feno'cp.o. route boxfeno'cp.o. route box 1684 frs[energy nuclear operating corny...
TRANSCRIPT
Beaver Valley Power StationRoute 168FENO'CP.O. Box 4
Frs[Energy Nuclear Operating Corny Shippingport, PA 15077-0004
December 19, 2013L-1 3-399
Department of Environmental ProtectionBureau of Water Quality ManagementAttention: DMR Clerk400 Waterfront DrivePittsburgh, PA 15222
SUBJECT:Beaver Valley Power Station Discharge Monitoring Report (NPDES) Permit No.PA0025615
Enclosed is the November 2013 NPDES Discharge Monitoring Report (DMR) forFirstEnergy Nuclear Operating Company (FENOC), Beaver Valley Power Station, inaccordance with the requirements of the Permit. Attachment 1 to this letter issupplemental monitoring data for Outfall 001 (dissolved oxygen).
A review of the data indicates no permit parameters were exceeded during the month.
Should you have any questions regarding the attached and enclosed documents,please direct them to Mrs. Beth Furdak, at 724-682-4114.
Sincerely,
Richard D. BolognaDirector, Site Operations
j~~J: 5
Beaver Valley Power Station, Unit Nos. 1 and 2L-13-399Page 2
Attachment(s):1. Weekly Dissolved Oxygen Monitoring Results at Outfall 001
Enclosure(s)A. Discharge Monitoring Report
cc: Document Control Desk US NRC (NOTE: No new US NRC commitments are contained in this letter.)
US Environmental Protection AgencyMs. Amanda Schmidt, PA DEP/Bureau of Water Quality Management
Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615FirstEnergy Nuclear Operating Company (FENOC)Beaver Valley Power Station
L-13-399
ATTACHMENT 1
Weekly Dissolved Oxygen Monitoring Results at Outfall 001
The following supplemental dissolved oxygen monitoring data for Ouffall 001 is providedas agreed.
SAMPLE DATE SAMPLE TIME VALUE UNITS
04-Nov-13 09:00 6 mg/L12-Nov-13 08:30 7 mg/L18-Nov-13 08:30 6 mg/L25-Nov-13 08:40 7 mg/L
- Attachment 1 END -
NA I IUNAL I-ULLU I AN I UI5SUMAI-(U1: ILIMINA I IUN 6Yi I 'M kNt-Ut--;')
DISCHARGE MONITORING REPORT (DMR)F om Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 1
PA0025615 001A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDD/YYYY MMTDDO/YYY
FROM 111/ 01/ 201 TO 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNITS 1&2 COOLG. TOWER BLWDNExternal Outfall
No Discharge F--
" . .. :'........ •NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE
PARAMETERVALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.3 N/A 8.4 pH 0 1 / 7 GRAB•H MEASUREMENT
004001 0 PERMIT 5 6'., . 0-, .- ;.r,.~.ji. a** . -. ~ .- ,,~.' ,v~nO(~N/A ~AIU<Wel2~ GA~Effluent Gross REQUIREMENT MIIMUM......u vi I
Nitrogen, ammonia total (as N) SAMPLE N/A N/A N/A N/A N/A NIA mg/L 0 1 / 7 GRABMEASUREMENT00610 1 0 PERMIT *00-f .. *.. Req. Mon r4-Req.Mon-% .'
Effluent Gross RQIREMENT N/ .~.MOAGDIYM <4 nL iWey..
CLAMTROL CT-1, TOTAL WATER SAMPLE N/A N/A N/A N/A GG GG GG GG / GG 24 HRMEASUREMENT COMP
04251 1 0 PERMIT ." :**** ........ ...o " * "oo "o ' o - ' P2 4---, .' " Whe'l "N/A ,A---"CM4Effluent Gross REQUIREMENT _":___.. __- ". .MO-AVG.' _-DAImLYMX-:. g mg/L ',. Discharglng -..
SAMPLE 3. 76 MD NANANANA - DLY CN
Flow, in conduit or thru treatment plant MEASUREMENT5R e q • M 6W0R eq0M o n . .5 0. .0. - . -N /A. , ,;".. . .. .. ... . ..... ... "1NEffluent Gross REQUIREMENT MO AVG D.ý""j"AILYMX" -'. MgaI/d ýý .'- "ý-i•" i. '•/' *"u'- u:•, ':,' n;
Chlorine, total residual SAMPLE N/A N/A N/A N/A <0.1 0.06 mg/L 0 1 / 7 GRABMEASUREMENT500601 0 PERMIT *7."*A ..*..* ..*..... , . . -5-.g/. . ,Effluent Gross REQUIREMENT N/A •. .. ,-.AVERAGE'-..:lM - m/ i- .... ldr'- '....AB
Chlorie, fre avalableSAMPLE -/
Chlorine, free available SUME N/A N/A N/A N/A <0.02 0.0 mg/L 0 CONT RCRD500641 0 PERMIT ". *. ** * * ** ** *N/A . .. *.*...: : ... '2. Con•lnuous::" 'OR"R':" • :•"": ;:-": :"""¢>• ": N/A L":" •'..;:"'?--•:' ,:• ',. . 11nuohti ' .Ji0:Si•Effluent Gross REQUIREMENT .i.,.'c=V:'E'xIMUM:.m..L r'.-:-: .-
HydrzineSAMPLEHydrazine MEASUREMENT N/A N/A N/A N/A GG GG mg/L 0 1 / 7 GRAB
8131310 . ~~~~PERMIT .. ***0******:.'. 0-' " 0' -'u ',4..."MEASUREMENT
Effluent Gross REQUIREMENT .. . .......NA.......Weekly
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of lew that this document and all attachments were prepared under my TELEPHONE DATEdirection or supervision in accordance mith a system designed to assure that qualified personnrl T DATE
property gather and evaluate the Information submitted. Based on my inquiry of the person ot
Richard D. Bologna, DIRECTOR OF SITE persons who manage the system. or those persona directly responsible for gathering the 724 682-7773 12/ 19/ 2013informaton. the Information submitted is. to the best of my knowledge and belief, true, accurate. ,
OPERATIONS and completa. I am eware that there rer significant penalties for submittng false information,including the possibility of fine and imprisonment for nowMing violations. SIGNATUR OFPICPLEE0 V FICER OR
TYPED OR PRINTED AUTHORIZED AG AREA Code NUMBER MMDD/YYYY
COMMENTS AND EXPLANATnON OF ANY VIOLATIONS (Reference all attachments here)HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING. THE LIMIT IS 35 MG/L AS A DAILY MAX.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINA] IUN SYb I I-M (NI'U`__5)DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 002A
PERMIT NUMBER DISCHARGE NUMBERI
IMONITORING PERIODMM/DD/YYYY
FROM 11/ 01/ 2013 TO 112j30/ 013
Form Approved
OMB No. 2040-0004
Page 2
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
INTAKE SCREEN BACKWASHExternal Outfall
No Dischargeo-]
I TYPED OR PRINTEDCOMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page I
I'J, I IVINMIJ rU LLU I tMNI U I On,rl r%!N3r- r.LlIVIItN/t tV I I4. 1 T 0 IT VI INF" Jr ..0)
DISCHARGE MONITORING REPORT (DMR)I-orrm AppMrea
OMB No. 2040-0004
Page 3PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 003A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMM[DDr/f I MM/DDT(YOYY
FROMI 111 01/ 201 TO 1 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
003External Ouffall
No Discharge[---
NAMEMTTLE PRINCIPAL EXECUTIVE OFFICER I -lilry under penalty of lamý that this dcomment and all attacmnltsot mona prepared u~nder mty TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the Information submitted. Based on my Inquiry of the person o
Richard D. Bologna, DIRECTOR OF SITE p...n.•f ro.manage tha system or thosa parsons directly rsaponsibleforgthering.the -7773 12/ 19/ 2013,ofnto lon. the Intormation submitted Is. to the best of my knowledge end belief. true., 724 682
OPERATIONS and complete. I am - that there ara signifilant penalties for submitting false information,including the possibility of fine and Imprisonment for knowirng violations. SIGNATURE OF PRINCIPAL EX(CUT E OFFICER OR
TYPED OR PRINTED AUTHORIZED A T AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)THE FLOWS FOR OUTFALLS 103, 203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.
Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1
NA I IUNAL tULLU I AN I UISUMAKUL .:LIMINA I IUN 5Y5 I -M (NI-LVb)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNAJDIR SITE OPER
Page 4
PA002 5 6 15 004A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDD/YYYY T MMIDD/YYYY
FROMI 11/ 01/ 201 TO 1 1/ 30/ 20131
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT ONE COOLG TOWER OVERFLOWExternal Outfall
No Discharge F -jNO. FREQUENCY SAMPLEa;•,' • :-•>- QUANTITY OR LOADING QUALITY OR CONCENTRATION... .... ,.". -EX•" OF ANALYSIS T P
PARAMETERVALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 6.4 N/A 7.9 pH 0 1 / 7 GRABMEASUREMENT
004001 0 PERMIT ,- 6 ...--. .. .* N/A " . . .Effluent Gross REQUIREMENT P. ,. . - -'. l- 2 _ _ _ ..-.,..... .... A...... ... '4 hu.
SAMPLE 28 .5 MD NANANANA1/7 MAFlow, in conduit or thru treatment plant MEASUREMENT 29 385 MGD N/A N/A N/A N/A 7 MEAS
-"R-a* -M n .R - *no-e . . . ooeun -..- , li.,, '150050 1 0 PERMIT Req.M aq M .,l.i.l.". . , ..... N L•., ; We.... : M" ,SR..,-Effluent Gross REQUIREMENT , MO. AVG DA XLYMX: : Mgal/d •*./; ''.- "--- '-- . - .. . _,._... .. ." -. - - . " .. .u.,
Chlorine, total residual SAMPLE N/A N/A N/A 0.0 0.03 mg/L 0 1 I 7 GRAB5 :.0'" -* .•'> .06-,1 0" :-.- P I-7 -, , ,' .V l IEffluent Gross REQUIREMENT .-... . ".J " '•. ti.•AMOAV, G;, • 'INST MAX mg/L AP ,.- : __,.____
Chlorine, free available SAMPLE N/A N/A N/A 0.0 0.1 mg/L 0 1 I 7 GRABMEASUREMENT500641 0 PERMIT 2.**'*-t• 1. .;y* *.*) ' *- A ER G ,"•'M -- l.5 . t, mg/L .2Ž.Effluent Gross REQUIREMENT . .:,,.- N/A ... AVERAGE . , ,.MA... .M.. mg/L .....
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and oll attachments wer* prepared under my TELEPHONE DATEdirection or supervision In accordance with a system designed to assure that qualified personnel , -.properly gather end evaluate the information submitted. Based on my Inquiry of the p7eon or
Richard D. Bologna, DIRECTOR OF SITE persone who manage the system. or thoee peneone directly responible for gtheingth. 724 682-7773 12/ 19/ 2013Information, the information submitted 1e, to the beet of my knowledge end belief, true, accurte, eta
OPERATIONS hand complete,. m aware that there ee significant penalties ton submitting false lnforraio.Including the possibility of fine end Imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXEC IV OFFICEROR
TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MMIDDNYYY
COMMENTS AND EXPLANATION OF ANYVIOLATIONS (Reference all attachments here) There was no flow during the 3rd and 4th week of November.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
IN I IUNAL 1'ULLU I AN I UIZ UI;H ILS[- -LIMINA I IUN bYZ I IlM (INI'Ul-)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 5
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
[A002615]
PEMI NMBER1006sA 1
DICAGENME
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)AUX. INTAKE SCREEN BACKWASHExternal Outfall
No Discharge[F-'
MONITORING PERIODMMIDD/YYYY MMIDD/YYYY
FROM 11/ 01/ 201 TO 11/ 30/ 2013
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER d cert fy under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified pa son n •property gather and evaluate the information submitted. Based on my Inquiry of the person or ,#
Richard D. Bologna, DIRECTOR OF SITE ,er.onswho manage the atenr. orthosepe...n.dir.ciyraponsibieto, gatherigtha 724 682-7773 12/ 19/ 2013information, the information submitted Is. to the best of my knrooiedge and belief, true. accurate.OPERATIONS and complete. I am....r that ther are.. significant penalties for submitting false information.
including the possibility of fine and imprisonment for knowing violations. SIGIATURE OF PRINCIPAL EX T E OFFICER ORTYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1
NA I IUNAL PULLU I AN I UIbL;HAUIzi- -LIMINA I IUN bY I 'M (NI-'U.t)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 6
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 NPERMIT NUMBE
007A.
DISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
AUX. INTAKE SYSTEMExternal Outfall
No Dischargeo'X-1
MONITORING PERIODMMIDD/YYYY TO MMIDD/YYYY
FROMI 11/ 01/ 2013 11/ 30/ 2013
NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION• '':"-••-:;••, ;; :EX OF ANALYSIS TYPE
PARAMETER .'
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLEMEASUREMENT
0. -.. - ._ ' *040*-01- , 0 PERMITEffluent Gross REQUIREMENT pH' - - ""....MIN"M M MAXlMUM' pH *•C•-._,______ ______-
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
500501 0 PERMIT -M'Reqi.o "-Req MnoW y_-, *"":""- Weeky;' "._ABEffluent Gross REQUIREMENT -`;MO AVG -ý.DAILY MX,, Mgal/d _-_____"_______ ""_._.,Chlorine, total residual SAMPLE
MEASUREMENT5iV *0* . .. '*..¶** 4 0 . .5 0 P125T ;, •Effluent Gross REQUIREMENT _-__N__ 0_ . .. ... ., . MOAVG .. . INST.MAX-. mg/L " . .k iChlorine, free available SAMPLE
MEASUREMENT50064 1 0 PERMIT * **A•' " ; ." -'5 ,\ ; ..****.t :Effluent Gross REQUIREMENT .! .• . AVERAGE .A..MUM. m ..........
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certfy under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEirection or supervision In accordance with a system designed to assure that qualified personnelproperly gather and evaluate the Infornation submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE persons who .n..ngethe system. orrthose persons directly responsibleforgatheringthe"724 682-7773 12/ 19/ 2013Information, the Information submitted Is, to the best of my knowledge and belief, true, ecour.te,7
OPERATIONS end COmplete. I em aw.re that there are signlilcant penalties for submitting false Information,Includirg the possibility of fine and Imprisonment for knowtng violations. SIGI RE PRINCIPAL C IVE OFFICER ORTYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachmfonts here) There was flow only during the third week of October. WMC 11-12-13MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORINE ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THEREACTOR PLANT RIVER WATER SYSTEM.Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
INMA I IUINIAL 'ULLU I MIN I LU• I MtirtK32L -LUIVIII'V I IUIN 0 7 01 'IVI ki•ll r-0)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 7
PA0025615 .008A
PERMIT NUMBER! DISCHARGE NUMBER
MONITORING PERIODMMRDDOYYYY I MMIDD/YYYY
FO I 11/ 01/ 201 TO 1 11/ 301 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 COOLING TOWER PUMPHOUSEExternal Outfall
No Discharge[Z--'
!; •i•:• $:•' •!.•:•:. ='NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION NO.
PARAMETER • •. ______"_ _,_,_$- EX OF ANALYSIS TYPEPARAMETER : .• - •;.: ••': -
S-;,, . VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
004001 0 PERMIT " * * . . . * " " '""G** " " ' ' "Effluent Gross i:;{ -.. ' . . . :',," "":", .... ..• . p MAXIMUM.H .j - l - t';.-b-•,._ .
Solids, total suspended SAMPLEMEASUREMENT
005301 0 PERMIT 'u e*n. 0 {J07'ý~ ~T~ePtEffluent Gross REQUIREMENT . . ..,O AVG....DAILY.MX mg/L -. ._,_.-... .Oil & grease SAMPLE
MEASUREMENT00556 1 0 PERMIT - " ' 'ir- ' 20 r ' TwI Ce Per "' -
Effluent Gross REQUIREMENT .. . Month."- M"AVG DAILY . mG... ..
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
50050 1 0 PERMIT Req.'MOnG• 'Req-Mon Mgal/d C.- -. .- '. NIA*'**O ..- . } ,..--,Effluent Gross REUREMENT I O AVG - -"tDAILY.MX' ..' I/ *.: ... 1--t .. ' .- !.9y
NAMErTITLE PRINCIPAL EXECUTIVE OFFICER i certify under penalty of law that this document and all attachments were prepared under mydlatelon or supamsion in accordance with a system designed to assure that qualified personnproperly gather and evaluate the Information submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE persons who or s. gethe system. dithosepersos directly responsible for gathering theInformation, the Information submitted It. to the best of my knowledge and belief, two, aocuretlOPERATIONS and complete. I am..... that ther ..... significant penalties for submitting false Information,
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attchmegnts here)
Computer Generated Version of EPA Form 3320-1 Irey. 011061 Page 1Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1
NA I IUNAL HULLU IAN I UlIZUMAK. t "LIMINA I IUN '5Yt5 I M (NL"UI)-b
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMIT-rEE NAME/ADDRESS (include Facility Name/Location if Different) Page 8
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 I 010A
PERMIT NUMBERI DISCHARGE NUMBER
MONITORING PERIODFR MMIDD/YYY MMIDD/YYYY
FROMI 111 01/ 203 TO 111 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 COOLING WATERExternal Outfall
No Discharge j-1
NO. FREQUENCY SAMPLE• ', ::•;;'•,QUANTITY OR LOADING QUALITY OR CONCENTRATION•PARAMETER ., .7v~ __.,__..EX OF ANALYSIS TYPEPARAMETER '. , : •:,:.•- .................. ...,.• •... ........ ,
, -.. VALUE VALUE UNITS VALUE VALUE VALUE UNITSpH SAMPLE N/A N/A N/A 7.8 N/A 8.4 pH 0 1 7 GRAB
MEASUREMENT
00400 1 0 PERMIT ' ***" * . . " 000*00 .; -:;.• I.. - '".-* . ....... GRA'" ..Effluent Gross REURMN MNIMUM'ý- MAXIMUM? -.
CLAMTROL CT-1, TOTAL WATER SAMPLE N/A N/A N/A N/A GG GG mg/L GG GG I GG 24 HRMEASUREMENT COMP
04251 1 0 PERMIT .:*'- 00***0..', •' .". .•*****a .*00* " ....0 '" 0 "" . ,"0 - "Effluent Gross REQUIREMENT N/A . - .. ..'.,....INSTMA , ml/L - D soharglng. ________
SAMPLE 5.6 9.4 MGD N/A N/A N/A N/A 1 7 MEASFlow, in conduit or thru treatment plant MEASUREMENT 5694 MD NANANANA - II7 MA
5 0 0 5 0 1 0 P E R M I T ; ; :e M o f l r •-t j, . ' "R e- j M o- - 1 7 4 - - ' 1`, .o a o ý.. ' *• .-, , , , : : a., • . - . - ,, .. -'
Effluent Gross .. ,', '" ' NA............DEff __ __uent_ _ross__ REQUIREMENT .k'OAGDAI.YMX '. Mgal/d 2.. V .. d.:... : .. .......... , . e .
Chlorine, total residual SAMPLE AAA .06 mg/L ______7_GRAB
MEASUREMENT N/A N/A N/A N/A <0.1 0.06 mg/L 0 1 7 GRAB50060 1 0 PERMIT q.*O0-34ý.'~*p~'~ ' ~r 2 ~ ~ ~ ~ A
Effluent Gross REQUIREMENT -..OAl NST .MAX ." mg/L M...........
Chlorie, fre avalableSAMPLE Tm/
Chlorine, free available SUME N/A N/A N/A N/A <0.1 0.1 mg/L 0 1 I 7 GRAB500641 0 PERMIT r.-,*- **" .- .. . *00-,* '-' ... ' . 2- 2 ,-."- 5" -'' . ""'.
E-':'.ff , 'AVE GE -'.MA IMUM Gro mg/L j - - - ...... .
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I cerfty under penalty of law that this document and all attachments wre prepared under my TELEPHONE DATEdirection or supervision In accordance wrth a system designed to assure that qualified pe sonn. .property gather and evaluate the Information submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE pe.son. who ranageothreyt or thosepersons directlyresponsibleforgathedngthe 724 682-7773 12/ 19/ 2013informntsonthe informatio submitted Is. to the best of my knowledge and belief, true, ccurate. 72--2--/ 19'2 1OPERATIONS and complete. I am a sa that there rer significant penalties for submitting false informa ion,
including the possibility of fine and imprisonment for knowring violations SIGNATURE OF PRINCIPAL EX T OFFICER OR OFTYPED OR PRINTED AUTHORIZED AGWT AREA Code NUMBER MM/DDJYYYY
COMMENTS AND EXPLANATION OF ANY VIOLAInONS (Reference all attachments here)REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/L AS A DAILY MAX)
Page 1
NA I LUNAL "ULLU I AN I UI;Lct1AIt' L LIMINA I IUN jYb I -M fNrI-U,-LJ )
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 9
PA0025615PERMIT NUMBER
7011A
DISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
DIESEL GEN & TURBINE DRAINSExternal Outfall
No Discharge --7I MONITORING PERIODMMIDD/YYYY IMM/DD/YYYY
FROM 111/ 2013/ TO 11/ 30/ 2013
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NA I IUNAL HULLU I AN I UISL.;HAKU' LLIMINA I IUN bYb I I-M (NUI-Ut)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
Page 10PERMITTEE NAMEJADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 012A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMM/DD/YYYY MM/DDTYYYO
FROMI 11/ 01/ 201 TO 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
BLOWDOWN FROM THE HVAC UNITExternal Outfall
No Dischargeo-"•
NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION
PARAMETER EX OF ANALYSIS TYPES,. • VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH MEASUREMENT N/A N/A N/A 8.7 N/A 8.7 pH 0 2 / 31 GRAB004 0 0 1 0 P E R M IT :..:•.• -. ;******..:,....-: .., .. . . . . . :..;-.......*C*.. .. *.. ." :C*.•,•. ,8. r .**.:.*. .Ca:.*,.. 9 • ,• •...•. ..• ;': ;- ,;• • I O• n ce P.e r '• ' .•
Effluent Gross REQUIREMENT N/A..- ,'.,.,. ... -•.':;,'•'.•.;'.•:': •;";;••MINIMUM.'` ______.. __.- __ ,:...., ' M XIUM .LL-,.___ Moth .GRA,..,
Copper, total (as Cu) MESURMLEN N/A N/A N/A N/A 0.0251 0.0401 mg/L 0 2 I 31 GRABMEASUREMENT
01042 1 0 PERM IT . -* ea* -..•..'. ". .. * ****.* Re," ........ e..Mo, '•:., wice Per.
Effluent Gross REQUIREMENT UM N/A.MOVG,-,,DAILY MX.,g-. M ..WAX MU GRAp
ZCoppe, total (as Zn) SAMPLE N/A N/A N/A N/A <0.1 <0.1 mlgL 0 2 / 31 GRABZinc totl (a Zn)MEASUREMENT
01092 1 0 PERMIT ..,•.,•,. :. .• r; I.",W.. .•.,' ***11,•: .. ' N/A, .... : .• *.,•.d'. .. . .. ....... •. ::•.- ' • -17.5s .....•;•. :•--.' •••. T..,, ;:•• -. wlce.•Per•.:• •,t•.•:.q- .. ; ,E ffluent G ross R E Q U IR E M E N T *.':.., . r• - -uv,:; •, i ' :; • :•., • ' N /A _ • '• t ~ '•r :.'; , • : M O A V G " ,:D A L YM-I m /L ..... ..
SAMPLE <.0 001 MD NANANANA1I3 SFlow, in conduit or thru treatment plant MEASUREMENT < .0 0 0 1 M DNANANANA1 I 3 S
50105021 0 PERMIT One'Mn' eqMn..~~ / nePr
Effluent Gross REQUIREMENT . M 'V - DAILY M, ý.-..• ... ... . . . - A.E.IMA..-
Solids, total dissolved SAMPLE N/A N/A N/A N/A 572 580 mg/L 0 2 / 31 GRAB
MEASUREMENT
71092910 PERMIT T~ u..~ e o I. '~cPe- N/A . ,RqMr' ~ E RB~'
Effluent Gross REQUIREMENT - - N .. . MO"AVG :'-DAiLY"MX L mg/L-..: :t,'DY ;mt... ..
NAl ETITL PRNCPA EXECUTIV OFFCE t treatmty pnanr penalty of 00 lam00 tht thiA docmen Nrd all atahet 3er pEprduSrtTLPO ED TE
direction or superv~ion In accordance oith a system designed to assure that qualified persaonnlproperly gather and evaluate the Information Submitted, eased on my inquiry or the person orRichard D. Bologna, DIRECTOR OF SITE par.....mwra.m.nagethesyatam... rthaseper...r. direotiy raeonihbletor gathering the72627731/ 9/ 03i rtor matlton , the i rtorm latl an subm otad Is. to the best of m y IltroW ledge and belief, true. . .. s ura ,.t7 46 2 " 73a2.9 / 2 1
O P ERATIO NS cid omplete,. ta aware. that ther are.. ignirc=ant penaltites tor submitting f noraie .... tlon. IN FPICPLEE I FCROinclu~lng te pos ibityof ti alnd imprisonmavt to, knowing vlolatlons. SG AP0 .o IICP LEE.•"V O FC RO
TYPED OR PRINTED AUTHORIZED AGBN• AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANAION OF ANY VIOLATIONS (Reference all attacttmenttN here
Solidstota dissrolved VSrMPoE o/A EPA Norm 3320- 572v 01806 Page 1 GA
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMM/DDYYYY I MMIDDIYYYY
FROM 11/ 01/ 2 3 TO 1 11/ 30/ 2013
Form Approved
OMB No. 2040-0004
Page 11
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
OUTFALL 013External Outfall
No Discharge F--
NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION... .-- •-- - :EX OF ANALYSIS TYPEPARAMETER .... ' -,.
.. ,.,, , VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.4 N/A 8.0 N/A 0 1 / 7 GRABMEASUREMENT00400 1 0 PERMIT N/AR- , (' " ........ • '",-ekly - G.BEffluent Gross REQUIREMENT IN N:MUM,. 6 p MA lM.•---' jo__
Cyanide, total (as CN) SAMPLE N/A N/A N/A N/A <0.01 <0.01 N/A 0 2 I 31 24 HRMEASUREMENT COMP
007201 0 PERMIT :Rd N/A. Req..M.-. .. ..Req..Mon-Effluent Gross REQUIREMENT M - I U ILYIMX).,''I' ,-.." .' .. " "... .
EfletGosSAMPLE T 1WU024 HCopper, total (as Cu) MEASUREMENT N/A N/A N/A N/A <0.01 <0.01 N/A 0 2 I 31 COMP010421 0 PERMIT R.. I . -*',, e .. n •,Req.Mon. • 'c
Effluent Gross REQUIREMENT fz , ', N/.....OAV*I L0M 'r' n/L_ _
Chlorobenzene SAMPLE N/A N/A N/A N/A <0.005 <0.005 N/A 0 2 I 31 24 HRMEASUREMENT COMP
34301 1 0 PERMIT N/A .. q.Mo: Re,, nwlceRbe 2-..Effluent Gross REQUIREMENT G'. ý..... . ., ,-W. ,:MO AVG DAILY.-MX:. mg/L ..- "';:,Month . ;e________
SAMPLE 002002 MD NANANANA2/3 SFlow, in conduit or thru treatment plant MEASUREMENT 0002 0002 MGD N/A N/A N/A N/A 2 3150050 1 0 PERMIT 'eq .. n R M"...'N T ejEffluent Gross REQUIREMENT " MO.AVG (AL.... Mgal/d 1..:"-'- • '-,'..............- I EM•ni4iP. rESI -
• :, -O.VG n-.-:••AI£ :;•,. MgldMbntf;'".;::•:-, •''•••': ;':'".;...:•.... .
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) Sample for 11-18-13 was analyzed outside 40CFR Part136 hold times for Chlorobenzene.THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.
Computer Generated Version of EPA Form 3320-1 IRev. 011061 Page 1Computer Generated Version of EPA Form 3320A (Rev. 01/06) Page I
1'4M I IU14'ML tULLU 1 MIN I Utl rlo-.1Mrr '-LIIVIIIM-/ I IUlN 0 T 0 I t'lVI I'4r"LJr"O)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 101A
PERMIT NUMBER DISCHARGE NUMBER
I MONITORING PERIOD
Form Approved
OMB No. 2040-0004
Page 12
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
101 CHEMICAL WASTE TREATMENTInternal Outfall
No Discharge •FROM MM/DDTYYYY OFO I 11/ 01/ 201 TO
I MMIDD0YYYY1 11/ 30/ 2013
'.: :;!- = ;,.: '•:• •:.;•?;?•;•NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAMETER ____"..________..__EX OF ANALYSIS TYPEPARAMETER '"•' '•• ..... ,'.:
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT * *- .. ." * .. , ' "6 . .- ' ' " " ' . .. IEffluent Gross REQUIREMENT . . .. ..: - MINIMUM. • = -?MAXIMUM- ;•H .• .":. .....
SAMPLESolids, total suspended MEASUREMENT00530 1 0 PERMIT.... ;•....... ."-"•" •:";'.............'-•:•• "..... ..*.*w<..<: 30 "'1'007; • ;e :•'.•' ' r.C MP j2Effluent Gross REQUIREMENT ........... __" ; :'•• MOAVG'• ' =" DAILY MX m"g"/L"*"/'•'>4 ":____"_...
SAMPLEOil & grease MEASUREMENT0053061 0 PERMIT 5' 3 . 20'Effluent Gross REQUIREMENT ________. , • -.. MOAVG , .DAIM,"'" mg/L _ ___
SAMPLENitrogen, ammonia total (as N) MEASUREMENT _
006101 0 PERMIT "•- ........ ........ '".' * ***...... . '".. GM..D .M . m L. , , ,,,. G BEffluent Gross REQUIREMENT MO AVG e • .'DAILY MX .... mg/L... -. "--
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT50050 1 0 PERMIT 7R7q Mon.-,Req Mon7 .i*...... .. ' ,. ..
Effluent Gross REQUIREMENT M.OAVG- AILYMX- Mgal/d .-. ..- __,_ _ J L'i GON'IN
SAMPLEHydrazine MEASUREMENT
813131 0 PERMIT ; **O ý.,..:, .. . ..*" ' ' Req ".;Monr-... Req Mon'..4 Mon gEffluent Gross REQUIREMENT __.___- ___. __ ..... ". MO.AVG.DAILY.MX"mg," ______ •.e..Ir _,,.__"
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANYOTHER WATER.Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page I
.IN/A II UINAL rULLU I /IN I UL ,I-t. /A. t- r, -I- LIM I IW I I UIN j f T I 'M lNIruI-j)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 13
MPA002561IPERMIT NUMBER102A
DISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
102 INTAKE SCREEN HOUSEInternal Outfall
No Dischargee"j
MONITORING PERIODMM/DD/YYYY T MM/DD/YYYY
FO I 11/ 01/ 201 TO 1 11/ 30/ 2013
NO. FREQUENCY SAMPLEPARAMETER _•:•-; QUANTITY OR LOADING QUALITY OR CONCENTRATIONPARMETR .,••,,•.•,••;•• ... EX OF ANALYSIS TYPE
.'W VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.8 N/A 8.0 pH 0 2 / 31 GRABMEASUREMENT
00400 1 0 PERMIT 105i*-***- ooa ~. gTiePr~ '
Effluent Gross REQUIREMENT ' NM/A"...IINiMUM "_"'"""" "-' iUM•M-•! pMon..itGiA'SAMPE•. .P
Solids, total suspended SAMPLE N/A N/A N/A N/A 7 9 mg/L 0 2 / 31 GRABMEASUREMENT
00530 1 0 PERMIT 30.. . .... ... 'Is,;OOO .... ......... ,.-G .BTwice PerEffluent Gross REQUIREMENT N/A "' •, rf".,. " /L
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 / 31 GRABM EAS UREM ENT:;•',•i2, .::.:
00556 1 0 PERMIT .. . . . . . .0,-.. . 15 . , rJ': ... •- Twlce ?er', 1Effluent Gross REQUIREMENT ..-- O ..o.../A,.-MOAVG DA Y mg/L,. Month .
Flow, in conduit or thru treatment plant SAMPLE <0.001 <0,001 MGD N/A N/A N/A N/A 2 / 31 ESTFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT : R..'".."- "Re..Mon -- - C " N/A ' •E:T'M•Effluent Gross REQUIREMENT MO AVG DAILY MX Mgal/d kk1g"k _______________ _______________ ___.. _/ <.-:;- ;MESi. MAr
NAMEIJITLE PRINCIPAL EXECUTIVE OFFICER i certy under penalty of law that this document and all attachments were prepared under my . TELEPHONE DATEdirection or supemision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the Information submitted. Based on my Inquiry of the person oa
Richard D. Bologna, DIRECTOR OF SITE p.rs..ns wh managethe system, e those persons directly responsible tor gathering the 724 682-7773 12/ 19/ 2013information, the Information submitted is, to the best of my knowvedge and bealef.t tr o. accurate.
OP ERATIONS 0and complate. I ..m awar that the.r are significant penalties for submitting talso Information.including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXE I OFFICER OR
TYPED OR PRINTED AUTHORIZED AGEN AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYS I EM (NP-.Lb)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMIT-TEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 14
PA0025615PERMIT NUMBER
D 103ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
SLUDGE SETTLING BASINInternal Outfall
No Discharge ---MONITORING PERIOD
MM/DD[YYYY I MMIDD0YYYYFO I 11/ 01/ 201 TO 1 11/ 30/_ 2013
NO. FREQUENCY SAMPLEPA.RAMETER- :••, QUANTITY OR LOADING QUALITY OR CONCENTRATION OF ANAY TYPE.;•:.:•%-••' •, ::',. '"EX OF ANALYSIS TYPE
PARAMETER ; • .•:,-••4 . VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.9 N/A 8.1 pH 0 2 I 31 GRABMEASUREMENT
004001 0 PERMIT ' 'T6Effluent Gross REQUIREMENT M. pH N"A ""Mon"h•'
SAQIRMPEN 24 HRSolids, total suspended SAMPLE N/A N/A N/A N/A 21 22 mg/L 0 2 / 31 24 HR
MEASUREMENT COMP
005301 0 PERMIT ~NA ~ ~ ~ ~ 10tEffluent Gross REQUIREMENT N/A ' __-_._____ M Mo"AVG ,DAI.Y.MX-:.•' mg/L . . ',.Montn .=-,- ,
Flow, in conduit or thru treatment plant SAMPLE 0.022 0.034 MGD N/A N/A N/A N/A 2 / 31 ESTFlo, n onui o thu retmntplnt MEASUREMENT,
50050 1 0 PERMIT Req- Mon; '-r, ' Req Mon -l-' ... * ':. ..... N/A -.-... ...Effluent Gross REQUIREMENT L• YMOAV&., DAIL. . UgaI/d I . .... ,. ." -". . . , -t I
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Verojon of EPA Form 3320-1 lRev. 011061 Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
I 1- M DISCEL "LLU I M NNTI OR LIN MIG N I IUI( DMR I I-M ) NI-UI-DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 111A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMDD/YYYY IMM/DD/YYYY
FROM 11/ 01/ 2013 TO 111/ 30/ 213
Form Approved
OMB No. 2040-0a04
Page 15
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
111 DIESEL GENERATOR BLDGInternal Outfall
No DIscharge F--
-;o NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION•:" • •"• "'•/ ;':' "•" EX OF ANALYSIS T P
PARAMETERVALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.3 N/A 8.6 pH 0 1 / 7 GRAB•H MEASUREMENT
004001 0 PERM IT, **" N/A -°,. ', "' ' ..... .. ...Effluent Gross REQUIREMENT ,_ ..,-__,_-. _ .MINIMUM.AMi .U M mum P.H__
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 1 / 7 GRABMEASUREMENT
0 0 5 3 0 1 0 P E R M IT : . . . ; - " N /A 3 0 . . .... ... ; ,.. . '¼
Effluent Gross REQUIREMENT ..- , .'+i -,. .... " ' N . , . . .M A G.- .. .'WILYM mg/L.; .,
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 1 / 7 GRABOil & reaseMEASUREMENT
00556 1 0 PERMIT "'' NA**15i* 20." *.... ...... .. .Effluent Gross R -.'.r.MA - DLMX., mg/L . .
Flow, in conduit or thru treatment plant SAMPLE 0.002 0.002 MGD N/A N/A N/A N/A 1 I 7 ESTFlwir cnditorthu retmntplnt MEASUREMENT
500501 0 PERMIT >iReq ,Mon '-rýReq" Mon -- N/ hI~r
Effluent Gross REQUIREMENT MO AV DAILY MX Mgal/d ' __
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I ' "'fir under penalty of law that tis documrent and all attachmnents were prepared under myTE E H NED T
dlrectionl or supervision In ac~cordance with a systerm designedI to ssulre that qualified personlnelT L P O ED T
property gathe r, ed eno ilthte Ore intorrnatlon subrrnltd. Bate•,d on roy inquiry Of the p.1000 ORichard D. Bologna, DIRECTOR OF SITE p.erons who managethesystem,... those ...... directly responsble fotr gathering the . . 4 682-7773 12/ 19/ 2013
information. the Information submitted is. to the best of my knowledge and belief, true, a 68cur3 2/t9/,01
OPERATIONS and complete.t am aware that there are signiflcant penalties for submitting false information SIncluding the possibility of fine and Imprisonment for knlowing Yfollttons. SG A U E OF PRINCIPAL EUECUYVT E OFFICER OR
TYPED OR PRINTED AUTHORIZED ART AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
INA IIUINAL tULLUJI AINI UIZ)UNAMiAtj tLIMINFA II1UN o YZ. I M kIII'frULj) Form Approved
DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004
Page 16PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA02615 11 3APERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIOD
FROM [ j1 /0/2013ý TO L2.-11130/2013J
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR06)
UNIT 2 SEWAGE TMT PLANTInternal Outfall
No Dlscharge[--'
NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAETER•::-•.;• :,-•..•i••:•:•:: •.• EX OF ANALYSIS TP
PARAMETERVALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT004001 0 PERMIT :j- e r,;~ RAEffluent Gross REQUIREMENT MINIMUM' A•IMU pH h .n Monthv'., ue
SAMPLESolids, total suspended MAME
MEASUREMENT005301 0 PERMIT.. - ., ..... .. - : . -. .. . . - . . .Effluent Gross REQUIREMENT 0•rt., - r, . MO AVG. DAILYMX.•, mg/L • '.Month(F, .
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
Effluent Gross REQUIREMENT .•i .M•T•G••!.•-"IMX,• Mgal/d .. '0#r $5.. . S,
SAMPLEChlorine, total residual MAUEET___________________ ___MEASUREMENT
SAMPLEColiform, fecal general MEASUREMENT _ _ _ _ _ _
Effluent Gross REQUIREMENT ___-_________,;+ .; •.% . .... :•. ,,. .,,7• ,____ .=-,.•: ..,..;-.,".:;MO GEOMN*7,' . .;:,•:.;. .. .••,•. #/100mL ;i!:t:••:' i -!iMonth.•(i!i -.!..• .,.,.•,
BaD, carbonaceous, 05 day 20 C SAMPLEMEASUREMENT ___ ________80082 1 0 PERMIT . ........ . 25
Effluent Gross REQUIREMENT . ,• ___,,._...._ N/A ____________ MO AVG DAILY M . mg/L " Moth - QM4
Choie toa residual. "S.'.MPLE••,,
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I orhtliy under penalty ot law thet this do...n..nt and ell attachments mere prepered under my • '•"• "•TELEPHONE DATEdirectIon or supervlsion In eccordance wIth a system designed to assure that qualified personnelproperly gather end evaluate the information submitted. Based ov my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE pi..... whr m....getheseystei .... thosepe...... dirctly resyonsibietorgethering the 724 682-7773 12/ 19/ 2013Intormetion, the information submltead as to the best of my knowledge end heliet, true, ecourate,OPE RATIO NS end complete. ta ... a.ethet thr ore.. significent penalties tor submitting false information,TYPED OR PRINTED [;AUTHORZENT AREA Code NUMBER MMIDD/YYY
COMMENTS AND EXPLANATION CF ANY VIOLATSONS (Reference all attachmentg here
SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.
CopuorGeerte Vrsor o EA ~om32-1(Ev. SU1R6EMageT
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
INMIIUINPML "ULLUI FdNI UIi;,MAtULILIMINAIIUN .•bYIM (NUI-'Ub)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 17
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBER
203ADISCHARGE NUMBER
DMR MAILING ZIP CODE:MAJOR(SUBR05)
150770004
I MONITORING PERIOD I
MAIN SEWAGE TMT PLANTInternal Outfall
No DIscharge•--IFROM MM/DD/YYYY2 MM/DD/YYYY2FO1 111/ 01/ 201 TO 11/ 30/ 2013
NO. FREQUENCY SAMPLEPARAMETER •, '•: QUANTITY OR LOADING QUALITY OR CONCENTRATION: ?•,".;::•,•.:• •i"• •,EX OANLIS TYPE
PARAMETER OF.•::••:,. .. ANALYSI
-. VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLEMEASUREMENT
004001 0 PERMIT &' ...**eeP, - ,,- -- '. . 'Effluent Gross REQUIREMENT Month_______ , III| , ',, AM UM pH ,
SAMPLESolids, total suspended MAME
MEASUREMENT
005301 0 PERMIT ýA ;ý.' ~ wc rEffluent Gross REQUIREMENT .- " -"' MO AVG •DlLMX m/L'.. 4 Mnh 1 -
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
500501 0 PERMIT -- ýR M i ~ ee~ .~r>rc."rrrua*.' -jubtu,Effluent Gross REQUIREMENT •t.(OAVGZ':, . DAI'YM' .. . .Mgal/d r.t_.", '.; -;__ _."
SAMPLEChlorine, total residual M A M E
MEASUREMENT50060 1 0 PERMIT . * " *****'"' * -. 4 3 3• '* . ., '., r• .TiC; er ,Effluent Gross REQUIREMENT I. r.. *.. ,•';;. M G mg/L ....,............ .. ... .___Coliform, fecal general SAMPLE
MEASUREMENT74055 11 PERMIT " . .* . .. *-,"200 4z*55...... v/" ." "* ... 8..... GEffluent Gross REQUIREMENT u ,;.,':.'..-,..,. : ,w.. .r.•r',P- MO :E.MN ,, y• #/100mL Zinr,. MOnth
BOD, carbonaceous, 05 day 20 C SAMPLEMEASUREMENT
80082 1 0 PERMIT 50.. % M.' 25............."0" *" ""'" ' .. ............. "•'Effluent Gross REQUIREMENT . ..-. _:.,; _,..,"_..._ - MO.AVG. DI M mg/L.. :.-8.
NAME/TTLE PRINCIPAL EXECUTIVE OFFICER I cmrtity under penalty of law thrat this document and all attachments ware prepared under my -'TELEPHONE DATEpirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the informahon submitted, Based on my Inquiry ofthe person or
Richard D. Bologna, DIRECTOR OF SITE personst wo manage the system or these persons directly cesponsIlbefor gatherinogthe7information. the information submitted Is to the best of my knowledge and beltiet two . re, 724 682-7773 12/ 19/ 2013
OPERATIONS and complete. I m aware that there are significant penalties for submitting false Information.including the possibility of fine and imprisonment for knowing violation. SIGNATURE OF PRINCIPAL U VE OFFICER OR
TYPED OR PRINTED AUTHORIZE AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
- , -I ' i I's•1•, c,. II=IIviIi ,% I I.J1'i 0! I -Ivl •qi' lc.O)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 18
PA0025615 211A
PERMIT NUMBER DISCHARGE NUMBER
I MONITORING PERIODR MMIDD/YYYY [ MMTDD/YYYY
FROM 1 11/ 01/ 201 TO I 11l 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
211 TURBINE BLDGInternal Outfall
No Discharge F1
-:.?7:"'-n ?z ,- L. •.7• NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONQUANTITY. OR LOADING, .,.;EX OF ANALYSIS TYPE
PARAMETER ..TYPE
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.4 N/A 8.4 pH 0 1 / 7 GRABMEASUREMENT
004001 0 PERMIT *****"K• ' : . ******." ' *: " vi•""iiviuwi"A- ... .... . '! - We,,.. .Effluent Gross R Q IE E T •''-- " ':•':;.• ' :• - :t. "•M' H .... .
Solids, total suspended SAMPLE N/A N/A N/A N/A 15 18 mg/L 0 1 / 7 GRABMEASUREMENT00530 1 0 PERMIT &. *****-"30 ......, ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 a:.,.,.<.•. .•••• .Effluent Gross REUIEMN 9:~? " MB OAG* DAL~X m/ ______ ____SAM- PLE"Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 1 / 7 GRABMEASUREMENT00556 1 0 PERMIT . N/A • :' ******"' "--2" 1' ..... "Effluent Gross REQUIREMENT .! : K. ... , " "" "'-MO.AVG,-,.... '-'
SAMPLE0.00.0 MGN/N/N/ /7 ESFlow, in conduit or thru treatment plant MEASUREMENT 0002 0002 MGD N/A N/A N/A 7 EST500501 0 PERMIT • -'ReqlMon. Re-*-Mon .. - , *****. . . " *. 2 N/A . . . •,.. T lMA.,Effluent Gross REQUIREMENT LYOMO-,AVG 'DAILY.MX . M.. Mgal/d I': _________________ _________________ _______ ____. _. , . .. _.._._,.
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
IN/ III•I/A.L rVLLL) I INI I LJIO,1M..r- rULIIVIIINM I IUII 0 T 0•1 t-IVI kI-4L)t-•)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNAJDIR SITE OPER
PA0025615 213A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDD/YYYY MMIDD/YYYY
FROM 11/ 01/ 23 TO 11/ 30/ 2013
Form Approved
OMB No. 2040-0004
Page 19
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 COOL TOWER PUMPHOUSEInternal Outfall
No Discharge -- j
..... •'"• • '• •"-"NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION NO FRANCY SAPE
PARAMETER I 1.1._ .E. -F ANAS•I TYPE
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT .. -**** MI... 6 .... ****.- -Effluent Gross REQUIREMENT -. . ' j ' N .. . ,";MAXIMUM ______tH ________
Solids, total suspended SAMPLEMEASUREMENT
00530 1 0 PERMIT . ' fZ.,30*10., ~EMOlAVG DAIL Y-MXi- mg/L ______ _________
Oil & grease SAMPLEMEASUREMENT
00556 1 0 PERMIT .,- '1~20 -,Twice Perýi "! -
Effluent Gross REQUIREMENT .:_,_. ___-.___-__-__._._. •..--.'O.VG .- DAILY MX; mg/L _______ ii....tIm ''9, .:.
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
50050 1 0 PERMIT -- ReqMo - Y.VReqt Mo 1 . ~ ,
Effluent Gross REURMN OAG -~'~L X Mgal/d____ EFMAChlorine, total residual SAMPLE
MEASUREMENT500601 0 PERMIT . .. . .- 5..***2** :-•-r,..iw..... ..Effluent Gross REQUIREMENT MO AVG .INST-MAX, mg/L .- .-,,G
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENTFROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM.Computer Generated Verajon of EPA Form 3320-1 (Rev. 01106) I-'age 1Computer Generated Version of EPA Form 3320-1 (Rev. O1/D6) Page 1
NA I IVIN L rULLU I IN I UIktA-1KML- I-LIMINA I IUN bY Z ; I -M kINIUt_;)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 20PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 301A
PERMIT NUMBER DISCHARGE NUMBER
I MONITORING PERIOD
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 AUX BOILER BLOWDOWNInternal Outfall
No DischargeF-1I MM/DDYYYY T MMIDD/YYYYFROMI 11/ 01/ 201 TO I 11/ 30/ 2013
...... . •- •. ,NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION NO FRANAYSI TPE
?-i-:•:':•"• '; :/;'•%•EX OF ANALYSIS TYPEPARAMETER ci.. co ._ __
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 2 / 31 GRABMEASUREMENT
00530 1 0 PERMIT * " '* *'30;, " '* " 1"00 . . ... Per-;Effluent Gross REQUIREMENT K N/A -- MoAVGDAILYM m/L -,.Month ',
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 I 31 GRABMEASUREMENT00556 0 PEMIT IT00556 1 0 PERMT •.:,.,•,•.,•... :. . .*. ) ':,. N/A *•.••,.., -' :!-•1.5. :. .".~ :•:".•..,;2n •% > •,, •T., enP~eri• "... :
Effluent Gross REQUIREMENT f - ,.,./,. .,•,,.',. M V'lLYmn
Flow, in conduit or thru treatment plant SAMPLE <0.001 <0.001 MGD N/A N/A N/A N/A - 1 / 7 ESTFlo, n onui o thu retmntplnt MEASUREMENT
500501 0 PERMIT e:q .... " R..,... M N/Ao WeekEffluent Gross REQUIREMENT MO AV -DAILY 1¥M-`'- Mgal/d I .r" -" ' +. ,.Al ,
NAM/TILE RICIPL EECTIV OFICR IOddtYunde pealty ot law that this docunrent and all attachments were prepared undrm TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE person, wo manege. •hesyster. at those parsons directlyresponsible for gathering.. 724 682-7773 12/ 19/ 2013Information, the information submitted is, to the best of my knowledge and belie true cuat
O P E R A T IO N S and complete. I ar marethrat therat e e.ignifictnt penaties for submitting false inturmu tion
including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EECU VE OFFICER OR
TYPED OR PRINTED AUTHORIZED '6NT AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NA I IUN/AL I-ULLU I AN I UI•L,;IAKL t-LIMINA I IUN bYb I LIM (NUPL-..)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040.0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 21
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATrN: RICHARD D BOLOGNA/DIR SITE OPER
I PA0025615IPERMIT NUMBER
303ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 OIL WATER SEPARATORInternal Outfall
No DischargeL-7
MONITORING PERIODMMFDD[YYYY I MMTDD/YYYY`
FROMI 11/ 01/ 201 TO 111/ 30/ 2011
NO. FREQUENCY SAMPLEPA'RAMETER.... .QUANTITY OR LOADING QUALITY OR CONCENTRATION:;.:.,:•;•,.>.: :=, •..,•.=EX OF ANALYSIS TYPE
PARAMETER •,,-".••••., .':••.
'• VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
004001 0 PERMIT . . . . ..W* 6 ... ". - .ky " " " -Effluent Gross REQUIREMENT .__'___ __ .MINIMUM MAXIMU - H ,-.
SAMPLESolids, total suspended MEASUREMENT
0053010 PERMIT 30. " . .... .. ,-0*"* :30 100 We.,.y 7 - :,"GRA. ,"Effluent Gross REQUIREMENT .-.- _________ MO'AVG--. DIYX mg/L_____
SAMPLEOil & grease MEASUREMENT005561 0 PERMIT , .. . .. 15 .20 , . ,' ' -GRAB;?---'Effluent Gross REQUIREMENT 0 >v-. ... ', . :.MO AVG. DAILY ' : v
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
500501 0 PERMIT ' e 4n e .......... ~~NAEffluent Gross REQUIE ET M 'AG.~'- ALY X Mks, / _______ _______ _____________________ ____
NAMETTLE PRINCIPAL EXECUTIVE OFFICER _ c under penalt of law that thi document and a atachments were prepared under . . TELEPHONE DATEdirection or supervision In accordance with a system designed to assure that qualified personnelproperly gather and evaluate the information submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE persons who manage thesyster n r. those persons directly responsiblefor gatherng the 724 682-7773 12/ 19/ 2013information, the information submitted Is, to the best of my knowledge and belief, true, accurate,
OPERATIONS and complete. I ant emat that there are signihicant penalties for submitting false information.including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL ?E TIVE OFFICER OR
TYPED OR PRINTED AUTHORIZED=ENT AREA Code NUMBER MM/DDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NA I IUNAL IVULLU I AN I UIbNiAKLi- t-LIMINA I IUN bYb I I-M (NHUL:b)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 22PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 313A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODFR MMDDYYYY MM DD/YYYY
FROMI 11/ 01/ 201 TO 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
313 TURBINE BLDG DRAINInternal Outfall
No Discharge -l
NO. FREQUENCY SAMPLEPARAMETER •-•:YQUANTITY OR LOADING QUALITY OR CONCENTRATION EX FRANAY TYPEPAR MET R .:.-'-i.••-.;.i. i:"">.:::,EX OF ANALYSIS TYPE
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.4 N/A 8.0 pH 1 1 I 7 GRABMEASUREMENT004001 0 PERMIT . N/A ' " " ,'-.''*5. - . . - .'.W y ., -hEffluent Gross REQUIREMENT .. ______._ .- :__.-___ :MINIMUM;:. MAXI MUM • pH A . , .
Solids, total suspended SAMPLE N/A N/A N/A N/A 8 8 mg/L 0 1 I 7 GRABMEASUREMENT00530 1 0 PERMIT ****** ' * . 3 WEMfAVGluent-M, , . . . .. .... -
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 1 I 7 GRABMEASUREMENT00556 1 0 PERMIT 0'*e~y\N/A '~-7, ~ ~Weekly GArEffluent Gross REQUIREMENT 6"__..._____ g.;-/ . ..... MOAVG' A .. mg/L.
Flow, in conduit or thru treatment plant SAMPLE 0.002 0.002 MGD N/A N/A N/A N/A 1 / 7 EST500501 0 PERMI MEASUREMENT R
Effluent Gross REQUIREMENT MO AVDILY'MX MgaI/d. t4i' I <
NAMEITTLE PRINCIPAL EXECUTIVE OFFICER I ceft une peat of law that this document aod all attahmoents were prepared unod, moy TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnelproperty gather and evaluate the inforrmation submrtted. Based on my inquiry of the person at
Richard D. Bologna, DIRECTOR OF SITE Ze...... r . n.geth,,yste .. direoty rsponsilforgatherngthe 724 682-7773 . 12/ 19/ 2013information, the Information submitted Is. to the best of my knowledge and belief, true, accurate.
OPERATIONS. and complete, am, swore that there are signiflcant penalties for submitting false information,including the possibility of fine antd imprisonment for knowing violationts. SIGNATUORE OF PRINCIPAL F./• UJIVE OFFICER OR
TYPED OR PRINTED AUTHORIZEteAG. NT AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) See non-compliance form attached to the cover letter. WMC 11-12-13SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NA I IUNAL IFULLU IAN I UDiUHAX ' -LLIMINA IIUN Y -ilM (NI-'UIb)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATrN: RICHARD D BOLOGNA/DIR SITE OPER
PERITNUMBE-1 DISCARGE NUMERI
Form Approved
OMB No. 2040-0004
Page 23
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CHEM.FEED AREA OF AUX BOILERSInternal Outfall
No Discharge[--
FO MONITORING PERIODIR MMIDD/YYY IY- MM/DD/YYY
FO I 11/ 01/ 201 TO 1 11/ 30/ 2013
:;.,,•,•.;,•:-•;•;•.• ;--;:!NO. FEUNY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAMETER. __________ _______EX OF ANALYSIS TYPEPARAMETER . . •
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 9.5 N/A 9.6 pH 0 2 I 31 GRABMEASUREMENT00400 1 0 PERMIT .... N/A . .. R. "M..Effluent Gross REQUIREMENT _. ___M_, M MMM - M~iM _., _ ____o__ l
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 2 / 31 GRABMEASUREMENT 4 7F777077 ý00530 1 0 PERMITN/ . >TIeeroEffluent Gross REQUIREMENT..>.. •. MO-AVG .,-, DAIL Y4M... mg/L -.. . .... GR .
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 / 31 GRABMEASUREMENT005561 0 PERMIT W -•- ." iEffluent Gross REQUIREMENT -- ". N/A on;• • ,20 ,I . m""'M .
0051R EQUREMENT o* o~ ~ ~DIYXk-~ mg/L ,... Moh~
Flow, in conduit or thru treatment plant SAMPLE <0.001 <0.001 MGD N/A N/A N/A N/A 1 / 7 ESTFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT R , ___. N/A .*,.' • - , 4..- TI. M,Effluent Gross .EURMET.MOAG . J2-.ILL:'. .a/d c:f, r P< f ""___; N ,,. ,i•/er y _______
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I e under penalty oflw a t document end oll attachents p d under mTELEPHON DATEdirection or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE per.ons wr mnanagethesystem.. orthosepersons directlyresponsibleforgathering theOPERATIONS information, the information submitted Is. to the best of my knuoMledge and belief. true. accurate.
O P E R A TnON S ,nd com plete. I a ol a wa that thera are significant penaties for subm itting fal ee inform ation.
including the possibility of fine and imprisonment for knooing violations. SIGPKTURE OF PRINCIPAL EXý VE OFFICER OR
TYPED OR PRINTED AUTHORIZED AG•T AREA Code NUMBER MMDYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
l'DMIIUINMLt"ULLUISINHAIRUG MONITORI LIRPINRIIUN (YDMR) NIU)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
[A002615_
PERMTNUMBER IDSCARGE NUMBERI
Form Approved
OMB No. 2040-0004
Page 24
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CONDENSATE BLOWDOWN & RIVR WATInternal Outfall
No Dischargeo
MONITORING PERIODMMIDD/YYYY IMMTDDO2
FROMI 11/ 01/ 201 TO 1 11/ 30/ 2013
NO. FREQUENCY SAMPLE.,,:•::•- ••o QUANTITY OR LOADING QUALITY OR CONCENTRATIONPARMETR :,;.-•:•.: • £@,••3. •." •7:EX OF ANALYSIS TYPE
PARAMETER________ ____
.. • #.. . VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT c..1 V r, ncEffluent Gross REQUIREMENT P.H.. . iL ••,W 1l.ioU"•,' . MA.IMUM • H , v•r•
Solids, total suspended SAMPLEMEASUREMENT
00530 1 0 PERMIT . .. ., . . .'... o " u "o-orl "r.. . *,1 r• "ý " , ,Effluent Gross REQUIREMENT T ,. r' . _,.... :4, i' i.0'c;:..tr'rMO AVG. .D mg/L , -
Oil & grease SAMPLEMEASUREMENT
005561 0 PERMIT . " . .*O" . . , .5 ',J. 0 .. .. ,. - , -. . .,, ".Effluent Gross REQUIREMENT . . . : , :H, AV,. .,•DLY•., 9,mg.L 0 i. 4
SAMPLENitrogen, ammonia total (as N) MEASUREMENT006101 0 PERMIT . . , . ' * '"-Rq-M n .........-,'.Mon. . ..oEffluent Gross REQUIREMENT K:.- .- A.-' .•GMO AVG,.. ,l!' D•lLY*MX .•" mg/L . . e,-l.;' . ..
-OR SAMPLECLAMTROL CT-i1, TOTAL WATER MEASUREMENT04251 1 0 PERMIT * - "r MO ,0' " COMP24Effluent Gross REQUIREMENT : -. ,--. s,.____,____ Acl a
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
50050 1 0 PERMIT •RM...o.. - ..... ___-_.. .. WeeklyEffluent Gross REQUIREMENT V MOAVG.,. ` DAILY..MX''ý Mgal/d. .. .. .,.- WlChlorine, total residual SAMPLE
MEASUREMENT500601 0 PERMIT -..*u..a*....... 5.* .* . . , .'5 2. r . A;.-'1 25',' §G. B'Effluent Gross REQUIREMENT 7-7- "7i;"d _ _ _ _MO'AVG ,' NSTMAX. mg/L ..
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER 1ertity under penelty of law Oral this document and ell attachments were prepared under my TELEPHONE DATEdirection or supervision In accordance with a system designed to assure that qualified personnelproperty gather and evaluate the information submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE persons wh.o managethe syste or. .ose persos .direcy. responsible fo, gatrering Oe . 724 682-7773 12/ 19/ 2013information, Ohe Intormation submitted Is. to the best of my knowledge and belief, true. ute.7
OPERATIONS and complete. Im aware that there are significant penalties for submitting false Information.including the possibility of ftne and Imprisonment for knowing violations. SIGNATURErOF PRINCIPAL EX E OFFICER OR
TYPED OR PRINTED AUTHORIZED NT AREA Code NUMBER MM/DDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
lNM' I IJINr'L r-JLLU I M'il I UI0I,,•rt-%r' •,3E- :LIIII IN I IUIN 0!0 I riv I kijrPUr-1o
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 25PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 NPERMIT NUMBER
~403ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CONDENSATE BLOWDOWN & RIVR WATInternal Outfall
No DischargeX'
MONITORING PERIODMMIDD/YYYY MM/DD/YYYY
FROM 11/ 01/ 2013 TO 111 30/ 2013
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEdirection or supervision In accordanca with a system designad to assure that qualified personnelproperly gather and evaluate the lnforoation submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE person who. manageth.esystn, or thosapersn directlyresponsibleforgathering tha 724 682-7773 12/ 19/ 2013inform ation , the tnorm ation subm ited Is. to the be s.tofm y know edge and belief, tu .. u: ,.. ,. 0 . . . / / ? • _ /. - . _ 2 8 - 7 31 / 1 / 2 1OPERATIONS andcomplete. I .rawar that there r.e signlficant penalties for submitting false Information,
including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXEC IV OFFICER ORTYPED OR PRINTED AUTHORIZED A AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 2
14^ 1 IJINDL rJLLLJ I MIN INI uREPOmrR%3c CLIVim 1 IVIN 0 T I MVI (DMrRUt)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 26
PA0025615
PERMIT NUMBER
413A
DISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
BULK FUEL STORAGE DRAINInternal Outfall
No DischargoX"
I MONITORING PERIOD IFROM [ I Ip3j TO [ O0 Y`IY
FO I 11/ 011 201 TO 11/ 30/ 2013
QUANTITY QUALITY.NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION
PARAMETER ..- '. - EX OF ANALYSIS TYPE
, VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A N/A pHMEASUREMENT
00400 1 0 PERMIT •.:'•f :! -•,:4- -, ,'.--.-•'"-..MINIMU; M , , ......... • ..- MA.X. IMUM:-•. ,•;•.= ... : ';".;: •;- -• .•<•.• ,... R
0053001 0 PERMIT ,.,Effluent Gross REQUIREMENT . . . 4,,:.N/ MIIU ':•.'- •.. --,.:,. 30.. •':"".. •, : :.... • .'M XM M.-• pH!v M • '~t v ,.••
Solids,_totalsuspendedSAMPLENAIY/MXN/A mg/L 12,
Oil & grease ~MEASUREMENT NANANANAm/Effluent Gross REQUIREMENT 2_:____"_______ k-i MAB:
SAMPLE NN/AU/005301 0 ~MEASUREMENTN/NA
Effluent Gross REQUIREMENT MGD 1/A EFl w ncn ui rtr ret etpat MEASUREMENTN/NAt
NAMEr TITLE PRINCIPAL EXECUTIVE OFFICER I oertify under penalty ot law that this d .... r. t end alt ettachmtent .. ore preprard undter toy .• • _ _. .TELEPHONE DATEdireotion or supervision In ecoordance with a system deslgned to assure that qualified parsonneaproperly gather end eveluate Itse Information submitted, eased on my Inquiry ot the pero 500
:Richard D. Bologna, DIRECTOR OF SITE per..on. who.....egemhsyste.... othose po......direutly roeponsibteforgatthenog the 724 682-7773 12/ 19/ 2013intormetion, the infotmetlon submitted Is, to me heat ot my knowldege end ballet., tre, accurase
O ERATIO NS Ond complete. I em.aw.r that mts are.. signifloant penalties lot submitting tots. intormation.Encluding the posstinlity of line and imprisonment to, knowing violations. SIGNATURE OF PRINCIPALeE IVE OFFICER OR
TYPED OR PRINTED AUTHORIZ ENT AREA Code NUMBER MM/DDYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refeoence ol attachmerti unerel
SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER.
Computerdrecio Georfe Versrison 1, EPArd nc worm 33 0- (R v301 6YP g
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NM I tUt'II L I-VLL.U I 'MN' I I ,r'-1 'MMMMr " M'LIMWI I UIN ,) T Z I "M (INl'U')
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 27PERMITT-EE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
o501ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 GENRTR BLWDWN FILT BWInternal Outfall
No DischargeJAI
I MONITORING PERIODFR MMlDDl/YYYY I MMIDDYYY
FROMI 11/ 01/ 2013 TO I1111 30/ 2013
NO. FREQUENCY SAMPLEA METE -"• :-:"' QUANTITY OR LOADING QUALITY OR CONCENTRATION OF ANALYSISPARAMETER EX ,T..YP...E...
." VALUE VALUE UNITS VALUE VALUE VALUE UNITS
Solids, total suspended SAMPLEMEASUREMENT
00530 1 0 PERMIT ' .... ' .... .":- '.. .; ;.*.* '30 i . . 100 .-' .• . . .. t..... ....... . h •GRA B• ,:Effluent Gross REQUIREMENT ___" .:"-i-"-: MD X mgL ,*:, e:l GR
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
50050 1 0 PERMIT 3 --Re"M; .. ,ýReq. Mon'- **** '"-- ** " :"•'-*"" ....Effluent Gross REQUIREMENT MO.AVG n. DAILY.MX- Mgal/d -. ." , .. .,-..•_ , _._.. . -.. 7.. ,wl,- _. ,.. .
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEdirection or upervislon I1 accordance with a system designed to assure that qualified personnelproperly gather and evaluate the informaton submitted. Based on my Inquiry of the pr o
Richard D. Bologna, DIRECTOR OF SITE persons who marrage the system or. those parsons directiy responsible for gatheringIh 724 682-7773 12/ 19/ 2013information. the information submitted is. to the best of my knowledge and belief, truen a, .
OPERATIONS and cormpite,. tam aware that there rer signficart penalties fot submiitig fate. riono ,including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL CA IVE OFFICER OR
TYPED OR PRINTED AUTHORIZE NT AREA Code NUMBER MMIDDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference ali attachments here)SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NA I IUNAL HULLU IAN I UýUIMA1-'LIL -LIMINA IIUN Y b I -M IN"UI")
DISCHARGE MONITORING REPORT (DMR)"orto Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 1
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
[A005615]
PEMI NMBýERj
001A
DISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNITS 1&2 COOLG. TOWER BLWDNExternal Ouffall
No Discharge -----
MONITORING PERIODMMFDD/YYYY I MM0DD/YYYY
FO I 11/ 01/ 201 TO 1 11/ 301 2013
NO. FREQUENCY SAMPLEPRMTR •;<:•:, -:QUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAMETER:••'"•'•":•4 EX OF ANALYSIS TY PE
. VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.3 N/A 8.4 pH 0 1 / 7 GRABpH MEASUREMENT
004001 0 PERMIT 9"........ " ';; N/A ." # no0*eu"; " ' -t '"" H'Weeky•''$-GRAB-Effluent Gross REQUIREMENT pH N/A.MINIMU .-- , ' 4M- • M . ..........
Nitrogen, ammonia total (as N) SAMPLE N/A N/A N/A N/A N/A N/A mg/L 0 1 / 7 GRAB
EEfunf G oslEQ IR M NTnt:".. Gross REQUI.RE.MEN.T, . ."..-"..-,' .' .. -...>!..,.-..,• . .•.,,.•.. .... ••
_______________ _____________ .' 6AIYMX"jK4 mg/L . 'c- .''
CLAMTROL CT-i, TOTAL WATER SAMPLE N/A N/A N/A N/A GG GG GG GG IGG COMPMEASUREMENT COMP
04251 1 0 PERMIT 000*R qo,. . 0• 0-05.M . 0.,, . .,- ,* 0 - C .6 I.- -
Effluent Gross REQUIREMENT N/A4• ' . ,, 3
Effuen Grss EQU REM NT :-;",•tMOAVG .,______-,_____ DAYX. __ _ _ _ _ _ _ ___.M ald v•:.',..•" MO:,..-:•::;.•P. AVG'..;.:h;. ..... , .- ,o.•,.•, DALY M . mg/L;•,-.•;,.•.•.• c..• '•.. ... ... .,. .Flow, in conduit or thru treatment plant ESAMPLE 31.6 37.6 MGD N/A NA N/A N/A <.DAILY CONT
MEASUREMENT50050 1 0 PERMIT •t " ' , eqM.... . N/A Mi.':." 5 .: b.. ......... •Effluent Gross REQUIREMENT .'M AVG . DAI.Y MX' NMgal/d :;".-"----.' ..... ___,.
Chlorine, total residualM SAMPLE N/A N/A N/A N/A <0.1 0.06 mg/L 0 1 I7 GRAB
MEASUREMENT50060 1 0 PERMIT *0C****?t**005 -* .' 2 .R B'Effluent Gross REQUIREMENT ..-- "N/A AVERAGE -MA.-M..•.,.mg/L_."__._._
Chlorine, free available SAMPLE N/A N/A N/A N/A <0.02 0.0 mg/L 0 CONT RCRD
MEASUREMENT500641 PERMIT " . ... *00*0, ............. RN/A AEAE MXMM m/ ~ ~'~cEffluent Gross REQUIREMENT :.1 .,. .. _-.. ,____.. __ .. _____ I _,__,__,,_,
Hydrazine MEASRMPEN N/A N/A N/A N/A GG GG mgIL 0 1 If 7 GRAB81313 10 PERMIT NA ~ **0 ~ 0~W~t~ GA,Effluent Gross R E_ _-__MDAILY MX -' mg/L t.'-., .• .- v:u'• z- . ..
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEdirection or supervision In accordance with a system designed to assure that qualified personnel ,property gather and evaluate the information submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE persons who manage the system o those persons directly responsiblefor gathering the 724 682-7773 12/ 19/ 2013information, the information submitted is, to the best of my knowledge and belief, true. accurate.
O PERATIO NS and complete. I .e.are that there are significant penalties for submitting false information,
Including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EX TVE OFFICER ORTYPED OR PRINTED AUTHORIZED AG AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachment$ here)
HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING. THE LIMIT IS 35 MG/L AS A DAILY MAX.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINATION SY6 I EM (NPIUHI:)LDISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 2
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
002ADISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
INTAKE SCREEN BACKWASHExternal Outfall
No Discharge&j
MONITORING PERIODMMiDD/YYYY MM2DD/YYYY
FROMI 11/ 011/ 2013d TO 1111/ 30/ 2013
direction or supervision in accordance with a system designed to assure that qualified personael
propedy gather and evaluate the Information submitted. eased on my inquiry of the persona
Richard D. Bologna, DIRECTOR OF SITE persons whtro manage the system, ortose persons directly responsible r gathering the .724 682-7773 12/ 19/ 2013informalion. the Information submitted Is, to the best of my knowledge and belief, true. accurate,- 47 31
OPERATIONS and oomplet,. Ilar . e.re that there are significant penalties for submitting false Informarion.including the possibility tf fine snd imprisonment tar ko.n. g violations. SIGNATURE OF PRINCIPAL EXEC T OFFICER OR
TYPED OR PRINTED AUTHORIZED AG64T-" AREA Code NUMBER MM/DO/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) Estimared flow.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
INM I I•UI•IML rVLLU I[JIN I .Jlu* rMr-.Ujr- JLIIVIIIN 1M I I UIN O T 0•1 CIVI kINI"L~r.-/0
DISCHARGE MONITORING REPORT (DMR)1-orm AppMvea
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 3
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
DIS G003ADISCHARGE NUMBER]
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
003Extemal Outfall
No DischargeF----FO MONITORING PERIOD
MM/DD/YYYY ýMM/DD/YYYYFROM 11/ 01/ 20 1 3 TO ll 30/ 2013
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)THE FLOWS FOR OUTFALLS 103, 203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
IN IIUNAL V-'ULLU I AN I UIRJUNAKI•t ILIMINA I IUN bY I I=M (NI-•t-•)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 4
PA0025615 004A
PERMIT NUMBERI DISCHARGE NUMBER
I MONITORING PERIODR MMIDD/YYYY I MMIDD/YYYY
FROMI 11/ 01/ 201 TO 1 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT ONE COOLG TOWER OVERFLOWExternal Outfall
No Discharge F--
NO. FREQUENCY SAMPLEPARAMETER •••••, QUANTITY OR LOADING QUALITY OR CONCENTRATIONo'.5:.• ',;,;••";•'••;•.EX OF ANALYSIS TYPEPARAMETER -' ;; •:•-.
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 6.4 N/A 7.9 pH 0 1 I 7 GRAB!pH MEASUREMENT
004001 0 PERMIT 70-- ',, .. - c , -Effluent Gross REQUIREMENT N I. pH N/A .. •,MAXIMUM H,.ee.ly.-: .
Flow, in conduit or thru treatment plant SAMPLE 2.89 3.85 MGD N/A N/A N/A N/A 1 / 7 MEASFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT Req.Man.Req"Mon_. .. t. . ..R. .- ' / " " Wl'••I,';iKq. o';.•Effluent Gross REQUIREMENT M." AV G.r - DAILY MX Mgal/d ....... _..... ,___-_ . .,,
Chlorine, total residual SAMPLE N/A N/A N/A 0.0 0.03 mguL 0 1 I 7 GRAB
50060 1 0 PERMIT -ki .1 N/4 1.2& ,; AEffluent Gross EUREMENTl
Chlorine, free available SAMPLE N/A N/A N/A 0.0 0.1 mg/L 0 1 / 7 GRABMEASUREMENT
50064 1 0 PERMIT "**'** '"2 5 ' "Effluent Gross REQUIREMENT .-__-__ _ -_ ,..,_._... N/A ......... .. ..A ..
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER ldcertify under penalty of lev that this document and all attachments wre prepared underm TELEPHONE DATEdirection or supervision In accordance with a system designed to assure that quallfied personnel TE E H N DA
properly gather and evaluate the information submitted. Based on my Inquiry of the person
Richard D. Bologna, DIRECTOR OF SITE persons who managethe system, or those persons directlyresponslileforgathering the 724 682-7773 12/ 19/ 2013information, the information submitted Is, to the best of my knowledge and belief, true acc724 a.7 3 1 9
OPERATIONS and complete. I tam a e that there are significant penalties for submitting false InformAtodnUM Eincluding the possibility of fine and imprisonment for kmnoing violations. SIGNATURE OF A RI ZED E NT ORTYPED OR PRINTED AUHRZDAETAREA Code NUMBER MM/DDr/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) There was no flow during the 3rd and 4th week of November.
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
NA I IUNAL - ULLU IANI UIUL;IAK{Ut -LIMINA I IULN j Y b I I'M (NI-U -.j)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 5
PA0025615
PERMIT NUMBER
006ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
AUX. INTAKE SCREEN BACKWASHExternal Outfall
No DischargeF--
IMONITORING PERIODMM/DD/YYYY MM/DDIYYYY
FROM 11/ 01/ 2013 TO 11/ 30/ 2013
Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
NA I IUNAL IFULLU IAN I UI HUI-A'(UL -LIMINA I IUN ,•1 L-M (NIUI)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
Page 6PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA002 5 6 1 5 007A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDDfYYYY MM/DD/YYYY
FRM 11/ 01/ 201 TO 111 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
AUX. INTAKE SYSTEMExternal Outfall
No DischargeF--'X
Jc ,'•-•,:'*;• = O FREQUENCY S M LQUANTITY OR LOADING QUALITY OR CONCENTRATION
PA R..," ,2 '• %,EX OF ANALYSIS TYPEPARAM ET E R . ;,,:...•;••••;
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT . .. '**...... '. ' 2Effluent Gross REQUIREMENT PH .... _____ MINIMUM : ! ,.AXIM.H . ,,:;,ey?. GR
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
50050 1 0 PERMIT R 1" '.... " ' "- .j'". • MonEffluent Gross RQIREMENT M V~~?AL X Ma/ ___
Effluent Gross ~REQUIR M N ,..M,: •'lO ,AvG:. ,.- .-;(iDA ILY. M X,,:,,,,. M al/d -, ...:: •.'.. :"". _."•.., .. •..,.f.-;:•,:..'..... ,. ,•.'- ,: ......-. ,.SAMPLE
Chlorine, total residual M ASU EEMEASUREMENT
5006015- *" .. *... .00601,* 0. PERM25'IEffluent Gross REQUIREMENT 6* .'..MO.AVG INST.MAX.. mg/L .: : ..... •r•...... ... ..
SAMPLEChlorine, free available M A M E
MEASUREMENT50064 1 0 PERMIT 4p.. . .. , 2.,. - . . .. -. " ...... ' . '
Effluent Gross REQUIREMENT .... ____._..". - ___.... _... _ ..... __ ___ -"..____ .._AVERAGEM'AXIU.M-:., . mg/L .' • r;,n.!..JA,.* ______. __
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1 cetty under penalty of lam that this document and all attachments were prepared under my TELEPHONE DATEdirection or supervision In accordance with . system designed to assure that qualified personnelproperly gather and evaluate the information submitted. Based on my Inquiry of the petson or
Richard D. Bologna, DIRECTOR OF SITE persons who manage the syster orr thorase persondirectly responsible for gathering the-724 682-7773 12/ 19/ 2013Information, the Information submitted Is, to the best of my knowtledge and belief, true, 724urate2
OPERATIONS and complete..am rae thatthere ate s.ignifin plties for ,ubmifing false Information.including the possibility of fine and imprisonment for knowing violations. SIG RE OF PRINCIPAL C IVE OFFICER OR
TYPED OR PRINTED AUTHORIZE T AREA Code NUMBER MM/DDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) There was flow only during the third week of October. WMC 11-12-13MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORINE ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THEREACTOR PLANT RIVER WATER SYSTEM.Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1
INA I IVUINAL I-VLLU I'IN I LA kMlM"I , M-LIIIINA- I IUIN CT 0 I lIVI kjNI"LI:0)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 7PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBER
008ADISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 COOLING TOWER PUMPHOUSEExternal Outfall
No Discharge -'•
MONITORING PERIODIR MMIDD/YYYY MMTDD/YYYY
FROMI 11/ 01/ 201 TO 11/ 30/ 2013
KY,•••._!• NO. FREQUENCY SAMPLE,*r*%• QUANTITY OR LOADING QUALITY OR CONCENTRATION
PARMEER ____ _________ ____ EX OF ANALYSIS TYPEPARAMETER :• ..
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT00400 1 0 PERMIT ........ . .... P.Effluent Gross REQUIREMENT . . ; '-'"MIMUM -3-'~~MXMiK ot
SAMPLESolids, total suspended MEASUREMENT
00530 1 0 PERMIT F-O, 30........R.A'";.. . Twce Pe..Effluent Gross REQUIREMENT ...M.VG. .'- ALYM mg/L -. .ots____
SAMPLEOil & grease MEASUREMENT00556 1 0 P E R M IT _ **.. , . ., . .. . .-.* .. .4.. . . . -. -'- ... 20 :W.c'-Pe;•, , •Effluent Gross REQUIREMENT .. 2.e-.%:....--_,.,____,___. MO1AV.G; DAILY.MX. . m L 4 .. 0. W..
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
50050 1 0 PERMIT `. .' Req :':Mor' • "R .!,j, L., , * *** . •i' " N/A 7 7 "75;-W # "C"
,Effluent Gross R R. D.Mgald N/A. I....".. ,..... ... ,... ... ,....,-,Efl etG os E UR METREQU.IREM:,,ENT Mir,'~ L-•Y; • ! Mgld • "!:'."• ;.;.::• :,,••..'L::•,.,.••..•.-,;.,••- .•,.;.;•: .••f•i.. •.
Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page I
NAI IUNAL -ULLU IAN I UI:SUHAIU- -LIMINAI IUN tYt I IM ( 'NI'UI_)DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
010A
DISCHARGE NUMBER
Form Approved
OMB No. 2040-0004
Page 8
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 COOLING WATERExternal Outfall
No Discharge F"1- MONITORING PERIOD I
MMIDD/YYYY MMIDD/YYYYFROM[ 11/ 01/ 2013 TO 11/ 30/ 2013
,- •:.-.. -. ;.:" .. •......,w.. •NO. RE U N Y SAMPLE:.:'-.- .. QUANTITY OR LOADING QUALITY OR CONCENTRATION NO RNAYSAP
PARAMETER"EX OF ANALYSIS TYPE>v'? ** VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.8 N/A 8.4 pH 0 1 I 7 GRABMEASUREMENT
004001 0 PERMIT -r-'.' -"**** ,.... .....Effluent Gross REQUIREMENT -; -' .i ; N/A. - MAXIMUM, H .. ,. .
CLAMTROL CT-1, TOTAL WATER SAMPLE N/A N/A N/A N/A GG GG mg/L GG GG / GG 24 HRMEASUREMENT COMP
04251 1 0 PERMIT 4A N/ ,,..24H
Effluent Gross REQUIREMENT g, . N/A : 7• i',, 1O A • "4•--ST*AX•&-mg/L •D-i": g'n. _"______
SAMPLE 5694 MD NANANANA1/7 MAFlow, in conduit or thru treatment plant MEASUREMENT 56 94 MGD N/A N/A N/A N/A 7 MEAS50050 1 0 PERMIT .q, •i..:.ReqlMonr .:. . • '"i -'-e,* ...... '.e**rj ".M.., l.. -. . N/A : .'' '-ieeKjy• . " SEffluent Gross REURMNFOAG DIY MgId______ __REQUIREM ENT' Md .. . .. .
Chlorine, total residual SAMPLE N/A N/A N/A N/A <0. 1 0.06 mg/L 0 1 / 7 GRABMEASUREMENT
500601 0 PERMIT 7,f.' . •,,- . -i25 ,*,7. .-
Ef.l G R . -.- .. ., ." AVG NST.MA mg/L W GBChlorine, free available SAMPLE N/A N/A N/A N/A <0.1 0.1 mglL 0 1 / 7 GRABMEASUREMENT500641 0 PERMIT " - 'e*****.., *****-. " 2 5.. -I. .: .,;' '-` - N/A Weýý: ekly GRAEffluent Gross REQUIREMENT ___. ________.-___________ ______ :__" AVERAGEMAXIMUM:"" mg/L T-._.__ __.e .__- ,-
REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/L AS A DAILY MAX)
Page 1
INA I IUNAL -ULLU I AN I UL;UIMAKlb "LIMINA I IUN ;Y Z I I-M (NUjL-~z)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 9
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615IPERMIT NUMBER
011ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
DIESEL GEN & TURBINE DRAINSExternal Outfall
No Discharge---FO MONITORING PERIOD
MMDDYYYY I MMIDD/YYYYFROM 11/ 01/ 2013 TO 11/ 30/ 2013
HAM JTILE RINIPA EXEUTIE OFICR Iorolfy under penalty of low that this docuntent and atl attachnments were prepared under mydirection or supervislon in accordance with a system designed to *%sure that qualified personnelpropery gather and evaluate the information submitted. Based on my inquiry of the peso
Richard D. Bologna, DIRECTOR OF SITE per.son who ma...gth e.yatem. ortthose persons direotly responsible for gatheringthe u724InomtoteIfrmation submited Is, to the best of my knowledge and belief, trwe, aZr.t,
OPERATIONS and complete. I .aware that thore ore significant penalties for submitting falfe 2maonE
TYPED ORthe possibility of fine and imprisonnrent for knowing violations. SIGNATURE OF PRINCIPALEXE "IV OFFICER OR AREA C
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page I
NA I IUNAL FULLU I AN I UIbUHAR-.UL .LIMINA I IUN 6Yb I -M (NI-'U5)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No, 2040-0004
Page 10PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBER
012ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
BLOWDOWN FROM THE HVAC UNITExternal Outfall
No Dlscharge F '1
MONITORING PERIODMM/DD/YYYY MMIDD/YYYY
FROMI 11/ 01/ 20,13 TO 1 11/ 30/ 20131
NO. FREQUENCY SAMPLEPAR.METER :,. QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPEPA RAM ET ER 'A;, ;•:•.,: "•.• .•..:!
,- . VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.7 N/A 8.7 pH 0 2 / 31 GRABMEASUREMENT
00400 1 0 PERMIT IM " N.,.. " "* ***.. • ;:j"Once-,Pet • _Effluent Gross REQUIREMENT .'•. •;• ::*:. ';. "•'"'•;:. :,.•:1! MINIMUM::•..!;• 1•• •`i'•- !•:"MAXI-MU•M'i!; pH •;:5••; •::iMonhthK...':", ;•
Copper, total (as Cu) SAMPLE N/A N/A N/A N/A 0.0251 0.0401 mg/L 0 2 / 31 GRABCopr oal(sC)MEASUREMENTI010421 0 PERMIT ...... Nn
Effluent Gross REQUIREMENT '___;._-o.__.MOAVG DALY.M-X m/L Month. _____...
Zinc, total (as Zn) SAMPLE N/A N/A N/A N/A <0. 1 <0.1 mg/L 0 2 / 31 GRABMEASUREMENT010921 0 PERMIT if. N/AJxr,***. .. , .. ..... "....., . T: :e..er. .Effluent Gross REQUIREMENT _--..__-..._ __-_.______ N/A ...... MO.AVG DAI MX.' mlL 'Month•,
Flow, in conduit or thru treatment plant MASUEE <0.001 <0.001 MGD N/A N/A N/A N/A 1 / 31 ESTFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT RqMn Rqon- , Once PerEflun Grs -' .,:>s 2 j; N/.14..)'>~ETI
E ffl u e n t G ro s s R E Q U IR E M E N T M O A V G D A IL Y oM X M gM"- . . ... . :_- . , - -`:3. .. . . ..... . - - - : -: N /A- '. M n t .F1., - 'Solids, totl 4sr SAMPLE--MAW
Solids, total dissolved MEASRMPEN N/A N/A N/A N/A 572 580 mg/L 0 2 /31 GRABMEASUREMENT70295 1.0 PERMIT N/A " :'•' "'?:RM--Mon "". T BEffluent Gross REQUIREMENT . '÷. -,! ... M ADAIL,,M. mg/L !: ."- :: ___._.._
Computer Generated Verolon of EPA Form 3320-1 (Rev. 01/001 Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 11
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER DISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
OUTFALL 013External Outfall
No Dlscharge lji]
MONITORING PERIODMM/DD/YYYY T MM[DD/YYYY
FO[11/ 011 201 TO 111/ 30/ 2013
t: •% •• • •'••'• -iNO. FEUNY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAMETER ___,._____ EX OF ANALYSIS TYPEPARAMETER ,';•,'•:.!
-• VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.4 N/A 8.0 N/A 0 1 / 7 GRABMEASUREMENT00400 1 0 PERMIT ....N/A. -*** " ' . .Effluent Gross REQUIREMENT ""o..-. .'.. - cMINIMUM. _,•t. _...._ . MAXIMUMk pH --- .. , •
SAMPLE24 HRCyanide, total (as CN) SAMPLE N/A N/A N/A N/A <0.01 <0.01 N/A 0 2 I 31 COMP
MEASUREMENT COMP00720 1 0 PERMIT W A.. 1tM"R M n- ......... -GO•r CO P'Effluent Gross REQUIREMENT NA N/Aeq 91"-2 , - " ,Copper, total (as Cu) MESURMPEN N/A N/A N/A N/A <0.01 <0.01 N/A 0 2 / 31 C4OMP
0102A10PREMINT N/COMPq~o'4
Effluent Gross REQUIREMENT :•, ___,__,_.____.• ,0OAG DILY DI.-M)(•, mg/ ,•.onh.
Chlorobenzene SAMPLE N/A N/A N/A N/A <0.005 <0.005 N/A 0 2 I 31 COMPMEASUREMENT ______OMP_ __________
34301 1 0 PERMIT ; . . , ' ' "•:t•' -• .. ' ' R Me nPS~N/A 6,ZiEffluent Gross REQUIREMENT I..;-., ,r. ____,_,; ".II'.M mg/L,.:, - i. .
Flow, in conduit or thru treatment plant SAMPLE 0.002 0.002 MGD N/A N/A N/A N/A 2 / 31 ESTFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT ReqMon Req Mon. . .; , •. N/A . . -:'Tw;.. rEffuen GrssREQUIREMENT MO AG "DAILY' MX-: Mga/ . " ''~~Month.. I
COMMENTS AND EXPLANATION OF ANY \IOLATIONS (Reference all attachments here) Sample for 11-18-13 was analyzedTHERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
INW I IUIVV L rULLU I MINI I rL-t-1/ft3P" t-LIIVIIIN'dA I IUIN 0 T I i"IVI •ljiU t-o)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
101ADISCHARGE NUMBER
Form Approved
OMB No. 2040-0004
Page 12
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
101 CHEMICAL WASTE TREATMENTInternal Outfall
No Discharge jA
I MONITORING PERIODI MM/DD/YYYY T
FROMI 11/ 01/ 20131 TO 1 11/301 2013
NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPEPARAMETERVALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLEMEASUREMENT
004001 0 PERMIT 40,_6P
KI
REQUIREMENT U- i1 q1lý M U M Aý MAAIMUM* pH ..............
Solids, total suspended SAMPLEMEASUREMENT
005301 0 PERMITEffluent Gross -W ""`COMRw2Z-:41 -,z bA'REQUIREMENT
wmg/L
oil & grease SAMPLEMEASUREMENT
00556 10 PERMIT 7ý-ý20Effluent Gross VýýWeeklytý',w '3ýR..
REQUIREMENT Wý ; W mg/L
Nitrogen, ammonia total (as N) SAMPLE
=A
MEASUREMENT006101 0 PERMIT V;-;,ý'4.i -Zi 'R ý-Mbh,-'--ý eqEffluent Gross - " -1,r , ý:,MOni,'-"-',-;
REQUIK 15A ý'Y X-:-hilillhNI mg/L tpMU-AVG-4ý-:a 1, Mo
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT500501 0 PERMIT Mo6j;ý. ý:4ýRbqýý Mon.--ý:ý,;-
z.Effluent Gross LY, 5A
REQUIREMENT Mgal/d
Hydrazine SAMPLEMEASURE MENT
813131 0 PERMIT ý,z "MV REffluent Gross REQUIREMENT mg/L I
NAME(TITLE PRINCIPAL EXECUTIVE OFFICER Id-I ty underp.mIty aflawthad this docurrIentrind.11 attachments were prepared under my= on or supervision , accordance With a system designed to assure that qualified person"ei TELEPHONE DATE
p p.rly gather and evaluete the information submitted. Based an my Inquiry of the person orRichard D. Bologna, DIRECTOR OF SITE pe'rsons who manage the system, or those persons directly responsible (Or gathering 1".OPERATIONS Info allon. the information submitted is. to the best of my knowledge and belief. true. a Uont o;-00(0ý _-Z24 682-7773 12/ 19/ 2013
and"winPlets. I am aware that there are significant penalties for submitting false inforniZa a,
Including the possibility of fine and Imprisonment for knowing violations. SIGNATURE OP PRINCIPAL EXE TIV OFFICER ORTYPED OR PRINTED AUTHORIZED A AREA Code NUM13ER MWDDfYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANYOTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
INVA I IINAAL rULLU I (AN I UIOUMAliA r)IMINA I UN OTO I rIVI kNrUO)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 13
PERMTNUMBER1
102A
DISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
102 INTAKE SCREEN HOUSEInternal Outfall
No Discharge F--MONITORING PERIODMM/DDlYYYY` I MMIDD/YYYY
FROMI 11/ 011 201 TO 1 11/ 30/- 2013
:;•:=';':•• ,-''&•:=g;. 'NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION FRANAY
.PAR,,A'M E.TER•;... EX OF ANALYSIS TY PEPARAMETER .,•m..
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.8 N/A 8.0 pH 0 2 / 31 GRABMEASUREMENT004001 0 PERMIT T"*.. " . .d6.r. . . -t- a " Z TWic Pe .Effluent Gross REQUIREMENT N/ A..".MINIMUM . ............... M..U H
SAMPLE NANA NA NA79ml 1 GASolids, total suspended MEASUREMENT NA N/A N/A N/A 7 9 mg/L
00530*0*5r01 0 N/AMIT " " " '3 .•.-' §'1oo.., ,. • - ,, . "wl Per ,Effluent Gross REQUIREMENT . . ". .. -,. _'1O..;">, D.ILY•,,, mg/L.. • Month
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 / 31 GRABoil & reaseMEASUREMENT00556 1 0 PERMIT M N/A ... ", , . .''k20--'.." •;• W!.e r ,0-
Effluen Grs M.4h.'a ~Effluent Gross REQUIREMENT m B • :A:.1O N/G. ,. •,mg/L : •
Flow, in conduit or thru treatment plant SAMPLE <0.001 <0.001 MGD N/A N/A N/A N/A 2 / 31 ESTMEASUREMENT** 2 31.. EST*•.•.•: ....••••.
500501 0 PERMIT ,A,:Re9fM.,,•.,, ,;,•,,eq.Mn...,*.,O* :.:. , N/A $MoSdt 4Effluent Gross REQUIREMENT :MO-4VG DAIL'Y;iX 2L Mgal/d ________r__ t • _____"_________ __"_"__
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Porn, 3320-1 lRev. 011051 Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYS I EM (NHL)_S)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
SPA0025615 103A
PERMIT NUMBER DISCHARGE NUMBER
I MONITORING PERIODIMMDD/YYYY I MM/DD/Y
FROM 11/ 01/ 2013 TO 11/ 30/ 2013
Page 14
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
SLUDGE SETTLING BASINInternal Outfall
No Discharge -j
'•.'••"."••.",'• : •'• ?• •.•!:NO. FEUNY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPA AM TE __._"____.___,____-"__EX OF ANALYSIS TYPEPARAMETER • :
• VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.9 N/A 8.1 pH 0 2 / 31 GRABMEASUREMENT00400 1 0 PERMIT 6i~unu / l-.-**~~
Effluent Gross RQIENT pH_____ -!K__ ur_____MXMIJ <.~Mnt
Solids, total suspended SAMPLE N/A N/A N/A N/A 21 22 mg/L 0 2 31 24 HRMEASUREMENT COMP
00530 1 0 PERM IT " -* * *** * " • - N/A** ce 30Effluent Gross REQUIREMENT -. m.,,-,.- " " AVG - D I......... . ..
Flow, in conduit or thru treatment plant SAMPLE 0.022 0.034 MGD N/A N/A N/A N/A 2 / 31 ESTFlwi cnui r hr reten lat MEASUREMENTI
50050 1 0 PERMIT R Req M.. . . Req M.. ... • : . . .. *.' ; ! Twice.Perz , fl t,, ',, : .E ff ____uent_ ___Gross_ ___ R EQ U IR EM EN T • -: ,M O A V G -•,, •-? .D A ILY ,M X ;- M ga l/d :..;.~ Y i- l f :.o l . . 4r.'Mn• : . ,' E S, TIM .Effluent Gross %_______ N/A__________________ ________ I_______ ______
NAMErTITLE PRINCIPAL EXECUTIVE OFFICER I dcerify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEdirecti.o .or spervislon in accordance with a system designed to assure that qualified pe .rsnn el Dproperty gather and evaluate the Informatlon submitted. Based on my Inquiry of the peneon or
Richard D. Bologna, DIRECTOR OF SITE .ersons who manage the system. orthosepersorns dlrectly responsibie for gatherngnthe 724 682-7773 12/ 19/ 2013informaton, the Information submitted is. to the best of my bomwedge and belief, true, accurate.OPERATIONS and complete. I amer. that there ara significant penalties for submitting false Infermation,
including the possibility of fine and imprisonment for ukrowng violationa. SIGNATURE OF PRINCIPAL EX OFFICER ORTYPED OR PRINTED AUTHORIZED AGE AREA Code NUMBER MMIDDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
I'0I IUI•IV ML rULLU I-MIN I LAUL,IMIM M ILIIVIIINA I IUN 0 YO I tIVI (IN-1U-6)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMR No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
Page 15
[ A02615
IPRMI NMBER1
111ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
111 DIESEL GENERATOR BLDGInternal Outfall
No Discharge[---
MONITORING PERIODMMIDD/YYYY I MMIDD/YYYY
FROM 1 11/ Olt 201 TO 1 11/ _30/ _2013
NO. FEUNY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION EX FRANAY TYPE! •:•'.••':•:••''•••':"•EX OF ANALYSIS TYPE
PARAMETER . .. ".VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.3 N/A 8.6 pH 0 1 / 7 GRABMEASUREMENT00400 1 0 PERMIT 0*** ', N/A-* '"6' -. *0*....... -. . . ..Effluent Gross REQUIREMENT ' . ,,MINiMUM "___________ .. MA.IMUM '
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 1 I 7 GRABMEASUREMENT005301 0 PERMIT CEffluent Gross REQUIREMENT " . - - . -. .. A....V...'...ILY,.MX.' -2mg/L .... -
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 1 / 7 GRABMEASUREMENT
00556 1 0 PERMIT 2.. . , " "•" * .... ... ' • .. .. ........Effluent Gross REQUIREMENT , N/A" , '- ' . ...M...... ;• DAILY MX '-. mg/L.__._...___. .
SAMPLE0.0000 MGN/N/N/N/1/7 ESFlow, in conduit or thru treatment plant MEASUREMENT 0002 0002 MGD N/A N/A NA N/A I 7 EST500501 0 PERMIT MReq Mon <.ReqrMon- .. . .** * :. . . Wek.-.-E.TAEffluent Gross REQUIREMENT 'A.MOAAVG- -DAL•X.'. Mgal/d - N/A ;'/e.A, I,
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER oratiy under penalty of low that this document and all attachments were prepared under my TELEPHONE DATEdIrection or supervision In accordance with a system designed to assure that qualified personnel ,,Property gather and evaluate the Information submitted. Based on my Inquiry of the pesono
Richard D. Bologna, DIRECTOR OF SITE parsons who r.enege the system. or those persons directly responsible tor gathengthe ring4 682-7773 12/ 19/ 2013information, the Information submitted Is. to the best of my knowledge and belief. true.
6 2cur/ne,1
OPERATIONS vnd oomplete r I am eethat ther. a. significant penalies for submitting false information.
including the poblity of fine and imprisonment for knowing violations. T RE EOFFICERORTYPED OR PRINTED AUTHORIZED AMT AREA Code NUMBER MM/DDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
INM I I[UNML rULLU I •IN I UI l, H I- .= .LtMUIIItNM I IUN Y,) I I -M kNi"U-)
DISCHARGE MONITORING REPORT (DMR)Form Approved
0MB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 16
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBER
113ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 SEWAGE TMT PLANTInternal Outfall
No Discharge 1'-
MONITORING PERIODMMFDDM/YY Y MM/D2/201
FROMI 11/ 01/ 201 TO 1 11/ 30/ 2013
NO. FREQUENCY SAMPLEPAAE". k":.' •.-•;: QUANTITY OR LOADING QUALITY OR CONCENTRATIONANALYSIS TYPEPARAMETER •. .:-,'•: . •= .,,, '•
''• r VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
004001 0 PERMIT per', . , .... :,*',•u,.,..---•" T l.Effluent Gross REQUIREMENT " ' MINIMUM.;!. "•..,.v'M?;:;hU . .,., B
SAMPLESolids, total suspended MA M E
MEASUREMENT
005 301 0 PERMT '.60 '. *.06jc :Perj,, QCEffluent Gross REQUIREMENT A . MO.AVG.. DAI...X• ;..-. .-...... O. ..
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT50050 1 0 PERMIT -1, 043 .,1# .. "y * ""-***' . .= " * " N/A ;"."4:•EA""PE M I ",% .,;''. '• # • •'' " ... .....-'M ',. .... ... .... . NIA ee, .'-'-",," BR"
______________REQUIREMENT 71AGA, DAILY MX-ý. Mgal/d Al ______ _________ __ ___Effluent Gross REQUIREMENT__ _.".____"M__..._G....._-'_ ..... ........ ._____ ...... ______,......._._.. . __ .... ......_ "? ,-..•:', ... , _____.. ____•,•'o!:
SAMPLEChlorine, total residual MAME
MEASUREMENT
500601 0 PERMIT "' ........ ;-•'w ''14"• ...... *""": "•"ABEffluent Gross REQUIREMENT ."" ,- .*; ''-, -; MO AVG INST MAX .ff .Mg/L ... "-ontt'I _____"
SAMPLEColiform, fecal general MEASUREMENT74055 1 1 PERMIT ..... 200 PA. .. . ... ,.,c... "..Effluent Gross REQUIREMENT #.' - "MO GEOMN. #/10mL I-'-- Moh'.
BOD, carbonaceous, 05 day 20 C SAMPLEMEASUREMENT_
8 0 0 8 2 1 0 P E R M IT ,0'. -. .... ,.-,'- .... 25.50..w- ... . . , C e-Effluent Gross REQUIREMENT . . ,,_,_____.__.__ _ __ _ M GX mg/L ______ " .--. t..-.•
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.
computer Generated Version of EPA Form 3320-1 lRev. 01106) rageComputer Generated Version of EPA Form 3320-1 (Rev. 01/06) PageI
I'-MIIUIN-P L I'ULLU IAN I UtttA /-f3L :LIM INA I IUN zi Y ., I -M (NVU -b)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 17
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNNDIR SITE OPER
[A005615PERMTNUMER1
M203ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
MAIN SEWAGE TMT PLANTInternal Outfall
No Dischargeo-X
MONITORING PERIODMM/DD/YYYY I MMTDD/YYY
FO I 11/ 01/ 201 TO 1 11/ 30/ 20173
NO. FREQUENCY SAMPLE.'...;.- .:.-... . QUANTITY OR LOADING QUALITY OR CONCENTRATION-•. -,e......"•EX OF ANALYSIS TYPE
PARAMETER . ___,_______._ __________..
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT jwledi.,.. ,? ~~'. ~~~-~~~Effluent Gross REQUIREMENT Pm.A.x., .. .MINIMUM. . .. M...MUM. PH , .I . . M., -,...
SAMPLESolids, total suspended M ASU EE
MEASUREMENT
00530 1 0 PERMIT . . . 3'Q *".- 601'•, TsIoeJiei ' C6M•-Effluent Gross REQUIREMENT V-.- .Z.. . M.AVG' .• &ILYMX ;,,.-L.M-.t .... '''
SAMPLEFlow, in conduit or thru treatment plant MEASUREMENT
50050 1 0 PERMIT I" -4102'z 7 14f.j'.•.23 ': _'" R :0 . .. "' 1ýý' ,-'Effluent Gross REQUIREMENT , OAVG • DAILY.X0 Ugal/d '. y: w ; -___,. .,
SAMPLEChlorine, total residual M A M E
MEASUREMENT
500601 0 PERMIT . " " " .t' ".i -c; " .:. . • ,. 3 .3 , " Rer" -Effluent Gross REURMNTt OAVG IS A mg/L
SAMPLEColiform, fecal general MEASUREMENT740551 1 PERMIT A.. ". .. . 200 . .Effluent Gross REQUIREMENT J . "O....Il.,is--.OGEMN #lO ,m . ,r {Mo, tht f,- ,
BOD, carbonaceous, 05 day 20 C SAMPLEMEASUREMENT
80082 1 0 PERMIT . - ******. •"..'t " 1•****** •"•'"•" -' 5; 0 .. ':'Twi" .. er• "'.Effluent Gross REQUIREMENT .. ,• ,.. ....-.. __.. . ..__ ' MO AVG DAILY MX.....gL '____ " .MonthA ..
NAMErITTLE PRINCIPAL EXECUTIVE OFFICER i certify under penalty of law that this document and al attachments were prepared under my, TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnel
properly gather end evaluate the Information submitted. Based on my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE pereons who mn gethe syst em or those persons directly responsible for gatheringtheInformation. the informatron submitted Is, to the best of my knowledge and belief t t 724 682-7773 12/ 19/ 2013
OPERATIONS ad complete. I am aware that the a..re significant penalties for submitting false Information,including the possibility of fine and imprisonment for knomwng violations. SIGNATURE OF PRINCIPAL U VE OFFICER OR O
TYPED OR PRINTED AUTHORIZE AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
flflhlr.J 1/-•1- ' 1-.L I ,1 1 L IJI.-J-I I/nlr a-.. L--..LIIVtIIItI I IkJlrI 0101 CI Il •II"JF
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 1B
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATION.LOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 211A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDD/YYYY I MMIDD/YYY
FROM 11/ 01/ 2 T O1 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
211 TURBINE BLDGInternal Outfall
No Discharge•j
... ,. •., • :• •• .••.:NO. FEUNY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPARAMETER __-___ ,____________EX OF ANALYSIS TYPE
.41 VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 8.4 N/A 8.4 pH 0 1 / 7 GRABMEASUREMENT00400"1 0 PERMIT ' "X-9 •'" - -
.,. N/A -- C tr'' Wekyi$ GRBEffluent Gross REQUIREMENT .... __... ___... ___., .. __.___.,__.._._, T MINIMUM ' Ar " I-:i.wI , \ MAXlMUM-;?.! p .. ... • . .- ,'.'rih .', , .
Solids, total suspended SAMPLE N/A N/A N/A N/A 15 18 mg/L 0 1 i 7 GRABMEASUREMENT00530 1 0 PE R M IT .,' " . . .. *. • . . . " . . . . .. . . . ..', 100. , . .-
Effluent.Gross:REQUIREMENT DAIL. N'A-MO AV " ' . DAIL ,M -- , mg/L"""_ ".___
Oil & grease MEASUREMENT N/A NIA N/A N/A <5 <5 mg/L 0 1 i 7 GRAB00556 1 0 PERMIT '., *. . 0O,-OOI<r.,-.• •': -20 .".Z - .Effluent Gross REQUIREMENT NP/A., .-. f-. . . .'" ,rAVG"..' DA' LY MX '-,' mg/L _._' __. - _ ,______
SAMPLE0.00,0 MGN/NAN/1/7 ESFlow, in conduit or thru treatment plant MEASUREMENT 0002 0002 MGD N/A N/A N/A 7 EST50050 1 0 PERMIT ,M > , , e. .M" -Ot"- - '. . . -,. " ". . "., . N ,Effluent Gross REQUIREMENT ',ýi-IMOý AV&'- W"AL-X Ma/ - 't~ .'~. __________
NAMEMTTLE PRINCIPAL EXECUTIVE OFFICER I .cotf ne penalty of la that this document end all attachments ee prpri u nder my TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnelproperty gather and evaluate the Information submitted. eased an my Inquiry of the p s. one
Richard D. Bologna, DIRECTOR OF SITE persona who m.anage the system., o those persons directly r. yonslble for gathering th 724 682-7773 12/ 19/ 2013inormtothe information submitted it. to the beat of my knowledge and belief. true, accurate,-77 2 1 / 2 1
OPERATIONS and wompltata. lam awar that tht.er oe ign•.fant penalties for submittingfalse inf __ormation.including the possibility of fine and Imprisonment for knowing violations. SIGNATURE OF PRINCIPAL XE. TIVE OFFICER OR
TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
I1P% 1 IJINML rULLU Ii'NI UI. l10,r,.AMji- -LiVIIII/A I IMIN 0 YT 1 -IVI Ii'rLJi"0)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNNDIR SITE OPER
Page 19
PA0025615i
PERMIT NUMBER
213ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 COOL TOWER PUMPHOUSEInternal Outfall
No Discharge-'
MONITORING PERIODMMFDD/YYYY I MMIDD/YYYY
FROMI Ill 01/ 201 TO 111/ 30/ 20131
QUANTITY OR LOADING QUALITY OR CONCENTRATION NO. FREQUENCY SAMPLEPARAMETER EX OF ANALYSIS TYPE
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLEMEASUREMENT [ _.___._.._
004001 0 PERM IT >. ** . ..... .... . . .. .. ......... e.Effluent Gross REQUIREMENT PH. - 0 4-INIMUM "• ' ; 'MXIMUM- H 2'....... )Mt'
Solids, total suspended SAMPLEMEASUREMENT ___!0_______ "__ " " _"
0053010 PERMIT 30' ' *.• . -" • AEffluent Gross REQUIREMENT R X R.N M.G4- vDA.M6Wm. ., .
SAMPLEOil & grease MEASUREMENT __...... __- _.___'5____ ,_.%___005561 0 PERMIT . . * " -• .' .* - " * .. ... 5 w'" ...... 20•-;"':• .•TWC..l6'P8I .Effluent Gross RQIEET___AGmg/L GA
Flow, in conduit or thru treatment plant SAMPLE• MEASUREMENT
50050 1 0 PERMIT R'-M~on~/~~Effluent Gross REQUIREMENT .Mg., AVG . ,AII'al MX.; Mgal/d ._.._____"._ _.,._____"._ ____ "______"_Chlorine, total residual SAMPLE
MEASUREMENT500601 0 PERMIT . e.*.. , *-. . .oo. 5, 1 25P . • 0:"It P3r"•,•,Effluent Gross REQUIREMENT --_..,______ MAVG,,.,: MA S;, mg/L A. .'Month. _____
COMMENTS AND EXPLANATION OF ANY VIOLAlnONS (Reference all attachments here)SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENTFROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM.Computer Generated Version of EPA form 3320-1 lRev. 011061 Page IComputer Generated Version of EPA form 3320-1 (Rev. 01/06) Page I
INA I IUIN L rU LLU I .IN I UL ,i-IA Xtjt I"LIM INA I IUN TY,3 I -M INt"U -.b)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 20PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 301A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMIDD[YYYY MMlDD/YYYY
FROMI 11/ 01/ 20131 TO 11/11 30/ 20131
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 2 AUX BOILER BLOWDOWNInternal Outfall
No Discharge F ]
NO. FREQUENCY SAMPLEPARMEER* •-.-*- • ~QUANTITY OR LOADING QUALITY OR CONCENTRATION• ••:",,P, ".i••;EX OF ANALYSIS TYPEPARAMETER • ••-••.-•
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 2 / 31 GRABMEASUREMENT
00530 1 0 PERMIT .* . . ...... .3.P4.N/A 'r _GRABII dit lEffluent Gross REURMN?Ž ______ý~~~'MO AVG"- DAIlYXr mL .'v Mnh io
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 i 31 GRABMEASUREMENT
005561 10 .PERMIT ee*** ,*Oe*.'.k**15p0' V"C TwcePr v
Effluent Gross REQUIREMENT ., . . N/A In, .--. MO AVG • •DA1L5.M...mg.L..••.• M-nt0i:, .., .
Flow, in conduit or thru treatment plant MAME <0.001 <0.001 MGD N/A N/A N/A N/A 1 / 7 ESTFlo, n onui o thu retmntplnt MEASUREMENT
50050 1 0 PERMIT ReqlM on . .. -, , .-R* ... , . ....... ' * .- .Effluent Gross REQUIREMENT ,-___MAG_:_ A Ix Mgal/d • :; N/A Weekly v-S.. M..
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document end ell attachments were prepared under my TELEPHONE DATEdirection or supervision In accordance with a system designed to %ssure that qualified personnelproperly gather and evaluate the information submitted. Based an my Inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE ...ons.who manage the system. rtho persons directly responsible fo gatherlngthe 724 682-7773 12/ 19/ 2013Informotion, the Information submitted Is. to the best of my knowledge and belief. true, accurate,
O PE RATIO N S ,ad complete. Iam sare that there are sIgnificant penalties for submitting false information,including the possibility of fine and imprisonment for knoraing violations. SIGNATURE OF PRINCIPAL CUVVE OFFICER OR
TYPED OR PRINTED AUTHORIZED T AREA Code NUMBER MM/DD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference alI attachments here)
SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
NAIIUN/'hL l'ULLUIAINI UIbL;•RAKIP- -LIMINA I IUN b Yb I -M (Nl--tb)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 21
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPIR
PA0025615 303A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMM/DD/YYYY MM0DD/YYYY
FROMI 11/ 01/ 201 TO 1 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 OIL WATER SEPARATORInternal Outfall
No DischargejjNjJ
: <• ,;P-. ••"•• :•.• 'NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATIONPAAEER:___,___. ____"______ ________EX OF ANALYSIS TYPEPARAM ETE R . ... •. .,.,,•.• ,.••.
" VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT
00400 1 0 PERMIT O**:... . OO*j... *seu-*' -9 -
Effluent Gross REQUIREMENT UM". . j,'/ pH,_, ._ MINIM'LIMrr14• .:,;,H; .,. ....SAMPLE
Solids, total suspended MEASUREMENT
00530 1 0 PERMIT '': ."u**e:- . '-<" O.. .* -"- .. *s* •. "- 100:, '. . .Effluent Gross REQUIREMENT -. Vt, 0-V .11. .- __'.AGAILY-"V-M.X?-1 r mg/L gl. 4
SAMPLEOil & grease MEASUREMENT00556 1 0 PERMIT , . * --. '. < -!i5)**.' .,. 20 n.,- -Effluent Gross REQUIREMENT .. ' . m. . -.. . .. '.AI'.-_.__,_ ; g/.MOLAVG DA MX.- ml/L r.. . -_ ,:-._..
SAMPLE
Flow, in conduit or thru treatment plant MEASUREMENT50050 1 0 PERMIT .'Req.Mon , Req• Mon,.9 tO******* ' .. SL.. N/A.""Effluent Gross REQUIREMENT MAVDILMX Mgal/d [ I - ES[M-
__ _ __ _ _ _ _ _ .... _ - __ __..... 41
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER i certify under penalty of law that this doum.ent and tll attachments were prepared under my" TELEPHONE DATEdirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the information submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE petsons who .nanagethe system. o thosep.ersons directly responsible forgathedng the 724 682-77.73 12/ 19/ 2013Information, the information submitted Is, to the best of my knowledge end belief, true. accurate,
OPERATIONS end complete. I an a.wre that there are ignincant penalties for submlttlng false Information.ding the possibility of One and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL gXE..TIVE OFFICER OR
TYPED OR PRINTED AUTHORIZE"ENT AREA Code NUMBER MMIDDIYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
NAIIUNAL I"1ULLUIANI UIL;-IAKUL- I-LIMINAIIUN 6YSIlM (NIUUL6)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
Page 22PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615
PERMIT NUMBER
U313ADISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
313 TURBINE BLDG DRAINInternal Outfall
No Discharge Fj1MONITORING PERIOD
MMFDD/YYYY I MM/DD/YYYYFROMI 11/ 01/ 201 TO 111/ 30/ 2013
., :iC•;••',!,•;i:-r '•: -'NO. FREQUENCY SAMPLE-- . QUANTITY OR LOADING QUALITY OR CONCENTRATION EX FRANAYSSAMPE
PARAMETER '....''.-,EX OF ANALYSIS "TYPE
....... VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 7.4 N/A 8.0 pH 1 1 / 7 GRABMEASUREMENT
00400 1 0 PERMIT -IIU t000Effluent 1Gross 0REQUIREMENT PERMIT * ýrY N - ,: • ;""•• :;•"•MUM ".:M.... .A UW:' '. : "•'".. .;, .',;•.• ;.' •; •. .:%, :• .o•.•...NA ' • '+'.•o:•• !+•+;•: :: ; •";- II UM :'"•::••.:".... .. ."••.: ....:• pH"..," •"'•• '" ;::
Solids, total suspended SAMPLENT N/A N/A N/A 8 8 mg/L 0 1 / 7 GRAB005301 0 ~ ~~MEASUREMENTN/N
mgL 07 GA
00530 1 0 PERMIT ".. '" * :0" 10" ....Effluent Gross REQUIREMENT . ,-. ... N/ (' -;MO AVAG -. DA-ILYMX . mg/L -.-. , • ... .
Oil & reaseSAMPLEOil & grease SUME N/A N/A N/A N/A <5 <5 mg/L 0 1 / 7 GRAB
005561 0 PERMIT i4. . .. 4,. .:r.k: 'i.**** ..N. "5" .... . " 20 'y ::;,ek y " ' :' RA'•
Effluent Gross REQUIREMENT -,... -. MO AVG' ,bDAILY MXý,! mglL ____ , zr't"';•SAMPLE 0.0
Mk. MGD N//A
Flow, in conduit or thru treatment plant MEASUREMENT 0.002 0/A
50050 1 0 PERMIT Req.... " i Req.Mon ""*-Effluent Gross REQUIREMENT -gadMO AVN/G DAL MX MgaI/d A;;,.:'i ;-?• ,,,""..J '-. . N/A Weeko..-,, . E.MA.•.
NAMEfTITLE PRINCIPAL EXECUTIVE OFFICER I cetf order penalty of low that this documert and ail attachments ware prepared under my T L P O ED Tdirection or supervision In accordance with a system designed to assure that qualified personnel
properly gather and evaluate the Information submitted. Based on my inquiry of the person orRichard D. Bologna, DIRECTOR OF SITE e rsaa who managethe system. orthose parsons directlyrespoanable tot gathering the 724 682-7773 12/ 19/ 2013
matlon. the information submitted Is. to the beast of my knowledge and belief, true. accutate.OPERATION S and complete. I em aware that there are significant penalties for submitting false information.
Including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL F C.IUJIVE OFFICER ORTYPED OR PRINTED AUTHORIZED AGNT AREA Code NUMBER MMIDD/YYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachmentsi here) See non-compliance form attached to the cover letter. WMC 11-12-13SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
NA I IUNAL I"ULLU I AN I UIUI-IAI-U- "LIMINA I IUN 6Yb I LM (NI-`UIb)
DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBER
401ADISCHARGE NUMBERI
Form Approved
OMB No. 2040-0004
Page 23
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CHEM.FEED AREA OF AUX BOILERSInternal Outfall
No Discharge j-"
MONITORING PERIODMM/DD/YYYY MMIDD/YYYY
FROM Ill 01/ 20131 TO 11/ 30/ 2013
NO. FREQUENCY SAMPLEPAR-AMETER •;•'; QUANTITY OR LOADING QUALITY OR CONCENTRATION OF ANAY TYPEPARAMETER ... •;•.-...1, •;•;.EX OF ANALYSIS TYPE
-'(;• f VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLE N/A N/A N/A 9.5 N/A 9.6 pH 0 2 / 31 GRABMEASUREMENT004001 0 PERMIT Xý kx N/ W)4!Rqýo TV ~ Gh~Effluent Gross REQUIREMENT AIR. ,- ,•,,____., __,__,__ LiINIM4M -, , . M U,,o ..
Solids, total suspended SAMPLE N/A N/A N/A N/A <4 <4 mg/L 0 2 / 31 GRABMEASUREMENT00530 1 0 PERMIT y****.. . ..."f. 1100*",.-..j: .I e -. -,Effluent Gross REQUIREMENT _"___'", DAILY M"X -"" " . g; . MbntliM, ii
Oil & grease SAMPLE N/A N/A N/A N/A <5 <5 mg/L 0 2 / 31 GRABMEASUREMENT005561 0 PERMIT ......... 5• '0 •!TWioep •. •.i•:::•.. ? •• .. ' N/A ,'.. ....... A. . ... :Effluent Gross REUREET"' .. ;,ý, "rMdAG wAL~X, m/ onth
Flow, in conduit or thru treatment plant SAMPLE <0.001 <0.001 MGD N/A N/A N/A N/A - 1 / 7 ESTMEASUREMENT
500501 0 PERMIT Req-Mon-- '"Req Mon. n-.. .. L . . N/A '"N. . We... .1... .ESTI'A".Effluent Gross REQUIREMENT MOAVG DAILY.MX' Mgal/d ,. . . '. - -" ÷. _____.__.• .. .
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Verojon of EPA Form 3320-1 (Rev. 01106) Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
I.M I IUI'J IL tI ULLU I MINIt Uhrt . I :•IM.4 . ILIIVIINA I IUN jYZ ILM t (NV-ULZi)DISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 2040-0004
Page 24PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 403A
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIODMMI/DDIYYYY MMI/DDYYYY
FROMI Ill 01/ 20131 TO 11/ 30/ 2013
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CONDENSATE BLOWDOWN & RIVR WATInternal Outfall
No Discharge --•
QUANTITY OR LOADING QUALITY OR CONCENTRATION NO. FREQUENCY SAMPLEPARAMETER : '-'• __"_________ ___________EX OF ANALYSIS TYPEPARAMETER • •?"YP
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
pH SAMPLEMEASUREMENT
00400 1 0 PERMIT eee******"- IAI . -. ****oo.. '•-o• . . , . - . 9 ... ., . ..... 'j ,._ ..
Effluent Gross REQUIREMENT - -- __._,_____.___ ,MINIMUM%' ! •Žo4!..IK",o MAXIMUM, pSolids, total suspended
SAMPLE
MEASUREMENT00530 1 0 PERMIT ','10 **0g0. .... *."000 " * * . . " .1... ......Effluent Gross REQUIREMENT 4'',',,.;,,. -'.; .. ., , r '.MO AVG . . .,. l- '.~
UIEMN fQ AV ýI_______ AILY MX.. ý mg/L__________Oil & grease SAMPLEMEASUREMENT
005561 0 PERMIT. . " .0 , - .. , ,'.• 212 k6wi t 9-20'Effluent Gross REUIREMENT A______ .______~M V i,. ~~X m/ ___ _________
Nitrogen, ammonia total (as N) SAMPLEMEASUREMENT
006101 0 PERMIT - **0.,- , ...-- 0**.""...--'.,.. °ReqMon * -- ...- . .o'- .rM1 ,- .- "-".. ey'A; 0 B, :Effluent Gross REQUIREMENT Al.. .... ., . . . .. , ......' .... .MO.AVG '...AILYIMX mg/L f... •.. -r.' :'i ,.CLAMTROL CT-1, TOTAL WATER SAMPLE
MEASUREMENT04251 1 0 PERMIT .-......... 0.,,'..,a.o.--,.,.s*., e ., ._-, 0..,: '. .. W . . . . OEffluent Gross REQUIREMENT -mg/L TIN_-_"___"_"_J"_"_......_
Flow, in conduit or thru treatment plant SAMPLEMEASUREMENT
50050 1 0 PERMIT BReq'Mon 'i•Re~Min . . l T e. .,0 , = W.e.....-: .-E t ,AEffluent Gross REQUIREMENT .-..MOAAVG" .- DALYMX,•' Mlal/d -. J-.'. .:- _. -.- _ . . .. ,. ...........Chlorine, total residual SAMPLE
MEASUREMENT50060 1 0 PERMIT 7 = . 0 ýrg.*... ._ . l.'..• .* .*,.* - - .* , * 0, . 7 125, , . .- :Effluent Gross REQUIREMENT .... • ...... t.,• . -,. - M'. VG 'INST .:MAX•U .gLk_____ ..._fGRA-"
NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments mere prepared undo, myTELEPHONE DATEdirection or supervision In accordance with a system designed to assure that qualified personnelproperly gather and evaluate the Informaton submitted. Based on my inquiry of the person or
Richard D. Bologna, DIRECTOR OF SITE parsons . who anage the systen. or those parsons directly reponsible for gathering the 724 682-7773 12/ 19/ 2013information, thefinformation submltted Is to the but of my knowledge and bellef, tru ... .r.te,OPERATIONS andomplaet. I am a.are that there are signficant penalties for submitting false Information.
Including the possibility of fine and Imprisonment for knoBng violations. SIGNATURE P ORTYPED OR PRINTED AUHRZDAaITAREA Code NUBRMDDYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1
114M I jVI4•M•L r-VLLU I P,111 I L.J10,nr'%'7r- CLIIVlPI'dM I IUIN 0 I 01 EIVI kI'dru-o)
DISCHARGE MONITORING REPORT (DMR)Form Approved
OMB No. 2040-0004
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 25
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615PERMIT NUMBEJR
D 403ADISCHARGE NUMBERI
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
CONDENSATE BLOWDOWN & RIVR WATInternal Outfall
No Discharge-'
MONITORING PERIODMMIDD/YYYY T MM/DD/YYYY11/IIl 01/ 201 TO 1 11/ 30/ 20131
TYPED OR PRINTED I I AUTHORIZED AE T".,., ',,u I. ,COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 2
%M I I %JINrL FJLLL I MS 1 H IARG 1MM%.7r CLIIVIiI'dM I R UE I 0 T I1MR VI)DISCHARGE MONITORING REPORT (DMR)
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 413A
PERMIT NUMBER DISCHARGE NUMBER
I MONITORING PERIOD
Form Approved
OMB No. 2040-0004
Page 26
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
BULK FUEL STORAGE DRAINInternal Outfall
No Dischargeo-I MM/DDTYYYY OFROMI 11/ 01/ 201 TO L2/DD/YYlY
:-• :•. :-......!-. :;.F-•;"NO, FREQUENCY SAMPLEPARAMETER.QUANTITY OR LOADING QUALITY OR CONCENTRATION EX FRANAYSSATPE
:..' .::'"o - .. <.... EX OF ANALYSIS TYPEPARAMETER"-. •. ,•:..,.:-
VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLEpH MEASUREMENT N/A N/A N/A N/A pH
004001 0 PERMIT -~- /Effluent Gross REQUIREMENT .- X MU.. H. "'.. ,:.'" Weekly;). GRAB
Solids, total suspended SAMPLE N/A N/A N/A mg/LMEASUREMENT00530 1 0 PERMIT N/A -.. -t --, 30-.' 'j;.- 00 ;-:', d " '= ' ,"- --. -' .'R.."E •• ':'--.U.> N/A 4.'•:: •-:.;':"•: .Effluent Gross REQUIREMENT m__'_______ /L"_.__.- _ MOAVG DAILY MX"- ; '°/L "SAMPLEOil & grease MEASUREMENT N/A N/A N/A N/A mg/L
00556 1 0 PERMIT .. .... ," * - ' M" "Jl.t-', 2'RAEffluent Gross REQUIREMENT "4. N/A -/SOVG 'w DIY X mgL .>y
SAMPLEMGN/Flow, in conduit or thru treatment plant MEASUREMENT
5 00 50 1 0 PEA S R EMI NT , M GDR e N /A e M n. ~ . . . * ** .
IO V .-P.ERMI -.-.- • /A .. ' . • SFT . .Effluent Gross REURMNT qV. -1/f
.T'IYM MgI/ -i F- ____________________ý: tt~\ f'~
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments herelSAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1
IN.'%D I IUI•I,"L r"VLLU ISC RIN E I UI0Lr'I• k-.r- r EPORTVIIIN- I IUIN M TO) I tIVIDISCHARGE MONITORING REPORT (DMR)
Form Approved
OMB No. 20413-0004
Page 27PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different)
NAME: FIRST ENERGY NUCLEAR OPERATINGADDRESS: PA ROUTE 168
SHIPPINGPORT, PA 150770004
FACILITY: BEAVER VALLEY POWER STATIONLOCATION: PA ROUTE 168
SHIPPINGPORT, PA 150770004
ATTN: RICHARD D BOLOGNA/DIR SITE OPER
PA0025615 501A
PERMIT NUMBER DISCHARGE NUMBER
DMR MAILING ZIP CODE: 150770004MAJOR(SUBR05)
UNIT 1 GENRTR BLWDWN FILT BWInternal Outfall
No Discharge ']
I MONITORING PERIOD .FROM MMIDD1YYYY
FO I 11/ Olt 201I MMID[iIYYYYTO 1 11/ 30/ 201-3
'•.•;i;. ?•!•:i••:•.::•.i ;,NO. FREQUENCY SAMPLEQUANTITY OR LOADING QUALITY OR CONCENTRATION NO FRUNCYSSAMPE
PAR MET R __ __ ___ __EX OF ANALYSIS TYPE., .. VALUE VALUE UNITS VALUE VALUE VALUE UNITS
SAMPLE
Solids, total suspended MEASUREMENT
005301 0 PERMIT W. . "1i t30G .- .. .-. ' .- ..Effluent Gross REQUIREMENT . . -, . .,-.O AV ,,AL.M.mg/L _ _ _ __•R.Flow, in conduit or thru treatment plant SAMPLE
MEASUREMENT
50050 1 0 PERMIT - eq on . Req 'Mon ro ****" **". . . : " • - . . ." ;,. . " ",'" " " .Effluent Gross REQUIREMENT dMO AVG DAILY MX Mgald -,".- . " : . t... , _____ ".-.-
NAMEtTITLE PRINCIPAL EXECUTIVE OFFICER I cartity, under penalty of law that this document and all attachments were prepared under my TELEPHONE DATEd rection or supervision In accordance with a system designed to assure that qualified personnelpý.p.,t, ... r and ev.lutil. the information submitted. Based on my Inquiry of the person
Richard D. Bologna, DIRECTOR OF SITE persons who manage the system, or those persons directly responsible for gathering thInformation. the information submitted Is. to the beat of my knowledge and belief, I ru., 724 682-7773 12/ 19/ 2013
OPERATIONS and complete. I am aware that there are significant penalties for submitting false Information,Including the possibility of fine and Imprisonment for knowing violations. SIGNATURE OF PRINCIPAL ECECP IVE OFFICER OR
TYPED OR PRIN ED AUTWnRIZED*aNT AREA Code NUMBER MWDDJYYYY
COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all aftachments here)
SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.
Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1