FHWA Bridge Scour Program
Michigan Bridge Scour Workshop
Big Rapids, Michigan
March 10, 2009
![Page 2: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/2.jpg)
FHWA Bridge Scour Program
Why Scour
History
Current Status
POA Highlights
Future Direction
![Page 3: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/3.jpg)
Why A Scour Program?
Floods Occur in Your Community
![Page 4: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/4.jpg)
Floods Damage Roads
Why A Scour Program?
![Page 5: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/5.jpg)
Floods Damage Bridges
Why A Scour Program?
![Page 6: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/6.jpg)
1973 – 23 bridge failures in Illinois
1985 – 73 bridges destroyed in
Pennsylvania, Virginia & WV
1987 – 17 bridges damaged or destroyed
New York and New England
Why A Scour Program?
![Page 7: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/7.jpg)
1993 – 23 bridge failures in upper
Mississippi River basin
1994 – 500 bridges failed in Georgia
Why A Scour Program?
![Page 8: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/8.jpg)
Hydraulic Issues 50 to 70% All
Bridge Failures
Why A Scour Program?
![Page 9: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/9.jpg)
Research– 1940’s – Laursen
Iowa State Highway Commission
– 1950’s – FHWA and CSU
– 1950’s – Mississippi and Alabama and CSU
Technical Guidance– 1978 – FHWA HDS 1 Chapter 7
– 1984 – FHWA-RD-84-100
History of FHWA Scour Program
![Page 10: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/10.jpg)
Impetus of FHWA Scour Program
1987 - Schoharie Creek I-90 Bridge Failure
![Page 11: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/11.jpg)
FHWA Technical Advisory T5140.20
– Interim Guidelines for Evaluating Bridges for Scour
NBIS Item 113
– Evaluate bridges for Scour
Program Formalized - 1988
![Page 12: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/12.jpg)
Additional Failure
1989 – Hatchie River TN Bridge Failure
![Page 13: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/13.jpg)
HEC 18
– Interim Guidance Updated
Phase I – Screening
Phase II - Scour evaluations
Semi-annual progress reports
Updated Guidance - 1990
![Page 14: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/14.jpg)
Technical Advisory T5140.23
– Evaluating Scour at Bridges
– 5 Components of Scour Program
http://www.fhwa.dot.gov/legsregs/directives/techadvs/t514023.htm
Updated Guidance - 1991
![Page 15: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/15.jpg)
1. Evaluation by Interdisciplinary Team Hydraulic
Geotech
Structural
Technical Advisory T5140.23
![Page 16: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/16.jpg)
2. New Bridges Hydraulic Analysis
– Withstand 100 year flood
– Not fail with superflood (>100 year)
Geotechnical Analysis
– Assume scour prism removed
Technical Advisory T5140.23
![Page 17: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/17.jpg)
3. Existing Bridges Identify Risk of Failure
– Initial Screening and Prioritization
Scour Evaluation
– Scour Observed
– Theoretical Scour (HEC 18)
Technical Advisory T5140.23
![Page 18: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/18.jpg)
4. Plan of ActionMonitor
– Inspections and Closures
– During and After Floods
Install Hydraulic or Structural Countermeasure
– Schedule
– Design
Technical Advisory T5140.23
![Page 19: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/19.jpg)
5. Bridge Inspectors Training
Record Information
– Condition of Bridge and Stream
– Cross-sections
Compare with previous
Communication if concerns
Technical Advisory T5140.23
![Page 20: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/20.jpg)
5. Bridge Inspectors NHI 135047
– Stream Stability and Scour at Highway Bridges for Bridge Inspectors
– http://www.nhi.dot.gov/
Technical Advisory T5140.23
![Page 21: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/21.jpg)
March 31, 1991 – Screening Completed
January 1997 – Evaluations Completed
– Exempt Tidal
– Exempt Unknowns (except Interstate)
Previous Deadlines
![Page 22: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/22.jpg)
1998 – Begin Evaluating Tidal “T”’s
1998 – Reminder about POAs
Previous Deadlines
![Page 23: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/23.jpg)
1997 – HEC 23
– Countermeasure Matrix
– Design Guides
Demo 98 Projects
– Fixed and portable scour instrumentation
Countermeasures
![Page 24: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/24.jpg)
2001 – Clarification of Item 113
– 7 – Countermeasure Installed but not Designed or Installed Correctly – Monitor
– 0, 1, 2 – Change Item 60 to Correspond
Update to Item 113
![Page 25: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/25.jpg)
2005 – Revision to NBIS
– 23 CFR 650.313(e)
Identify Scour Critical Bridges
Develop POA for known and potential deficiencies
– Monitor
– Address Critical Findings
Implement POA
– Monitor according to plan
Revision to NBIS
![Page 26: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/26.jpg)
Pre 1998 – Bridge Funds– Inspection– Scour Evaluations and POAs
1998 – TEA-21 – Bridge Funds– Inspection– Scour Evaluations and POAs– Countermeasures, only on eligible bridges
2005 – SAFETEA-LU – Bridge Funds– Inspection– Scour Evaluations and POAs– Countermeasures (preventative maintenance)
Funding
![Page 27: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/27.jpg)
January 4, 2008 Memo
– Target Dates to Comply with NBIS
Complete Evaluations – November 2008
Develop POAs – November 2008 and 2009
Implement POAs – April 2009 and 2010
– Michigan Division and MDOT have agreed on acceptable completion date
Current Status of FHWA Scour Program
![Page 28: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/28.jpg)
HEC 18 – 4th Ed – 2001– Evaluating Scour at Bridges
HEC 20 – 3rd Ed – 2001– Stream Stability at Highway Structures
HEC 23 – 2nd Ed – 2001– Bridge Scour and Stream Instability Countermeasure
Experience, Selection, and Design Guidance
HEC 25 – 2nd Ed – 2008– Highways in the Coastal Environment
POA Template – 2007
Technical Guidance
![Page 29: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/29.jpg)
NHI 135046– Stream Instability and Scour at Highway Bridges
NHI 135047– Stream Instability and Scour at Highway Bridges for
Inspectors
NHI 135048– Countermeasure Design for Scour and Stream
Instability
NHI 135082– Highways in the Coastal Environment
NHI 135085– POA for Scour Critical Bridges (Web-based)
Training
![Page 30: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/30.jpg)
T 5140.23
23CFR 650.313e
– Identify Scour Critical Bridges
– Develop Plan
Monitor Known and Potential Deficiencies
Address Critical Findings
– Implement Plan
Monitor according to Plan
POA Required
![Page 31: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/31.jpg)
FHWA Template
– http://www.fhwa.dot.gov/engineering/hydraulics/bridgehyd/poaform.cfm
MDOT
– Template in MBIS
POA Template
![Page 32: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/32.jpg)
Plan to Monitor Known and Potential Deficiencies
– Who, What, When, and Where Monitor?
Plan to Address Critical Findings
– Replace Bridge
– Countermeasures (HEC 23)
Components of POA
![Page 33: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/33.jpg)
Who will inspect bridge?
– During Flood
– After Flood
– Who Notify
– Authority to Act
Plan to Monitor
![Page 34: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/34.jpg)
What Look For?
– Scour Limits
– Bridge Movement Vibration
Rotation of members
Dip in Roadway
– Countermeasure in Place
– Instrumentation Functional
Plan to Monitor
![Page 35: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/35.jpg)
What Look For?
Plan to Monitor
![Page 36: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/36.jpg)
When Inspect?
– Water Level
– Flow
– During/After
– Periodically/Continuously
Plan to Monitor
![Page 37: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/37.jpg)
Where Inspect?
– Bridge Location Information
– Scour Critical Bridges IdentifiedMaps
GIS
Plan to Monitor
![Page 38: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/38.jpg)
Close Bridge
– When Close– Who has Authority– Notification
Internally Local OfficialsMedia
– Document– Detour
Plan to Monitor - Action
![Page 39: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/39.jpg)
Detour Map
Plan to Monitor - Action
![Page 40: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/40.jpg)
Reopen Bridge
– When Reopen– Who has Authority– Notification
Internally Local OfficialsMedia
– Document
Plan to Monitor - Action
![Page 41: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/41.jpg)
Replace Bridge
– Timeframe Temporary Countermeasures
Monitoring
Address Critical Findings
![Page 42: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/42.jpg)
Countermeasures (HEC 23)
– River Training Structures Spurs
Bendway Weirs
Drop Structures
Retards
Jacks
Address Critical Findings
![Page 43: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/43.jpg)
Countermeasures
– Armoring Riprap
Articulated Blocks
Address Critical Findings
![Page 44: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/44.jpg)
Countermeasures
– Structural Crutch Piles
Sacrificial Piles/Dolphins
Lengthen Bridge
Address Critical Findings
![Page 45: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/45.jpg)
Countermeasures
– Monitoring Fixed
Instrumentation
Portable
Instrumentation
Address Critical Findings
![Page 46: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/46.jpg)
Signatures
– Author
– Supervisor
– Governmental Officials
Buy In
![Page 47: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/47.jpg)
Periodic Review– Check Names and Phone Numbers
– Review Actions Taken After Emergency
– Check Status of Countermeasures
Training– Emergency Planning Exercises
Completed – change coding
Maintenance and Implementation
![Page 48: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/48.jpg)
Update Guidance
– HEC 23
Update Training
- NHI 135047
Research
Future of FHWA Scour Program
![Page 49: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/49.jpg)
Turner Fairbanks Lab
– Optimum Bridge Deck Shapes to Minimize Pressure Flow Scour
– Effects of Water Flow and Shaking on Scouring of Bridge Piers
– Pier Scour Countermeasures Using Fluidic Devices
Research
![Page 50: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/50.jpg)
NCHRP– Project 20-05
Monitoring Scour Critical Bridges
– Project 24-07(2) Countermeasures to Protect Bridge Piers from Scour
– Project 24-15(2) Abutment Scour in Cohesive Materials
– Project 24-20 Prediction of Scour at Bridge Abutments
– Project 24-26 Effects of Debris on Bridge Pier Scour
– Project 24-29 Scour at Bridge Foundations on Rock
– Project 24-32 Scour at Wide Piers and Long Skewed Piers
Research
![Page 51: FHWA Bridge Scour Program-Nurmi](https://reader033.vdocuments.mx/reader033/viewer/2022051323/549e57ddb37959a5618b466b/html5/thumbnails/51.jpg)
January 9, 2008 – Memo
– Target Completion for Evaluations – November 2010
– POAs if not evaluated
Developing Guidance
– Met with various states
– Compiling Guidance
– Website