![Page 1: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/1.jpg)
Fermilab PIP Booster Accelerator RF
Cavity Refurbishment
Matt Slabaugh
ARW 2015
27 April 2015
![Page 2: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/2.jpg)
Topics
• Proton Improvement Plan (PIP)
• Booster Radio Frequency (RF) Cavities
• Cavity Refurbishment
• Tuner Refurbishment
• Planning for failure
• Testing and Summary
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 2
![Page 3: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/3.jpg)
Booster RF Cavity
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 3
Circa. 1969 bid drawing (obsolete)
Critical advantage: Access to retired personnel with development knowledge
![Page 4: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/4.jpg)
Cavity Refurbishment- Scope
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4
Vacuum
Misc.
RF Contact
Cavities are radioactive and fragile!
![Page 5: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/5.jpg)
Cavity Refurbishment- RF Contact
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 5
Milling improved quality, reduced time and distance (dose). ~ 7 days2 days
Insufficient contact = heat and RF leakage
![Page 6: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/6.jpg)
Cavity Refurbishment- Vacuum Repair and Upgrade
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 6
Leaking “pie-tin” quick disconnect flange
Removal with Wach’s tool
Replace with solid flange
![Page 7: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/7.jpg)
Cavity Refurbishment
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 7
Water cooling repair/upgrade
Alignment fiducials installed Improvised repair tooling
Internal sparking and damage
![Page 8: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/8.jpg)
Tuner Refurbishment
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 8
Contact surfaces
Cones
Cooling lines
Each tuner:
• 500+ pieces
• 150ft+ tubing
• 50+ water connections
• 44in long
• 650lbs
Ferrite
![Page 9: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/9.jpg)
Tuner Refurbishment
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 9
![Page 10: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/10.jpg)
Tuner Refurbishment- Risk
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 10
![Page 11: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/11.jpg)
Tuner Refurbishment- Procurement and challenges
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 11
• Difficult procurement
– Stock items not stock (tube sizes)
– Common processes no longer
common
– Unusual materials
• Original drawings not updated
– Undocumented revisions
– All hand drawings, no CAD
• Little data available for optimizing
design changes or benchmarking
![Page 12: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/12.jpg)
Tuner Refurbishment- Planning for failure
• Have begun building new tuner assemblies
• Potentially replace all refurbished tuners with new
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 12
![Page 13: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing](https://reader034.vdocuments.mx/reader034/viewer/2022042107/5e85fada8bbdaa5bca41dc37/html5/thumbnails/13.jpg)
Cavity Testing and Summary
• Each assembly tested for two weeks prior to install
• Thermal sensors near critical surfaces for real time data
• Beginning production of two spare cavities
4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 13
• 17 of 20 cavities
installed
• 50 tuners
refurbished
• 3 tuners built new