Applying for a Permit for an Installation
The Application Process
(1) An application must—
(a) be made by the applicant on the form provided by the EA; and
(b) include the information specified on the form.
(2) Every application must be accompanied by any fee prescribed in a charging scheme made by the regulator under section 41 of the 1995 Act or by the appropriate authority under regulation 65.
The EA provides
General Guidance on applying for a Permit and on Risk Assessment
Specific Guidance on Waste Incineration
The “operator” must apply for the permit
Fic
htn
er
Co
nsu
ltin
g E
ngi
neer
s U
K
Getting the Permit
The Process:
1. Submit the application to the Environment Agency
2. Wait for it to be “duly made”
3. EA advertise the application – available on Covanta web-site
4. Public Consultation period of 4 weeks
5. Respond to requests for further information (“Schedule 5 request”)
6. Draft Permit issued to Covanta to check accuracy
7. Draft then issued for public consultation
8. Environment Agency issues permit
The process should take 4 months to issue of draft permit, but may take longer.
The clock stops while responding to Schedule 5 requests.
Fic
htn
er
Co
nsu
ltin
g E
ngi
neer
s U
K
What is in the application?1. Application Form (Parts A, B2, B3 and F1)
2. Supporting Technical Information Information on Raw Materials
List of emissions
Description of Monitoring methods
Justification of Technology (BAT)
Justification of Energy Efficiency
Information on Waste Recovery and Disposal Management
Specific questions for legislation (WID)
Site plan and location plan
3. Environmental Risk Assessment Qualitative Risk Assessment - tabular
Air Quality Assessment
Noise Assessment
H1 Assessment – Environmental Risk
4. Application Site Report
5. Non-Technical Summary
Fic
htn
er
Co
nsu
ltin
g E
ngi
neer
s U
K
Table of Contents
1. The Application Forms
2. Non Technical Summary
3. Supporting Information
Annex 1 – Plans and Drawing
Annex 2 – Site Condition Report
Annex 3 – Noise Assessment
Annex 4 – Environmental Risk Assessment
Appendix A – Greenhouse Gas Assessment (WRATE analysis)
Annex 5 – Air Quality Assessment
Annex 6 – BAT Assessment