fermilab neutrino program jim strait neutrino discussion at cern 26 november 2013

18
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Upload: matsu

Post on 22-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013. Fermilab Accelerator Complex. LBNE. Ongoing Accelerator Upgrades. Proton Improvement Plan (2012-2018): double beam power of the proton source by increasing rep-rate. 40  80 kW @ 8 GeV. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Fermilab Neutrino Program

Jim StraitNeutrino Discussion at CERN

26 November 2013

Page 2: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Fermilab Accelerator Complex

LBNE

Page 3: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Ongoing Accelerator Upgrades

LBNE

Main Injector (being commissioned now): double beam power by stacking beam in the Recycler and decreasing

MI cycle time

Muon Campus (2013-2018): convert antiproton source to

meet needs of the muon program

Proton Improvement Plan (2012-2018): double beam power of the proton source

by increasing rep-rate

40 80 kW @ 8 GeV

350 700 kW @ 120 GeV

Page 4: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

4

Next Accelerator Upgrades

New 800 MeV SRF, CW capable linac:

80 120 kW @ 8 GeV0.7 1.2 MW @ 80 -120 GeV

Ready before LBNE starts

Reorientation of “Project X” (now Proton Improvement Plan II) to focus on beam power for neutrinos.

0.8 to 3 GeV & 3 to 8 GeV linacsreplaces Booster1.2 2.3 MW @ 60 -120 GeV

~5 years years later

Plan to be presented at P5 meeting, 16 Dec at BNL

Page 5: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

U.S. neutrino program

• Accelerator based Neutrino Experiments

using Fermilab Accelerators

T2K ICARUS …

• Reactor based Daya Bay, Double CHOOZ, …

• Neutrino-less double beta decay EXO, MAJORANA demonstrator, CUORE, …

Topic for this presentation

Page 6: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Neutrino Program (both n and n beams)

• Measure and characterize the pattern of neutrino masses and mixings:

MINOS / MINOS+ NOvA LBNE• Discover if the situation is more complex than 3 neutrinos with

Standard Model Interactions:

MINOS / MINOS+ NOvA LBNE MiniBooNE MicroBooNE

Proposed: ICARUS, LAr1-ND nSTORM• Neutrino interactions / cross sections and neutrino engineering

measurements that make the above points possible:

MiniBooNE MINERvA MicroBooNE LBNE ND / Proposed: ICARUS, LAr1-ND nSTORM

_

Page 7: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MINERvA

MiniBooNE

735 km (on-axis)

MINOS (far)at 2340 ft level

5 kton

MINOS (near)

operatingsince 2005350 kW (>400 kW)

Evolution of U.S. Neutrino Experiments

Page 8: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MINERvA

MiniBooNE

735 km (on-axis)

MINOS (far)at 2340 ft level

5 kton

MINOS (near)

operatingsince 2005350 kW (>400 kW)

Evolution of U.S. Neutrino Experiments

NOvA (far)Surface14 kton

under constructiononline 2014

700 kW

MicroBooNEunder construction

(LAr TPC)

NOvA(near)

810 km (off-axis)

Page 9: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MINERvA

MiniBooNE

735 km (on-axis)

MINOS (far)at 2340 ft level

5 kton

MINOS (near)

operatingsince 2005350 kW (>400 kW)

Evolution of U.S. Neutrino Experiments

NOvA (far)Surface14 kton

under constructiononline 2013

700 kW

MicroBooNEunder construction

(LAr TPC)

NOvA(near)

810 km (off-axis)1300 km (on-axis)

New beamlineNear detector

LBNE Far detectorat 4850 ft level>10 kton 35 kton LAr TPC1.2 MW 2.3 MW proton beam

Page 10: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MINOS+ and MINERvA

MINOS+:Sensitivities to new physics

Machado, Nunokawa, Funchal

Kopp, Machado, Parke

0 5 10 15En (GeV)

MINOS MINOS+

MINERvA: Cross section meas. with various targets

MINERvA

Page 11: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MicroBooNE Detector Constructionwill start taking data summer 2014

Page 12: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

MicroBooNE Cryogenics

12

Page 13: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

NOvA Detector Construction

MINOS near detectorMINERvA detector

NOvA near detector hall

25 of 28 blocks installed, 20.7 filled (10.4 kt), 5.7 instrumented (2.8 kt)

NOvA near detector

Project Complete Fall 2014

Page 14: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

NOvA:

• Far detector (14 kt): Cosmic muons

observed (Feb. 2013) Running with 3 kt in

June 13, 2013

• Near detector prototype (surface):

Measured the electron neutrino component of the beam

Page 15: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

15LBNE CD-1 Director's Review - 26-30 March 2012

Sample with bullet points

• First Bullet• Second Bullet

More Yet more Still more

• Less important• Trivial

New Neutrino Beam at Fermilab…

Long Baseline Neutrino Experiment

…aimed at the Sanford Underground Research Facility (SURF)in Lead, South Dakota35 kton Liquid Argon TPC Far Detectorat a depth of 4850 feet

LBNE-doc-7074

Precision Near Detector

on the Fermilab site

Page 16: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

Related R&D Programs

• LArIAT – Liquid Argon in a Test Beam• CAPTAIN – Cryogenic Apparatus for Precision Tests

of Argon Interactions with Neutrinos

16

Page 17: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

17

Page 18: Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013

18