35C16 10’-0" G-1 8X25Z16 5’-8 1/2" G-2 8X25Z16 5’-4 1/2"

BOLT TABLE: FRAME LINE 1LOCATION QUAN TYPE DIA LENER-1-ER-2 4 A325 1/2" 1 1/4"Columns 2 A325 1/2" 1 1/4"

12’-2

"

12’-5

"

12’-8

"

2’-9

"

3’-0

"

13’-5

"

13’-8

"

13’-8

"

13’-5

"

3’-0

"

2’-9

"

12’-8

"

12’-5

"

12’-2

"

1 1

2

1 1

2

VRTX20 VRTX20VPB

1"12

1"12

EC-1 EC-2 EC-3 EC-3 EC-2 EC-4

ER-1 ER-2

DH-1 DH-1

BA

RA

G-1 G-2 G-1

ENDWALL SHEETING & TRIM: FRAME LINE 1PANELS: 26 Ga. R - Light Stone

ENDWALL FRAMING: FRAME LINE 1

A H

B D E G6’-4" 10’-0" 6’-0" 10’-0" 6’-4"8" 8"

40’-0" OUT-TO-OUT OF STEEL

7’-3

1/2

"4’

-8 1

/2"

7’-3

1/2

"4’

-8 1

/2"

12’-0

"

10’-0

"

10’-0

"

F4

M1

E1 E6

D1 D1

A1

C1

T3

Page 23: FIELD ERECTION MANUAL - Vulcan Steel

Q2 DIAGONAL CABLE, EYEBOLT END

NUT

WASHERFLAT

WASHERHILLSIDE

AND EYEBOLTHILLSIDE WASHERSLOT IN WEB TO INSERT

EYEBOLT

CABLE

RAFTER WEBCOLUMN OR

DOOR HEADER TODOOR JAMBM1

ROOF PURLIN TOG2 RIGID FRAME

BY 1.0"

WITH COLUMN SUPPORT

BOLTS, 0.5"

RAFTER SPLICE AT SURFACE CHANGE

PLATECONNECTION

RAFTERENDWALL

PLATEPEAK

F4

ENDWALL GIRT TOCOLUMNS

8"

C1A1

#12 S. D. SCREW

RAFTERENDWALL

ROOF PURLINGABLE RAKE ANGLEEND OF BUILDING

SECTION THRU ENDWALL RAFTER

SECTIONS AND DETAILS

A307 BOLTSC-6 CLIP

DOORHEADER

DOORJAMB

1/2"x1 1/4"3"

1 3/

4"

DBC-1 FLANGEBRACE CLIP

ROOF PURLIN

RIGID FRAMERAFTER

PC-1PURLIN

CLIP

A307 BOLTS1/2"x1 1/4"

FLANGE BRACE(IF REQ)SEE FRAME CROSSSECTION FOR LOCATIONS

C-5 CLIP

BOLTS (TYP)

ENDWALL COLUMN

C-5 CLIP

ENDWALL GIRTS1/2"x1 1/4" A307

SECTIONS AND DETAILS THAT APPLY WILL BE INCLUDED IN EACH SET OF FINAL DRAWINGS.

16

Page 24: FIELD ERECTION MANUAL - Vulcan Steel

SECTION lII

PRE - ERECTION

ACCESS TO SITE

The vehicle transporting your building parts must gain access to the building sitefrom the adjacent highway or road. Such access should be studied and preparedin advance of arrival. All obstructions, overhead and otherwise, must be removedand the access route graveled or planked if the soil will not sustain the heavywheel loads.

Inspect to insure that there is enough room to physically perform the tasksrequired to erect the building. Application of sheeting and trim can be expensivewhen there is not sufficient working space because of the proximity of adjacentbuildings or other obstructions.

The availability of any required utilities should also be considered in advance.Take careful note of any overhead electric lines or other utilities to avoid hazardsand damage (Notify your utility company(s) when necessary)

Develop a comprehensive safety awareness program in advance to familiarizethe work force with the unique conditions of the site, and the building materials,along with the appropriate “Safe Work” practices that will be utilized.

NOTE ! Two sets of erection drawings for construction and threeshipping lists will be delivered by the carrier’s driver for everybuilding. These documents are specifically prepared for theconstruction of each individual building and must be strictlyadhered to. Make sure the first page of each document isstamped as shown below:

FINALDATE MM/DD/YY

Familiarize yourself and your crew with these drawings priorto start - up.Previous sets of drawings marked “for permit” or “forapproval” are not to be referenced for construction.

17

Page 25: FIELD ERECTION MANUAL - Vulcan Steel

UNLOADING OPERATIONS

Pre- planning of the unloading operations is an important part of theerection procedure. This involves careful, safe and orderly storage of allmaterials. Detailed planning is required at the job site where storage spaceis restricted. Here, a planned separation of materials in the order of theerection process is necessary to minimize the costly double handling ofmaterials. While set procedures are not possible in all cases, specialattention should be given to the following items.

Note! THE MANUFACTURER’S trucks are loaded to maximize efficiency ,maximize trailer weight ,and insure safety. Unfortunately, THEMANUFACTURER can not load trucks per customer request.

*** THINK SAFETY AT ALL TIMES ***

1. Location of carrier vehicle during unloadingUnload material near their usage points to minimize lifting, traveland rehandling during building assembly.

2. Prepare necessary ramp for truckThe edges of the concrete slab should be protected to minimize thedanger of chipping or cracking from truck traffic if the materials areto be laid out on the slab. One important safety consideration is thefact that materials stored on the slab may subject the workers topossible injury from falling objects.

3. Schedule lifting equipment (not by The Manufacturer)The type and size of lifting equipment is determined by the size ofthe building and the site conditions. Length of boom, capacity andmaneuverability of lifting equipment will determine its location forboth unloading and erection.

Use the same lifting equipment to unload and erect structural parts.Lifting equipment costs are usually minimized by combining theunloading process with building erection. As soon as the truck isunloaded, the lifting equipment should start erecting the columnsand raising the assembled rafters into position.

18

Page 26: FIELD ERECTION MANUAL - Vulcan Steel

4. Consideration of overhead electric wiresOverhead power lines are a continuing source of danger. Extremecare must be used in locating and using lifting equipment to avoidcontact with power lines.

5. Schedule crewDepending on the crew size, valuable time can generally be gainedif the supervisor plans and watches ahead instead of getting tied upwith a particular unloading chore.

6. Check shipment !!!!!!When shipments are received in the field, two inspections arenecessary :

a. When items, boxes, crates, bundles or other large componentsare received and unloaded from the carrier, they should be checkedoff from the packing list.

If during the inspection, damages, or shortages of items are found,a report should be filed with the carrier immediately at the site. Whendamages are evident from the exterior of containers, they should beopened and inspected thoroughly at the time of receiving shipments. Panelcrates should be opened and inspected for water damage. Galvanized orgalvalume panel crates should always be opened and inspected for whiteor black rust.

b. When bundles, crates, cartons, boxes, etc. are opened followingdelivery, another check must be performed to determine thequantity received and their condition.

If during this inspection damages or shortages of items are found uponopening the crates or cartons, a written claim should be sent to the carrierno later than fourteen (14) days after delivery. If a shortage is discoveredwithin a container, then a written notice should be mailed to TheManufacturer at the same time the claim is sent to the carrier.

Unless these two important inspections are made and any reports orclaims are filed immediately, settlements become very difficult and usuallyall parties suffer the loss.

NOTE! Even when The Manufacturer’s trucks are involved in the delivery,careful attention should be paid to the material, and claims filed in thesame timely manner.

19

Page 27: FIELD ERECTION MANUAL - Vulcan Steel

When filing claims either with the carrier, or with The Manufacturer, theclaim should indicate the item(s) in question, the bundle or container inquestion (if any), the actual quantity received, the quantity which shouldhave been received, or that which was damaged. This is important forquickly retrieving the necessary information. Also, other information suchas numbers, names and addresses of consignees and consignors shouldbe indicated on claims, as well as invoice numbers.

These procedures are primarily for your protection. A shortage discoveredlater, can be caused by theft, misplacement, or other causes, and neitherthe carrier or The Manufacturer can accept responsibility.

NOTE! Galvanized and galvalume materials are susceptible to damagefrom prolonged periods of contact with moisture while stacked together. Ifthere is evidence of moisture during unloading, the panels should beseparated, dried and stored out of the weather to prevent permanentdiscoloration. Never install any material if its’ quality is in question!

20

Page 28: FIELD ERECTION MANUAL - Vulcan Steel

LOCATION OF BUILDING PARTS

• Columns and rafters are usually unloaded near their respective installedpositions on blocking on the slab in position for easy makeup.

• Endwalls are usually laid out at each end of slab with the columns nearrespective anchor bolts.

NOTE! An access area through the center of the building should be leftfor erection equipment.

• Hardware packages should be located centrally, usually along one sidewallnear the center of the building. This will minimize walking distances toother parts of the slab area.

• Purlins and girts, depending on the number of bundles, are usually storednear the sidewalls clear of other packages or parts.

• Sheet packages are usually located along one or both sidewalls off theground and sloping to one end to encourage drainage in case of rain.

• Accessories are usually unloaded on a corner of the slab or off the slabnear one end of the building to keep them as much out of the way aspossible from the active area during steel erection.

NOTE: Steps must be taken to protect the entire job site fromvandalism and pilferage.

21

Page 29: FIELD ERECTION MANUAL - Vulcan Steel

22

SECTION lV

UNLOADING, HANDLING AND STORING MATERIALS

STRUCTURAL

As previously emphasized, a great amount of time and trouble can besaved if the building parts are unloaded at the building site according to apre-arranged plan. Proper location and handling of components willeliminate unnecessary handling.

Inspect all shipments prior to releasing the tie-downs for loads that mayhave shifted during transit! REMEMBER, SAFETY FIRST!

Blocking under the columns and rafters protects the splice plates and theslab from damage during the unloading process. It also facilitates theplacing of slings or cables around the members for later lifting and allowsmembers to be bolted together into sub-assemblies while on the ground.Extra care should always be exercised in the unloading operation toprevent injuries from handling the steel and to prevent damage tomaterials and the concrete slab.

If water is allowed to remain for extended periods in bundles of primedparts such as girts, purlins, etc., the pigment will fade and the paint willgradually soften reducing its bond to the steel. Therefore, upon receipt of ajob, all bundles of primed parts should be stored at an angle to allow anytrapped water to drain away and permit air circulation for drying. Puddlesof water should not be allowed to collect and remain on columns or raftersfor the same reason.

All primer should be touched up as required before erection!

NOTE! Piece marks are stenciledon primary structural members atlower end, 1'-0 from end.

Page 30: FIELD ERECTION MANUAL - Vulcan Steel

23

WALL AND ROOF PANELS

THE MANUFACTURER’s wall and roof panels including color coated,galvalume and galvanized, provide excellent service under widely variedconditions. All unloading and erection personnel should fully understandthat these panels are quality merchandise which merit cautious care inhandling.

Under no circumstances should panels be handled roughly. Packages ofsheets should be lifted off the truck with extreme care taken to insure thatno damage occurs to ends of the sheets or to side ribs. The packagesshould be stored off the ground sufficiently high to allow air circulationunderneath the packages. This avoids ground moisture and deters peoplefrom walking on the packages. One end of the package should always beelevated to encourage drainage in case of rain.

All stacked metal panels are subject, to some degree, to localizeddiscoloration or stain when water is trapped between their closely nestedsurfaces. THE MANUFACTURER exercises extreme caution duringfabricating and shipping operations to insure that all panel stock is keptdry. However, due to climatic conditions, water formed by condensation ofhumid air can become trapped between stacked sheets. Water can also betrapped between the stacked sheets when exposed to rain. Thisdiscoloration caused by trapped moisture is often called wet storage stain.

The stain is usually superficial and has little effect on the appearance orservice life of the panels as long as it is not permitted to remain on thepanels. However, moisture in contact with the surface of the panels overan extended period can severely attack the finish and reduce the effectiveservice life. Therefore, it is imperative that all panels be inspected formoisture upon receipt of the order. If moisture is present, dry the panels atonce and store in a dry, warm place.

CAUTION: Care should always be taken when walking on panels. Usesafety lines and nets when necessary! Panels are slippery. Oil or waxapplied to the roof and wall panels for protection against weather damagewill make them a very slippery surface. Wipe dry any oil that has puddledfrom bundles stored on a slope. Dew, frost, or other forms of moisturegreatly increase the slipperiness of the panels. Always assume panelsurface is slippery and act accordingly. Think safety!!

Page 31: FIELD ERECTION MANUAL - Vulcan Steel

24

WALL AND ROOF PANELS (CONTINUED)

Use wood blocking to elevate and slope the panels in a manner that willallow moisture to drain. Wood blocking placed between bundles willprovide additional air circulation. Cover the stacked bundles with a tarp orplastic cover leaving enough opening at the bottom for air to circulate.

When handling or uncrating the panels, lift, rather than slide, them apart.Burred edges may scratch the coated surfaces when sheets are slid overone another. Never allow panels to be walked on while on the ground.

Rough and improper handling of a panel is inexcusable and a primeexample of poor job supervision.

NOTE! Use gloves when handling metal panels to prevent hand injuries.Be aware of the dangers of handling panels on a windy day. A large panelcan catch enough wind to knock a worker off his feet, even at groundlevel!! Safety first!

Page 32: FIELD ERECTION MANUAL - Vulcan Steel

25

UNLOADING

A Crane and/or forklift is necessary for unloading the components of ametal building. Care should always be taken to avoid damaging material.

Always spread the forks as wide as possible to prevent the panels frombending. Even with the forks as wide as possible, it still may be necessaryto lift certain loads with a crane and spreader bar to avoid damagingmaterial.

Page 33: FIELD ERECTION MANUAL - Vulcan Steel

CABLE TENSION AND HOOK HEIGHT

Tension and hook height for lifting weights at various angles are shown bythe diagrams below.

Notice how the cable tension increases as the lifting angle is decreased. Itis of interest to note that if this angle is reduced to 15˚, the cable tension is3.9 times the vertical lift; at 10˚, it is 5.7 and at 5˚ it is 11.5. When tensionin the cable increases, the compressive or buckling load on the peak raftersection also increases. Slings with low lifting angles should therefore beavoided both to protect the cable and to prevent buckling the rafter.

SAFETY NOTE! Check wire rope for broken strands, broken wires andkinking. Replace damaged, unsafe rope immediately. Always useequipment with an adequate safety margin over the lifted load! Safetyfirst!!!

26

Page 34: FIELD ERECTION MANUAL - Vulcan Steel

STRUCTURAL FRAMING PRECAUTIONS

The layout, assembly and erection of steel should be completed byresponsible personnel, experienced in rigging and handling light steelmembers in a safe manner. Improper handling can easily result in injury,delays and unexpected added costs. This is particularly true when raisingassembled rafters for wide buildings.

KEEPING ERECTION COSTS DOWN

Minimum costs should be obtained when the following conditions are metduring the erection of a building:1. When safety practices are discussed and initiated in advance

of any work procedure.2. When the overall work of erecting the building is divided into

individual jobs, and when each job is assigned (in proper sequence)to teams of workers consisting of from two to seven workers each,with three to five worker teams preferred.

3. When individual workers are properly trained and instructed inadvance as to what they are to do and the safe way to do it. Thiseliminates time wasted while waiting to be told what to do next.

4. When building parts are properly laid out according to advancedplanning so as to avoid lost time in repetitive handling or insearching for specific items.

5. When as many parts as can be safely raised in a single lift arebolted together in sub-assemblies on the ground where assemblywork is faster and safer, thereby, requiring fewer lifts and fewerconnections to be made in the air.

6. When erection of the steel framework starts at one end andcontinues bay by bay to the other end of the building.

7. When the first bay is completed, the individual frames are erectedand tied together by skeleton purlins, and the fill-in purlins areinstalled after the costly lifting equipment has been released.

8. When tools and equipment of the proper kind, in good,safecondition, are available in sufficient quantity.

27

Page 35: FIELD ERECTION MANUAL - Vulcan Steel

28

SECTION V

ERECTION OF PRIMARY AND SECONDARY STRUCTURAL

GENERAL INFORMATION

Many methods and procedures are in use for erecting the structuralportion of metal buildings. The techniques of raising frames vary fromerecting small clear spans and endwall frames in units to erecting thelarger clear spans and modular frames in sections. The erection methodsused depend strictly on the type of building, the available equipment, theexperience level of the crews, and the individual job conditions.

The variation in these factors preclude the establishment of a firm orspecific set of erection rules and procedures. Consequently, the erectionoperation must be tailored by the erector to fit individual conditions andrequirements. However, there are certain erection practices, pertaining tostructural members, which are in general use and have proven sound overthe years. Descriptions of these follow.

Erectors are cautioned not to cut primary members (rigid frame columns,rafters, end bearing frame rafters, interior columns) . These are theprimary support members for the frame and are designed as such. Anycutting of these members may affect the structural stabil i ty. Arepresentative of The Manufacturer should be consulted prior toattempting alterations of these members.

NOTE! Do Not install any material if its quality is in question. THEMANUFACTURER will not be responsible for costs incurred associatedwith the installation and/or removal of same.

NOTE! In no case should building erection be started on green concrete.Anchor bolts may pull loose, concrete spall (chip out along edges) mayoccur and equipment may crush or crack slab. Normal Portland cementconcrete should cure at least seven days and high-early-strength concreteat least three days before the structural columns are erected. Specialcircumstances may require even longer curing periods, consult the projectengineer, not The Manufacturer, on foundation questions.

Page 36: FIELD ERECTION MANUAL - Vulcan Steel

29

RECOMMENDED TOOLS

When buying tools for building erection, it is recommended that onlyindustrial rated, top quality tools be purchased. Experience shows thatlighter duty tools, although cheaper initially, will not hold up satisfactorily,and in the long run, will cost more, not only in repairs, but also in lost time.High speed drill bits are always recommended since carbon steel bits willnot give satisfactory service. Most erectors find that short jobbers lengthbits are more economical and rugged than standard length bits.

The smaller hand tools are particularly difficult to maintain because ofbreakage, losses, pilferage, etc. Some erectors require the workers on thecrew to furnish their own tools in this category. Others issue the tools toindividuals or foremen who are held responsible and liable for them. Sincework rules and customs differ according to localities, each erector shouldestablish a definite policy which is acceptable to his workers whileprotecting his property.

Maintaining equipment and tools in safe clean first class condition reducesinjuries, lowers replacement expense, and stimulates workers to takebetter care of equipment and greater pride in their work.

NOTE! Make certain that the correct tool is available and used for eachphase of building erection. Improper tool usage results in employee injury.All tools should be OSHA approved for commercial construction use.Safety first!!

Page 37: FIELD ERECTION MANUAL - Vulcan Steel

30

RECOMMENDED MINIMUM BASIC TOOL PACKAGEFOR 5–7 MAN ERECTION WORK CREWS

HAND TOOLS QUANTITY

Belts w/ bolt bags 4 - 6Bridge reamer, 9⁄16", 11⁄16", 13⁄16", 15⁄16" 1 eachBroom, push 1 - 3Brush, paint, misc. 2 - 6Brush, wire 1Bucket 2“C” clamps (6", 9" and 12") 4 - 10Cable, 1⁄2" diameter 300'Cable clamps 12 - 32Can, 5 gal gasoline w/safety spout 1 - 2Can, oil 1Caulking gun, open barrel 2 - 6Chain , 35' long (to lock equipment) 1Chalk line, 100’ long and chalk 2Channel locks 2Chokers ( or as required )

1⁄2" cable, 6' long, eyes both ends 4 - 65⁄8" cable, 6' long, eyes both ends 21⁄2" cable, 10'–14' long, eyes both ends 4

Circuit tester 1Cold chisel 1Come-a-long, 3 ton 1Come-a-long, 1 ton 2Dolly 1Drift pin (barrel pin, bull pin) 2 - 5Extension cord, #10-3, 2/4 way box, 250’ long 1Extension cord, #12-3, 100' long 2 - 3Extension cord, #12-3, 25' long 1Fire extinguisher, #10 2Files, assorted 4First aid kit 1Flashlight 1Gloves, pr. 10Goggles, cutting 3Goggles, safety 10Ground fault interrupter(circuit breaker) as req’dHammers

Carpenters claw 1 - 2Ball peen 2 - 5

Page 38: FIELD ERECTION MANUAL - Vulcan Steel

31

Sledge (10 lb.) 1 - 2Rubber 1 - 3Welders chipping 1

Handlines (rope), 1⁄2"–5⁄8" dia., 60' long w/hooks 4 - 7Hard hats 5 - 11Knife, pocket 1Knife, putty 2Ladders

Extension, 20' to 40' long 2Step, 6' to 8' long 2 - 3

Level rod 1Load binders 3Mop, sponge 1Padlocks 4Pliers, side cutter 2Plumb bob 1 - 2Pop rivet gun (manual or electric) 2 - 3Punch, center 1Safety Harnesses 5 - 7Safety Harness tie-off rigging as req’dSafety Netting as req’dSalt tablets quantitySaws, carpenters, hand 1Saws, hack w/blade 1Saw horses 4Scaffold - section w/wheels 2Screwdriver, sets, flat and Phillips 1 - 4Screwdriver, 10 pc. set, 1⁄4" hex drive 1Shear, portable panel 1 eachShovels 2Slings, nylon, 4" wide, 10' - 12' long 4Snips,aviation (2 R/H, 2 L/H, straight cut) 5Snips, large (bulldogs) 1Spirit level 4’ long 1Sponges 2Spreader, 1 set 3⁄4" dia., 20',center eye w/hook ends 1Staple gun and staples 4Square, framing 1 - 2Square, Try 1 - 2Tape measure - 12' to 16' long 1 - 5Tape measure - 100' long 1Tool box 5Transit 1Turnbuckles - 3⁄4" min 8

Page 39: FIELD ERECTION MANUAL - Vulcan Steel

Vice grips, sheet metal 2 - 4Vice grips, standard 5Vise grips, welding clamp 2 - 4Water cooler (5 gal.) and 1 case cups 1Wedge, steel 2Wire (9#), rolls 2Wrecking bar 1Wrenches, 12" adjustable 5Wrenches, 15" adjustable 2Open end structural w/drift handle( 3⁄4", 7⁄8", 11⁄8", 11⁄4", 17⁄16", 11⁄2", 15⁄8"17⁄8", 21⁄4" ) 2 - 7Box end structural( 3⁄4", 7⁄8", 11⁄8", 11⁄4", 17⁄16", 11⁄2", 15⁄8"17⁄8", 21⁄4" ) 2 - 71⁄2" drive ratchet w/ 3⁄4", 7⁄8", 11⁄8" and11⁄4" six point sockets,extensions anduniversal 2 - 73⁄4" or 1' drive ratchet with 20" or 24" handle andsockets to a maximum size of 15⁄8" 2 - 7

POWER TOOLSCutting torch w/100' hose, bottle cart, with fire extinguishers 1Drill, 1⁄4" drive 2 - 3Drill 1⁄2" drive 1Drill bits (1⁄8") 2 - 6 dozGenerator - 2 to 5 KW, with 110V D.C.with 50’ ground, 75' lead and access 1Hammer drill with 6 bits 1Impact tool 1⁄2" 1 - 2Impact wrench and sockets 1Power nibbler 1Power shears 171⁄2" heavy duty skill saw 1Screw guns

1900 RPM electric screw gun-self drill screws 3 - 5500 RPM electric screw gun self - tapping screws 3 - 55⁄16", 3⁄8" and 7⁄16" hexhead sockets 3 - 5

Welding hood with spare lens 1Welding unit 1Note! Additional tools may be required depending on the specificrequirements of the building.The erector should plan ahead to eliminatedelays!

32

Page 40: FIELD ERECTION MANUAL - Vulcan Steel

LIFTING CABLES AND SPREADER BARS

In all instances the length of the lifting cables should be such that theangle between the rafter and the lifting cables is no less than 45 degrees.To reduce the severe compression stresses at the ridge of the rafterswhich are created by the angle of lifting cables, a spreader bar isrecommended, which allows the lifting cables to be parallel to each other.See page 21 for additional information!

NOTE! Stay well in the clear of loads being moved by any lifting device.Hands and feet should be kept clear of moving loads and never standunder a load being lifted. Remember, SAFETY FIRST!

33

Page 41: FIELD ERECTION MANUAL - Vulcan Steel

RAISING RIGID FRAMES

The intermediate or interior frames nearest the bearing endwall areusually erected first. This bay usually contains the optional diagonalbracing. The proper completion and plumbing of this first bay, as will bediscussed later, is extremely important to the successful completion of thebuilding.

Although several methods are used to erect rigid frames, it has been foundmost satisfactory to erect the columns first, tie them together with the girtsand tighten the anchor bolts*. On small spans and short eave heights,columns can often be set in place by hand without the use of hoistingequipment. Temporary bracing should always be installed as soon assections are lifted in place.

* The anchor bolt tension may need to be adjusted to seat the rafter.

NOTE! Each worker should be trained to use the safest and mostproductive erection techniques. Safety first!

34

Page 42: FIELD ERECTION MANUAL - Vulcan Steel

RAISING RIGID FRAMES (CONTINUED)

After the columns have been erected, the ground assembled rafter ishoisted into place and connected to the columns. The size of the rafterwhich can be safely handled depends on the equipment available and theexperience of the erection foreman. Generally as many connections aspossible are made on the ground.

The flange brace should be bolted to the rafter prior to raising in order tosave time. The hoisting equipment should never be released from therafter until the frame is adequately braced, so it cannot buckle or tip in thelongitudinal direction of the building.

NOTE! Stay well in the clear of loads being moved by any type of liftingequipment. Safety first!

35

Page 43: FIELD ERECTION MANUAL - Vulcan Steel

RAISING RIGID FRAMES (CONTINUED)

A second method, when equipment is limited, (while not recommended) isillustrated below. After the column is erected, the first rafter section, withthe lifting cable around the balance point, is raised into position and boltedto the column. Then, when the free end of the rafter is supported by anysafe method ( such as an adequate wood frame, or a metal scaffold,properly braced, and of satisfactory capacity ) the lifting cable can bereleased. The procedure is then repeated until the entire frame is in placeand bolted together at the ridge.

Still a third method for erecting rigid frames with limited equipment adoptsthe same support procedure described previously, but differs in that thesidewall column and the first rafter section are bolted together on theground and raised into position in one lift. The lifting cable is againattached at the balance point (about the quarter point of the rafter in thiscase). When the column is secured by the anchor bolts and the free endsupported, the process is repeated with the frame bolted together at theridge.

NOTE! Stay well in the clear of loads being moved by any type of liftingequipment or supported by temporary bracing. Safety first!

36

Page 44: FIELD ERECTION MANUAL - Vulcan Steel

RAISING RIGID FRAMES (CONTINUED)

When the rafters consist of several roof beams, as in the case of widebuildings, a safe procedure of raising by sections and supporting the freeend must be followed, regardless of the type of equipment available. Inmost instances the work proceeds from outside columns inward towardthe peak until the entire frame is bolted into place.

The same general procedures of erection apply to either clear span ormultiple span frames. In the case of the latter, the support for raftersections during erection is generally supplied by the interior columns,themselves, making temporary supports unnecessary.

Two words of caution concerning the erection of rigid frames is in order.The first is that rigid frames, especially free ends or cantilevered sectionsshould never be left “for the day” in an unsupported, unbraced or unguyedcondition. Such practice has resulted in the total loss of considerableamounts of erected steel because of wind. The second word of cautionpertains to the additional care required in the erection of multiple spanframes compared to clear span frames. Frames with interior columns,because of closer supports, have much lighter sections. They are muchmore apt to buckle during erection than clear span frames, andconsequently require greater care in rigging and handling.

CONNECTION BOLTS

Bolts used to make connections in secondary framing members such asthe purlins are usually 1⁄2" diameter, ASTM designation A307. All primaryframing connections are made with ASTM A325 bolts, usually 5⁄8", 3⁄4", 7⁄8"and 1' diameters. The size and grade of the bolt are marked on thebuilding erection drawings.

NOTE! Each worker should be trained to use the safest and mostproductive erection techniques. Safety first!

37

Page 45: FIELD ERECTION MANUAL - Vulcan Steel

BOLT TIGHTENING PROCEDURES

A325 BOLTS

JOINTS NOT SUBJECT TO TENSION LOADS

JOINTS NOT SUBJECT TO TENSION LOADS need only be tightened tothe snug tight condition, defined as the tightness attained by a few impactsof an impact wrench or the full effort of a man using an ordinary spudwrench.

JOINTS SUBJECT TO TENSION LOADS

Two tightening procedures are specified for A325 bolts in joints subject totension loads, Turn-of-the-nut method and Direct tension indicator.

Turn-of-the-nut method - When turn-of-the-nut method is used to providetension, first bring enough bolts to a “snug tight” condition to insure thatthe parts of the joints are brought into good contact with each other. Next,place bolts in all remaining bolt holes and bring to “snug tight”. Thenadditionally tighten all bolts per the above table - progressing from thebolts nearest the web, to the free edges. During this operation there shallbe no rotatation of the part not turned by the wrench.

Tightening by use of a direct tension indicator - Tightening by this meansis permitted provided it can be demonstrated, by an accurate directmeasurement procedure, that the bolts have been tightened to specifiedtension.

Consult latest edition of the AISC Manual of Steel Construction for morecomplete instructions for installing high strength bolts.

BOLT SIZEINCHES

1⁄25⁄83⁄47⁄8

1

11⁄4

7⁄8

11⁄16

11⁄4

17⁄16

15⁄8

2

12

19

28

39

51

71

1⁄3 TURN 1⁄2 TURN

WINCHES BOLT LENGTH

<=4 DIAMETERSBOLT LENGTH>4 DIAMETERS

SPECIFIEDMINIMUM FASTENER

TENSION KIPS(1000 LBS.)

SPECIFIED NUT ROTATION

38

Page 46: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL PRIMARY FRAMING CONNECTION DETAILS

COLUMN TO RAFTERAT KNEE

RAFTER AT RIDGEWITHOUT COLUMN

RAFTER AT RIDGEWITH COLUMN

39

Page 47: FIELD ERECTION MANUAL - Vulcan Steel

40

TYPICAL PRIMARY FRAMING CONNECTION DETAILS

RAFTER AT INTERMEDIATEFIELD SPLICE

INTERIOR COLUMNTO RAFTER

EXTERIOR COLUMNTO FOUNDATION

INTERIOR COLUMNTO FOUNDATION

Page 48: FIELD ERECTION MANUAL - Vulcan Steel

41

TYPICAL SECONDARY FRAMING CONNECTIONS

EAVE STRUT TO COLUMN

Page 49: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL SECONDARY FRAMING CONNECTIONS

EAVE STRUT TO COLUMNFLUSH GIRT CONDITION

NOTE! The above example represents a typical flush girt - eave strutconnection. Consult your personalized erection drawings for specificrequirements. Safety first!

42

Page 50: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL SECONDARY FRAMING CONNECTIONS

FLANGE BRACE TO PURLIN

NOTE! Bolts shown here required to be tightened to snug tight conditionon round holes only.

43

Page 51: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL SECONDARY FRAMING CONNECTIONSINTERIOR BAY PURLIN/GIRT FRAMING

THE MANUFACTURER utilizes uneven legs on “Z” shapes to improveerection time and to increase the overall strength of the member. Since the“Z”s are designed to nest, the erector must be aware that the 21⁄8" flangeshould be up on odd number bays and down on even number bays, toallow the members to seat properly

NOTE! Bolts shown here required to be tightened to snug tight conditiononly!

2' – 31⁄2" LAP

0 - 71⁄2" LAP (IF AVAILABLE)

ODD BAY EVEN BAY

44

Page 52: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL SECONDARY FRAMING CONNECTIONS

INTERIOR BAY PURLIN / GIRT FRAMING

NOTE! Typical connection for girt/purlin to frame at 2'–31⁄2", 3'–31⁄2",4'–31⁄2", 5'–31⁄2" and 6'-31⁄2" lap. Use (6) 1⁄2" dia. A307 bolts without washersas shown. Safety first!

45

Page 53: FIELD ERECTION MANUAL - Vulcan Steel

TYPICAL SECONDARY FRAMING CONNECTIONS

GIRT TO FRAME

NOTE! The flush girt connection requires two (2) or four (4) 1⁄2" dia. bolts.Safety first!

46

Page 54: FIELD ERECTION MANUAL - Vulcan Steel

EAVE STRUT

PLUMB BOB

MEASURE

MEASURE

PLUMBING CABLE

COMPLETING AND PLUMBING THE FIRST BAY

After the first intermediate or interior frames have been set, THEMANUFACTURER recommends that all purlins, girts, and eave struts beinstalled in the braced bay and the entire bay plumbed, aligned and bracedbefore proceeding further. If the building is designed without cable bracing,the erector is responsible for providing temporary erection bracing.

When this bay is properly and accurately plumbed and braced, theremaining members, to a large degree, will automatically plumb and alignwhen installed. Only a final check of the building plumb remains, and fewadjustments, if any, will be necessary.

Plumb the frame with a plumb bob or transit, not a spirit level. To measurelateral plumbness hang plumb bob from top of the column down theoutside flange as shown below. Adjust plumbing cables to obtain equaltape measurements at top of column.

NOTE! Use OSHA approved tie offs, netting or rails when working onroof areas, and adhere to all OSHA safety rules. Safety first!

47

Page 55: FIELD ERECTION MANUAL - Vulcan Steel

48

PLUMBING THE BUILDING (CONTINUED)

To plumb the braced bay lengthwise using a transit, sight in the transitparallel to the base of the frame columns by using a position a few inchesfrom the frame line (See sketch). Make sure transit is level. Check frameby reading tape through transit. First bring columns into plumb, thenrafters, by adjusting diagonal bracing. Take all measurements fromcenterline of flange. Take a measurement at the base of the columns andadjust the bracing to correct the transit reading at the rafter measuringlocation. Once the frame is plumb, all connection bolts and anchor boltsshould be tightened.

To plumb the braced bay without a transit, run a chalk line from out offlange to out of flange of columns on the foundation (per drawing). Dropplumb bob(s) from rafter flange(s) and square the frame using the rodbracing for leverage.

NOTE! Each worker should be trained to use the safest and mostproductive erection techniques. Safety first!

Page 56: FIELD ERECTION MANUAL - Vulcan Steel

49

ERECTING THE COLUMN AND BEAM ENDWALLS

Column and beam endwalls of 50 feet or less in span may be raised intoposition and set on the anchor bolts as a unit. All rafters, columns,girts(except outside endwall girts which connect to the sidewall girts) ,door headers, door jambs, clips, diagonal brace rods, etc. should beassembled on the ground with the bolts left finger tight. A spreader barshould be used to raise the endwall frame. Because of the flexibility of thecolumn and beam frames, care must be taken in locating the points ofattachment of the cables, and in raising the frame, to avoid bending aboutthe minor axis.

For spans of 60 feet and greater, the columns are usually erected first andthen capped with the endwall rafter. The girts, headers, jambs anddiagonal brace rods are then added between the end columns. During thiserection process, the frame must be properly braced or guyed before thelifting lines are disengaged. Final bolt tightening should be done once theframe is plumb and square.

NOTE! Stay clear of all moving loads Make certain all framing is properlybraced or guyed before lifting lines are removed. Follow all OSHAregulations! Safety first!

Page 57: FIELD ERECTION MANUAL - Vulcan Steel

ERECTING THE REMAINING FRAMES

The remaining frames are erected in like manner, initially with only a fewpurlins being installed in each bay, as shown below, working from one endof the building to the other. To lend overall rigidity to the structure, installflange braces to the purlins at specified locations. All purlin, girt and eavestrut connection bolts are left loose so that the entire skeleton frame workcan be plumbed without undue difficulty.The remaining purlins can bepositioned on the rafter in each bay to facilitate the completion of the roofframing.

NOTE! Always follow all OSHA safety recommendations. Safety first!

50

Page 58: FIELD ERECTION MANUAL - Vulcan Steel

ERECTING THE REMAINING FRAMES (CONTINUED)

At this point, hoisting equipment will normally not be used again until roofsheeting begins. Remaining purlins and girts are then loose bolted inplace, as well as flange braces.

NOTE! Always use OSHA approved tie off, netting or rails when workingon roof areas. Safety first!

51

Page 59: FIELD ERECTION MANUAL - Vulcan Steel

INSTALLATION OF THE WIND BRACING

Diagonal bracing in metal buildings is critical! They provide support forwind loads or other longitudinal loads, such as those created by anoverhead crane in the completed structure. Many times additionaltemporary bracing is needed to stabilize the structure during erection. Thisrequirement should be reviewed by the erector, and any additional bracingshould be provided by the erector. On some smaller buildings, diagonalbracing is not needed for the building design, so any erection bracingneeded must be furnished by the erector.

NOTE! Workers should always use gloves when working on metal framesand sheeting. Always follow all OSHA safety recommendations.Safety first!

52

Page 60: FIELD ERECTION MANUAL - Vulcan Steel

INSTALLATION OF WIND BRACING ( CONTINUED)

The diagonal bracing is usually cable or round rod. It should always beinstalled as shown on the erection drawing and should be tensioned sothat the building will not sway or rock when the wind blows. Care should betaken, however, not to over tighten and bend the structural members. Theworkman should watch the structural members carefully as he tightens thebracing.

Occasionally the bracing in the wall of a building cannot be installed in thespecified bay because of doors or other complications. Usually these canbe moved to other bays without affecting the structural integrity of thebuilding. However, before moving any wind bracing check with TheManufacturer. Never modify a building without first notifying TheManufacturer in writing.

NOTE! Follow all OSHA approved safety recommendations, Safety first.

HILLSIDE WASHER

FLAT WASHERHILLSIDE WASHER

FLAT WASHER

WEB OF COLUMN

HEX NUT

EYE BOLT

FLO-LOC

HEX NUT

ROD BRACE

WEB OF COLUMN

53

Page 61: FIELD ERECTION MANUAL - Vulcan Steel

INSTALLATION OF WIND BRACING (CONTINUED)

HILLSIDE WASHER INSTALLATION

NOTE! Care should be taken not to over-tighten the wind bracing. Over-tightening the bracing can cause permanent damage to the framing.

PURLIN BRIDGING INSTALLATION

NOTE! HILLSIDE WASHER INSTALLATIONSIMILAR AT BASE

INSTALL BRIDGING EAVE TO PEAK

FLAT WASHER

HILLSIDE WASHER

6C16 SAG CHANNELS ~ SEE ROOF PLAN FOR LOCATION.

SAG CHANNEL DETAIL1/2" A307 FLAT HEAD BOLTS

STANDARD 1/2" A307 BOLTS TYPICAL EXCEPT AT EAVE STRUTS.

54

Page 62: FIELD ERECTION MANUAL - Vulcan Steel

Endwall Girt

Endwall Column

Cee Rafter

FLUSH GIRT ENDWALL

Purlin

AngleRake

(2) 1/2 x 1 1/4 A325

"CEE" RAFTER

1/4"

"CEE" RAFTER

Endwall Girt

Endwall Column

(2) 1/2 x 1 1/4 A325Cee Rafter

AngleRake

1/4"

Purlin

BY-PASS GIRT ENDWALL

ENDWALL COLUMN TO RAFTER DETAILS8"

8"1’-4"

Endwall Girt

AngleRake

Zee Rafter(2) 1/2 x 1 1/4 A325

Endwall Column

Purlin

"ZEE" RAFTER

1/4"

8"

Endwall Girt

Endwall Column

(2) 1/2 x 1 1/4 A325

"ZEE" RAFTER

Zee Rafter

Purlin

AngleRake

1/4"

8"

1’-4"

Endwall Girt

WF RAFTER

Wide Flange

Endwall Column

Rafter

1/4"

AngleSheeting

Purlin

8"

1’-0"

WF RAFTER

Endwall Girt

SheetingAngle

Endwall Column

Wide FlangeRafter

Purlin

1/4"

4"

SECTION VI

PRIMARY AND SECONDARY STRUCTURAL DETAILS

BEARING FRAME ENDWALL FRAMING

55

Page 63: FIELD ERECTION MANUAL - Vulcan Steel

EN

DW

ALL

CE

NT

ER

CO

LUM

N

1/2"

X 1

-1/4

" A

307

BO

LTS

PE

AK

PLA

TE

EN

DW

ALL

RA

FT

ER

RO

OF

PU

RLI

N

OF

BO

LTS

AT

TH

IS C

ON

NE

CT

ION

.F

RA

MIN

G P

LAN

FO

R S

IZE

AN

D Q

UA

NIT

YN

OT

E: R

EF

ER

TO

ER

EC

TIO

N D

RA

WIN

GS

EN

DW

ALL

EN

DW

ALL

CO

RN

ER

CO

LUM

N

RA

KE

AN

GLE

EN

DW

ALL

ZE

E R

AF

TE

R

(2)

1/2"

X 1

-1/4

" A

307

BO

LTS

EA

VE

ST

RU

T

CO

RN

ER

CO

LUM

N/R

AF

TE

R C

ON

N.

RA

FT

ER

/RA

FT

ER

CO

NN

.

CE

NT

ER

CO

LUM

N/R

AF

TE

R C

ON

N.

CO

NN

EC

TIO

N P

LAT

E(S

HO

P B

OLT

ED

TO

ON

E R

AF

TE

R)

(SH

OP

BO

LTE

D T

O O

NE

RA

FT

ER

)

TY

PIC

AL

EN

DW

ALL

FR

AM

ING

LA

YO

UT

56

Page 64: FIELD ERECTION MANUAL - Vulcan Steel

57

EN

DW

ALL

CE

NT

ER

CO

LUM

N

PE

AK

PLA

TE

EN

DW

ALL

RA

FT

ER

CE

NT

ER

CO

LUM

N/R

AF

TE

R

(SH

OP

BO

LTE

D T

O O

NE

RA

FT

ER

)

EN

DW

ALL

FR

AM

ING

LA

YO

UT

@ "

FU

LL F

LUS

H"

EN

DW

ALL

CO

NN

EC

TIO

N P

LAT

E

RA

FT

ER

BA

CK

TO

BA

CK

AN

GLE

S

"CE

E"

EN

DW

ALL

CO

LUM

N

"B"

"B"

SE

CT

ION

"B

-B"

W/F

ULL

FLU

SH

CH

AN

NE

L E

ND

WA

LL

(SH

OP

BO

LTE

D T

O P

EA

K P

LAT

E)

PE

AK

AN

GLE

S

"A"

"A"

SE

CT

ION

"A

-A"

4"

Page 65: FIELD ERECTION MANUAL - Vulcan Steel

58

BEARING FRAME EAVE STRUT FRAMING

FLUSH GIRT ENDWALL

BY-PASS GIRT ENDWALL

"ZEE" RAFTER

AngleRake

Zee Rafter

Purlin

1/4"

6 1/4"

WF RAFTER

SheetingAngle

Wide FlangeRafter

Purlin

1/4"

2 7/8"

Eave Strut

AngleRake

"CEE" RAFTER

1/4"

9 3/4"

"ZEE" RAFTER

Zee Rafter

AngleRake

1/4"

1’-2 1/4"

"CEE" RAFTER

Cee Rafter

AngleRake

1/4"

1’-5 3/4"

WF RAFTER

Wide FlangeRafter

1/4"

AngleSheeting

10 7/8"

Page 66: FIELD ERECTION MANUAL - Vulcan Steel

59

EAVE STRUT

(2) 1/2" A-325 BOLTSSIDEWALL GIRT

ENDWALL GIRT

FLUSH ENDWALL

SHOP BOLTED CLIPS

SINGLE CEE CORNER COLUMN

CGC-2 CLIP

BY-PASS ENDWALLSINGLE CEE CORNER COLUMN

SIDEWALL GIRT

ENDWALL GIRT

EAVE

STRUT

(2) 1/2" A-325 BOLTS

BY-PASS ENDWALL

(DOUBLE CEE SIMILAR)HOT ROLLED CORNER COLUMN

(2) 1/2" A-325 BOLTSSIDEWALL GIRT

EAVE STRUT

ENDWALL GIRTCGC-2 CLIP

SHOP BOLTED CLIPS

FLUSH ENDWALL

SIDEWALL GIRT

ENDWALL GIRT

EAVE STRUT

(2) 1/2" A-325 BOLTS

HOT ROLLED CORNER COLUMN(DOUBLE CEE SIMILAR)

CORNER COLUMN FRAMING DETAILSCOLD FORMED RAFTER

Page 67: FIELD ERECTION MANUAL - Vulcan Steel

EAVE STRUT

(2) 1/2" A-325 BOLTSSIDEWALL GIRT

ENDWALL GIRTFLUSH ENDWALL

SIDEWALL GIRT

ENDWALL GIRT

(2) 1/2" A-325 BOLTS

EAVE STRUT

CGC-2 CLIP

BY-PASS ENDWALL

CORNER COLUMN FRAMING DETAILSHOT ROLLED COLUMN & RAFTER

60

Page 68: FIELD ERECTION MANUAL - Vulcan Steel

Hot Rolled

HOT ROLLED ENDWALL COLUMN

Endwall Column

3 3/4"

3 3/4"

COLD FORM ENDWALL COLUMN

Cold Form Endwall Column

1/4"

3 3/4"

ENDWALL JAMB/COLUMN

Jamb/Column 3 3/4"

Open

ing W

idth

Endwall Girt

Endwall Girt

COLD FORM ENDWALL COLUMN

4

Endwall ColumnCold Form

3 3/4"

(BACK TO BACK CEE’S)

Back to Back 3 3/4"

Endwall Girt

COLD FORM CORNER COLUMN

Sidewall Girt

Cold Form CornerColumn

1/4"

3 3/4"

8"

Endwall Girt

HOT ROLLED CORNER COLUMN

Sidewall Girt

1’-0

Hot Rolled Corner Column

Endwall Girt

ENDWALL FRAMING WITH FLUSH GIRTS

61

Page 69: FIELD ERECTION MANUAL - Vulcan Steel

ENDWALL JAMB/COLUMN

Endwall ColumnCold Form

3 3/4"

Open

ing W

idth

Girt

Lap

Endwall ColumnHot Rolled

HOT ROLLED ENDWALL COLUMN

ColumnC

(Six Bolt Connection)

Endwall Girt

Cold Form Endwall

COLD FORM ENDWALL COLUMN

(Six Bolt Connection)

(Girt

Lap

)

Endwall Girt

(Back to Back Cee’s)

Cold Form Endwall

(Girt

Lap

)

(Six Bolt Connection)

COLD FORM ENDWALL COLUMN

Endwall Girt

HOT ROLLED CORNER COLUMN

Corner ColumnHot Rolled

Sidewall Girt8 1/4"

8"

1’-0

(Six Bolt Connection)

CGC-2 CLIP

Endwall Girt

Cold Form Corner

COLD FORM CORNER COLUMN

1/4" Sidewall Girt

Column

8"

(Six Bolt Connection)

Endwall Girt

ENDWALL FRAMING WITH BY-PASS GIRTS

62

Page 70: FIELD ERECTION MANUAL - Vulcan Steel

RafterMain Frame

Endwall Girt

A325 BoltsEndwall Column

FLUSH GIRT ENDWALL

Purlin

AngleSheeting

1’-2Roof Steel Line

1/2" x 1 1/4"

BY-PASS GIRT ENDWALL

Endwall Girt

Roof Steel Line1’-2

1/2" x 1 1/4"A325 Bolts

AngleSheeting

Endwall Column

RafterMain Frame

Purlin

MAIN FRAME ENDWALL FRAMING

63

Page 71: FIELD ERECTION MANUAL - Vulcan Steel

END BAY

Main FrameColumn

1/4"

AngleSheeting

1’-2"

1 1/2" 1 1/2"

INTERIOR BAY

1 1/2"1 1/2"

Main FrameColumn

FLUSH OR BY-PASS GIRT ENDWALL

FLUSH OR BY-PASS GIRT ENDWALL

L INTERIOR FRAMEC

MAIN FRAME EAVE STRUT FRAMING

64

Page 72: FIELD ERECTION MANUAL - Vulcan Steel

1’-2

Main FrameCorner Column

EndwallGirt

Sidewall Girt

End Frame

BY-PASS GIRT CORNER COLUMN

C

CGC-2

Bay Dimension

Main FrameInterior Column

SidewallSteel Line

SidewallGirt

Int Frame

BY-PASS INTERIOR COLUMN

(Girt Lap As Req’d)

Flange Brace(As Req’d)

C

1’-2

Main FrameCorner Column

SidewallGirt

End Frame

EndwallGirt

FLUSH GIRT CORNER COLUMN

C Bay Dimension

Main FrameInterior Column

SidewallGirt

Int. Frame

SidewallSteel Line

FLUSH GIRT INTERIOR COLUMN

C

MAIN END FRAME AND INTERIOR FRAMEGIRT CONNECTIONS

65

Page 73: FIELD ERECTION MANUAL - Vulcan Steel

C Frame

C Frame

1’-1 3/4"

2’-3 1/2" LAP

C

Additional

(If Required)Flange Brace

Flange Brace (Typ.)

Frame

3 3/4"

0’-7 1/2" LAP

C Frame

C Frame

3 3/4" 1’-1 3/4"

1’-1 3/4" 2’-1 3/4"

3’-3 1/2" LAP

2’-1 3/4"

4’-3 1/2" LAP

FrameC

2’-1 3/4"

2’-1 3/4" 3’-1 3/4" 3’-1 3/4"3’-1 3/4"

6’-3 1/2" LAP5’-3 1/2" LAP

INTERIOR BAY PURLIN / GIRT FRAMING

66

Page 74: FIELD ERECTION MANUAL - Vulcan Steel

FLUSH GIRT ENDWALL

Endwall Girt

Zee Rafter(2) 1/2 x 1 1/4 A325

Endwall Column

Purlin

Endwall Girt

Endwall Column

(2) 1/2 x 1 1/4 A325Zee Rafter

Purlin

BY-PASS GIRT ENDWALL

8"

8"

1’-4"

SheetingAngle

1/4"

Varies

SheetingAngle

1/4"

Varies

COLD FORMED ENDWALL FRAMINGWITH PURLIN EXTENSION

67

Page 75: FIELD ERECTION MANUAL - Vulcan Steel

68

FLUSH GIRT ENDWALL

Endwall Girt

SheetingAngle

Endwall Column

Wide FlangeRafter

Purlin1/4"

Endwall Girt

Wide Flange

Endwall Column

Rafter

Purlin

4"

8"

1’-0"

AngleSheeting

Varies

SheetingAngle

1/4"

Varies

HOT ROLLED ENDWALL FRAMINGWITH PURLIN EXTENSION

Page 76: FIELD ERECTION MANUAL - Vulcan Steel

69

RafterMain Frame

Endwall Girt

A325 BoltsEndwall Column

FLUSH GIRT ENDWALL

Purlin

1’-2

1/2" x 1 1/4"

BY-PASS GIRT ENDWALL

Endwall Girt

1/2" x 1 1/4"A325 Bolts

Endwall Column

RafterMain Frame

VARIES

SHEETING ANGLE

Purlin

VARIES 1’-2

SHEETING ANGLE

MAIN FRAME ENDWALL FRAMINGWITH PURLIN EXTENSION

Page 77: FIELD ERECTION MANUAL - Vulcan Steel

EAVE CANOPY AT MAIN FRAME

RafterMain Frame

Sidewall Steel LineVARIES

ClipShop Bolted

BeamCanopy Purlin

FirstEaveStrut

ChannelEave

Member Screws At12" On Center

Roof Panel

Eave Strut

Stitch Screws At12" On CenterSoffit Trim

Outside Closure

Eave Channel

Stitch Screws At6" on Center

Gutter

Member Screws At6" On Center

Inside Closure

Canopy Eave Trim

Return Downspout

Member Screws At12" On Center

Wall Panel

Varies

SECTION THRU EAVE CANOPYWITH SOFFIT

Soffit Panel

Member Screws At6" On Center

Inside Closure

Canopy Eave Trim

Member Screws At12" On Center

Soffit Panel

CANOPY WITH EAVE TRIM

EAVE CANOPY SHEETING

Shop Welded

Clip

EAVE CANOPY FRAMING

70

Page 78: FIELD ERECTION MANUAL - Vulcan Steel

FLO-LOC GRIP

SLOT IN WEB TOINSERT HILLSIDE

WASHER & EYEBOLT

CABLE

EYEBOLT

FLATWASHER

COLUMN ORRAFTER WEB

NUT

HILLSIDEWASHER

CABLE BRACE TO FRAME DETAIL

WASHER & EYEBOLTINSERT HILLSIDESLOT IN WEB TO

WASHERFLAT

WASHERHILLSIDE

NUT

RAFTER WEBCOLUMN OR

ROD BRACE

CABLE OR ROD BRACETO FRAME CONNECTION

71

Page 79: FIELD ERECTION MANUAL - Vulcan Steel

FLO-LOC GRIP

CABLEENDWALL

EN

DW

ALL

SIDEWALL

EYEBOLT

WASHERHILLSIDE

FLAT WASHER

NUT

BOLT1/2"

COLUMNENDWALL

BRACE ANCHOR

CABLE BRACE TO COLDFORMED ENDWALL COLUMN DETAIL

HOT ROLLED

BRACE ANCHOR DETAIL

AUXILIARY BRACING DETAILS

72

Page 80: FIELD ERECTION MANUAL - Vulcan Steel

PURLIN / EAVE STRUT DETAILS

73

Page 81: FIELD ERECTION MANUAL - Vulcan Steel

WIND COLUMN TO MAIN FRAME DETAIL

74

MAIN FRAMECOLUMN

Page 82: FIELD ERECTION MANUAL - Vulcan Steel

PORTAL FRAME TO MAIN FRAME DETAIL

75

Page 83: FIELD ERECTION MANUAL - Vulcan Steel

FRAMED OPENING FRAMING DETAILS

WALL ELEVATION* = 1'-51⁄2 MINIMUM

76

SECTION "B"

EAVE STRUT

JAMB

SECTION "C"

GIRT

JAMB

ALL BOLTS ARE 1/2" Ø x 1" M.B. UNLESS NOTED

Page 84: FIELD ERECTION MANUAL - Vulcan Steel

EAVE LINE AND BELOW EAVE LINELEAN-TO CONNECTIONS

77

Page 85: FIELD ERECTION MANUAL - Vulcan Steel

FRAMING AT HI-LO CONDITIONAT COMMON WALL

78

Page 86: FIELD ERECTION MANUAL - Vulcan Steel

CL

73

Bottom Connection

Crane Bracket

Web Stiffeners

Flange Brace

SECTION "A"

Column

Channel Cap

Crane Beam

Crane Beam & RailCrane Beam

Top Connection

Crane Beam

Rail

C

SECTION "B"

BOX STRUT

Column

STIFFENER

FLANGE BRACE

Brace Angle

KNIFE PLATE

For Clarity.Rail Not Shown

Crane BeamTop Connection

Crane Bracket

ColumnC

C

Bottom ConnectionCrane Bracket

SECTION "C"

Web Stiffeners

Channel Cap

Crane BeamCrane Beam

Rail " Gap

ColumnC

12

"B"

"C"

C\ L TO C \

MAIN FRAME

EA

VE

HE

IGH

T

CLEAR DIM.

CLR

.

Flange Brace

Crane Beam & Rail

Crane Beam

DETAIL "A"

CRANE BEAM AND BRACKET

FIN. FLR.

L OF BEAM

TO

P O

F R

AIL

TOP RUNNING CRANE BRACKET DETAILS

Specific bracket details vary from building to building — consult erection drawingsprior to installation.

79

Page 87: FIELD ERECTION MANUAL - Vulcan Steel

80

CL

CL

DETAIL "A"(MIN. LENGHT BRACKET)

(MAX. LENGHT BRACKET) DETAIL "A"

CLLC

DETAIL "B"

TIEPLATE(FIELDWELD)

CRANEBEAM A325

BOLTSW/BEVELWASHERS

CAPCHANNEL(IFREQ‘DBYDESIGN)

CRANEBRACKET

CRANE BEAM

CRANEBEAM

TIE PLATE(FIELD WELD)

A325BOLTS

W/BEVEL

WASHERS

CAPCHANNEL

(IFREQ‘D

BYDESIGN)

CRANEBRACKET

ANGLEBRACE(IFREQ‘DBYDESIGN

A325 BOLTS

RAFTER

BRACE SLOT(IF REQ‘D)

RAFTER

CRANEBEAM

A325 BOLTS W/BEVEL WASHERS

CRANE BEAM

TIE PLATE(FIELD WELD)

CAP CHANNEL(IF REQ‘D BY DESIGN)

"B"DETAIL "A"

CRANE BEAM AND BRACKET FRAMING

FIN. FLR.

C\ L TO C \ L OF BEAM

MAIN FRAMEBRACE

(IF REQ‘D)

CLEAR

BO

TT

OM

OF

BE

AM

CLE

AR

EA

VE

HE

IGH

T

MIN

.

1/8" GAP

6"6"

UNDERHUNG CRANE BRACKET DETAILS

Page 88: FIELD ERECTION MANUAL - Vulcan Steel

81

RAKE (GABLE) ANGLE

NOTE! Each worker should be trained to use the safest and mostproductive erection techniques. Safety first!

4 x 2 RAKE ANGLE

Page 89: FIELD ERECTION MANUAL - Vulcan Steel

SECTION VII

SHEETING

All the primary and secondary framing should be erected, plumbed andthe bolts properly tightened before the sheeting of the building is started.Framed openings should also be installed, plumbed, squared andtightened before sheeting begins.

THE MANUFACTURER’s wall and roof panels are quality merchandiseand should be handled with care. When unpacking panels, pick them upand apart; never slide one panel over another. When lifting panels, supportlong panels to prevent buckling.

This section contains erection instructions for exposed fastener metalpanels only. The Ultra-Dek and Double-Lok roof systems, as well as theBatten-Lok roof system have their own Erection Manuals.

NOTE! Workers should always use gloves when lifting sheets and followall OSHA safety recommendations. Safety first!

82

Page 90: FIELD ERECTION MANUAL - Vulcan Steel

“R” PANEL

The “R” panels are designed for both roof and wall applications. Itssymmetric profile allows for installation without regard to sheetingdirection. Sheeting can be started from either end of the building; however,by applying the sheets toward the direction of the prevailing view, theoverlap line on the side of every third rib will be less visible. Where heavyprevailing winds occur, place the edge to be lapped into the wind!

DANGER! Do not step on the major ribs, the side edge or end edge of theR panel. Always follow all OSHA safety recommendations. Safety first!

83

Page 91: FIELD ERECTION MANUAL - Vulcan Steel

“PBR” PANELS

The “PBR” panels are designed for roof application, but may on occasionbe installed on the wall. The profile is the same as the “R” panels exceptfor the addition of the support leg on the leading edge on one side.Erection of this panel requires that the proper direction of its application beestablished. The support leg allows for better nesting with the overlappingrib of the next panel. As shown below, the installation of the panels wouldproceed from left to right.

DANGER! Do not step on the major ribs of the PBR panels. Always followall OSHA safety recommendations, Safety first!

84

Page 92: FIELD ERECTION MANUAL - Vulcan Steel

1 1/8"

3/8"

1"

6" 6"2 5/16"

12"12" 12"

36" NET COVERAGE

“A” PANEL

The “A” panels are designed for wall applications only. The r ibsincorporated into its design produce smooth shadow lines and semi-concealed fasteners. Sheeting can begin from either end of the building,and application of the architectural panel is not directional. Properlyinstalled, the lap edges of the “A” panel will have minimum visibility.

NOTE! Do not apply pressure to the pan of the panels during installation,when the pressure is released “oil canning” will occur. Safety first!

85

“A”WALL PANEL

Page 93: FIELD ERECTION MANUAL - Vulcan Steel

86

ROOF FASTENERS

LONG LIFE FASTENER

LONG LIFE FASTENER

LONG LIFE FASTENER

LONG LIFE FASTENER

86

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

Page 94: FIELD ERECTION MANUAL - Vulcan Steel

87

WALL FASTENERS

LONG LIFE FASTENER

#12 SELF DRILLING LONG LIFE FASTENER

#14 SELF TAPPING LONG LIFE FASTENER

87

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

0–31⁄2" INSULATION – 1" LONG31⁄2–6" INSULATION – 11/4" LONG

Page 95: FIELD ERECTION MANUAL - Vulcan Steel

88

RECOMMENDED DRILL SIZES FOR SELF-TAPPING FASTENERS

NOTE! Always wear OSHA approved eye protection when necessary, aswell as adhering to all OSHA safety recommendations. Safety first!

Page 96: FIELD ERECTION MANUAL - Vulcan Steel

89

FASTENER INSTALLATION

Correct fastener installation is one of the most critical steps when installingroof panels. Drive the fastener in until it is tight and the washer is firmlyseated. Do not overdrive fasteners. A slight extrusion of neoprene aroundthe washer is a good visual tightness check.

Always use the proper tool to install fasteners. A fastener driver (screwgun) with an RPM of 1700-2000 should be used for self-drilling screws. A500-600 RPM fastener driver should be used for self-tapping screws.Discard worn sockets, these can cause the fastener to wobble duringinstallation.

NOTE! Always remove metal filings from surface of panels at the end ofeach work period. Rusting filings can destroy the paint finish and void anywarranty.

MASTIC SEALANT

Proper mastic application is critical to the weather tightness of a building.Mastic should not be stretched when installed. Apply only to clean, drysurfaces. Keep only enough mastic on the roof that can be installed in aday. During warm weather, store mastic in a cool dry place. During coldweather (below 60˚) mastic must be kept warm (60˚–90˚) until application.After mastic has been applied, keep protective paper in place until panel isready to be installed.

Page 97: FIELD ERECTION MANUAL - Vulcan Steel

FASTENER LAYOUT

“R” and “PBR” Roof Panel Fastener SpacingIntermediate Purlins

“R” and “PBR” Roof Panel Fastener Spacing Eave Strut,Wall and Roof Panel End Laps, Ridge Purlin, Base Angle, Eave Struts

Note! UL 90 Uplift Rated Roofs Require Fasteners At Each Side of High RibsAt All Purlin On Certain “UL” Construction Systems And Eave Strut Locations

(Consult Your Specific Requirements Prior To Installation)

Architectural Wall Panel Fastener SpacingBase Angle, Intermediate Girts, Eave Strut

“R” and “PBR”Wall Panel Fastener SpacingIntermediate Girts

NOTE! Do not overdrive fasteners!!

20" O.C. AT SIDELAP

20" O.C. AT SIDELAP

20" O.C. AT SIDELAP

90

20" O.C. AT SIDELAP

Page 98: FIELD ERECTION MANUAL - Vulcan Steel

SCREW ALIGNMENT

Good alignment of the screws, especially on the wall panels, will give aprofessional appearance to the wall panel installation. One way this can beaccomplished is by pre-drilling holes in the panels at identical locations.Up to 15 panels can be stacked together and drilled using a templatepanel. Use 1⁄8" or 5⁄32" diameter drill bit for panel to structural fasteners and a1⁄4" diameter bit for the sidelap clearance holes. It is important to cleanmetal filings off panel surfaces after drilling to avoid rust stains.

NOTE! Use OSHA approved eye protection when operating a drill.Electrical tools must be properly grounded. Do not use electrical tools orequipment while standing on wet surfaces. Safety first!

91

Page 99: FIELD ERECTION MANUAL - Vulcan Steel

SIDEWALL PANEL (TYP.)

FINISHED FLOOR

"VBT" SHOWN, ACTUAL BASE CONDITION PER CONTRACT

SIDEWALL GIRT

2"

"1

1/4

"1

1 1/4"

1 1/4"

1 1/4"

4"

4"

SCREW ALIGNMENT (CONTINUED)

The template panel should be laid out for the proper screw locations inaccordance with the building erection drawings. Since pre-drilling will“hand” the panels, it will also be necessary to select the end of the buildingfrom which the paneling is to begin. Before drilling the template panel, itshould be checked for proper hole locations against the buildingframework. Be sure there is no excessive deflection in the purlins andgirts.

NOTE! Safety first!

92

Page 100: FIELD ERECTION MANUAL - Vulcan Steel

ALIGNING THE GIRTS

Installation of the building walls is generally done before the roof. Beforestarting the wall installation, check to be sure that the eave strut and girtsare straight and plumb. One method of aligning the gir ts is to cuttemporary wood blocking to the proper length and install between the linesof girts.. This blocking can be moved from bay to bay which will reduce thenumber of pieces required. Normally, one line of blocking per bay will besufficient. Banding can also be used to hold the girts straight and plumb.

NOTE! Temporary girt blocking is not recommended on concealedfastener panels. The removal of the blocks after panel installation willcause oil canning.

NOTE! Do not allow blocking tobecome a falling hazard. Workers shouldwear OSHA approved hard-hats. Girtsshould never be used as a climbingladder. Damage to girt clips, as well asinjury to worker may result. Safety first!

Typical construction of the wood blocking is shown below. A 2 x 4 minimumboard size should be used. Refer to the cross section framing drawing thataccompanied the building to determine the girt spacing.

93

Page 101: FIELD ERECTION MANUAL - Vulcan Steel

VAPOR BARRIER TOOR BARRIER TO

INSIDE OF BUILDINGOUTSIDE OF BUILDINGFIBERGLASS INSULATION TO

WALL INSULATION

There are many types of insulation installed in pre-engineered steelbuildings. However, fiberglass blanket insulation is the most common typeused, and these instructions pertain to this type only. One side of theblanket insulation should have a vapor barrier that must face the inside ofthe building regardless of whether the insulation is for heating or cooling.

WALL INSULATION INSTALLATION

Cut the insulation to length allowing an additional 6" or more to facilitatehandling. The wall panel can be used as a guide.

NOTE! The insulation must compress between the girt and the wallduring installation. Insulation too thick or dense to compress adequatelywill induce waviness or oil canning in certain types of wall panels.

94

Page 102: FIELD ERECTION MANUAL - Vulcan Steel

WALL INSULATION ( CONTINUED)

The first run of wall insulation should be installed so that its forward edgeis just ahead of the leading edge of the wall panel. The most widely usedprocedure is to use a 4 ft. starter run, then switch to 3 ft. or 6 ft. runs. Thiskeeps the forward edge of the insulation 1 ft. ahead of the wall panel forjoining the next blanket.

Top and Bottom

Note! Do not allow the insulation to wick moisture from the floor!

NOTE! Insulation has no load bearing strength. Do not lean or propmaterial against wall insulation. Observe all proper safety procedureswhen handling fiberglass insulation, such as dust masks, gloves, and longsleeved shirts, to minimize contact with the insulation fibers. Safety first!

95

Page 103: FIELD ERECTION MANUAL - Vulcan Steel

96

ROOF INSULATION

Pre-cut roof insulation to reach from eave to eave allowing approximately 2feet of additional length to facilitate handling. Hold insulation at onesidewall and roll out insulation across the purlins, vapor barrier to theinside of the building. Stretch the insulation to provide a tight and smoothinside surface. Weights clamped to each end can be used to holdinsulation taut.

NOTE! Insulation has no load bearing strength. Maintain body weight onapproved scaffold or walk boards. Follow all OSHA recommended safetyinstructions regarding safety harnesses and/or nets to protect from falls!Safety first!

Page 104: FIELD ERECTION MANUAL - Vulcan Steel

97

ROOF INSULATION (CONTINUED)

Double sided tape or contact adhesives can be used to hold insulation inplace while the roof sheets are being installed. Trim excess insulation tothe edge of the eave trim and cut fiberglass approximately 4 inches fromend leaving only facing. Fold facing over end of blanket insulation to sealthe ends.

NOTE! Do not install more insulation on the roof than can be covered byroof panels before the work period ends. Do not allow the insulation tobecome wet. Safety first!

Page 105: FIELD ERECTION MANUAL - Vulcan Steel

98

ROOF INSULATION (CONTINUED)

A four foot starter roll of insulation is recommended to maintain theinsulation joint ahead of the sheeting edge. Seal insulation sidelap jointswith adhesives or fold and staple per manufacturer’s instructions. As onthe walls, the general sequence is to install the roof sheets in conjunctionwith the insulation.

NOTE! Wipe oil and other slippery substances from roof panels. Do notstep on rib of panel, near a crease in the panel,near a side edge or withinfive feet of the end of unsecured panel. Use OSHA approved tie offs,netting or rails when working on roof. Insulation has no load bearingstrength. Maintain body weight on approved scaffold or walk boardsSafety first!

NOTE! The insulation sidelap must be sealed to prevent condensationand minimize temperature loss at laps.

Page 106: FIELD ERECTION MANUAL - Vulcan Steel

99

INSTALLATION OF WALL PANELS

Adjoining panels are installed with the pre-drilled overlapping rib towardthe last erected panel. Position panel to structural making sure that it iskept plumb. Drill structural if required and install fasteners at lapped rib.Check for proper coverage and correct as necessary. Install remainingfasteners. Note that clearance holes in overlapping rib must be pre-drilled.

NOTE! Wear OSHA approved eye protection when operating drill.Electric tools must be properly grounded. Do not use electricalequipment while standing on wet surfaces. Safety first!

Page 107: FIELD ERECTION MANUAL - Vulcan Steel

100

INSTALLATION OF WALL PANELS (CONTINUED)

Backlapping the panels 1 foot or 2 foot is routinely done to match panelcoverage with the building width and length. On the sidewall this is donewith the last panel installed. On the endwall this is normally done near thecenter and will be marked on the erection drawings.

NOTE! Always follow all OSHA safety recommendations. Remember,Safety first!

Page 108: FIELD ERECTION MANUAL - Vulcan Steel

101

SAFETY PRECAUTIONS FOR ROOFING WORK

THE MANUFACTURER strongly recommends that erection employees becontinuously trained and re-trained in safe and productive work practices.Working on the roof area in the installation of roof structurals, insulation orroof panels requires proper training, correct equipment and constantalertness to minimize the danger of falls. Hard hats should be worn on jobsites to prevent injury from falling objects. Safe work practices on allerection duties should be carefully reviewed with erection crews prior tobeginning each job

NEVER STEP ON SKYLIGHTS OR TRANSLUCENT PANELS!!!!!!!

Panels May Collapse If Not Properly Secured

Roof panels must be completely attached to the purlins and to panels oneither side before they can be a safe walking surface. Skylights ortranslucent panels can never be considered as a walking surface.

Partially attached or unattached panels should never be walked on!

Do Not:1. Step on rib at edge of panel.2. Step near crease in rib at edge of panel.3. Step within 5 feet of edge on unsecured panel.

A single roof panel must never be used as a work platform. An OSHAapproved runway should be used for work platforms! (consult OSHASafety and Health Regulations for the Construction Industry). Safety first!

Page 109: FIELD ERECTION MANUAL - Vulcan Steel

102

SAFETY NOTE! CAUTION!!! PANELS MAY BE SLICK

Because of the demands of the manufacturing process, oil has beenapplied to the coil stock to protect the coil, as well as the finished panelduring manufacturing, shipping and storage! Metal panels must be wipedclean prior to panel installation.

NOTE! Always wear rubber sole work boots! When on the roof, useOSHA approved protection devices such as safety lines, safety nets orcatch platforms.

UNSECURED PANELS MAY SLIP IF STEPPED ON!

Employees should be continuously warned to never step on a singleunsecured roof panel, or a stack of roof panels laying unattached on thepurlins.

Secure each end of the panel with clamps or appropriate fasteners andplace walkboards of adequate size and strength in the flat of any panelsnot fully secured to the purlins and supported by panels on each side.Walkboards should run the full length of the panel and be fastenedtogether by drilling a hole near the end of each board and tied with rope tothe next board.Cut a groove in the bottom of each board so that the board will lie flat andnot tip back and forth because of the rope.

SAFETY PRECAUTIONS

All safety precautions referred to throughout this manual, as well as allOSHA safety requirements or other customary or statutory requirementsmust be adhered to in order to maximize employee safety.

Daily meetings describing safe work procedures, use of hard hats, rubbersole shoes for roof work, proper equipment for handling material andprotection devices are recommended. Safety first!

Page 110: FIELD ERECTION MANUAL - Vulcan Steel

103

PREPARING THE EAVE

After installing the first run of insulation, prepare the eave for the first roofpanel by applying tape sealant along the eave outside of the insulationand leaving release paper in place. Sealant must be applied in a straightline and without voids. Do not stretch the sealant. Use a knife to cut ifnecessary. Cut an inside closure strip as shown and place starter piece ontop of the sealant (removing protective paper from the sealant only asrequired). Align the major rib of the closure with the edge of the endwallroof line. Splice a full closure to the starting closure and apply along thetop of the eave sealant. If roof is subject to ice and snow build-up, thesplice in the closure strip must be caulked to insure weathertightness.

NOTE! Insulation has no load bearing strength. Maintain body weight onapproved scaffolding or walk boards. Safety first!

(OPTIONAL)

Page 111: FIELD ERECTION MANUAL - Vulcan Steel

104

PREPARING THE EAVE (CONTINUED)

Along the top of the closures that have been placed along the eave, applya second run of tape mastic. Prior to removing paper backing, check andmark for proper alignment of the first roof panel.. Note that self-tappingscrews will require holes be drilled in the supporting structure prior toinstallation. Continue mastic and closure run along eave in preparation forthe next roof panel.

NOTE! Safety first!

*

* Outside closure is optional

(OPTIONAL)

(OPTIONAL)

(OPTIONAL)

Page 112: FIELD ERECTION MANUAL - Vulcan Steel

105

INSTALLATION OF FIRST ROOF PANEL

Once the eave is prepared, the first roof panel may be installed. Check theerection drawings to determine the roof overhang at the eave. Set the roofpanel in place over the inside closure (after removing the paper from themastic) insuring the major ribs of the panel nest properly with the insideclosure. Align the panel edge with the edge of the endwall roof line. Withthe panel properly placed, secure the panel to the structure withappropriate fasteners. If the building requires more than one panel per run,do not install fasteners at the purlin located at the upslope end of thepanel. These fasteners will be installed after the overlapped panel isinstalled.

NOTE! Do not walk on unsecured panels. Wipe oil and other slipperysubstances from roof panels. Safety first!

Page 113: FIELD ERECTION MANUAL - Vulcan Steel

SECTION AT EAVE

Note! Safety first

*

(OPTIONAL)(OPTIONAL)

(OPTIONAL)

(OPTIONAL)

(OPTIONAL)

106

Page 114: FIELD ERECTION MANUAL - Vulcan Steel

SEALING THE SIDELAP

Apply the sidelap tape sealant to the weather side edge of the lowerpanel’s major rib as shown. The tape sealant should only be applied toclean, dry surfaces. With the release paper in place, press firmly along thelength of the sealant to insure proper adhesion. In removing the protectivepaper from the tape sealant, care should be taken not to pull the tapesealant away from the panel. Install the adjoining panel positioning theoverlapping rib with care. Drill, at the center of the clearance holes in theoverlapping panel, 1⁄8" pilot holes for the lap fasteners. Stitch the lap withthe No. 14 self-tapping fasteners supplied with the job. Never allow thesealant to be placed in other locations.

NOTE! Use OSHA approved eye protection when operating a drill.Sweep up all drill shavings from panels at end of each work period tominimize surface rust and damage to panel finish Safety first!.

107

Page 115: FIELD ERECTION MANUAL - Vulcan Steel

SEALING THE EAVE

Tape sealant location at the eave is critical. To insure a weather tight seal,the sidelap sealant must extend down from the top of the rib to the sealanton the eave closure. The sealant extension must splice into the eavemastic.

NOTE! Workers should maintain a constant awareness of their location inrelation to the roof edge at all times. Follow all OSHA recommended safetysuggestions. Safety first!

108

Page 116: FIELD ERECTION MANUAL - Vulcan Steel

SEALING THE ENDLAPS

At the panel endlaps place a run of tape sealant across the full panel width1⁄2" below the fastener line. The panel endlaps have a 4" minimum overlaplocated over a purlin as shown. Locate the fasteners 1" above the purlinweb according to the fastener layout .

NOTE! Do not step on panel endlaps until fully secured with fastenersSafety first!

109

Page 117: FIELD ERECTION MANUAL - Vulcan Steel

PANEL ENDLAPS

* Apply tape sealant to far side of major rib to complete seal at Panel Lap.** Structural Fasteners must be placed on the uphill side of mastic.

NOTE! Each worker should be trained to use the safest and mostproductive erection techniques. Safety first!

TAPE SEALANT(TYP)

*

ROOF FASTENERS**

ROOFFASTENERS**

4" LAP

1⁄2" DOWN HILL

TAPESEALANT

110

Page 118: FIELD ERECTION MANUAL - Vulcan Steel

ROOF SHEETING SEQUENCE

It is recommended that both sides of the ridge of a building be sheetedsimultaneously. This will keep the insulation covered for the maximumamount of time and the panel ribs can be kept in proper alignment for theridge panel. Check for proper coverage as the sheeting progresses. Notepanel sheeting sequence below!

NOTE! If oil or other slippery substances are present on the roof panels,wipe them clean immediately to prevent slipping or falling. Workers shouldmaintain a constant awareness of their location relative to the roof edge.Use OSHA approved tie offs, netting’s or rails when working on roofsurfaces. Safety first!

111

Page 119: FIELD ERECTION MANUAL - Vulcan Steel

112

DIE FORMED RIDGE INSTALLATION

Die formed ridge panels are to be installed as each side of the roof issheeted. This will aid in keeping both sides of the roof aligned. After havinginstalled a run of panels on each side of the roof, apply sealant to thepanels as shown. Set die formed ridge panel in place and install lap andpurlin fasteners. Apply tape sealant along the top of the leading rib toprepare for the next sidelap.

NOTE! Do not walk on unsecured ends of panels.Safety first!!

Page 120: FIELD ERECTION MANUAL - Vulcan Steel

113

INSTALLATION OF ROOF PANELS

With the first panel run installed and secured, and sidelap sealant applied,the second panel run may be started. Prepare the eave with an insideclosure and tape sealant as shown previously. Position the panel so thatthe overlapping ribs will nest properly. Be sure to check for properoverhang and panel coverage. Stitch the major ribs of the two panelstogether, and fasten panel to the purlins.

NOTE! Safety first!

NOTE! Sweep up all drill shavings from panels at end of each workperiod to avoid surface rust and damage to panel finish.

(OPTIONAL)

Page 121: FIELD ERECTION MANUAL - Vulcan Steel

SKYLIGHT INSTALLATION

Skylight panels are installed using the same procedures as a steel panel.Care should be taken when installing fasteners in the skylights to avoidcracking the material. Pre-drill 1⁄4" diameter fastener clearance holes in theoverlapping sidelap and endlap.

NOTE! Do not under any circumstances step or walk on surface ofskylight. If foot traffic is necessary over skylight, use walk boards that areproperly supported by building purlins. Placing of “DANGER, DO NOTWALK”markings on every skylight must be done without fail. Safety first!

114

Page 122: FIELD ERECTION MANUAL - Vulcan Steel

TAPE SEALANT APPLICATION AT RIDGE FLASHING

Apply panel sidelap tape sealant as shown for building with ridge flashingand outside closures. The mastic is placed along the inside edge of themajor rib from the ridge purlin web line to the upper end of the panel.

115

Page 123: FIELD ERECTION MANUAL - Vulcan Steel

INSTALLATION OF FINAL PANEL

While backlapping the last roof panel (to match panel coverage with thebuilding length) is routinely done, this installation method can compromisethe integrity of the roof by trapping moisture between the panels. Thismoisture could, in time, create an environment conducive to rust and metalfailure. THE MANUFACTURER recommends field cutting the final panellengthwise to create the desired panel width necessary to finish off thebuilding. The cut edge of the panel should always be installed on theoutside edge, not the lap edge. The “narrow” panel should be handled withcare, and foot traffic avoided until the final panel is completely installed.

NOTE! Safety first!

116

Page 124: FIELD ERECTION MANUAL - Vulcan Steel

SECTION VIII

FLASHING, GUTTER AND TRIM

The correct installation of flashing, gutters, and trim cannot be over-emphasized. The overall appearance of the finished building depends primarily on the quality of the installation of the flashing, gutters and trim. Keep all gutter and flashing lines straight. Make all bends sharp and neat. Be sure edges are not jagged, dented, crimped, or serrated. End joints and laps must be closely controlled.

NOTE! Flashing should be stored off the ground to avoid moisture andhandling damage. Elevate one end of the package above the lower end toencourage drainage in case of rain. Always wear gloves when handlingsheet metal. Safety First!

PEAK CAP

WALL PANEL

RAKE ANGLE

DIE FORMED RIDGE

RIDGE FLASHING

EAVE TRIM

GUTTER

GUTTER

RAKE TRIM

117

Page 125: FIELD ERECTION MANUAL - Vulcan Steel

VRE

RAKE END CAP INSTALLATION

INSTALLATIONAS REQD FORBLIND RIVET

VRT

ENDCAP)

(SEE NOTES)BUILDING CORNER

1/8 RIVET

1/4" BEADGUTTER SEAL

(11 REQ’D. PERBLIND RIVET

VEG

VGE

(10 REQ’D. PER CORNERCORNER BOX)1/8 RIVET

(SEE NOTES)

BLIND RIVET

VCB

VRT

GUTTER SEAL

BUILDING

1/4" BEAD

RAKE TRIM ENDCAP INSTALLATION

For buildings with minimum eave trim and no gutter, install rake* end capas shown below. Attach to rake trim with 7 blind rivets. Trim inside andoutside closures to fill void between rake trim and roof.

CORNER BOX INSTALLATION*

* Various building types do not come with a corner box - on thesebuildings the rake and eave trim must be field fitted as required.

Caulk and install an end cap in the end of a section of gutter and fastenwith blind rivets. Position the gutter and rake trim allowing a minimum of 2"overlap with the corner box. The corner box laps over the gutter and underthe rake trim. An alternate method is to assemble the corner box to asection of rake or gutter and lift into position. Align the corner box for goodappearance and fasten with blind rivets. Seal connection with caulk,closure and sealant as shown Caulk over rivets located on top side ofcorner box.

*NOTE! THE MANUFACTURER Manufactures various trim profiles — theexamples shown may or may not match building in question.

118

EDGE OF WALL PANEL AT CORNERS.AT BUILDING CORNERS AND ALIGN WITH OUTSIDE

2. CORNER BOX CAN BE USED ON

1. START AND STOP GUTTER AND RAKE FLASHING

ALL ROOF SLOPES.

NOTES:

SAFETY PRECAUTION:WORKERS SHOULD ALWAYS WEAR

SURFACES WITH SHARP EDGES.GLOVES WHEN HANDLING METAL

CORNER BOX INSTALLATION

Page 126: FIELD ERECTION MANUAL - Vulcan Steel

TAPE SEALANT(TOP AND BOTTOM)

GUTTER

EAVE TRIM(OPTIONAL)

CORNER TRIM

ENDWALL PANEL

ROOF PANEL

RAKE TRIM

EAVE FLASHING AND GUTTER INSTALLATION

Eave flashing and/or gutters should be installed from the rear to front ofthe building so that the flashing or gutter sections starting at the front ofthe building always overlap the following sections This will conceal anyexposed raw seams when looking down the sidewall from the front (orprevailing view). Assemble as many sections of gutter as can be handledby equipment and crew on the ground and lift into place.

NOTE! Workers should always use gloves when handling flashing andfollow all OSHA safety recommendations. Never install any material if itsquality or appropriateness is in question! THE MANUFACTURERmanufactures various trim profiles - the examples shown may or may notmatch building in question. Safety first!

119

Page 127: FIELD ERECTION MANUAL - Vulcan Steel

ROOF PANEL

#12 X 1" S.D.S. (6") O.C.

1/8" POP RIVETS

EAVE GUTTER

#14 X 7/8" S.D.S. (12") O.C.

GUTTER STRAP

EAVE STRUT

(2) PER GUTTER STRAP#14 X 7/8" S.D.S.

INSIDE CLOSURE

TAPE SEAL

INSTALLING GUTTER CLIPS

Below is the method of attaching the gutter to the building. Gutter strapswill be provided with all buildings ordered with gutter. The system requiresthe gutter straps be installed at 3’-0 centers.

NOTE! Use extreme caution when working at the eave of the building.Safety first! THE MANUFACTURER utilizes different gutter profiles. Whensnow and ice conditions exist, an alternate Eave Detail may beconsidered.

120

Page 128: FIELD ERECTION MANUAL - Vulcan Steel

GUTTER

CUT ALONG SOLID LINE

BEND ALONG DASHED LINE

GUTTER

DOWNSPOUT

BLIND RIVET

DOWNSPOUT OUTLET DETAIL

1/2" 4"

5"

1/8 RIVET

Pop Rivet

Downspout Strap

Downspout

A" Panel"

"A" PANEL WALL

DOWNSPOUT INSTALLATION DETAIL

INSTALLATION OF DOWNSPOUT TO WALL PANELS

Pop Rivet

Downspout Strap

Downspout

R" Panel"

"R" PANEL WALL

121

Page 129: FIELD ERECTION MANUAL - Vulcan Steel

TAPE MASTICDIE-FORMED RIDGE 1/2

VRT

VPB

#14 FOOF FASTENERS *

POP RIVET

CAULK

RAKE TRIM AND PEAK BOX INSTALLATION

THE MANUFACTURER manufacturers various trim profiles. The profileshown may or may not apply to your building. The example still serves as ageneral guideline to installing the peak box and rake trim.

Apply caulking to rake trim as shown below prior to finial installation. RakeTrim and/or Peak Box should lap over rake trim a minimum of 2 inches.Attach to wall panel with pop rivets using an outside closure to seal box atthe wall. Attach box to roof with #14 roof fasteners and stitch to trim withblind rivets as shown. Seal the connection at the roof panel with 1⁄8 tapesealant.

Safety first!

* Splice rake trim together with rivets as shown at peak box (1” on centers max.) Seal all rake trim laps with sealant to assure a weather-tight seal.

122

Page 130: FIELD ERECTION MANUAL - Vulcan Steel

FLASHINGCAULK AND LAP DETAILS

NOTE! THE MANUFACTURER manufactures a wide variety of flashingconfigurations . The examples shown are meant to impress upon theerector the importance of sealants and fasteners at flashing laps. ConsultThe Manufacturer for any questionable details. Safety first!

“ROOF TO WALL” TRIM

123

Page 131: FIELD ERECTION MANUAL - Vulcan Steel

7’-3

1/2"

TOP VIEW

A

SECTION A-A

DOOR JAMB

FINISH FLOOR

WALL GIRT

(2) 1/2" X 1-1/4" A307 BOLTS

# 12 X 1" S.D.S.(AS REQUIRED)

WEDGE ANCHORS (BY OTHERS)

WALL GIRT

PERSONNEL DOORS

124

Page 132: FIELD ERECTION MANUAL - Vulcan Steel

OVERHEAD DOOR FRAMED OPENING

125

EAVE STRUT

GIRT

HEADER

GIRTJA

MB

"1"

"2"

"3"

"3"

"4"

FRAMING ELEVATION

SECTION "1"

GIRT

(2)

DOOR JAMB

EAVE STRUT

" x 1 " M.B.12

SECTION "2"

MEMBER SCREWS @ 12" ON CENTERDOOR HEAD TRIM

HEADER

WALL PANEL

COVER TRIM (OPTIONAL)

SECTION "3"

DOOR JAMB

JAMB TRIM

WALL PANEL("A" PANEL SHOWN)

COVER TRIM (OPTIONAL)

~("A" PANEL SHOWN TRIM SAME @ "R" PANEL)

SECTION "4"

Page 133: FIELD ERECTION MANUAL - Vulcan Steel

ALUMINUM HORIZONTAL SLIDE WINDOWIN “R” PANEL WALL

CHANNEL FRAMING (NOT SHOWN) IS REQUIRED AT WINDOW LOCATIONWHEN LINER PANEL IS REQUESTED, SUB FRAMING AT WINDOWS ANDLOUVERS IS OPTIONAL, SEE PAGE 126.

126

Page 134: FIELD ERECTION MANUAL - Vulcan Steel

DETAIL @ WINDOW/LOUVER FRAMED OPENING(OPTIONAL)

7’-3

1/2"

TOP VIEW

AA SECTION A-A

DOOR JAMB

FINISH FLOOR

WALL GIRT

(2) 1/2" X 1-1/4" A307 BOLTS

WEDGE ANCHORS (BY OTHERS)

WALL GIRT

127

Page 135: FIELD ERECTION MANUAL - Vulcan Steel

ALUMINUM HORIZONTAL SLIDE WINDOWIN “A” PANEL WALL

128

Page 136: FIELD ERECTION MANUAL - Vulcan Steel

DE

TA

IL @

SL

IM L

INE

WIN

DO

W

WAL

L GI

RT

WED

GE A

NCHO

RS (B

Y OT

HERS

)7’-3 1/2"

FINI

SH F

LOOR

(2) 1

/2" X

1-1

/4" A

307

BOLT

S

SUB

JAM

B

A

TO

P V

IEW

A

WAL

L GI

RT

SUB

JAM

B

BASE

ANG

LE

SECT

ION

B-B

B-B

SEC

TIO

N

WAL

L GI

RT

SUB

JAM

B

CC

SEC

TIO

NC

-C

SEC

TIO

NA

-A

HE

AD

SIL

L

FIEL

D CU

T

GR

AD

E

WIN

DO

W F

RA

ME

( S

ILL

)

FIE

LD C

UT

BA

SE

AN

GLE

AS

RE

Q’D

.

FIN

ISH

FLO

OR

WIN

DO

W F

RA

ME

( H

EA

D )

HE

AD

TR

IM

WA

LL P

AN

EL

BA

SE

CLI

P

SU

B J

AM

B

WIN

DO

W F

RA

ME

( J

AM

B )

WA

LL P

AN

EL

#12

X 1

SD

S 6

" O

.C

JAM

B T

RIM

TY

PIC

AL

DE

TA

IL W

IND

OW

GR

AD

E

#12

X 1

SD

S6"

O.C

.H

EA

DE

R C

HA

NN

EL

WA

LL G

IRT

#12

X 1

SD

S 6

" O

.C.

HE

AD

ER

CH

AN

NE

L

4’ G

IRT

ELE

V.

IF R

EQ

’D.

CA

ULK

ST

RA

IGH

T F

IN(

CF

400

)

NO

TE

: SU

B J

AM

B O

NL

Y W

HE

N L

INE

R P

AN

EL

OR

LO

W G

IRT

IS

RE

Q’D

.

W/ S

UB

-JA

MB

WIN

DOW

DIM

.

1"

ALUMINUM NARROW LITE ACCENT WINDOW

129

Page 137: FIELD ERECTION MANUAL - Vulcan Steel

DE

TA

IL @

SL

IM L

INE

WIN

DO

W

7’-3 1/2"

A

TO

P V

IEW

A

WAL

L GI

RT

BB

SEC

TIO

NB

-B

HE

AD

SIL

L

FIEL

D CU

T

GR

AD

E

WIN

DO

W F

RA

ME

( S

ILL

)

FIE

LD C

UT

BA

SE

AN

GLE

AS

RE

Q’D

.

FIN

ISH

FLO

OR

WIN

DO

W F

RA

ME

( H

EA

D )

HE

AD

TR

IM

WA

LL P

AN

EL

#12

X 1

SD

S 6

" O

.C

WIN

DO

W F

RA

ME

( J

AM

B )

WA

LL P

AN

EL

#12

X 1

SD

S 6

" O

.C

JAM

B T

RIMSE

CT

ION

A-A

NO

TE

: E

RE

CT

OR

TO

FIE

LD

BE

ND

3/4"

TA

P T

O A

LL

OW

FO

R

T

HE

AN

GL

E.

#12

X 1

SD

S 6

" O

.C

2" X

4"

BA

SE

AN

GLE

WA

LL G

IRT

CA

ULK

2" X

4"

X 1

6ga.

AN

GLE

PA

RT

MA

RK

# S

LJA

2" X

4"

X 1

6ga.

AN

GLE

PA

RT

MA

RK

# S

LJA

PA

RT

MA

RK

# S

LJA

2" X

4"

X 1

6ga.

AN

GLE

ST

RA

IGH

T F

IN(

CF

400

)

TY

P. S

LIM

LIN

E W

IND

OW

FR

AM

ING

WIN

DO

W F

RA

ME

( J

AM

B )

W/ A

NG

LE

FR

AM

ING

WIN

DOW

DIM

.

1"

130

Page 138: FIELD ERECTION MANUAL - Vulcan Steel

SELF - FLASHING FIXEDAND ADJUSTABLE LOUVERS

131

Page 139: FIELD ERECTION MANUAL - Vulcan Steel

ROUND GRAVITY VENTS

132

Page 140: FIELD ERECTION MANUAL - Vulcan Steel

DRAIN AT MULTI-UNIT SPLICE

ROOF PANEL MAJOR RIBNOTE:BREAK DRAIN ASSEMBLY TOFOLLOW EXACT ROOF SLOPE.

VARIES8-1/2"

# 14 X 7/8" S.D.S. ( 12" O.C. )

# 12 X 1" S.D.S. ( 6" O.C. )

RIDGE VENTILATOR

# 12 X 1" S.D.S. ( 6" O.C. )

VARIES

8-1/2"

DIE FORMED RIDGE CAP

RIDGE VENTILATOR

CL

ROOF PANEL MAJOR RIB

END CAP OF VENT

END CAP OF VENT END CAP OF VENT

POP RIVET END CAP TO DRAIN ASSEMBLY

TAPE SEAL TOP & BOTTOMOF OUTSIDE CLOSURE

# 14 X 7/8" S.D.S. ( 12" O.C. )

DRAIN ASSEMBLY DETAIL @ SINGLE RIDGE VENT

DRAIN ASSEMBLY DETAIL @ CONTINUOUS RIDGE VENT

TYPICAL SECTION @ RIDGE VENT

RIDGE VENT DETAILS FOR "R" TYPE ROOF SYSTEM

(SPECIAL DETAILS APPLY FOR STANDING SEAM ORINSULATED ROOF SYSTEMS, SEE ERECTION DRAWINGS)

CONTINUOUS RIDGE VENTILATORS

133

Page 141: FIELD ERECTION MANUAL - Vulcan Steel

ULTRA VENT

134

Page 142: FIELD ERECTION MANUAL - Vulcan Steel

NO

TE

: ST

RIP

4"

OF

INS

ULA

TIO

N F

RO

M

V

AP

ER

BA

RR

IER

AN

D F

OLD

VA

PE

R

B

AR

RIE

R B

AC

K O

VE

R IN

SU

LAT

ION

.

LAP

VA

PO

R B

AR

RIE

R O

VE

RS

KY

LIG

HT

TR

IM H

IGH

RIB

.

TA

PE

SE

AL

#12

X 1

" S

.D.S

. (6"

) O

.C.

TA

PE

SE

AL

(OP

TIO

NA

L)IN

SU

LAT

ION

RO

OF

PA

NE

L

RO

OF

PA

NE

L

RO

OF

PU

RLI

N

4"

8" M

IN. L

AP

4"

SK

YLI

GH

T P

AN

EL

#12

X 1

" S

.D.S

. (6"

) O

.C.

RO

OF

PA

NE

L

(OP

TIO

NA

L)S

KY

LIG

HT

TR

IM

TA

PE

SE

AL

SK

YLI

GH

T P

AN

EL

#14

X 7

/8"

S.D

.S. (

20")

O.C

.

TA

PE

SE

AL

RO

OF

PU

RLI

N

SK

YLI

GH

T P

AN

EL

8" M

IN. L

AP

4"4"

INS

ULA

TIO

N

RO

OF

PA

NE

L

SK

YLI

TE

DE

TA

ILS

FO

R "

R"

TY

PE

PA

NE

L

“R” PANEL TRANSLUCENT ROOF PANELS

135

Page 143: FIELD ERECTION MANUAL - Vulcan Steel

MAJOR RIB

12"

1"

4"12"

3 1/2"4"4"

3/4"

3/16

"

1 1/4"

MINOR RIB

36" NOMINAL COVERAGE

12"

TOP PANEL IS WHITE (LIGHT TRANSMITING)

(4) 1/4"x1/2" FOAM STRIPS BETWEEN PANELS

BOTTOM PANEL IS CLEAR

1/4"x1/2" FOAM STRIP BETWEEN PANELS

1/4"x1/2" FOAM STRIP BETWEEN PANELS

1/4"x1/2" FOAM STRIP BETWEEN PANELS

1/4"x1/2" FOAM STRIP BETWEEN PANELS

“INSULATED” SKY LIGHT PANEL

136

Page 144: FIELD ERECTION MANUAL - Vulcan Steel

ROOF JACK

137