ffy 18-27 stip application cover sheet · 2023 benjamin pond bridget, ri 15 mineral spring ave at...

3
FFY 18-27 STIP Application Cover Sheet CONTACT Contact Information Applicant Name: ______________________________ Contact Person (if different):____________________________Title:______________________________ Mailing Address: _______________________________________________________________________ City:______________________________________ Zip Code:__________________ Phone:__________________________________ Email:_________________________________ CERTIFICATION Applicant Certification Contact Person Signature Date CHECKLIST Submittal Checklist 3 collated copies of complete STIP submittal package, including: Project Prioritization cover sheet New Project Application Form for each new or updated project 2-page narrative on evaluation criteria Email a copy of complete STIP submittal package to [email protected] or provide on a CD Submit complete STIP submittal package to: Rhode Island Statewide Planning Program ATTN: Michael D’Alessandro One Capitol Hill Providence, RI 02908 Please complete this form and the project prioritization sheets on the following pages. STATE PLANNING COUNCIL │ One Capitol Hill, Providence, RI 02908 │ www.planning.ri.gov ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY AUGUST 11, 2017 8.5” x 11” PDF map of project location

Upload: lyhanh

Post on 18-Aug-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

FFY 18-27 STIP Application Cover Sheet

CON

TACT

Contact Information

Applicant Name: ______________________________

Contact Person (if different):____________________________Title:______________________________

Mailing Address: _______________________________________________________________________

City:______________________________________ Zip Code:__________________

Phone:__________________________________

Email:_________________________________

CERT

IFIC

ATIO

N Applicant Certification

Contact Person Signature Date

CHEC

KLIS

T

Submittal Checklist

3 collated copies of complete STIP submittal package, including:

Project Prioritization cover sheet

New Project Application Form for each new or updated project

2-page narrative on evaluation criteria

Email a copy of complete STIP submittal package to [email protected] or provide on a CD

☐ Submit complete STIP submittal package to:

Rhode Island Statewide Planning Program ATTN: Michael D’Alessandro One Capitol Hill Providence, RI 02908

Please complete this form and the project prioritization sheets on the following pages.

STATE PLANNING COUNCIL │ One Capitol Hill, Providence, RI 02908 │ www.planning.ri.gov

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY AUGUST 11, 2017

8.5” x 11” PDF map of project location

North Providence

Project Prioritization

Bridge Group 

Earliest Funded Year RIDOT/RIPTA 18‐27 Ten Year Plan

Priority Project Name STIP ID

Non‐Bridge2018 Rt 146 (I‐95 to 0.6 miles south of Sherman Ave) 1291

Non‐Bridge2024 Rt 104, Farnum Pk and Waterman Ave (Rt 116 to Rt 15) 1394

Non‐Bridge2021 Route 146 Guide Sign and Sign Structure Replacement ‐Route 246 to I‐95

1540

Non‐Bridge2024 Rt 7 ‐ Douglas Pike (Whipples Pond to Joslin Rd) 1578

Bridge Group 172018 Douglas Ave Bridge, RI 7 Douglas Pike at West River 6263

Bridge Group 242023 Benjamin Pond Bridget, RI 15 Mineral Spring Ave at West River 6264

Bridge Group 242023 Greystone Sluiceway, Greystone Ave at Woonasquatucket River

6265

Bridge Group 392019 Lincoln Farms Bridge, RI 146 Eddie Dowling Hwy at RI 246 Charles St

6266

Bridge Group 392019 Mineral Spring Ave Bridge at RI 146 Eddie Dowling Hwy 6267

Bridge Group 462027 Celona Culvert, RI 15 Mineral Spring Ave at Kit Brown Brook 6268

PRO

JECT

PRI

ORI

TIZA

TIO

N

FFY 18-27 STIP Application/Project Priority Form

Newly Proposed Projects (Please use an additional sheet if necessary)

PRO

JECT

PRI

ORI

TIZA

TIO

N

Priority Project Name STIP ID

STATE PLANNING COUNCIL │ One Capitol Hill, Providence, RI 02908 │ www.planning.ri.gov