fiber plant construction british columbia dynamic rfq information session

39
Proprietary and Confidential to Rogers and Accenture 1 Fiber Plant Construction British Columbia Dynamic RFQ Information Session

Upload: lillith-walker

Post on 31-Dec-2015

27 views

Category:

Documents


2 download

DESCRIPTION

Fiber Plant Construction British Columbia Dynamic RFQ Information Session. Agenda. Introduction Scope Timeline Dynamic RFQ Training Dynamic RFQ Event Rules Q & A. Introduction. Scope. British Columbia Regional Fiber Construction 2011 Forecast is at $16 M - PowerPoint PPT Presentation

TRANSCRIPT

Proprietary and Confidential to Rogers and Accenture 1

Fiber Plant Construction British Columbia Dynamic RFQ Information Session

Proprietary and Confidential to Rogers and Accenture 22

Agenda

Introduction

Scope

Timeline

Dynamic RFQ Training

Dynamic RFQ Event Rules

Q & A

Proprietary and Confidential to Rogers and Accenture 33

Introduction

Agenda Item Speaker Time

Introductions Emil Thorose 5 minutes

Scope Wil Donovan 5 minutes

Timeline Emil Thorose 5 minutes

Award Decisions Emil Thorose 5 minutes

Dynamic RFQ Training Cam Patterson 30 minutes

Dynamic RFQ Event Rules Cam Patterson 5 minutes

Q & ACam Patterson/ Emil Thorose

10 minutes

Proprietary and Confidential to Rogers and Accenture 44

Scope

British Columbia Regional Fiber Construction

− 2011 Forecast is at $16 M

− Suppliers will be charging task code rates for projects less than $30K

− This Dynamic RFQ is only for projects $30K and up:

Project TiersProjected

Spend# of Projects** Incremental Discount

$0K - $30K $ 0.39 M 34Projects executed with

Task Code rates$30K - $60K $ 1.97 M 43  

$60K - $100K $ 2.71 M 37  $100K + $ 10.94M 46  

$ 16.00 M 160* All the projects less than $30 k will be executed under agreed upon task code prices

Proprietary and Confidential to Rogers and Accenture 55

A quick overview of the Scope of our Fiber Construction Projects

Fiber Construction Projects consist of construction only (permits, route selection, design, engineering are excluded in scope)

− Our project volumes have increased by 6 times compared to last year

− These projects, on an average, equal 2kms and are located in Vancouver, North Van, Richmond, Burnaby, Surrey and surrounding areas

− Types of projects include Access, Backbone, NNI, Business or Commercial fiber builds

• 60% aerial (overlash or new strand) and 40% buried

• Some require Civil builds and others leverage 3rd Party support structures

− All 2011 projects are expected to be completed in 2011

− 50% of the projects complete within 2 months of the year i.e. June/July or Sept/Oct and the remainder throughout the year

Proprietary and Confidential to Rogers and Accenture 66

Timeline

1. Online Bidding Event  Training – May 4th, 2011 (3pm EDT)

2. Pre-bidding Begins   – May 4th, 2011 (4pm EDT)

3. Pre-bidding closes   – May 9th, 2011 (3pm EDT)

4. Online Bidding Event – May 10th, 2011 (3pm EDT) – British Columbia Region

Proprietary and Confidential to Rogers and Accenture 77

Award Decisions

In the BC area, we believe we can deliver our business needs over the next few years with 4 primes. In exchange for providing us with attractive discounts during this event, we are prepared to provide additional volumes to the top ranked vendors. Our goal is to use the following allocation model across our chosen primes in BC:               

1st Place :                             45% volume                2nd Place :                            30% volume                3rd Place :                             15% volume                4th Place :                             10% volume                                                    ------                                             100%                                                             ------  Caveats:        Any new vendor will be brought in under pilot mode for the first 3 months, before being ramped up to the volume allocation committed.

Rogers Communication reserves the right to remove prime status from vendors under the following scenarios:

- Undue delays in project timelines- Work quality not meeting Rogers standards- Undue cost over runs- Excessive change order

Proprietary and Confidential to Rogers and Accenture 88

The Email Invitation

Invitation email includes: 1) Your user name or ID2) Hyperlink to access the

website for bidding (just click on it to proceed)

3) Help Desk phone #

Proprietary and Confidential to Rogers and Accenture 99

Login

1) Enter your user name2) Enter your password

Proprietary and Confidential to Rogers and Accenture 1010

Creating a Password

Create a permanent password

Proprietary and Confidential to Rogers and Accenture 1111

Accept Terms and Agreement

Ariba Terms & Conditions for use of the site must be

accepted

Proprietary and Confidential to Rogers and Accenture 1212

Create Personal Profile

Create your personal Profile

Proprietary and Confidential to Rogers and Accenture 1313

Open the Event

1) Find the online event in OPEN or PREVIEW status

2) Click to open

Proprietary and Confidential to Rogers and Accenture 1414

Review Prerequisites

1) Click to proceed with answering required Pre-Bid questions

Proprietary and Confidential to Rogers and Accenture 1515

Submit All 3 Prerequisites

You must :1) Accept the agreement2) Agree to the process3) Download then upload

a revised Capability worksheet.

Proprietary and Confidential to Rogers and Accenture 1616

Accept Rogers Online NDA

Accept the online Rogers

NDA

Proprietary and Confidential to Rogers and Accenture 1717

Select Lots

Before entering your opening bids, please select the appropriate lot you will be bidding for

Proprietary and Confidential to Rogers and Accenture 1818

Phase 1 – Pre Bid : Enter Opening Bids (1 of 3) 1) Read each section of the event carefully

2) Enter your bids (discount percents) for the three highest $ groupings of projects

Proprietary and Confidential to Rogers and Accenture 1919

Phase 1 – Pre Bid : Enter Opening Bids (2 of 3) 1) Click the link to download a file

2) Click update file to upload into the tool

3) Help is on every page!

Proprietary and Confidential to Rogers and Accenture 2020

Phase 1 – Pre Bid : Enter Opening Bids (3 of 3) 1) Need to talk with Rogers? Compose a message online

2) Save every 10 minutes or when you set away

3) Submit when ready, you can do revision.

Proprietary and Confidential to Rogers and Accenture 2121

Revising your Pre-Bid

1) Your Pre-Bid has been submitted

2) Click Revise to make changes

Proprietary and Confidential to Rogers and Accenture 2222

Login For Event Day

1) Enter your user name2) Enter your password

Proprietary and Confidential to Rogers and Accenture 2323

Event Day Screen Layout

You must :1) Enter Discount %2) Update Total (optional)3) Submit Current Lot to

send bid to Rogers4) Click on All Content to

review other sections of this event.

Proprietary and Confidential to Rogers and Accenture 2424

Phase 2 – Online Event: Enter Bids (1 of 4) You must :1) Enter a Discount % in

Line 1 – 2 – 32) Click Update Totals to

see Extended Price3) Click Submit Current

Bid to send to Rogers (click OK if asked)

4) Review other parts of the event

Proprietary and Confidential to Rogers and Accenture 2525

Phase 2 – Online Event: Enter Bids (2 of 4)

You must :1) After you click Submit

Current Lot, you must SUBMIT for Rogers to receive the event

Proprietary and Confidential to Rogers and Accenture 2626

Phase 2 – Online Event: Enter Bids (3 of 4)

You must :1) After you click Submit

Current Lot, you must SUBMIT for Rogers to receive the event

Proprietary and Confidential to Rogers and Accenture 2727

Phase 2 – Online Event: Enter Bids (4 of 4)

If a bid is submitted within the last 3 minutes, the time will be extended an additional 3 minutes

Proprietary and Confidential to Rogers and Accenture 2828

Repeat Bid if Applicable

You can submit bids as many times as you want before the time runs out, and see how your rankings change

Proprietary and Confidential to Rogers and Accenture 2929

Bid Increment Error

To fix an increment error:1) Your new bid must be

at least 0.25% less than you previous bid on the overall spend

2) Actual increment changes with every bid

Proprietary and Confidential to Rogers and Accenture 3030

Alternate Bidding Submission: Increment Selected Items (1 of 3)

To fix an increment error:1) Your new bid must be

at least 0.25% less than you previous bid on the overall spend.

2) Actual increment changes with every bid

Proprietary and Confidential to Rogers and Accenture 3131

Alternate Bidding Submission: Increment Selected Items (2 of 3)

To Bid a % Increment:1) Mark the Lines you

want to bid2) Enter the Increment %

and click Apply3) Submit Current Lot

Proprietary and Confidential to Rogers and Accenture 3232

Alternate Bidding Submission: Increment Selected Items (3 of 3)

To Bid a % Increment:1) Click OK to actually

submit to Rogers

Proprietary and Confidential to Rogers and Accenture 3333

Compose Message (1 of 2)

Need to communicate with Rogers? Click the Compose a Message button

Proprietary and Confidential to Rogers and Accenture 3434

Compose Message (2 of 2)

Type your message or attach a file, then click Send

Type your message here.

Proprietary and Confidential to Rogers and Accenture 3535

End of Bidding

The online event is complete:1) All participating suppliers

must send a screen- shot of this page to the Rogers contact to confirm final bids.

2) Rogers will contact selected suppliers to finalize Awards.

Proprietary and Confidential to Rogers and Accenture 3636

Review Period

The event will go into Review mode once bidding ends

Proprietary and Confidential to Rogers and Accenture 3737

Contact Info

Problems?Call Rogers or Help Desk

Proprietary and Confidential to Rogers and Accenture 3838

Dynamic RFQ Execution Rules

Parameter Values Strategy and Potential Options

Dynamic RFQ Type Rank • Rank – Participants see their current rank

Duration30

minutes• Event will be executed for 30 minutes

Auto-Extension period 3 minutes

• Auto-extension period is set to allow that any additional movement is allowed to take place by extending Dynamic RFQ timing (prevents last second movement without other suppliers being able to react)

• This extends the overall Dynamic RFQ length each time each time a trigger occurs

Grace period for Auto-extension(Period in which extension are triggered)

3 minutes • For bids placed near the end of the Dynamic RFQ , the extension period will apply

Trigger for Auto-Extension Multiple• Any Bid within the grace period• Movement within top 4 participants

Bid increments amounts (or percentage)

0.25% • The minimum increment that is needed to be placed for successful increments

Proprietary and Confidential to Rogers and Accenture 3939

Questions and Answers