FFC Briefing to the Portfolio Committee on Energy 18 June 2013

Upload: moya

Post on 04-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

FFC Briefing to the Portfolio Committee on Energy. 18 June 2013. Presentation Outline. Introduction Access to Free Basic Electricity (FBE) and Free Basic Alternative Energy (FBAE) Financing FBE and FBAE Constraints to Adequate Electricity Provision - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FFC Briefing to the Portfolio Committee on Energy

FFC Briefing to the Portfolio Committee on Energy

18 June 2013

Page 2: FFC Briefing to the Portfolio Committee on Energy

Presentation Outline

1. Introduction

2. Access to Free Basic Electricity (FBE) and Free Basic Alternative Energy (FBAE)

3. Financing FBE and FBAE

4. Constraints to Adequate Electricity Provision

5. Other Complementary Energy Provision Initiatives

6. Implementing FBE and FBAE

7. Conclusions

FFC Briefing to Portfolio Committee on Energy 18 June 2013

2

Page 3: FFC Briefing to the Portfolio Committee on Energy

INTRODUCTION• NDP vision for 2030 entails SA energy sector that promotes:

– Economic growth and development: through adequate investment in infrastructure

– Social equity: through expanded access to energy services with affordable tariffs and well targeted subsidies for poor households

– Environmental sustainability: through efforts to reduce pollution and mitigate effects of climate change

– Less use of coal to fulfil primary energy needs and greater emphasis on gas and renewable energy resources (wind, solar and imported hydroelectricity)

• Critical to balance supply security, affordability and climate change mitigation objectives– Moving to a lower carbon-intensive power generation mix is more

expensive versus need to maintain competitiveness of electricity prices and security of supply so as to power economic growth and development

3FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 4: FFC Briefing to the Portfolio Committee on Energy

INTRODUCTION [CONT.]

• SA is intensifying efforts to provide poor with energy: evidence is in the electricity policies and strategies and expenditures– Electrifying low income areas and rural regions– Universal electrification as a national goal

• Policies identify FBE as fundamental in improving the livelihoods of poor.

• FBE to promote gender equity and enhance lives of women and children: FBE frees time and resources for other services

• Environmentally unfriendly fuel alternatives abandoned for cleaner electricity 4

Page 5: FFC Briefing to the Portfolio Committee on Energy

5

Access to Free Basic Electricity Access to Free Basic Electricity (FBE) and Free Basic Alternative (FBE) and Free Basic Alternative

Energy (FBAE)Energy (FBAE)

Page 6: FFC Briefing to the Portfolio Committee on Energy

HOUSEHOLDS WITH ACCESS TO ELECTRICITY 2001 - 2011

6

Page 7: FFC Briefing to the Portfolio Committee on Energy

7FFC Briefing to Portfolio Committee on Energy 18/06/2013

1. Consumer Units (CUs) receiving electricity are on the increase

2. Consumer Units (CUs) receiving FBE are on the increase after some decline between 2006-2009

Page 8: FFC Briefing to the Portfolio Committee on Energy

FBE COVERAGE AGAINST IDENTIFIED INDIGENTS

8

Page 9: FFC Briefing to the Portfolio Committee on Energy

2. IMPLEMENTATION OF FBE AND FBAE 2011

FFC Briefing to Portfolio Committee on Energy 18 June 2013

Municipal FBE Authority and ProvidersType of Municipality Number Electricity Authority Electricity Provider FBE Policy FBE ImplementingMetros 8 8 8 8 8Secondary cities 19 19 19 14 15Larger Towns 26 26 25 24 22Smaller Towns 113 109 104 102 80Rural municipalities 68 33 25 56 50Total 234 195 181 204 175

Page 10: FFC Briefing to the Portfolio Committee on Energy

NUMBER OF MUNICIPALITIES PROVIDING ALTERNATIVE ENERGY

2010 AND 2011

10FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 11: FFC Briefing to the Portfolio Committee on Energy

11

3. Funding FBE and FBAE3. Funding FBE and FBAE

Page 12: FFC Briefing to the Portfolio Committee on Energy

NEW LES AND FUNDING OF FBE AND FBAE

• FBE and FBAE funded by LES– Electricity component of the BS component

• New LES formula implemented in 2013– Electricity component remained as part of BS

– Improved accuracy and targeting of funding of FBE and FBAE

– Greater support to rural municipalities to delivery FBE and FBAE

12FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 13: FFC Briefing to the Portfolio Committee on Energy

REVISED SUBSIDY IN LES FORMULA

• R5.7 billion of total LES for FBE and FBAE 2013/14– R56.29 per poor household per month• R50.66 for operational expenditure in FBE and FBAE

delivery per poor household per month• R5.63 for maintenance of infrastructure

– Calculation based on NERSA tariff guidelines• Second block tariff of 82c/kWh• 50kWh used as benchmark as per current policy

standard

13FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 14: FFC Briefing to the Portfolio Committee on Energy

NEW LES FORMULA AND IMPLICATIONS FOR FBE AND

FBAE• Poverty threshold in LES increased from R800 to R2300– Households earning less than R2300 per month receive

funding for FBE– Covers 59% of total households in SA

• Increased funding for FBAE– Previous formula distinguished between household

connected and not connected to services resulting in funding for FBAE being lower than FBE

– Standard subsidy for FBE and FBAE in new formula• Delivery of FBAE is likely to be as expensive as FBE

FFC Briefing to Portfolio Committee on Energy 18 June 2013

14

Page 15: FFC Briefing to the Portfolio Committee on Energy

15

4. Constraints to Adequate 4. Constraints to Adequate Electricity ProvisionElectricity Provision

FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 16: FFC Briefing to the Portfolio Committee on Energy

SUMMARY OF ELECTRICITY CAPITAL RENEWALS BACKLOG-FINDINGS OF FFC

SUBMISSION FOR 2014 DOR

16

Target Condition Standard

Electricity

Amount Years

1 Optimum R 41 billion 11

2Sub-optimal R 25 billion 7

3Absolute Baseline R 8 billion 2

•Total capital investment in renewals is estimated at between R600 and R800 million per annum •Capital renewals backlog of between R20 and R40 billion in municipal electricity sector •To address backlog requires capital renewal programme with allocation of at least R4 billion per annum over a 10 year period (depending on target standard of infrastructure preferred)

Page 17: FFC Briefing to the Portfolio Committee on Energy

CONDITION OF ELECTRICITY DISTRIBUTION INFRASTRUCTURE IN 2012

AND IN 5 YEARS TIME

17

2012 5 Years Time

0

1

2

3

4

5

6

7

8

VG G F P VP

R Bi

llion

p a

Time

0

2

4

6

8

VG G F P VP

R Bi

llion

p a

Time

•Should current levels of investment continue, in 5 years time SA will see a severe deterioration of its electricity distribution infrastructure

FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 18: FFC Briefing to the Portfolio Committee on Energy

18

Other Complementary Energy Other Complementary Energy Provision InitiativesProvision Initiatives

FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 19: FFC Briefing to the Portfolio Committee on Energy

NATIONAL SPENDING ON PRIORITY AREAS

19FFC Briefing to Portfolio Committee on Energy 18/06/2013

Page 20: FFC Briefing to the Portfolio Committee on Energy

20

8. Conclusion8. Conclusion

FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 21: FFC Briefing to the Portfolio Committee on Energy

Conclusion

• FBE and FBAE vital for economy and for households- escaping poverty

• LGES has made explicit provisions for repairs and maintenance and the issue is the will to use such provisions for intended purposes. Big risk is impact on the national economy if significant investment are not made. Avoid reactive maintenance, go for preventative maintenance

• There is need for proper targeting of FBE and correct use of indigent registers

• Efficiency in the distribution of electricity is paramount: Important to minimise electricity leakages, illegal connections and institute adequate repair and maintenance

21FFC Briefing to Portfolio Committee on Energy 18 June 2013

Page 22: FFC Briefing to the Portfolio Committee on Energy

THANK YOU.THANK YOU.

Financial and Fiscal CommissionMontrose Place (2nd Floor), Bekker Street,Waterfall Park, Vorna Valley, Midrand,Private Bag X69, Halfway House 1685

www.ffc.co.zaTel: +27 11 207 2300Fax: +27 86 589 1038

22