    Millennium Challenge Corporation

    Malawi Power System

    Project StudiesRevised Final Feasibility StudyReport

    Annex 10: Costing Model, Project

    Packaging, and Cost Estimates(Publ ic Version)

    January 18, 2011

    Prepared for

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    2/84

    Prepared for

    blankpage

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    3/84

    Table of Contents

    Annex 10: Costing Model, Project Packaging, and Cost Estimates ..................................... 1Introduction .......................................................................................................................... 1Costing Model and Methodology for Developing Costs ........................................................ 1Project Packaging ................................................................................................................ 7

    Annex 10.1: Technical/Engineering Project Cost Estimates for Indiv idual Projects ..........11Annex 10.2: Cost Estimates for Project Packages ...............................................................55Annex 10.3: Pro ject-Level Cost Estimates for Weed Management, Sediment Contro l,

    Environmental Mitigation, and Resettlement ........................................................57Weed Management and Sediment Control Costs ............................................................... 57Environmental Mitigation Costs .......................................................................................... 63Resettlement Costs ............................................................................................................ 73

    List of Exhibits

    Exhibit 1: An Example for the Build Up of the Costs for the Upgrade and Rehabilitationof the Bwengu 66/33-kV Substation.......................................................................................................... 3

    Exhibit 2. Constant Cost Element Percentages.............................................................................................................. 4Exhibit 3: Historic US$/ZAR Exchange Rate .................................................................................................................. 6Exhibit 4: Composition of Project Packages ................................................................................................................... 9Exhibit 5: Weed Management Project Costs ................................................................................................................ 57Exhibit 6: Sediment Management Project Costs .......................................................................................................... 61Exhibit 7: Nkula A Environmental Mitigation Costs....................................................................................................... 64Exhibit 8: Environmental Mitigation Costs by Project ................................................................................................... 68Exhibit 9: Resettlement Compensation Costs by Project ............................................................................................. 76

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    4/84

    blankpage

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    5/84

    Annex 10: Costing Model, Project Packaging, and Cost Est imates

    IntroductionAnnex 10 contains all the cost estimate reports and is divided into three subsections, described

    as follows:

    Annex 10.1: This annex provides engineering/technical cost estimates for the

    recommended rehabilitation and upgrades for each individual project. Costs for weed

    management, sediment control, environmental mitigation, and right-of-way (ROW) are

    provided in Annex 10.3 and have been incorporated at the package level in Annex 10.2.Also, please note that the costs for program administration and capacity building will be

    added by MCC in the Costing Model after the precise modalities of program administration

    and the areas of capacity-building needs have been finalized.

    Annex 10.2: This annex provides cost estimates for project packages with grouped projects.

    These costs include costs of weed management, sediment control, environmental

    mitigation, and ROW. Accordingly, Annex 10.2 includes all costs except the cost for program

    administration and capacity building as noted above.

    Annex 10.3: This annex includes project-level cost details for weed management, sediment

    control, environmental mitigation, and ROW.

    Costing Model and Methodology for Developing Costs

    Costing Methodology for Annexes 10.1 and 10.2

    The technical and engineering costs for the Individual Project Cost Reports are included in

    Annex 10.1. An example of the output generated from the Individual Project Cost Report is

    shown in Exhibit 1. All prices are expressed in 2010 U.S. dollars.

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    6/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    Associated steelwork and support structures

    Control cabling.

    Column E includes the price of the Installation, Commissioning, and Site Establishment.

    This includes the estimated cost of installing the equipment, hot and cold commissioning,

    and the costs associated with site establishment to perform these tasks.

    Column F is the sum of Column D and Column E, which gives the EPC Costwithout any

    contingencies.

    Column G provides the contingency amount added to each piece of equipment, installationand Commissioning (EPC Cost). The contingency value is based on a percentage of the EPC

    Cost. The Contingency Factoris included for unforeseeable risk and is project type specific.

    Column H includes the EPC Cost plus the contingency. This is the sum of Columns F and G.

    Column I includes the costs for Engineering, Surveys, Consulting, and Project

    Monitoring (Including Contingency). These are all the associated engineering costs

    required to complete the particular project and are estimated to be 14 percent of the EPC

    Cost, including the contingency. The basis for this cost is a percentage based on historical

    engineering costs in Africa.

    Column J provides the value ofVAT on the EPC Cost including the Contingency value.

    Because of the nature of the project funding, VAT is currently 0 percent for all equipment

    and projects but can be adjusted in the Costing Model to the actual rate of 16.5 percent or

    any other rate, if required. For the percentage value ofVAT, see Exhibit 2.

    Column K includes Customs and Duties that are applicable to goods imported into Malawi;as such, this percentage is only applied to Column D, Materials and Equipment. These

    values have been provided by ESCOM and are based on the current laws in Malawi. See

    Exhibit 2 for percentage values of Customs and Duties Customs and Duties percentages

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    7/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 3 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Exhibit 1: An Example for the Buil d Up of the Costs for t he Upgrade and Rehabilitation o f the Bwengu 66/33-kV Substation

    Project No: 6005 TSN Bwengu 66/33kV Substation (equipment removed to fit on 8 x 11 page SAMPLE ONLY) Contingency: XX%

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

    TotalCostPrice

    (IncludingContingency)

    Ma

    terialsandEquipment

    (Including

    Transport,

    Insurance,

    Storage,

    Handling,

    andClearingCharges)

    Insta

    llation,

    Commissioning,

    andSiteEstablishment

    EPCCost

    (W

    ithoutContingency)

    Contingency

    EPCCost

    (In

    cludingContingency)

    Surveys,

    PreliminaryEngineering,

    TenderDocument,ContractSupervision,

    andProjectManagement

    (In

    cludingContingency)

    VATonEPCCost

    (In

    cludingContingency)

    CustomsandDuties

    (In

    cludingContingency)

    UnitCostPrice

    (In

    cludingContingency)

    A B C D E F G H I J K L M

    CB_33kV 1 ea $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX

    Isolator + e/s_33kV 3 ea $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX

    CT_1p_33kV 3 ea $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX

    SA_33kV_1p 3 ea $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX

    VT_1p_33kV 3 ea $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX $XXX

    Project Totals SAMPLE ONLY SAMPLE ONLY

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    8/84

    Exhibi t 2. Constant Cos t Element Percentages

    Cost Element Percentage

    Customs and Duty (applicablefor Malawi, but currently set at0% as it is not applicable to theCompact)

    10%

    VAT (applicable for Malawi, butcurrently set at 0% as it is notapplicable to the Compact)

    16.5%

    Insurance 10%

    Storage and Handling 5%

    Clearing 5%

    Price Contingencies

    In the power engineering industry, price contingencies vary from project to project based on the

    level of uncertainty and risk associated with the project. For example, a project to replace an existingtransformer at a substation does not pose as much risk as a project to refurbish turbines at the

    Nkula A power plant. The risk associated with the Nkula A turbine rehabilitation/refurbishment

    project is clearly higher because one can develop accurate pricing only by shutting down the plant

    and physically inspecting the turbine. The same consideration applies to other projects. The

    discussion below provides our assumptions about contingencies for different types of rehabilitation

    and upgrade projects based on standard industry practices.

    Overhead Line ContingencyXXX Percent

    Access to the line route

    Soil conditions

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    9/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    System configuration

    Building material available in Malawi Contractor capacity

    Equipment manufacturer capacity

    Security enhancement.

    Underground Cables XXX Percent

    Soil and ground conditions

    Excessive rock Site access

    Underground services

    Unforeseen route deviation

    Contractor capacity

    Equipment manufacturer capacity

    Security enhancement Occupied servitude.

    SCADA Cont ingencyXXX Percent

    Substation building constraints

    Final number of I/O (inputs and outputs required)

    Contractor capacity

    Equipment manufacturer capacity Security enhancement

    Final extent of system

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    10/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    Alternative options have been priced only for the overhead transmission line because of the

    large scope of work and large capital cost.

    Equipment and Installation Costs

    Costs for the distribution and transmission equipment have been sourced through discussions

    with reputable suppliers and manufacturers in South Africa, such as Areva, Alstom, Actom,

    ABB, Siemens, Babcock, Powertech, Bateman, and Schneider. All prices have been compared

    with historical project data. The South African manufacturers invariably have international

    holding or sister organizations, and therefore the equipment designs employ the latesttechnology available, but at the same time are suitable for local conditions and end user needs.

    The outline designs produced for the Malawi projects are proven and extensively used in many

    southern African countries, including Malawi, Namibia, South Africa, Botswana, Mozambique, and

    Zambia. The designs comply with local and international standards and internationally accepted

    standards that have been utilized extensively in southern Africa over the past decades.

    The costing model is based on an actual cost approach for all distribution and substation work.

    All pricing was obtained in South African Rand (ZAR) and was converted to U.S. dollars at an

    exchange rate of 7 to 1 taking into consideration the historic fluctuations in the US$/ZAR

    exchange rate (see Exhibit 3). All prices are based on material and labor costs as of March

    2010 and are subject to indices, including (but not limited to) labor, metal, zinc, aluminum,

    cement, road freight, and fuel indices. Historic US$/ZAR exchange rate is shown in Exhibit 3.

    Exhibit 3: Histori c US$/ZAR Exchange Rate

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    11/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    One of the key drivers to developing the cost estimates for the recommended projects was that our

    costing experts routinely bid such jobs all over Africa and internationally under the Engineer,Procure, and Construct (EPC) approach for tendering. Accordingly, the cost estimates proposed by

    the ICF/CORE team will withstand industry benchmarks and tests in terms of their reasonableness.

    Equipment Related Costs

    When assigning equipment related costs (for example, steelwork, busbar system, earthing and

    civils, etc.), a percentage based approach was adopted. The percentage varies in accordance

    with the main asset/equipment type (e.g., the civil component for batteries or panels is muchlower than for transformers). This approach has been successfully used by Merz and McLellan

    on other assignments in southern Africa for the past 50 years.

    The percentages associated with the equipment related costs do not show a direct correlation to

    the equipments Ex Works price due to the method in which the costing is calculated. A High Ex

    Works price will usually result in a lower percentage.

    Transmission and Distribution Line CostsFor the transmission line costs, our costing experts have sourced prices through discussions

    with established construction companies and then checked these against current equipment

    prices. The equipment prices have been obtained from suppliers and are reflective of the typical

    types of equipment used on lines in southern Africa.

    The prices are expressed per kilometer of transmission line but include all overhead and site

    establishment costs, and as such cannot be used out of context of the specific project. Because

    of the specialized nature of transmission line construction, pricing can vary massively depending

    on the level of interest from the international line construction companies, which is invariably

    linked to their individual order books. Additional outline engineering is required to refine the

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    12/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    MCCs overall Compact budget is fixed at $XXX including all capacity building, project-related

    technical assistance, and program administration costs. Accordingly, MCC, MCA-M, ESCOM,and the ICF/CORE Team representatives held discussions on J uly 22-23, 2010 to prioritize the

    individual projects and develop a new set of technically sound and high priority projects based

    on both the additional load flow studies and the constraints of the MCC budget. This exercise

    resulted in the development of a total of 7 final project packages for further detailed costing and

    economic and financial analysis. Exhibit 4 provides the composition of the final 7 packages that

    were analyzed for the Final Feasibility Report.

    Final Project PackagesMCA-Malawi, ESCOM, and ICF/CORE agreed on the following total of 7 project packages in the

    Tx, Dx, and SCADA subsectors as described below:

    1. Nkula A Rehabilitation and Modernization:This package includes the refurbishment and

    upgrading of the Nkula A plant.

    2. Weed and Sediment Management: Because of the specialized nature of these two tasks

    they are packaged separately. This package also includes the costs of an additional weedharvester at Nkula.

    3. Central and Southern Transmission Backbone Lines and Substations:This package

    includes the new Blantyre and Lilongwe substations and 220kV transmission lines as well as

    the 66kV Lilongwe lines.

    4. Northern Transmission Backbone Lines and Substations: The northern transmission

    system is the weakest and requires upgraded lines and substations.

    5. Central and Southern Local Transmission and Distribution Lines and Substations:

    This is a large group of Tx and Dx localized projects feeding specific centers.

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    13/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    Exhibit 4: Composition of Project Packages

    PackageNumber

    PackageShort Name

    PackageLong Name

    (Description)

    ProjectsIncluded inthe Package

    Descriptionsof the Project

    Included in Each Package

    1 NKULA_ANkula A Rehabilitation andModernization

    5001 Nkula A Hydropower Station

    2 WSM Weed & Silt Management

    3001-44001-3

    Weed & silt projects.

    NEW Additional weed harvester at Nkula.

    3 C&S TXCentral & Southern TransmissionBackbone Lines & Substations

    6050 Nkula B-Golomoti OHL 220kV

    6048 Nkula B substation - 220kV additions

    6012 Lilongwe 66kV OHL

    6017New Lilongwe (Nkhoma) 220/132kVSubstation

    6018 New Blantyre Substation

    4 N TXNorthern Transmission BackboneLines & Substations

    6001 Chintheche-Mzuzu (Luwinga) OHL

    6003 Luwinga 132/33/11kV Substation

    6004 Luwinga-Bwengu OHL

    6045 New Bwengu 132/66kV Substation

    6046 Bwengu 66/33kV - Bwengu New 66 kV Line

    6014 Area 48 66/11kV Substation

    6027 Lilongwe A/Old Town 66/11kV Substation

    6028

    LilongweB/Kanengo 132/66/33/11kV

    Substation

    6042 Lilongwe C 66/11kV (Barracks) Substation

    6043 Bunda T/off 66/11kV Substation

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    14/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Costi ng Model, Pr ojec t Packagin g, and Cost Est imates

    Package

    Number

    Package

    Short Name

    PackageLong Name

    (Description)

    ProjectsIncluded inthe Package

    Descriptionsof the Project

    Included in Each Package

    7004 David Whitehead33/11kV Substation

    7005 Limbe A 33/11kV Substation

    7006 Limbe B 33/11kV Substation

    7008 Maldeco 33 /11kV Substation

    7012 Ntonda 33/11kV Substation

    7013 Queens 11kV Substation

    7014 Thyolo A 33/11kV Substation

    7015 Thyolo B 33/11kV Substation

    7017 Zomba 33/11kV Substation

    7035 Chigumula 105 - Bangwe 105 OHL

    7045 Sharpe road - ABS 249 UGC

    7048 Limbe 'B' - Unilever UGC

    7049 Zomba 1L5 - ABS 804 UGC7050 Zomba 2L5 - ABS 785 UGC

    7051 Zomba 3L5 - ABS 704 UGC

    7052 Zomba 4L5 - ABS 794 UGC

    7053 Zomba 5L5 - ABS 804 UGC

    Northern Local Transmission &

    6002Chinteche 66/33/11kV Substation (also7079)

    6005 Bwengu 66/33kV Substation (also 7077)7082 Karonga 66/33/11kV Substation

    7084 Mzuzu 33/11kV Substation

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    15/84

    ICF International/Core International, Inc. 11 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Annex 10.1: Technical/Engineer ing Project Cost Est imates fo r Individual ProjectsAnnex 10.1 includes the results of the costing model for all individual Gx, Tx, and Dx projects.

    Project No: 7096 DCN Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 900 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Katoto - Existing OHL UGC

    EquipmentDescription

    Qty

    Unit

    Project No: 7100 DCN Contingency:

    MaterialsandEquipment

    (Includin

    gTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges

    )

    Installation,

    Commissioning,and

    SiteEsta

    blishment

    EPCCost(withoutContingency)

    Continge

    ncy

    EPCCost(including

    Continge

    ncy)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    Contract

    Supervision,and

    ProjectM

    anagement(including

    Continge

    ncy)

    VATonEPCCost(including

    Continge

    ncy)

    Customs

    andDuties(including

    Continge

    ncy)

    UnitCos

    tPrice(including

    Continge

    ncy)

    TotalCo

    stPrice(including

    Continge

    ncy)

    Cable_185mm_3Core_Cu_XLPE_11kV 500 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Karonga S/S - Existing OHL (Ref. 7082 DSN) UGC

    Equipme

    ntDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    16/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 12 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7045 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,In

    surance,

    Storage,

    Handling,and

    Clearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDo

    cument,

    ContractSupervision,a

    nd

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(in

    cluding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(includ

    ing

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 600 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Sharpe road - ABS 249 UGC

    EquipmentDescription

    Qty

    Unit

    Project No: 7048 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 640 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost BreakdownLimbe 'B' - Unilever UGC

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    17/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 13 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7049 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,and

    Clearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDo

    cument,

    ContractSupervision,and

    ProjectManagement(in

    cluding

    Contingency)

    VATonEPCCost(inclu

    ding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(includin

    g

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 200 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Zomba 1L5 - ABS 804 UGC

    EquipmentDescription

    Qty

    Unit

    Project No: 7050 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 1000 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Zomba 2L5 - ABS 785 UGC

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    18/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 14 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7051 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,and

    Clearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDo

    cument,

    ContractSupervision,and

    ProjectManagement(in

    cluding

    Contingency)

    VATonEPCCost(inclu

    ding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(includin

    g

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 200 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Zomba 3L5 - ABS 704 UGC

    EquipmentDescription

    Qty

    Unit

    Project No: 7052 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 200 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Zomba 4L5 - ABS 794 UGC

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    19/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 15 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7053 DCS Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,and

    Clearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDo

    cument,

    ContractSupervision,and

    ProjectManagement(in

    cluding

    Contingency)

    VATonEPCCost(inclu

    ding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(includin

    g

    Contingency)

    TotalCostPrice(including

    Contingency)

    Cable_185mm_3Core_Cu_XLPE_11kV 200 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Zomba 5L5 - ABS 804 UGC

    EquipmentDescription

    Qty

    Unit

    Project No: 7069 DLC Contingency:

    M

    aterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    In

    stallation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_ 33kV_ 'T'-Wood_ ACSR_ Wolf_ SC 8 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Area 33 - L ilo ngw e City Centr e OHL

    33 kV 175mm2 OHL

    EquipmentDescription

    Q

    ty

    U

    nit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    20/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 16 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7070 DLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andCle

    aring

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutConting

    ency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(inclu

    ding

    Contingency)

    VATonEPCCost(includin

    g

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_33kV_ 'T'-Wood_ACSR_Wolf_SC 4 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Lilongwe City Centre - Barracks OHL

    33 kV 175mm2

    OHL

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

    Project No: 7071 DLC Contingency:

    Mate

    rialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Insta

    llation,

    Commissioning,and

    Site

    Establishment

    EPC

    Cost(withoutContingency)

    Contingency

    EPC

    Cost(including

    Contingency)

    Surv

    eys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VAT

    onEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    Unit

    CostPrice(including

    Contingency)

    Tota

    lCostPrice(including

    Contingency)

    OHL_ 33kV_ 'T'-Wood_ ACSR_ Wolf_ SC 8 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Barracks - Kauma OHL

    33 kV 175mm2 OHL

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    21/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 17 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7072 DLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insur

    ance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutConting

    ency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocu

    ment,

    ContractSupervision,and

    ProjectManagement(inclu

    ding

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(inclu

    ding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_ 33kV_ 'T'-Wood_ ACSR_ Wolf_ SC 7 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Kauma - Chatata OHL

    33 kV 175mm2 OHL

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

    Project No: 7073 DLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Stor

    age,

    Handling,andClearing

    Cha

    rges)

    Installation,

    Commissioning,and

    Site

    Establishment

    EPC

    Cost(withoutContingency)

    Con

    tingency

    EPC

    Cost(including

    Con

    tingency)

    Surv

    eys,

    Preliminary

    Engineering,

    TenderDocument,

    Con

    tractSupervision,and

    ProjectManagement(including

    Con

    tingency)

    VAT

    onEPCCost(including

    Con

    tingency)

    CustomsandDuties(including

    Con

    tingency)

    Unit

    CostPrice(including

    Con

    tingency)

    Tota

    lCostPrice(including

    Con

    tingency)

    OHL_33kV_ 'T'-Wood_ACSR_Wolf_SC 6 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Chatata - Kanengo OHL

    33 kV 175mm2

    OHL

    Equ

    ipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    22/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 18 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7074 DLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insur

    ance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutConting

    ency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocu

    ment,

    ContractSupervision,and

    ProjectManagement(inclu

    ding

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(inclu

    ding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_ 33kV_ 'T'-Wood_ ACSR_ Wolf_ SC 10 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Kanengo - Area 25 OHL

    33 kV 175mm2 OHL

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

    Project No: 7088 DLN Contingency:

    MaterialsandEquipment

    (Inclu

    dingTransport,

    Insurance,

    Stora

    ge,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteE

    stablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surve

    ys,

    Preliminary

    Engin

    eering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    Custo

    msandDuties(including

    Contingency)

    UnitC

    ostPrice(including

    Contingency)

    Total

    CostPrice(including

    Contingency)

    OHL_33kV_ 'T'-Wood_ACSR_Dog_SC 2 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Bwengu - Phwezi Turn off OHL

    33 kV Up-Rating 100mm2

    Equip

    mentDescription

    Qty

    Unit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    23/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 19 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7089 DLN Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andCle

    aring

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutConting

    ency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(inclu

    ding

    Contingency)

    VATonEPCCost(includin

    g

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_33kV_ 'T'-Wood_ACSR_Dog_SC 3.5 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Karonga - Songwe Turn off OHL

    33 kV Up-Rating 100mm2

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

    Project No: 7118 DLN Contingency:

    MaterialsandEquipment

    (Inc

    ludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Cha

    rges)

    Installation,

    Commissioning,and

    Site

    Establishment

    EPCCost(withoutContingency)

    Con

    tingency

    EPCCost(including

    Con

    tingency)

    Sur

    veys,

    Preliminary

    Eng

    ineering,

    TenderDocument,

    Con

    tractSupervision,and

    Pro

    jectManagement(including

    Con

    tingency)

    VATonEPCCost(including

    Con

    tingency)

    Cus

    tomsandDuties(including

    Con

    tingency)

    UnitCostPrice(including

    Con

    tingency)

    TotalCostPrice(including

    Con

    tingency)

    OHL_33kV_ 'T'-Wood_ACSR_Wolf_SC 20.6 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Mzuzu-Katoto-Luwinga OHL (New)

    33 kV 175mm2OHL

    Project Totals

    Ass

    etDescription

    Qty Unit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    24/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 20 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7035 DLS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insur

    ance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutConting

    ency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocu

    ment,

    ContractSupervision,and

    ProjectManagement(inclu

    ding

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(inclu

    ding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_33kV_ 'T'-Wood_ACSR_Dog_SC 11 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Chigumula 105 - Bangwe 105 OHL

    33 kV 100mm2

    OHL

    Project Totals

    EquipmentDescription

    Qty

    Unit

    Unit Cost Breakdown

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    25/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 21 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7054 DSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,a

    ndClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tender

    Document,

    ContractSupervision

    ,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(inclu

    ding

    Contingency)

    TotalCostPrice(including

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    26/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 22 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7055 DSC Contingency:

    MaterialsandEquipmen

    t

    (IncludingTransport,Ins

    urance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commission

    ing,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDocument,

    ContractSupervision,an

    d

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(inc

    luding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Isolator +e/s_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_33kV_ Auto_ Reclose 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_33kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Project Totals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Unit Cost Breakdown

    Area 33 33/11kV Sub stat ion

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    27/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 23 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7064 DSC Contingency:

    MaterialsandEquipm

    ent

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commiss

    ioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tender

    Document,

    ContractSupervision,and

    ProjectManagement

    (including

    Contingency)

    VATonEPCCost(in

    cluding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(inclu

    ding

    Contingency)

    TotalCostPrice(including

    Contingency)

    Control_Protection_ Panel_Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    28/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 24 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7066 DSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,a

    ndClearing

    Charges)

    Installation,Commis

    sioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,Tender

    Document,

    ContractSupervision

    ,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(inc

    luding

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    29/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 25 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7082 DSN Contingency:

    MaterialsandEquipme

    nt

    (IncludingTransport,In

    surance,

    Storage,Handling,and

    Clearing

    Charges)

    Installation,Commissio

    ning,and

    SiteEstablishment

    EPCCost(withoutCon

    tingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDocument,

    ContractSupervision,a

    nd

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(in

    cluding

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(includ

    ing

    Contingency)

    CB_33kV_Auto_Reclose 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_33kV_1p 9 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00TR_AUX_0.050MVA_33kV_0.4kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_ 11kV_ 1250A_25kA_ INC_I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_ 11kV_630A_ 25kA_FDR_I/D 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Project Totals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Unit Cost Breakdown

    Karonga 66/33/11kV Substatio n

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    30/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 26 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7084 DSN Contingency:

    MaterialsandEquipme

    nt

    (IncludingTransport,Insurance,

    Storage,

    Handling,and

    Clearing

    Charges)

    Installation,

    Commissio

    ning,and

    SiteEstablishment

    EPCCost(withoutCon

    tingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderD

    ocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    Isolator +e/s_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_1250A_25kA_INC_I/D 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_11kV_1250A_25kA_B-S_ I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_630A_25kA_FDR_I/D 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_Building 56 m2 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_33kV_1p 9 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV_Auto_Reclose 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Project Totals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Unit Cost Breakdown

    Mzuzu 33/11kV Substati on

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    31/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 27 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7003 DSS Contingency:

    MaterialsandEquipme

    nt

    (IncludingTransport,In

    surance,

    Storage,

    Handling,and

    Clearing

    Charges)

    Installation,

    Commissio

    ning,and

    SiteEstablishment

    EPCCost(withoutCon

    tingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderD

    ocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    CB_11kV_1250A_25kA_INC_I/D 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_1250A_25kA_B-S_I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_ 11kV_ 630A_ 25kA_ FDR_I/D 7 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_Building 100 m2

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Fence_Concrete_P alisade 120 m $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Earthing_Earth_Mat 900 m2

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Substation_Stoning 900 m2

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Project Totals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Unit Cost Breakdown

    Blantyre Main 11kV Substation

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    32/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 28 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7004 DSS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,a

    ndClearing

    Charges)

    Installation,

    Commis

    sioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tender

    Document,

    ContractSupervision

    ,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(inc

    luding

    Contingency)

    Isolator +e/s_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_33kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    TR_10MVA_66kV_33kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    33/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 29 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7005 DSS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,

    andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tende

    rDocument,

    ContractSupervisio

    n,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDutie

    s(including

    Contingency)

    UnitCostPrice(inc

    luding

    Contingency)

    TotalCostPrice(in

    cluding

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_33kV 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV_Auto_Reclose 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_33kV_1p 18 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    C ontrol_ Protection_ Panel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    34/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 30 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7006 DSS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,a

    ndClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tender

    Document,

    ContractSupervision

    ,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(inclu

    ding

    Contingency)

    TotalCostPrice(including

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_33kV 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00TR_AUX_0.050MVA_33kV_0.4kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_33kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_Protection_ Panel_Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    35/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 31 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7008 DSS Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,a

    ndClearing

    Charges)

    Installation,

    Commis

    sioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagemen

    t(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(inc

    luding

    Contingency)

    TR_5MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_33kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_1250A_25kA_INC_I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_630A_25kA_FDR_I/D 4 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_Protection_Panel_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_Protection_ Panel_Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    36/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 32 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7012 DSS Contingency:

    MaterialsandEquip

    ment

    (IncludingTransport,Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commis

    sioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagemen

    t(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties

    (including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(inc

    luding

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    37/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 33 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7013 DSS Contingency:

    MaterialsandEquipme

    nt

    (IncludingTransport,In

    surance,

    Storage,

    Handling,and

    Clearing

    Charges)

    Installation,

    Commissio

    ning,and

    SiteEstablishment

    EPCCost(withoutCon

    tingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(includ

    ing

    Contingency)

    CB_11kV_1250A_25kA_ INC_ I/D 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_1250A_25kA_B-S_I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_630A_25kA_FDR_ I/D 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Project Totals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Unit Cost Breakdown

    Queens 11kV Substation

    EquipmentDescription

    Qty

    Unit

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    38/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 34 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7014 DSS Contingency:

    MaterialsandEquip

    ment

    (IncludingTransport,Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutC

    ontingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagemen

    t(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_33kV_Auto_Reclose 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_33kV 4 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00TR_AUX_0.050MVA_33kV_0.4kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_33kV_1p 12 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    39/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 35 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7015 DSS Contingency:

    MaterialsandEquipm

    ent

    (IncludingTransport,

    Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commiss

    ioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,Tender

    Document,

    ContractSupervision,and

    ProjectManagement

    (including

    Contingency)

    VATonEPCCost(in

    cluding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(inclu

    ding

    Contingency)

    TotalCostPrice(including

    Contingency)

    CB_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_33kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_11kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_Protection_ Panel_Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    40/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 36 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 7017 DSS Contingency:

    MaterialsandEquip

    ment

    (IncludingTransport,Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tende

    rDocument,

    ContractSupervisio

    n,and

    ProjectManagemen

    t(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    TR_10MVA_33kV_11kV_OLTC 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    41/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 37 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: SCA_1000 Contingency:

    MaterialsandEquipment

    (IncludingTrans

    port,Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Com

    missioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(inclu

    ding

    Contingency)

    Surveys,Prelim

    inary

    Engineering,Te

    nderDocument,

    ContractSupervision,and

    ProjectManage

    ment(including

    Contingency)

    VATonEPCCo

    st(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice

    (including

    Contingency)

    Comms_Fibre_Blantyre_Main_To_Chichiri_UGC 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Blantyre_Main_To_Customs_UGC 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Nkula_To_Headpond_ADSS 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Tedzani_To_Headpond_ADSS 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Old_Bwengu_To_New_Bwengu_ADSS 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Turn_ In_New_Lilongwe 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Turn_ In_New_Blantyre 1 Lot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Fibre_Indoor_Terminal_Equipment_Type_1 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_PLC_Line_Traps/CVT's/Matching Units 18 per link $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_PLC_Indoor_Terminal_Equipment 18 per link $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Comms_Radio_End_To_End_Link_Complete 37 per link $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RTU_Basic 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RTU_Small 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RTU_Medium 48 ea

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RTU_Large 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Batteries_50V DC_95Ah 18 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Battery C harger _ 20A_ 50V DC 18 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Master_Station_NCC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Master_Station_RCC_South 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Master_Station_RCC_Central 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Master_Station_RCC_North 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Master_Station_GCC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Voice_Exchange 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Voice_ Remote_ Unit_Type_ 1 61 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Voice_ Remote_ Unit_Type_ 2 28 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    SCADA - Escom Malawi

    Unit Cost Breakdown

    EquipmentDescription

    Qty

    Unit

    M l i P S P j S di Fi l F ibili S d R

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    42/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 38 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6012 TLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderD

    ocument,

    ContractSupervision,

    and

    ProjectManagement(

    including

    Contingency)

    VATonEPCCost(inc

    luding

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(includ

    ing

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_66kV_Steel_Pole_ACSR_Lynx_SC 35 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00OHL_ 66kV_ Steel_ Lattice_ ACSR_ Lynx_ SC 35 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Lilongwe 66kV OHL

    66kV Steel Lattice Single Circuit

    EquipmentDescription

    Qty

    Unit

    Project No: 6050 TLC Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_ 220kV_Steel_ Lattice_ ACSR_P arakeet_SC 203 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00OHL_ 132kV_Steel_Lattice_ACSR_P arakeet_SC 203 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Nkula B-New Lilongwe OHL

    220 kV Steel Lattice Single Circuit

    EquipmentDescription

    Qty

    Unit

    M l i P S t P j t St di Fi l F ibilit St d R t

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    43/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 39 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6001 TLN Contingency:

    MaterialsandEquipm

    ent

    (IncludingTransport,Insurance,

    Storage,

    Handling,an

    dClearing

    Charges)

    Installation,

    Commiss

    ioning,and

    SiteEstablishment

    EPCCost(withoutCo

    ntingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement

    (including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(inclu

    ding

    Contingency)

    OHL_ 132kV_ Steel_ Lattice_ ACSR _Mulberry_ S 71 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Chintheche-Mzuzu (Luw inga) OHL

    132kV Wood Pole Single Circui t

    EquipmentDescriptio

    n

    Qty

    Unit

    Project No: 6004 TLN Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_ 132kV_ Steel_ Lattice_ AC SR _Mulberry_ S 60 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Luwinga-Bwengu OHL

    132kV Wood Pole Single Circui t

    EquipmentDescription

    Qty

    Unit

    Mala i Po er S stem Project St dies Final Feasibilit St d Report

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    44/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 40 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6046 TLN Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,

    Handling,and

    Clearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDo

    cument,

    ContractSupervision,a

    nd

    ProjectManagement(in

    cluding

    Contingency)

    VATonEPCCost(inclu

    ding

    Contingency)

    CustomsandDuties(in

    cluding

    Contingency)

    UnitCostPrice(includin

    g

    Contingency)

    TotalCostPrice(including

    Contingency)

    OHL_66kV_Steel_ Lattice_ACSR_Lynx_SC 3 km $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Project Totals

    Unit Cost Breakdown

    Bweng u 66/33kV - New Bwengu 132/66KV 66 kV OHL

    66kV Steel Lattice Single Circu it

    EquipmentDescription

    Qty

    Unit

    Project No: 6014 TSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    TenderDocument,

    ContractSupervision,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    CB_11kV 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_11kV 8 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_11kV_Auto_Reclose 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_11kV_1p 24 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_11kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    TR_15MVA_66kV_11kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    45/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 41 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6017 TSC Contingency:

    MaterialsandEquipment

    (IncludingTransp

    ort,Insurance,

    Storage,Handling,andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withou

    tContingency)

    Contingency

    EPCCost(includ

    ing

    Contingency)

    Surveys,Prelimin

    ary

    Engineering,Ten

    derDocument,

    ContractSupervision,and

    ProjectManagem

    ent(including

    Contingency)

    VATonEPCCos

    t(including

    Contingency)

    CustomsandDuties(including

    Contingency)

    UnitCostPrice(including

    Contingency)

    TotalCostPrice(including

    Contingency)

    CB_132kV 9 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_132kV_B/P 4 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_132kV 26 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CT_1p_132kV 21 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    VT_1p_132kV 24 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_132kV_1p 24 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_220kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_220kV_B/P 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_220kV 4 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CT_1p_220kV 9 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    VT_CVT/LineTrap_1p_220kV 6 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SA_220kV_1p 9 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_ Protection_ P anel_Trf_220kV_ &_TCCP 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_Protection_Panel_220kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    TR_100MVA_132kV_220KV_OLTC_AUTO 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_66kV 7 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_66kV 12 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CT_1p_66kV 12 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_66kV_1p 18 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_66kV 12 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_33kV_Auto_Reclose 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    CB_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Isolator +e/s_33kV 7 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CT_1p_33kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    VT_1p_33kV 12 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_33kV_1p 15 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    TR_15MVA_66kV_33kV_OLTC 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00TR_40MVA_132kV_66kV_OLTC_AUTO 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    TR_AUX_0.1MVA_33kV_0.4kV 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_Protection_Panel_132kV 4 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    Control_Protection_Panel_66kV 2 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_P rotection_ P anel_Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    46/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 42 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6027 TSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,

    andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,Tende

    rDocument,

    ContractSupervisio

    n,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDutie

    s(including

    Contingency)

    UnitCostPrice(inc

    luding

    Contingency)

    TotalCostPrice(in

    cluding

    Contingency)

    CB_11kV_1250A_25kA_INC_I/D 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_1250A_25kA_B-S_I/D 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00CB_11kV_630A_25kA_FDR_I/D 7 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Batteries_110V DC_32Ah 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Battery Charger _ 10A_110V DC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    47/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 43 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6028 TSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,

    Insurance,

    Storage,

    Handling,

    andClearing

    Charges)

    Installation,

    Commissioning,and

    SiteEstablishment

    EPCCost(withoutContingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,

    Preliminary

    Engineering,

    Tende

    rDocument,

    ContractSupervisio

    n,and

    ProjectManagement(including

    Contingency)

    VATonEPCCost(including

    Contingency)

    CustomsandDutie

    s(including

    Contingency)

    UnitCostPrice(inc

    luding

    Contingency)

    TotalCostPrice(in

    cluding

    Contingency)

    CB_66kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Isolator +e/s_66kV 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00VT_1p_66kV 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    SA_66kV_1p 3 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00TR_15MVA_66kV_33kV_OLTC 1 ea $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Control_ Protection_ P anel_ Trf_

  • 7/29/2019 FFS Annex 10-Project Costing Model ExternalVersion NoCost

    48/84

    Malawi Power System Project Studies:Final Feasibility Study ReportAnn ex 10: Cost ing Mo del, Pro ject Pac kagi ng, and Co st Est imates

    ICF International/Core International, Inc. 44 Millennium Challenge Corporation10-010 FINAL January 18, 2011

    Project No: 6042 TSC Contingency:

    MaterialsandEquipment

    (IncludingTransport,Insurance,

    Storage,Handling,

    andClearing

    Charges)

    Installation,Commissioning,and

    SiteEstablishment

    EPCCost(without

    Contingency)

    Contingency

    EPCCost(including

    Contingency)

    Surveys,Preliminary

    Engineering,Tende

    rDocument,

    ContractSupervisio

    n,and

    Pr